Golden Dawn Minerals Corporate Presentation

Preview:

DESCRIPTION

This is the updated corporate presentation for Golden Dawn Minerals. It includes information about the company's drilling program and finances.

Citation preview

GOLDEN DAWN MINERALS INC.

GREENWOOD & ROYAL ATTWOOD PROJECTS

Greenwood, British Columbia, CanadaNovember 2010

GOLDEN DAWN MINERALS Forward Looking Statements

Forward Looking Statements

Except for historical information contained herein, this presenta-tion may contain forward-looking statements including, but not limited to, comments regarding predictions and projections. For-ward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Although Golden Dawn Minerals, Inc. believes that such expectations are reasonable, there can be no assurance that such expectations will prove to be correct, and therefore actual results may differ materially from those currently anticipated in such statements. You are cautioned not to place reliance on such forward-looking statements, whether made in this presentation or in any question and answer period related to this presentation.

GOLDEN DAWN CLAIMS Greenwood Project (Wild Rose, Tam O’ Shanter, &

Boundary Falls Claims) & Royal Attwood Project

GREENWOOD PROJECT HIGHLIGHTS

o $20 million historical database: +100 drillholes, geophysical & geochemical surveys, reports, etc.

o Planned mine bulk sample – potential early production.

o On-site mill & tailings pond w/ infrastructure & power.

o +3,000 ha contiguous property. Excellent year-round road access.

o Two operational gold-silver-copper mines. 2,000 tpd custom gold mill 70 km to south soliciting feed.

GREENWOOD PROJECT OVERVIEW

o GDM Wild Rose Claims (1,000 ha).

o GDM Boundary Falls Claims (759 ha).

o Tam O’ Shanter Claims (1,259 ha) optioned from Kettle River Resources.

o Decisive 2010-2011 program of drilling, geophysics, & geochemistry.

GREENWOOD PROJECT Potential Target Types

o Multiple gold-copper target types from previous work & current geophysical surveys:

o Bulk tonnage gold-copper systems of Overlook-type & South Penn in Republic District.

o Higher-grade sulphide-rich gold-silver base metals in Rossland-type veins.

o Gold & copper-bearing massive sulphides & skarns of Motherlode & Phoenix-type.

o Magnetite-gold systems of Belcher & Buckhorn-type.

o High-grade Bonanza-type gold vein systems of Knob Hill & K2-type.

GREENWOOD PROJECTHistoric Drillholes, Airborne ZOFF2 (AeroTEM III), & EM

Conductors

GREENWOOD PROJECT Geophysical Surveys Completed

Airborne & ground geophysics:

o Total Magnetic Intensity (TMI).

o Vertical Magnetic Component Derivative (ZOFF2).

o Electro-magnetics (EM).

o Induced Polarization (IP).

GREENWOOD PROJECT Current Exploration Targets

o Potential for open-ended low-grade gold zone 2,000 meters long X 250 meters wide.

o High-grade vein-type massive sulphides 750 & 2,000 meters long.

GREENWOOD PROJECT Summary of Geophysics & Geochemistry

o Soil geochemistry (up to 1,160 ppb gold) coincident with magnetic anomalies up to 2,000 meters long .

o Magnetic anomalies may reflect magnetite-bearing-intrusives bordered by gold skarns.

o EM Conductors are numerous & un-tested. May correspond to massive sulfides.

GREENWOOD PROJECTDetailed View – Low-Grade Gold Zones in Drillholes, Workings,

ZOFF, & EM Conductors

GREENWOOD PROJECT Wild Rose & Wild Cat Veins – 3D View NW

Proposed Drillholes

GREENWOOD PROJECTWild Rose & Tam O’ Shanter Claims

Bulk-Tonnage Geological Exploration Target

THICK-INTERVAL INTERCEPTS - Potential Bulk Tonnage

o DH 92-27- 63.0 m @ 0.950 g/to DH 91-16 - 26.15 m @ 0.754 g/t Au

VEIN INTERCEPTS - Early Bulk Sample Targets

o DH 92-31 - 1.03 m @ 21.30 g/t Auo DDH 86-5 - 1.8 m @ 10.23 g/t Au & 14.57 ppm Ago DH 86-12 - 1.7 m @ 8.37 g/t Au & 6.82 ppm Ago DH 87-4 - 2.16 m @ 8.50 g/t & 4.65 ppm Ago DH 87-3 - 2.5 m @ 7.90 g/t Au, 12 ppm Ag, & 0.38% Cuo DH 92-40 - 0.8 m @ 3.41 g/t Auo DH 92-41 - 0.6 m @ 3.05 g/t Au & 0.7 m @ 25.7 g/t Auo DH 92-42 - 3.4 m @ 1.68 g/t Au & 3.0 m @ 0.92 g/t Au

GREENWOOD PROJECTWild Rose & Tam O’ Shanter Claims

Historic Thick-Interval & Vein Intercepts

GREENWOOD PROJECT

Wild Rose Property Proposed Drillholes

GREENWOOD PROJECT Boundary Falls Mine & Mill Site

MINE

DUMP

MILL

GREENWOOD PROJECT Boundary Falls Claims

Electro-magnetic, Magnetic, & Soil Anomalies

BOUNDARY FALLS CLAIMSBOUNDARY FALLS CLAIMS

GOLDEN DAWN CLAIMS Greenwood Project (Wild Rose, Tam O’ Shanter, &

Boundary Falls Claims) & Royal Attwood Project

ROYAL ATTWOOD PROJECT Stream Sediment & Soil Geochemistry

Royal AttwoodRoyal Attwood PropertyProperty

4,000 soil & stream samples

ANOMALOUS GOLD IN STREAM & SOILANOMALOUS GOLD IN STREAM & SOIL

0 1100 METERS

N

17,000 ppb Au17,000 ppb Au

11,000 ppb Au11,000 ppb Au

79,000 ppb Au79,000 ppb Au

+50 ppb Au in soil

+10,000 ppb Au in Stream Sed.

+200 ppb Au in soil

Soil Survey Limits

ROYAL ATTWOOD PROJECT Geophysical & Soil Grid Gold Anomalies &

Pending Titan 24 Survey

2011 OVERALL BUDGETSGreenwood Project Budget

TAM O’ SHANTER-WILD ROSE CLAIMS - $3.87 Million

o $2.0 Million - 40 holes

o $1.5 Million - Underground & bulk sampling. Potential yield: 10,000 tonnes (1,500-3,000 oz Gold-Equivalent).

o $50,000 - Additional evaluation of historic data.

o $250,000 - Additional geophysics.

o $50,000 - Additional geochemistry.

o $20,000 - Additional mapping.

2011 OVERALL BUDGETS Greenwood Project (Cont’d) & Royal Attwood Project

BOUNDARY FALLS CLAIMS - $700,000

o $250,000 - Titan 24 Survey & other geophysics.

o $350,000 - Drilling.

o $100,000 - Other.

ROYAL ATTWOOD PROJECT - $1.0 Million

o GDM & Hi Ho Silver spend $400,000 & $600,000 respectively.

o $350,000 - Titan 24 Survey & other geophysics.

o $600,000 - Drilling.

o $50,000 - Other.

$5.0 Million - 2011 GDM BUDGET GRAND TOTAL

GOLDEN DAWN MINERALS 2011 Summary Budget

o $3.87 Million – Wild Rose & Tam O’ Shanter Claims (Greenwood Project).

o $0.7 Million - Boundary Falls Claims (Greenwood Project).

o $1.0 Million - Royal Attwood Project ($400,000 GDM).

$5.0 Million – GDM 2011 BUDGET GRAND TOTAL

GOLDEN DAWN MINERALS Share Structure & Financials

CAPITAL STRUCTURE & FINANCIALS

ISSUED SHARES: 75 Million

OUTSTANDING WARRANTS: 33 Million (yields $6.0 Million)

OUTSTANDING OPTIONS: 5 Million

FULLY DILUTED SHARES: 112 Million (yields cash $6.2 Million)

SHAREHOLDERS: 1,000 (approx.)

DIRECTORS/MANAGEMENT OWNERSHIP: 15%

CASH IN BANK: $500,000

CURRENT BUDGET PLANNED

2011 Budget - $5.0 Million

GOLDEN DAWN MINERALS Cautionary Warning

CAUTION

There are no known mineral resources on any of the company’s properties and it is not known if any will be discovered. Further, if discovered, there can be no assurance any such mineral resources can be economically recovered.

GOLDEN DAWN MINERALS

Contact info

#575 1111 West Hastings StreetVancouver, B.C.Canada V6E 2J3

Telephone: 604-221-8936Facsimile: 604-685-2360

Email: allinfo@goldendawnminerals.com

Recommended