Westerra Brochure

Preview:

DESCRIPTION

Urban Planning

Citation preview

We make PEOPLE Places.

“Find what is UNIQUE and AUTHENTIC about the place and build the master plan around it.”Bernard Zyscovich

ABOUT US• NATIONAL AND INTERNATIONAL EXPERTISE• OFFICES IN MIAMI, NEW YORK, ORLANDO• 90+ PROFESSIONALS• INTEGRATED MULTI-DISCIPLINARY PRACTICE

ABOUT OUR WORK• MIXED-USE• RETAIL / COMMERCIAL• ENTERTAINMENT• CIVIC / MUNICIPAL• AIRPORTS• RESIDENTIAL• LEARNING ENVIRONMENTS• PLANNING

PHILOSOPHYCREATE A STORY LINE• SENSE OF THEATER AND PLACE• UNIQUE AND AUTHENTIC CHARACTER• SUSTAINABLE CONCEPTS

BERNARD ZYSCOVICH, FAIAManaging Principal

Bachelor of Architecture / Pratt InstituteSpecial Study in Urban Design / Universita’ Di Architettura / Venice, Italy40+ Years Experience

• 441 Corridor Plan • Hohhut Redevelopment CBD • Miami International Airport (MIA) Airport City• Midtown Miami • Park Square at Doral and Parking Garage• Aventura Waterways• Las Colinas• Gunhillroad Retail

SURIA YAFFAR, ASSOC. AIA, LEED APDirector of Design

Bachelor of Architecture / University of MiamiMaster of Architecture / Princeton University27+ Years Experience

• 500 Block of Collins • Airport City at Miami International Airport • Lincoln Road Cinema• Midtown Miami • Park Square at Doral and Parking Garage• St. Moritz Hotel• Aventura Waterways• Village at Sailboat Bend & Artspace Sailboat Bend Lofts

AHMED ALVAREZ, AIA, LEED APProject Manager

Bachelor of Architecture / University of Miami Architectural Design and DetailingContract Administration30+ Years Experience

• Flamingo South Beach• Grove Garden• Park Square at Doral and Parking Garage• Mirador Residences and Parking Structure• St. Moritz Hotel• Anchors Shops and Parking Garage

ANABELLA VOGELER SMITH, IDDirector of Interior Architecture

Architecture / Universidad Simon Bolivar / Caracas, VenezuelaBachelor of Architectural Technology / Florida International University35+ Years Experience

• Airport City• Bal Harbour Shops• Broward Government Center West Complex • Cobb Theatres, Cinébistro• Lincoln Road Cinema• Mirador Residences and Parking Structure• Midtown Miami• Park Square at Doral and Parking Garage

STEVEN GUTHRIE, LEED AP BD+C, UBCIDirector of Construction Administration

LEED for Building Design & Construction Accredited Professional 32 Years of Experience

• Airport City • Baptist Health South Florida Corporation Headquarters Complex • Midtown Miami • Pirtle Construction Company Office Building and Tenant Build-outs• Jose Marti Park Gymnasium & Community Center• Right Space 2 Meet

THORN GRAFTON, AIA, LEED AP BD+CDirector of Sustainable Initiatives / LEED Coordinator

Bachelor of Architecture / Tulane UniversityMaster of Architecture / Tulane UniversityLEED for Building Design & Construction Accredited ProfessionalFounding member of the US Green Building Council South Florida Chapter 38+ Years Experience

• Airport City• Aventura Waterways • Baptist Health South Florida Corporation Headquarters Complex • Pirtle Construction Office Complex • U.S. Marine Corps Camp Lejeune Fitness Center• Seminole Tribe of Florida Brighton Public Safety & Administration

Complex

EXPERIENCE

WESTERRA / SUNRISE, FLORIDA

1

2

SUNRISE BLVD.

3

PROPOSED HOTEL

METROPICA

CITY HALL MASTER PLAN [EXISTING]

1

2

2

LOCA

L PR

OJE

CTS

PRO

JEC

TS

OFF

ICES

OFFICE COMPLEX AT AIRPORT CITY / MIAMI, FL

PRO

JEC

TS

GOVERNMENT CENTER WEST OFFICE COMPLEX / FT. LAUDERDALE, FL

OFF

ICES

PRO

JEC

TS

BAPTIST HEALTH SOUTH FLORIDA’S CORPORATE ADMINISTRATIVE COMPLEX / MIAMI, FL

OFF

ICES

PRO

JEC

TS

FLL BCAD OFFICES/ FORT LAUDERDALE, FL

OFF

ICES

GAR

AGES

MIRADOR GARAGE / MIAMI, FL

GAR

AGES

FIU PARKING GARAGE / MIAMI, FL

GAR

AGES

FAU PARKING GARAGE /BOCA RATON, FL

RES

IDEN

TIAL

GROVE GARDEN / COCONUT GROVE, FL

FLAMINGO SOUTH BEACH / SOUTH BEACH, FL

RES

IDEN

TIAL

COBB THEATRES, CINÉBISTRO / DORAL, FL

RET

AIL

RET

AIL

BAL HARBOUR SHOPS COLLINS / NORTH MIAMI BEACH

BAL HARBOUR SHOPS / MIAMI, FL

RET

AIL

RET

AIL

BAL HARBOUR SHOPS COLLINS / NORTH MIAMI BEACH

GUNHILLROAD RETAIL / GUNHILL, NY

LINCOLN ROAD CINEMA / MIAMI BEACH

RET

AIL

MIAMI BEACH CONVENTION CENTER DISTRICT REDEVELOPMENT PLAN / MIAMI BEACH

PLAN

NIN

G

MIAMI BEACH CONVENTION CENTER DISTRICT REDEVELOPMENT PLAN / MIAMI BEACH, FL

PLAN

NIN

G

PLAN

NIN

G

AIRPORT CITY / MIAMI, FL

PLAN

NIN

G

SOUTHSIDE BOULEVARD VISIONING STUDY/ JACKSONVILLE, FL

PLAN

NIN

G

441 CORRIDOR PLAN / HOLLYWOOD, FL

HOHHOT RUYI / CHIna

PLAN

NIN

G

SUBURBAN

PARK SQUARE DORAL, FL

SUBURBANM

IXED

USE

SUBURBANM

IXED

USE

PARK SQUARE DORAL/ DORAL, FL

SUBURBANM

IXED

USE

PARKSQUARE DORAL/ DORAL, FL

HYBRIDM

IXED

USE

METROPICA/ SUNRISE, FL

MIX

ED U

SE URBAN

MIDTOWN MIAMI MASTER PLAN / MIAMI, FL After

PRO

JEC

TS

No copies, transmissions, reproductions, or electronic revisions of any portions of these drawings in whole or in part may be made without the express written permission of Zyscovich Architects. All designs indicated in these drawings are the property of Zyscovich Architects.All copyrights reserved ©2014.

ParkSquare Aventura Aventura, Florida January 7, 2014

No copies, transmissions, reproductions, or electronic revisions of any portions of these drawings in whole or inpart be made without the express written permission of Zyscovich Architects. All designs indicated in thesedrawings are property of Zyscovich Architects. All copyrights reserved © 2014.

100 N Biscayne Blvd . 27th FlMiami . FL 33132.2304t 305.372.5222 f 305.577.4521

e info@zyscovich.comw www.zyscovich.com

January 7, 2014

0 80' 160'

SCALE: 1" = 80'

40'

SITE: Roof

Site Plan

URBANM

IXED

USE

WATERWAYS / AVENTURA, FL

PRO

JEC

TS

URBANM

IXED

USE

WATERWAYS / AVENTURA, FL

LEED AND BIM

Galaxy ElEmEntary School / Boynton BEach, Fl USmc FitnESS cEntEr / camp lEjUnE, nc

LEED PLATINUM

BaptiSt hEalth SoUth Florida corporation hEadqUartErS complEx / miami, Fl

LEED CORE & SHELL STRATEGYregister projects before june 2015 under lEEd 2009 (lEEd version 4 will be more challenging)• lEEd for core and Shell allows early marketing of a pre-certified lEEd shell• there are good and bad lEEd strategies for projects• a good lEEd strategy adds more market value than the design

& construction cost premium• register project as a “campus”: common site with individual building certifications

LEED

FAU PARKING GARAGE / BOCA RATON, , FLMIAMI-DADE WOLFSON CAMPUS / MIAMI, FL

BUIL

DING

INFO

RMAT

ION

MOD

ELIN

GBENEFITS• Improved Visualization• Increased Coordination of Construction Documents• Faster Productivity• Data Extraction for Pricing• Speedier Delivery• Reduced Costs

PROJECT SITE

HYBRID URBANSUBURBAN. Horizontal Separated

.Use Oriented

.Common Shared Areas

. Integrated Horizontal + Vertical

.Lifestyle Oriented

.Maximize Value

. Horizontal Separated

. Parcel Oriented

.Centralized

. No Synergetic Value

MIX

ED U

SE

WESTERRA / SUNRISE, FLORIDA

SUNRISE BLVD.

OFFICE

RETAIL

PARKING GARAGE

RESIDENTIAL

ALL PHASES

1

3 2

2

1

4

113

3

SCH

EME

1REARRANGE PHASESPHASE 1

SCH

EME

1REARRANGE PHASES

REARRANGE PHASES

PHASE 2

REARRANGE PHASESPHASE 3

SCH

EME

1

REARRANGE PHASESPHASE 4

SCH

EME

1

SCH

EME

2

CONNECTION TO OFFICECOMPLEX

INTEGRATED DESIGN

WESTERRA / SUNRISE, FLORIDA

SUNRISE BLVD.

EXISTING OFFICE

SCH

EME

2

LOOP ROADINTEGRATED DESIGN

WESTERRA / SUNRISE, FLORIDA

SUNRISE BLVD.

EXISTING OFFICE

SCH

EME

2

LOCAL STREETSINTEGRATED DESIGN

WESTERRA / SUNRISE, FLORIDA

SUNRISE BLVD.

EXISTING OFFICE

SCH

EME

2

ACTIVATING USESINTEGRATED DESIGN

OFFICE 200,000SFPHASE 2

8 STORY

OFFICE 200,000SFPHASE 3

8 STORY

RETAIL7,800SFPHASE 3

RETAIL26,850SFPHASE 2

RETAIL14,600SFPHASE 2

RESIDENTIAL4.0 ACRESPHASE 2

RESIDENTIAL4.0 ACRESPHASE 1

LAKE

RETAIL13,200SFPHASE 2

RETAIL13,200SFPHASE 1

OFFICE 200,000SFPHASE 1

8 STORY

RETAIL16,000SFPHASE 3

PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES

PHASE 1

PARKING DECK PHASE 3

1ST & 2ND: 31,800 SF / 91 SPACES 3RD-6TH : 39,600SF / 113 SPACES

SCH

EME

2

PEDESTRIAN CONNECTIONINTEGRATED DESIGN

OFFICE 200,000SFPHASE 2

8 STORY

OFFICE 200,000SFPHASE 3

8 STORY

RETAIL7,800SFPHASE 3

RETAIL26,850SFPHASE 2

RETAIL14,600SFPHASE 2

RESIDENTIAL4.0 ACRESPHASE 2

RESIDENTIAL4.0 ACRESPHASE 1

LAKE

RETAIL13,200SFPHASE 2

RETAIL13,200SFPHASE 1

OFFICE 200,000SFPHASE 1

8 STORY

RETAIL16,000SFPHASE 3

PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES

PHASE 1

PARKING DECK PHASE 3

1ST & 2ND: 31,800 SF / 91 SPACES 3RD-6TH : 39,600SF / 113 SPACES

SCH

EME

2INTEGRATED DESIGN

RETAIL14,600SFPHASE 2

RESIDENTIAL4.0 ACRESPHASE 1

LAKE

RETAIL13,200SFPHASE 1

OFFICE 200,000SFPHASE 1

8 STORY

PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES

PHASE 1

PHASE 1

SCH

EME

2INTEGRATED DESIGN

OFFICE 200,000SFPHASE 2

8 STORY

RETAIL26,850SFPHASE 2

RETAIL14,600SFPHASE 2

RESIDENTIAL4.0 ACRESPHASE 2

RESIDENTIAL4.0 ACRESPHASE 1

LAKE

RETAIL13,200SFPHASE 2

RETAIL13,200SFPHASE 1

OFFICE 200,000SFPHASE 1

8 STORY

PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES

PHASE 1

PHASE 2

SCH

EME

2INTEGRATED DESIGN

OFFICE 200,000SFPHASE 2

8 STORY

OFFICE 200,000SFPHASE 3

8 STORY

RETAIL7,800SFPHASE 3

RETAIL26,850SFPHASE 2

RETAIL14,600SFPHASE 2

RESIDENTIAL4.0 ACRESPHASE 2

RESIDENTIAL4.0 ACRESPHASE 1

LAKE

RETAIL13,200SFPHASE 2

RETAIL13,200SFPHASE 1

OFFICE 200,000SFPHASE 1

8 STORY

RETAIL16,000SFPHASE 3

PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES

PHASE 1

PARKING DECK PHASE 3

1ST & 2ND: 31,800 SF / 91 SPACES 3RD-6TH : 39,600SF / 113 SPACES

PHASE 3

BREATHE DEEPLY. LAUGH HARD. LOVE LIFE. RECYCLE.

Recommended