C270 (HK BIODIESEL PLANT) Safety Report
Month: Jul 2012 Aug 2012Accumulated man-hour: 279,201 314,771Days worked since project commenced: 265 296Accumulated man-day lost: 51 113Cumulative Accident Frequency Rate: 0.72 0.64
ALL are an important stakeholder !
SAFETY STATISTICS
C270 Monthly Safety Report – August 2012
SAFETY INSPECTION / MEETINGPhysical site safety walks
C270 Monthly Safety Report – August 2012
SAFETY INSPECTION / MEETING
Weekly Safety Meetings
C270 Monthly Safety Report – August 2012
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
FALL FROM HEIGHTFloor opening should be covered
Improvement – Floor opening covered by plywood
C270 Monthly Safety Report – August 2012
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
FALL FROM HEIGHTFloor edge fencing should be reinstalled immediately
Improvement – Floor edge fencing reinstalled in position
C270 Monthly Safety Report – August 2012
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
HOUSEKEEPINGConstruction waste should be removed and disposed on time
Improvement – Construction waste removed and disposed
C270 Monthly Safety Report – August 2012
POSITIVE POINTERS
Meeting with client and subcontractors for promotion of positive climate
Pre-work meeting with different level of subcontractors prior to commencement of works
C270 Monthly Safety Report – August 2012
SAFETY AWARD
Mr. Au Wai Chiu (Section Manager) presented SAFETY IMPROVEMENT AWARD to subcontractor Chung Kong
Commendations
C270 Monthly Safety Report – August 2012
SAFETY TRAINING
INDUCTION
TRAINING
Site Specific Safety Induction
Current MonthAccumulate
(Oct 2011 – Aug 2012)
No. of class 22 211
No. of Attendee 95 1020
C270 Monthly Safety Report – August 2012
TOOL BOX TALKTRAININGSAFETY TRAINING
Topic No. of attendee
Occupational Safety Prevent Heatstroke 81 nos.
Occupational Safety Inclement Weather 81 nos.
Occupational Health General Duties 72 nos.
Occupational Safety Prevention of Slip & Trip 76 nos.
Current Month Total 310 nos.
Accumulated Total : 2,595 nos.
C270 Monthly Safety Report – August 2012
SAFETY Promotion
12 days Very Hot Weather Warning
8 days Thunderstorm Warning
2 days Typhoon Warning
6 nos.AECOME – BDI – Safety Alert – incompliance to statutory requirement
4 nos. HSE news sharing
3 nos. Safety Warning to subcontractors
7 nos. Safety Comment to Method Statements
2 nos. General Safety Requirement Reminder
Safety Circulation
C270 Monthly Safety Report – August 2012
GOVERNMENT / AUTHORITIES VISIT
LD conducted site inspection to our site on 30/8/2012
C270 Monthly Safety Report – August 2012
GOVERNMENT / AUTHORITIES VISIT
SE of HyD visit on 8/8/2012 ICE conduct Environment Audit on 23/8/2012
SE of HyD visited our site for CCSA 2012 assessment
ICE conduct regular Environment Audit to the site
C270 Monthly Safety Report – August 2012
HKIE Technical Visit to our site on 18/8/2012
GOVERNMENT / AUTHORITIES VISIT
C270 Monthly Safety Report – August 2012
GOVERNMENT / AUTHORITIES VISIT
HKIE Technical Visit to our site on 18/8/2012
C270 Monthly Safety Report – August 2012
Thanks for watching!!
THE END
C270 Monthly Safety Report – August 2012