Presentation från informationsdagen om den nya europeiska utlysningen i programmet Future Internet-PPP (Public Private Partnership) den 27 september 2013
Citation preview
WW
W.V
INNOVA.S
E
FI-PPP information day
Peter Nõu, peter.nou@vinnova.se
Johan Lindberg, johan.lindberg@vinnova.se
Bild 1
Agenda
Welcome & introduction, VINNOVA
FI-PPP, Call information & existing projects, EC
Lunch break
Existing projects and plans for the future
Offline coffe & discussion
Bild 2
Swedish researchand innovation in figures
Slide 3
Innovation UnionScoreboard 20104
Global CompetitivenessIndex 2010/20114
1. Switzerland 1. Switzerland
2. Sweden 2. Sweden
3. Denmark 3. Singapore
4. Finland 4. USA
5. Germany 5. Germany
6. United Kingdom 6. Japan
7. Belgium 7. Finland
8. Austria 8. Netherlands
9. Netherlands 9. Danmark
10. Ireland 10. Canada
3.6%of GDP equivalent to annual R&D investment in Sweden
Sources: 1SCB (forecast for 2009) 2VINNOVA 2010 3SCB (forecast for 2009) 4Innovation Union Scoreboard 2010, The Global Competitiveness Report 2010-2011
Equivalent to 3.6% of Sweden’s GDP for 2009 invested in R&D.3
GDP
(billionSEK)
112
Total Swedish R&D1
29.5
Total government R&D2
2.1VINNOVA’s
grants to R&I
Slide 4
Innovationcapacity
Infrastructure for innovation
Policy development
Outside analysis
Catalyticmeeting places
Strategic processes
Global links
Bilateral R&Ipartnerships
Swedishparticipation in
EU R&D programme
Verification
R&I projects
Test anddemo sites
Coaching
R&I projectsfor increased
growth
Participation ininternationalpartnerships
Investing in R&I Innovation capacity in
SMEs
Utilisation
Strong R&I milieus
Incubation
Knowledge triangle
Slide 5
But
Slide 6
99% of the worlds research takes place outside Sweden
EU 7:th framework programme important source for funding R&D
Vetenskapsrådet
FP7
VINNOVA
Energimyndigheten
FORMAS
FAS
Rymdstyrelsen
4,500
2,097
1,905
1,318
895
393
80
Miljoner SEK
Finansiering per år Jäm-förelseår 2010
** Exklusive ESA
Bild 7
Timeframe for FP7 projects
20122006 2007 20142008 2009 2010 20152011 2013 2016
Official duration of FP7 2007-2013
Projects resulting from FP7 calls operating
Results from FP7 projects in use
Last projects startFirst projects start
First calls Last projects end
2017 2018 2019 2020 2021
Bild 8
Horizon 2020: 2014-2020
WW
W.V
INNOVA.S
E
Towards …
Maria Hagardt
Kommunikatör/NCP Science in Society
Bild 9
Formal roles of the Member State in FP7 & Horizon 2020The NCP and the Programme Committee (PC) role
PC
NCPCreation of the
Work Programme (call text)
Stimulating the R&D community in Sweden
Monitoring of the evaluation and
selection
PC
SE NCP and PC representatives
Departmentsskrivelse
• http://www.regeringen.se/sb/d/16736/a/221359
Hearing with concearned Public Authorities on 30/8
• Written input until 11/9
• Decision shortly after that …
Slide 11
Support fromNational Contact Points
Information about FP7
• Information days
• Thematic workshops
• One-on-one meetings
• Legal and financial advice
Training courses
Analysis and statistics of Swedish participation
Following the development and content of FP7
Bild 13
2014 2015 2016 2017 2018 2019 2020
Strategic Programme 1
WP1 Strategic Programme 2
WP 2 Strategic Programme 3
WP3
WP4
Work-programmes
Swedish Horizon 2020 Information tourDate Place
3 Okt. Umeå
8 Okt. Växjö/Kalmar
10 Okt. Karolinska
15 Okt. Uppsala
22 Okt. Lund
24 Okt. SU/KTH/Alba Nova
31 Okt. Göteborg
Slide 14
Link: http://www.vinnova.se/sv/EU-internationell-samverkan/Nyheter/2013/130904-Strax-dags-for-informationsturne-om-EUs-nya-ramprogram---Horisont-2020-/
FI-PPP projects open calls FI-PPP project open calls information day
• http://www.fi-ppp.eu/ai1ec_event/fi-ppp-open-call-information-day/?instance_id
FI-CONTENT 2
• http://www.fi-ppp.eu/wp-content/uploads/2013/07/01-FI-Content2-Open-Call-pres-V2-1.pdf
FI-STAR
• http://www.fi-ppp.eu/wp-content/uploads/2013/07/02-Fi-STAR.pdf
FINESCE
• http://www.finesce.eu/Open_Call.html
Fispace
• http://www.fi-ppp.eu/wp-content/uploads/2013/07/04-FIspace_Open-Call_v1.8_short.pdf
FITMAN
• http://www.fi-ppp.eu/wp-content/uploads/2013/07/05-FITMAN_Sergio-Gusmeroli.pdf
XIFI
• http://www.fi-ppp.eu/wp-content/uploads/2013/07/06-XIFI-for-Open-CAll-25-Sept-2013-Bruxelles-Maurizio-Cecchi.pdf
Bild 15
Important events
3:rd of October, Brussels, FI-PPP Objective 1.8 Expansion of use cases information day
4:th of October, Brussels, FI-PPP Objective 1.9 Technology foundation and extension information day
• http://ec.europa.eu/digital-agenda/en/fi-ppp-call-3-information-days
6-8 November, Vilnius, ICT 2013
• http://ec.europa.eu/digital-agenda/en/ict-2013
Bild 16
FI-PPP contacts in Sweden
FP7 ICT-NCP
• Johan Lindberg, +4684546453, johan.lindberg@vinnova.se
• Andrej Litwin, +4684733045, andrej.litwin@vinnova.se
FiF – Future Internet Forum
• Peter Nõu, peter.nou@vinnova.se
Bild 17
Slide 18
EU is a great opportunity
Difficulties can beovercome!
FI-PPP project XIFI
eXperimental Infrastructure for the Future Internet
Competitive call for additional partners:
• https://fi-xifi.eu/open-call/
• No Swedish partners yet …
Bild 19
FI-PPP project FI-Ware
http://www.fi-ware.eu/
Open APIs for Open Minds
Bild 20
FI-PPP projects from 1st phase Technology Foundation:
• FI-WARE
Use Cases:
• ENVIROFI
• FINSENY
• FI-CONTENT
• FINEST
• INSTANT MOBILITY
• OUTSMART
• SAFE CITY
• SMARTAGRIFOOD
Capacity Building and Infrastructure:
• INFINITY
Programme Facilitation and Support:
• CONCORD Bild 21
Recommended