2
Hwy #3 Hwy #41 Hwy #3 Transmission Line Power Line Power Line B.C. Mine Rathmullen Tokyo Bluebell Minnie Moore Jumbo Emma Oro Denoro Cyclops Rbell Pac Niagara LG2 Marshall Sylvester K Gilt Edge San Jacinto Brooklyn Phoenix Stemwinder Crescent Lake Skylark Bay Mavis Prince Henry Last Chance EPU Goldfinch Providence War Eagle Snowshoe Yellow Jacket Rawhide Monarch Grey Eagle Winnipeg Winner Keno Athelsan Wild Rose Motherlode No.7 City of Paris British Columbia Washington State British Columbia Washington State Greenwood Grand Forks Midway Lexington Le e i i xingto ton GOLDEN DAWN MINERALS Lone Star e S St tar Lo L ne GOLDEN DAWN MINERALS GOLDEN DAWN MINERALS GOLDEN DAWN MINERALS GOLDEN DAWN MINERALS Phoenix Property Golden Crown Boundary Falls GOLDEN DAWN MINERALS Tam O’Shanter Kinross Gold Option 2017 PEA 2017 PEA Kinross Gold Option Kinross Gold Option Kinross Gold Option Greenwood Mill Open Pit +30 historic mines NE Cluster of Mines SW Cluster of Mines Phoenix Cluster of Mines Golden Crown Mine Lexington Mine May Mac Mine 296T @ 5.5% Zn 136KT @ 1.37% Cu 1.5MT @ 0.95% Cu 254KT @ 1.01% Cu & 0.8 g/t Au Historic Production 353T @ 22.8 g/t Au & 10.75 g/t Ag 294T @ 7.3% Cu & 392.9 g/t Ag 103KT @ 4.36% Cu & 58 g/t Ag Near term gold producer With significant upside potential www.goldendawnminerals.com During the mining sector downturn GOM acquired past producing mines, deposits and exploration targets and a modern processing facility in British Columbia's prolific Greenwood mining camp, becoming one of the larg- est land owners in the district. The company plans to start producing at three precious/base metal mine proj- ects in the short term. All three projects are within 15 km of its 100% owned processing facility. GOM acquired an additional 12,700 ha. of land (Phoenix Property) contiguous with the properties where the Lexington/Golden Crown mines and mill are located. Utilizing modern exploration technology such as deep penetration airborne geophysics the Company plans to revisit the 30 past producting mines, including the major Phoenix mine, in search of potential deep feeder systems which may be the source of mineralization. Golden Dawn Minerals Inc. Golden Dawn Minerals Inc. TSX.V: GOM TSX.V: GOM Frankfurt Xetra: 3G8A Frankfurt Xetra: 3G8A OTC : GDMRF OTC : GDMRF Greenwood Precious Metal Project Greenwood Precious Metal Project

Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. · PDF fileGolden Dawn Minerals Inc.Golden Dawn Minerals Inc.“A Near Term Producer”“A Near Term Producer” Technical information

  • Upload
    dokiet

  • View
    226

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. · PDF fileGolden Dawn Minerals Inc.Golden Dawn Minerals Inc.“A Near Term Producer”“A Near Term Producer” Technical information

Hw

y #

3

Hw

y #4

1

Hwy #

3

Transmission Line

Power Line

Power Line

B.C. Mine

Rathmullen

Tokyo

Bluebell

Minnie Moore

Jumbo

Emma

Oro Denoro

CyclopsRbell

Pac

Niagara

LG2

Marshall

Sylvester K

Gilt Edge

San Jacinto

Brooklyn

Phoenix

StemwinderCrescent

Lake

Skylark

BayMavis

Prince Henry

LastChance

EPU

Goldfinch

Providence

WarEagle

Snowshoe

Yellow Jacket

RawhideMonarchGrey

Eagle

Winnipeg

Winner

Keno

Athelsan

Wild Rose

Motherlode

No.7

City of Paris

British Columbia

Washington StateBritish Columbia

Washington State

Gre

en

wo

od

Grand ForksM idway

LexingtonLee iixingtotonGOLDEN DAWN MINERALS

Lone Stare SSttarLoL neGOLDEN DAWN MINERALS

GOLDEN DAWN MINERALS

GOLDEN DAWN MINERALS

GOLDEN DAWN MINERALS

Phoenix Property

Golden Crown

BoundaryFalls

GOLDEN DAWN MINERALS

Tam O’Shanter

K i n r o s s G o l d

O p t i o n2017 PEA

2017 PEA

K i n r o s s G o l d

O p t i o n

K i n r o s s G o l d

O p t i o n

K i n r o s s G o l d

O p t i o n

GreenwoodMill

OpenPit

+30 historic mines

NE Clusterof Mines

SW Clusterof Mines

Phoenix Cluster

of Mines

Golden CrownMine

LexingtonMine

May MacMine

296T @ 5.5% Zn

136KT @ 1.37% Cu1.5MT @ 0.95% Cu

254KT @ 1.01% Cu& 0.8 g/t Au

Historic Production

353T @ 22.8 g/t Au& 10.75 g/t Ag

294T @ 7.3% Cu& 392.9 g/t Ag

103KT @ 4.36% Cu& 58 g/t Ag

Near term gold producer

With significant upside potential

www.goldendawnminerals.com

During the mining sector downturn GOM acquired past producing mines, deposits and exploration targets and a modern processing facility in British Columbia's prolific Greenwood mining camp, becoming one of the larg-est land owners in the district. The company plans to start producing at three precious/base metal mine proj-ects in the short term. All three projects are within 15 km of its 100% owned processing facility.

GOM acquired an additional 12,700 ha. of land (Phoenix Property) contiguous with the properties where the Lexington/Golden Crown mines and mill are located. Utilizing modern exploration technology such as deep penetration airborne geophysics the Company plans to revisit the 30 past producting mines, including the major Phoenix mine, in search of potential deep feeder systems which may be the source of mineralization.

Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. TSX.V: GOMTSX.V: GOMFrankfurt Xetra: 3G8AFrankfurt Xetra: 3G8A

OTC : GDMRFOTC : GDMRFGreenwood Precious Metal ProjectGreenwood Precious Metal Project

Page 2: Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. · PDF fileGolden Dawn Minerals Inc.Golden Dawn Minerals Inc.“A Near Term Producer”“A Near Term Producer” Technical information

Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. “A Near Term Producer”“A Near Term Producer”

www.goldendawnminerals.com

Technical information in this document has been approved by Dr. Mathew Ball, P.Geo., a Qualified Person as defined by National Instrument 43-101, and COO of the Company.

May Mac Mine - Silver, Gold, Lead, ZincHistoric production from 1903 to 1983 is reported to be 4,228 tonnes averaging 5.35g/t Au, 227 g/t Ag.Consists of a series of vertical parallel silver,gold veinsRecent UG drilling has extended the Skomac vein an additional 250 meters in depth.and also delineated a second parallel vein (Rose Vein)The Company is awaiting approval to extend the No.7 adit and extract a bulk sample to be processed at its Greenwood Mill.

Greenwood MillMill built and operated briefly in 2008 by Merit Mining Corp., after which it ceased operation due to lack of funding indirectly related to the 2008 market crash.GOM has received permit to restart the mill and receive material from Lexington mine and also potentialy from the numerous smaller historic mines in the Phoenix property if and when re-developed.

Lexington Mine - Copper, GoldMine saw a short period of production in 2008 by Merit Mining Corp., after which it ceased operation due to lack of funding indirectly related to the 2008 market crash.2016 Resource update and 2017 positive PEA.Dewatering has commenced. Material extraction and processing at the Greenwood Mill to start by approximately November.

WestWWWWestWestWesWesWestWestWWestWestWeWWeWestWeWestWestWestWestWestWesWestWestWestWeWestWestWWestWesWestWestWestWWWesWestWWee tWestWesteese tttWestWestWestWestWWestestWestWestWesssWestssestttWestestssWestestWestWestWestesssesWesWestsWeststWestWesWeWeWesesWestttsttWestWestWeeWesttWestWWesWesWWeestttttWestWWWesWW sW PorPoPPPoPorPorPororPoPPPPoroPPPorPoPPPPPorPorPPoorPorPorPoorPorPPooPoPorPorPorPororPPPPorPorPorPPPoPPorPororPorPoorPorPorPoroPorPorrrPoPorrrPPPooooPorPoPPoPoP rrrPorrrtttatatataltaltaltaltaltaltalltalttttaltaltaltaltaltttatatalltataltatattaalattattaatataltattataaltattaalttaaaltaaalataltaatt lWest PortalEastEastEasEEasEaEEastEastEastEastEastEastEastEastEastEasEaststststEastasttaststEastEasEastEastEastEastEastEastastEastastEastastastttEasEastEaEaEastastEasttastEasEEEastEastEasEasasttastEaasastEasEastEastEastEastaEassasttastEasEEastastastastasastssttEaaastttEaststssttEasEaEaaaststEaassEasassssstasssEEEEaa tE ttEEE PPorPorPorPoPPorPorPorPPorPorPororPororPorPororPorPorPorPPorPPPPPoPorPorPoPoroPorPororPorPPPPorPorPoorPorPorPorPPororPoPoPoPorPoPorPorPPPorPorrPorPPPPoPororPorPoorPoPoooooPoPPoPoooorrPP rPooPooorrroooooorrrPoPPPPoorPoPoPoPorPoPooo tttaltataltaltaatatatataltaltaltaltalt llt ltaltaltaltaltaltaltaaltalltatalltaltalalallllalttaltalltalttaatalltalttttaltaltattaatatatatalaltatallllttattataaatt ltaEast Portal

201620162016201620166 ResRResR sRessResouourcurcurcourcourcee2016 Resource

CurrCurrent ent UndeUnd rgrorgrrgrr undundWorkings

Current UndergroundWorkings

Proproposedo UndndergrrgrroundoundouWorkingsings

Proposed UndergroundWorkings

Golden Crown Mine - Gold, Copper

Similar to the Lexington Mine ceased production in 20082016 Resource update and 2017 positive PEA.Company is awaiting drill permit to conduct surface drilling to potentially expand upon the current resource.

to

CurrCurrent UndeUndergroundddddWorkingngs

Current UndergroundWorkings

20161 Resourcrcceeee2016 Resource

Proposede UUndergrg ounundWorkWorkings

Proposed UndergroundWorkings

2017 Preliminary Economic Assessment Highlights

Base case after-tax IRR of 103.4% and NPV of C$19.7MPre-production capital requirements of C$3.4MPre-production period of six months as a result of existing infrastructure and permits from the acquisition of the processing plant and Lexington-Grenoble and Golden Crown Mines Life of mine ("LOM") all-in sustaining costs of US$786 per ounce goldExploration Targets for increasing Mineral Resources at both Lexington and Golden Crown

Lexington, Golden Crown Properties, Deposits and Greenwood Mill

Exploration Target for further mill feed from the company’s 100% owned May Mac Mine

2016 Resource Update (3.5 g/t AuEq cut-off)Class Tonnes Au g/t Cu % AuEq g/t AuEq ozs

Meas & Ind 372,000 6.47 1.05 8.05 96,300Inferred 12,000 4.42 1.03 5.96 2,300

2016 Resource Update (3.5 g/t AuEq cut-off)Class Tonnes Au g/t Cu % AuEq g/t AuEq ozs

Indicated 163,000 11.09 0.56 11.93 62,500Inferred 42,000 9.04 0.43 9.68 13,100

(1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.

(1)

(1)