ALM Saturday
Agile planning and portfolio management
su Team Foundation Server
Pordenone - 5 Ottobre 2013
Gian Maria Ricci – VisualStudio ALM MVP
Purpose of the Session
• How to correctly manage «requirements»• How to scale requirement through the
organization• Different level of view for your
«requirements»• Fast feedback and fast cycle
What exactly «Development Team» does
BacklogPrioritized list of everything that might be neededSingle source of requirementsNever complete
Dev Team
Sprint Backlog
My wonderful producthttp://www.url.com
Team like professional Chefs
Backlog -> IngredientsDev Team -> Team of ChefsIncrement -> DishIf the backlog is not good, the product will be no goodThe backlog is the highest value of the productBad Backlog lead to bad increments
The mythical man month
• I believe the hard part of building software to be the specification, design, and testing of conceptual construct, not the labor of representing it and testing the fidelity of the representation.
•The hardest single part of building a software system is deciding precisely what to build
Right size requirements
Independent Negotiable
Valuable Estimable
Sized appropriately Testable
Right Size is importantBig requirements are not estimableA PBI must fit into an iterationBig requirements documentation are a waste in the system
Requirement at Dev LevelHow a requirement is seen by developer
User StoryRequirements as User StoryAs a <role> I want <goal> so that <value>Simple to write, convey core of the conceptIt contains both the needs of the Product Owner as well as the proposed solutionIt is both in the Problem Domain as well in the Solution DomainIt usually do not touch many UI part or many part of the system
As a call center user I want the
system to helps me to insert correct data into the system so I can insert more correct data
in a shorter time.
PBI SizeSize of a user StoryMust be implemented in a single iterationIt should contains enough details to be estimatedIt must give added business value to the productNo dark corner or hidden rocks
As a call center user I want the
system to helps me to insert correct data into the system so I can insert more correct data
in a shorter time.
Estimating PBIAcceptance criteriaChecklist of condition that must be fulfilled to complete the User StoryGood detail level, often based on real action done to the systemCan be composed by a series of Test Cases
When I insert some specific data the system should suggest me the right data to insertCity Names: after the first two letters a suggestion box with compatible city names should appearZIP CODE: Should be automatically populated upon city insertion….
• Type two letters in the City textbox and a suggestion list should appear
• Typing invalid city (ignoring suggestions )turns the textbox Red
• Upon valid city population Zip Code should be automatically set
• …
OR
Backlog in TFSHow to manage Backlog in Team Foundation Server
Requirement at management LevelHow a requirement is seen by management people
EpicsWhen a User Story Become Too BigDecompose in smaller User StoriesPropose alternative smaller solution (T-Shirt Sizing, Rock Sizing, etc)Do not lose the original value The story become an Epic
Es: Implement heuristics to validate dataReally big User StoryMany possible solution of different sizeMany part of the system involvedBut It is a clear Business Value
Implement Euristics to Validate
Data
Epics in form of User Story
Form of user Story is still validThe form “As a <role> I want <goal> so that <value>” is still validIt is more generic and conveys a broader conceptsIt contains mainly the needs not the solutionsIt is almost entirely in the Problem Domain
As a Manager of the Call Center I want the system to suggest to Call Center Users potentially bad data with some form of heuristics. I want also the system to scan actual data to warn for suspicious data The system should make it simple to identify and correct potential errors.
Epics acceptance criteriaWhen an epics is Done?Acceptance criteria are similar to PBIs, just more genericAn epic has several PBI as Childs Not all Childs needs to be finishedKanban board can helps you out
• Manager can find quickly suspicious data • Manager can fix the data and this should make the system "learn"
from this error• Call Center Users should be warned (not blocked) when heuristic
find some problemsNice to have• Heuristic should also "suggest" correction to the data• Once some Manager does a fix, the system should propose similar
fix in the system
Epics in TFSHow to manage Epics in TFS thanks to Enterprise Agile Planning or Portfolio Management
Executive RequirementsVision of the productContains general directions of the productsInvolves investments and funding teamsCould comprehend many teams across organization
Requirement metaphor breaks downThere are vague acceptance criteria. Es. The system should guarantee maximum degree of data correctnessNeeds lots of investigation, risk analysis, planning for internal resourcesIt has no certainty of being implemented (Es. cancellation after risk analysis)
Needs relation to other artifactsDecomposed in Epic and User StoriesProgress trackingIn agile world usually called Themes
Agile ThemeAnalysis of a Theme Identify the general needsAssess the current status of the productAnalyze risks and countermeasuresEstimate ROI of the theme or Business ValueExpress the Vision and Goal with few and simple sentencesA3 problem solving type of analysis (Es Toyota)
Planning and managing running themes Have a clear and ubiquitous Risk managementDecompose in Epics that in turns will be decomposed in PBI/User StoriesPrioritize EpicsDefine Acceptance Criteria for the EpicsMonitor progress of Epics
Theme in TFSCustomization of template and Enterprise Agile Planning
Kanban and LeanFlow of statesEach element flow from a status to anotherEach column has a maximum Work In Process LimitVisual and immediate feedback of how the backlog is evolvingIt is a pull process not a push process
New Analysis Ready Committed Testing Done
Kanban in organizationKanban for epicsSame structure applies to epicsIt can potentially aggregate multiple backlog
New Active Preview Acceptable Closed
Kanban in organizationKanban for ThemePrioritization of visions
New In progress Done
Chain of consequenceThemesThemes are decomposed in epicsWhen a theme transition to in progress it actives its epics
EpicsEpics are decomposed in PBI / User StoriesPrioritized in order to fulfill the vision of the ThemeWhen Epics transition to in progress is actives its PBI
PBIPrioritized to fulfill EpicsDeveloped with self organization by teamsCommon cadence
Using Multiple teams in TFSHow TFS 2012 handles multiple team with different types of self organization
Drum – Buffer - RopeIterative is the keyMultiple team can have multiple backlogs but they share a single drumAll teams are synchronizedDevelopment is iterative to gather maximum transparency and feedback
Backlog
Feedback
Developing Backlog Grooming
Backlog is aliveBacklog groomingAt team level it occurs each SprintEpics backlog usually span for multiple sprintThemes persists for month or even one or two years
FeedbackBacklog is fueled by feedbackFeedback for iterationEarly feedback with UI Mockup
Feedback toolGathering feedback with TFS