12
AREVA Introduction Buisness in uranium mining Since 1996 in Mongolia with ArevaMongol. Since 2006 : cooperation with COGEGOBI Key figures : 12 licenses in Sainshand 16 licenses in Dariganga More than 120 employees

28.02.2013, AREVA - Introduction, Lauren Bodin

Embed Size (px)

Citation preview

Page 1: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.1

AREVA Introduction

Buisness in uranium mining

Since 1996 in Mongolia with ArevaMongol.

Since 2006 : cooperation with COGEGOBI

Key figures :

12 licenses in Sainshand

16 licenses in Dariganga

More than 120 employees

Page 2: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.2

AREVA Introduction

Page 3: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.3

Environmental Assessment

Baseline Dulaan Uul in 2008

DEIA Umnut in 2010

Baseline Zoovch Ovoo in 2012

DEIA Zoovch Ovoo for 2013

Page 4: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.4

Environmental Issues

Road Tracks

Waste Management

Storage

Drilling Remediation

Saxaul Forest

Page 5: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.5

Roads Tracks

Multiple Tracks for one drill

Vegetation destruction

Dust and noise increasing

Roads networks (main and

secondary)

Remediation monitoring

Page 6: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.6

Waste Management

In 2012 : only plastic

recycled

For 2013 :

Recycle cans, papers,

domestics waste

Monitoring quantity

Improving storage for

oil and hydrocarbons

Page 7: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.7

Storage Fuel tank

Tank 50t

New location, better for

security

Core storage

Need a new shelter

Recycle old cores

Page 8: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.8

Drill Remediation

Too high, disturb

landscape

New remediation sign

Smaller

Less visible

Page 9: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.9

Saxaul forest

Protected area on Zoovch

Ovoo

Plan monitoring and

reforestation

Seeds program

Page 10: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.10

Environmental Monitoring

Environmental Tracking System

All datas since 2009

Monitoring Equipment

Dust Monitor

For Radiation

Monitoring Procedure

Environment bonus for contractors

Page 11: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.11

Program 2013

Training program for locals, contractors and employees

Environmental management plan

Environmental protection plan

Community based environmental program

Junior Ranger Program for school children

Page 12: 28.02.2013,  AREVA - Introduction,  Lauren Bodin

Environnement – Nicolas Glenat – 16/02/12 - p.12

Thank you for your attention