By1.ASIF ALI(27301314023)2.ASHRAFUL ABEDIN(27301314022)3.JITENDRA HALDER(27301313019)

M.a construction pvt ltd

Land Acquisition Land Clearance Excavation & Compaction Leveling Demarcation Plan Layout , Shuttering And Footing Onward Construction Of Substructure &

Super Structure

Project: Natural city bardhaman

Contract : Natural group

Contractor: M.a construction (India)pvt.Ltd.

16 Towers Tower –G+7(all

tower) Having 2/3/4 BHK 600+ apartments 450 cottahs

Spacers Fly ash bricks Chair

Tie rod sikanja

Prop-jack

Batching Plant Mechanical Pump ETC.

• L –angles• 5-7.5cms height• High grade mortar

In case of column starter casting they maintained the mixing ratio about 1:1.5:3.

After kicker casting of column-2

Reinforcement Placements of

Column

Reinforcement Placements of Column according to design

For beam-2 constriction:3-16mmΦ bar in top 3-20mmΦ bar in bottom2-20mmΦ extra bars in bottom3-16mmΦ extra bars in topFor stirrup 10mmΦ bar

12

Floor beam-2 section

13

concrete mixing in mixture machine

using crane for pulling up the

concrete

Beam casting

During slab casting, using

vibrator & Steel runner.

14

shuttering of Stair

15

Using vibrator during stair casting

Curing of stair by moist jute fabric

Brick work MasonryFinishing

Need to wear helmet all the time Proper fencing is done First aid kit is available along with safety

engineer as well as doctor At height safety belts are also required

Gained basic knowledge in the field of construction.

Learned an importance of proper communication between office and work site.

Learned wise use of available resources. The training has revamped my confidence. Learn about safety requirments at site. I m happy that I choose civil engineering.