Factors Driving Market Factors Driving Market PotentialPotential

►Aging T&D system averages 40 Aging T&D system averages 40 years.years.

►Competit ive markets driving Competit ive markets driving maintenance –vs- new maintenance –vs- new expenditures.expenditures.

►Renewed emphasis on Renewed emphasis on maintenance to ensure maintenance to ensure system system reliabil i ty.reliabil i ty.

Page 5: Induron new substation powerpoint rev1

Market SizeMarket Size►Ameren UEAmeren UE

►325 Substations325 Substations►1000 Power Transformers1000 Power Transformers►3000 Circuit Breakers3000 Circuit Breakers

►Alabama PowerAlabama Power►4000 Power Transformers4000 Power Transformers►10,000 Circuit Breakers10,000 Circuit Breakers

Page 6: Induron new substation powerpoint rev1

SUBSTATION APPARATUSSUBSTATION APPARATUS

►TransformersTransformers►Circuit BreakersCircuit Breakers►Voltage RegulatorsVoltage Regulators►Structural SteelStructural Steel►Control BuildingsControl Buildings

Page 7: Induron new substation powerpoint rev1
Page 8: Induron new substation powerpoint rev1
Page 9: Induron new substation powerpoint rev1
Page 10: Induron new substation powerpoint rev1
Page 11: Induron new substation powerpoint rev1
Page 12: Induron new substation powerpoint rev1

WHAT MAKES SUBSTATION WHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE?

► SURFACE PREPARATIONSURFACE PREPARATION► FLOW COATINGFLOW COATING

►Maintain viscosityMaintain viscosity►Apply uniform 2.5-3.0 mils dft along entire Apply uniform 2.5-3.0 mils dft along entire

length of radiatorlength of radiator

► SAFETY IN A HIGH VOLTAGE SAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT

Page 13: Induron new substation powerpoint rev1

Surface PreparationSurface PreparationAll prices are for total cost to clean, blast, and paint on a per square foot basis.All prices are for total cost to clean, blast, and paint on a per square foot basis.

Before painting equipment, customer and contractor will make field inspections to determine condition of Before painting equipment, customer and contractor will make field inspections to determine condition of equipment and square footage.equipment and square footage.

DEFINITIONS GENERAL PAINT SCOPEDEFINITIONS GENERAL PAINT SCOPE

Good: Less than 25% surface rust spot blast, spot prime, 2 coatsGood: Less than 25% surface rust spot blast, spot prime, 2 coatsFair: 25% to 50% surface rust spot blast, spot prime, 2 coatsFair: 25% to 50% surface rust spot blast, spot prime, 2 coatsPoor: greater than 50% surface rust full blast, 3 coatsPoor: greater than 50% surface rust full blast, 3 coats

Equipment Type Condition of EquipmentEquipment Type Condition of Equipment Good Fair PoorGood Fair PoorTransformer Tanks – Medium- 15 to 40 MVA 4.15 5.65 7.55Transformer Tanks – Medium- 15 to 40 MVA 4.15 5.65 7.55 +36% +82%+36% +82%Radiators ( flo-coating) .85 1.05 1.45Radiators ( flo-coating) .85 1.05 1.45 +24% +71%+24% +71%230 KV Breakers 3.45 4.25 6.10230 KV Breakers 3.45 4.25 6.10 +23% +77%+23% +77%7.2 KV Regulators 4.80 5.35 6.007.2 KV Regulators 4.80 5.35 6.00 +11% +25%+11% +25%

Approximate price for a 40 MVA Transformer Approximate price for a 40 MVA Transformer Tank: 1008 square feet: $7717.00 $10,060.00 $13,639.00Tank: 1008 square feet: $7717.00 $10,060.00 $13,639.00Radiators: 4158 square feet:Radiators: 4158 square feet:

Page 14: Induron new substation powerpoint rev1
Page 15: Induron new substation powerpoint rev1
Page 16: Induron new substation powerpoint rev1
Page 17: Induron new substation powerpoint rev1
Page 18: Induron new substation powerpoint rev1
Page 19: Induron new substation powerpoint rev1

WHAT MAKES SUBSTATION WHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE?

► SURFACE PREPSURFACE PREP► FLOW COATINGFLOW COATING

►Maintain viscosityMaintain viscosity►Apply uniform 2.5-3.0 mils dft along entire Apply uniform 2.5-3.0 mils dft along entire

length of radiatorlength of radiator

► SAFETY IN A HIGH VOLTAGE SAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT

► COATING SELECTIONCOATING SELECTION

Page 20: Induron new substation powerpoint rev1
Page 21: Induron new substation powerpoint rev1
Page 22: Induron new substation powerpoint rev1
Page 23: Induron new substation powerpoint rev1

WHAT MAKES SUBSTATION WHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE?

►SURFACESURFACE PREPARATIONPREPARATION► FLOW COATINGFLOW COATING

►Maintain viscosityMaintain viscosity►Apply uniform 2.5-3.0 mils dft along entire Apply uniform 2.5-3.0 mils dft along entire

length of radiatorlength of radiator

► SAFETY IN A HIGH VOLTAGE SAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT

► COATING SELECTIONCOATING SELECTION

Page 24: Induron new substation powerpoint rev1

Safe Working DistancesSafe Working Distances

VOLTAGE MINIMUM DISTANCE

50 - 1,000 Avoid Contact

1,100 - 15,000 2’ 2”

15,100 - 36,000 2’ 7”

36,100 - 46,000 2’ 10”

46,100 - 72,500 3’ 6”

72,600 - 121,000 4’ 3”

138,000 - 145,000 4’ 11”

161,000 - 169,000 5’ 8”

230,000 - 242,000 7’ 6”

345,000 - 362,000 12’ 6”

500,000 - 550,000 18’ 1”

OSHA Standards (29 CFR 1910.269)

Page 25: Induron new substation powerpoint rev1
Page 26: Induron new substation powerpoint rev1
Page 27: Induron new substation powerpoint rev1

WHAT MAKES SUBSTATION WHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE?

► SURFACE PREPSURFACE PREP► FLOW COATINGFLOW COATING

►Maintain viscosityMaintain viscosity►Apply uniform 2.5-3.0 mils DFT along entire Apply uniform 2.5-3.0 mils DFT along entire

length of radiatorlength of radiator

► SAFETY IN A HIGH VOLTAGE SAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT

► COATING SELECTIONCOATING SELECTION

Page 28: Induron new substation powerpoint rev1

SUBSTATION STRUCTURAL SUBSTATION STRUCTURAL STEEL & FENCESTEEL & FENCE

►One coat of Induron’s One coat of Induron’s Induraguard 9200 Tower Paint Induraguard 9200 Tower Paint @ 8 to 12 mils DFT.@ 8 to 12 mils DFT.

►Single Component (no pot l i fe).Single Component (no pot l i fe).►Easy application by brush or Easy application by brush or

mittmitt►20 year service l i fe.20 year service l i fe.

Page 29: Induron new substation powerpoint rev1

SUBSTATION EQUIPMENT SUBSTATION EQUIPMENT COATING SYSTEMCOATING SYSTEM

►Full prime Body Full prime Body Induron’s P-30 Primer Red Induron’s P-30 Primer Red

►Full Intermediate CoatFull Intermediate CoatInduron’s P-30 Primer TanInduron’s P-30 Primer Tan

►Full Finish CoatFull Finish CoatInduron’s Indurasil Silicone EnamelInduron’s Indurasil Silicone Enamel

Page 30: Induron new substation powerpoint rev1
Page 31: Induron new substation powerpoint rev1
Page 32: Induron new substation powerpoint rev1

BIGGEST MAINTENANCE BIGGEST MAINTENANCE PROBLEM IS TRANSFORMERSPROBLEM IS TRANSFORMERS

►Most expensive ($1,000,000 Most expensive ($1,000,000 plus)plus)

►Hardest to replace (6 month Hardest to replace (6 month lead time)lead time)

►Most crit ical for system load Most crit ical for system load and reliabil i ty.and reliabil i ty.

Page 33: Induron new substation powerpoint rev1

Transformer Coating SystemTransformer Coating System

► Full prime Body Full prime Body Induron’s Induramastic 85 orInduron’s Induramastic 85 or

Induron’s P-30 Primer RedInduron’s P-30 Primer Red► Full prime RadiatorsFull prime Radiators

Induron’s P-30 Primer RedInduron’s P-30 Primer Red► Full Intermediate CoatFull Intermediate Coat

Induron’s P-30 Primer TanInduron’s P-30 Primer Tan► Full Finish CoatFull Finish Coat

Induron’s Indurasil Sky GrayInduron’s Indurasil Sky Gray

Page 34: Induron new substation powerpoint rev1

General Electric 40 MVA General Electric 40 MVA TransformerTransformer

► Tank Surface Area = 1008 sq. ft.Tank Surface Area = 1008 sq. ft.► Radiator Surface Area = 4158 sq. ft.Radiator Surface Area = 4158 sq. ft.

Page 35: Induron new substation powerpoint rev1

Westinghouse 120 MVA TransformerWestinghouse 120 MVA Transformer

► Tank surface area = 1862 sq. f t .Tank surface area = 1862 sq. f t .► Radiator surface area = 18,630 sq. f t.Radiator surface area = 18,630 sq. f t.

Page 36: Induron new substation powerpoint rev1

ABB 400 MVA SINGLE PHASE ABB 400 MVA SINGLE PHASE TRANSFORMERSTRANSFORMERS

► Tank Surface Area = 4006 sq. ft.Tank Surface Area = 4006 sq. ft.► Radiator Surface Area = 77,600 sq. ft. Radiator Surface Area = 77,600 sq. ft.

(each)(each)► 95% of surface area in the radiators95% of surface area in the radiators

Page 37: Induron new substation powerpoint rev1

MAINTENANCMAINTENANCEE

PLANNINGPLANNINGPROGRAMPROGRAM

Page 38: Induron new substation powerpoint rev1

MAINTENANCE PLANNING MAINTENANCE PLANNING PROGRAMPROGRAM

► Physical survey of all substations.Physical survey of all substations.

► Rank items in order of priority.Rank items in order of priority.

► Photograph of high priority i tems.Photograph of high priority i tems.

► Test for lead in coatings.Test for lead in coatings.

► Survey 7-10 subs per day.Survey 7-10 subs per day.► Typical Cost: $1200 per day of survey time Typical Cost: $1200 per day of survey time

plus travel expenses.plus travel expenses.

Page 39: Induron new substation powerpoint rev1
Page 40: Induron new substation powerpoint rev1

PAINTING SPECIFICATIONSBY

UTILITY SERVICE & MAINTENANCE, INC.for

SOUTHERN ILLINOIS POWER COOPERATIVEELIZABETHTOWN SUBSTATION

ITEM 1 PRIORITY 1

TRANSFORMER, GENERAL ELECTRIC30/40/56 MVA

161,000-69,000 VOLTSSerial Number: L252271Company Number: TR#2

REMOVE FANS, CLEAN, PRIME, BODY AND FINISH COAT, REPLACE ON TRANSFORMER AND TOUCH UP AFTER REMOUNTING.

HIGH PRESSURE WASH TANK, ACCESSORIES AND RADIATORS TO REMOVE GLOSS/CHALK AND TO NEUTRALIZE.REMOVE RUST AND/OR LOOSE PAINT FROM ALL TANK AREAS (HAND SAND, POWER SAND, SCRAPE, SPOT BLAST OR

WATER BLAST). SPOT PRIME ALL BARE METAL AREAS.

FULL BODY COAT TANK AND ACCESSORIES.FULL BODY COAT RADIATOR TUBES (FLOW COAT).FULL SPRAY FINISH COAT TANK AND ACCESSORIES.FINISH COAT RADIATOR TUBES (FLOW COAT).

NOTE:SIPCOOP TO PROVIDE WATER AT SITE.

SPOT PRIME BOLT HEADS. COVER ALUMINUM FAN BLADES.SIPCOOP TO PROVIDE GROUNDING.

USM TO REMOVE AND REPLACE FANS.MATERIALS

PRIMER -- INDURON INDURAMASTIC 85 EPOXY MASTICBODY COAT -- INDURON P-30 PRIMER, TAN

FINISH COAT –- INDURON INDURASIL SILICONE ALKYD, SKY GRAY, ANSI 70PRICE --------------------------$18,484.53

Page 41: Induron new substation powerpoint rev1

MAINTENANCE PLANNING MAINTENANCE PLANNING PROGRAMPROGRAM

Benefits to CustomerBenefits to Customer► Provides individual specif ications for Provides individual specif ications for

each itemeach item► Prepares budgetPrepares budget

►By substationBy substation►For entire systemFor entire system

► Priorit izes al l painting needsPriorit izes al l painting needs► Report with photos for Top Priority i temsReport with photos for Top Priority i tems

Page 42: Induron new substation powerpoint rev1

Lead in Paint

Generator/Owner responsible for lead paint chips “cradle to grave”.

Most states require contractor to be licensed by the state in lead removal.

Always contact your Environmental Department, different states have different rules.

Some states require “chain of custody” forms for test samples.

Two governmental agencies with lead requirements: EPA – Environmental

OSHA – Worker Safety

Page 43: Induron new substation powerpoint rev1

EPA

Generator – Any person, by site, whose act or process produces hazardous waste identified or listed in 40 CFR Part 261 or whoseact first causes a hazardous waste to become subject to regulation.

Sampling of debris the responsibility of the generator. 40 CFR Part 262.11

TCLP – Toxicity Characteristics Leaching Procedures, if waste tested has a leachable lead concentration of greater than 5 ppm it is considered hazardous under the RCRA Act.( Resource Conservation and Recovery Act )

One 55 gallon drum = approximately 200 kg, less than 100 kg per month you are considered a conditionally exempt small quantity generator.

Storage times of 180 days or will be considered “operators of a hazardous waste storage facility”.

Page 44: Induron new substation powerpoint rev1

Lead In Paint

OSHA Definition: any coating containing ANY amount of lead triggers the standard, then the exposure levels determine the level of implementations/worker protection.

Page 45: Induron new substation powerpoint rev1

OSHA

1993 - Lead Exposure in Construction Standard 29 CFR 1926.62 Worker safety responsibility of the contractor. Must have a written compliance program. Employee training is triggered when employee exposures equal or

exceed the Action Level on any one day. Action Level: 30 micrograms per cubic meter, 8 hour time

weighted average. PEL – Permissible Exposure Limit: 50 micrograms per cubic meter

8 hour TWA. Competent Person –must be able to identify existing and

predictable lead hazards in the work area and have the authorityto take prompt measures to eliminate such problems