Slide 1
Shower modification with new standard
Plant : Pantnagar
submitted by Dheeraj patidar Auto planner
Slide 2
Scope:-
This Tata motors specification covers the requirements of shower test to be conducted on all Tata vehicles with enclosed compartments for carriage of passengers or goods
Test facility:- The nozzles used for top & sides shall be of full cone and solid type having a spray angle
of 60 degrees & capable of spray pattern for maximum surface
Pitch of theses nozzles 400 mm in both direction
Two nozzles shall be of full cone & solid type having a spray angle of 120 degrees, theses nozzles shall be placed along the center line of vehicle – first nozzle placed 500mm behind front axle & second one 1000 mm from first nozzle
Group A Group B
Zip, IRIS, ACE magic , Super ACE, Venture
All PVBU Vehicles
Slide 3
Test parameters for side & top nozzles
Test parameters Group A Group B
Pressure , kpa 150 ± 10% 200 ± 10%
flow lpm 7 ± 10% 15 ± 10
Time, Min. 3 min. 3 min.
Test parameters for bottom nozzles
Test parameters All categories of vehicles
Pressure , kpa 100 ± 10%
flow lpm 7 ± 10%
Time, Min. 3 min.
New standard shower test for vehicle:-
Slide 4
1 A SHOP shower modification test pictures
2nd nozzle
1st nozzle
Distance500 mm from the center of front axle
1000mm from the first nozzle
Slide 5
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 150 ± 10% Kpa(135 - 165 Kpa,1.35 - 1.65 Bar)
Time 3 min.
Spray angle 60 degree
5.7 1.5 3min. 60
Top & both side nozzles
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 100 ± 10% Kpa(90 - 110 Kpa,0.9 - 1.1 Bar)
Time 3 min.
Spray angle 120 degree
7.5 1.1 3 min. 120
Bottom side nozzles test parameters
1 A SHOP shower modification test data
Slide 6
1 B SHOP shower modification test pictures
Distance 500 mm from the center of front axle
1st nozzle
1000mm from the first nozzle
2nd nozzle
bottom line for first vehicle bottom line for second vehicle
1st nozzle
2nd nozzle
Slide 7
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 150 ± 10% Kpa(135 - 165 Kpa,1.35 - 1.65 Bar)
Time 3 min.
Spray angle 60 degree
7.7 1.47 3 min. 60
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 100 ± 10% Kpa(90 - 110 Kpa,0.9 - 1.1 Bar)
Time 3 min.
Spray angle 120 degree
7.5 1.1 3 min. 120
Top & both side nozzles
Bottom side nozzles test parameters
1 B SHOP shower modification test data
Slide 8
1 C SHOP shower modification test pictures
1000mm from the first nozzle
Distance 500 mm from the center of front axle
1st nozzle
2nd nozzle
Slide 9
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 150 ± 10% Kpa(135 - 165 Kpa,1.35 - 1.65 Bar)
Time 3 min.
Spray angle 60 degree
7.8 1.5 3 min. 60
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 100 ± 10% Kpa(90 - 110 Kpa,0.9 - 1.1 Bar)
Time 3 min.
Spray angle 120 degree
6.7 1 3 min. 120
Top & both side nozzles Parameters
Bottom side nozzles test parameters
1 C SHOP shower modification test data
Slide 10
1 D SHOP shower modification test data
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 150 ± 10% Kpa(135 - 165 Kpa,1.35 - 1.65 Bar)
Time 3 min.
Spray angle 60 degree
7.5 1.5 3 min. 60
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 100 ± 10% Kpa(90 - 110 Kpa,0.9 - 1.1 Bar)
Time 3 min.
Spray angle 120 degree
6.4 1.1 3 min. 120
Bottom side nozzles test parameters
Top & both side nozzles Parameters
Slide 12
2 B SHOP shower modification test pictures
1Sst nozzle
Add S.S Pipe With reference of center line
2nd nozzle
Slide 13
2 B SHOP shower modification test pictures
Distance 1000 mm between first nozzle to second nozzle
500 mm from the center of front axle
Pressure Gauge location
Slide 14
2B SHOP shower modification test data
Flow rate15 ± 10% LPM(13.5- 16.5 LPM)
Pressure 200 ± 10% Kpa(180 - 220 Kpa,1.8 - 2.2 Bar)
Time 3 min.
Spray angle 60 degree
12.5 2.0 3 min. 60
Flow rate7 ± 10% LPM(6.3 - 7.7 LPM)
Pressure 100 ± 10% Kpa(90 - 110 Kpa,0.9 - 1.1 Bar)
Time 3 min.
Spray angle 120 degree
7.7 1 3 min. 120
Bottom side nozzles test parameters
Top & both side nozzles Parameters