By1.ASIF ALI(27301314023)2.ASHRAFUL ABEDIN(27301314022)3.JITENDRA HALDER(27301313019)
M.a construction pvt ltd
Land Acquisition Land Clearance Excavation & Compaction Leveling Demarcation Plan Layout , Shuttering And Footing Onward Construction Of Substructure &
Super Structure
Project: Natural city bardhaman
Contract : Natural group
Contractor: M.a construction (India)pvt.Ltd.
16 Towers Tower –G+7(all
tower) Having 2/3/4 BHK 600+ apartments 450 cottahs
Spacers Fly ash bricks Chair
Tie rod sikanja
Prop-jack
Batching Plant Mechanical Pump ETC.
• L –angles• 5-7.5cms height• High grade mortar
In case of column starter casting they maintained the mixing ratio about 1:1.5:3.
After kicker casting of column-2
Reinforcement Placements of
Column
Reinforcement Placements of Column according to design
For beam-2 constriction:3-16mmΦ bar in top 3-20mmΦ bar in bottom2-20mmΦ extra bars in bottom3-16mmΦ extra bars in topFor stirrup 10mmΦ bar
12
Floor beam-2 section
13
concrete mixing in mixture machine
using crane for pulling up the
concrete
Beam casting
During slab casting, using
vibrator & Steel runner.
14
shuttering of Stair
15
Using vibrator during stair casting
Curing of stair by moist jute fabric
Brick work MasonryFinishing
Need to wear helmet all the time Proper fencing is done First aid kit is available along with safety
engineer as well as doctor At height safety belts are also required
Gained basic knowledge in the field of construction.
Learned an importance of proper communication between office and work site.
Learned wise use of available resources. The training has revamped my confidence. Learn about safety requirments at site. I m happy that I choose civil engineering.