Upload
jean-claude-bien-aime
View
215
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Urban Planning
Citation preview
We make PEOPLE Places.
“Find what is UNIQUE and AUTHENTIC about the place and build the master plan around it.”Bernard Zyscovich
ABOUT US• NATIONAL AND INTERNATIONAL EXPERTISE• OFFICES IN MIAMI, NEW YORK, ORLANDO• 90+ PROFESSIONALS• INTEGRATED MULTI-DISCIPLINARY PRACTICE
ABOUT OUR WORK• MIXED-USE• RETAIL / COMMERCIAL• ENTERTAINMENT• CIVIC / MUNICIPAL• AIRPORTS• RESIDENTIAL• LEARNING ENVIRONMENTS• PLANNING
PHILOSOPHYCREATE A STORY LINE• SENSE OF THEATER AND PLACE• UNIQUE AND AUTHENTIC CHARACTER• SUSTAINABLE CONCEPTS
BERNARD ZYSCOVICH, FAIAManaging Principal
Bachelor of Architecture / Pratt InstituteSpecial Study in Urban Design / Universita’ Di Architettura / Venice, Italy40+ Years Experience
• 441 Corridor Plan • Hohhut Redevelopment CBD • Miami International Airport (MIA) Airport City• Midtown Miami • Park Square at Doral and Parking Garage• Aventura Waterways• Las Colinas• Gunhillroad Retail
SURIA YAFFAR, ASSOC. AIA, LEED APDirector of Design
Bachelor of Architecture / University of MiamiMaster of Architecture / Princeton University27+ Years Experience
• 500 Block of Collins • Airport City at Miami International Airport • Lincoln Road Cinema• Midtown Miami • Park Square at Doral and Parking Garage• St. Moritz Hotel• Aventura Waterways• Village at Sailboat Bend & Artspace Sailboat Bend Lofts
AHMED ALVAREZ, AIA, LEED APProject Manager
Bachelor of Architecture / University of Miami Architectural Design and DetailingContract Administration30+ Years Experience
• Flamingo South Beach• Grove Garden• Park Square at Doral and Parking Garage• Mirador Residences and Parking Structure• St. Moritz Hotel• Anchors Shops and Parking Garage
ANABELLA VOGELER SMITH, IDDirector of Interior Architecture
Architecture / Universidad Simon Bolivar / Caracas, VenezuelaBachelor of Architectural Technology / Florida International University35+ Years Experience
• Airport City• Bal Harbour Shops• Broward Government Center West Complex • Cobb Theatres, Cinébistro• Lincoln Road Cinema• Mirador Residences and Parking Structure• Midtown Miami• Park Square at Doral and Parking Garage
STEVEN GUTHRIE, LEED AP BD+C, UBCIDirector of Construction Administration
LEED for Building Design & Construction Accredited Professional 32 Years of Experience
• Airport City • Baptist Health South Florida Corporation Headquarters Complex • Midtown Miami • Pirtle Construction Company Office Building and Tenant Build-outs• Jose Marti Park Gymnasium & Community Center• Right Space 2 Meet
THORN GRAFTON, AIA, LEED AP BD+CDirector of Sustainable Initiatives / LEED Coordinator
Bachelor of Architecture / Tulane UniversityMaster of Architecture / Tulane UniversityLEED for Building Design & Construction Accredited ProfessionalFounding member of the US Green Building Council South Florida Chapter 38+ Years Experience
• Airport City• Aventura Waterways • Baptist Health South Florida Corporation Headquarters Complex • Pirtle Construction Office Complex • U.S. Marine Corps Camp Lejeune Fitness Center• Seminole Tribe of Florida Brighton Public Safety & Administration
Complex
EXPERIENCE
WESTERRA / SUNRISE, FLORIDA
1
2
SUNRISE BLVD.
3
PROPOSED HOTEL
METROPICA
CITY HALL MASTER PLAN [EXISTING]
1
2
2
LOCA
L PR
OJE
CTS
PRO
JEC
TS
OFF
ICES
OFFICE COMPLEX AT AIRPORT CITY / MIAMI, FL
PRO
JEC
TS
GOVERNMENT CENTER WEST OFFICE COMPLEX / FT. LAUDERDALE, FL
OFF
ICES
PRO
JEC
TS
BAPTIST HEALTH SOUTH FLORIDA’S CORPORATE ADMINISTRATIVE COMPLEX / MIAMI, FL
OFF
ICES
PRO
JEC
TS
FLL BCAD OFFICES/ FORT LAUDERDALE, FL
OFF
ICES
GAR
AGES
MIRADOR GARAGE / MIAMI, FL
GAR
AGES
FIU PARKING GARAGE / MIAMI, FL
GAR
AGES
FAU PARKING GARAGE /BOCA RATON, FL
RES
IDEN
TIAL
GROVE GARDEN / COCONUT GROVE, FL
FLAMINGO SOUTH BEACH / SOUTH BEACH, FL
RES
IDEN
TIAL
COBB THEATRES, CINÉBISTRO / DORAL, FL
RET
AIL
RET
AIL
BAL HARBOUR SHOPS COLLINS / NORTH MIAMI BEACH
BAL HARBOUR SHOPS / MIAMI, FL
RET
AIL
RET
AIL
BAL HARBOUR SHOPS COLLINS / NORTH MIAMI BEACH
GUNHILLROAD RETAIL / GUNHILL, NY
LINCOLN ROAD CINEMA / MIAMI BEACH
RET
AIL
MIAMI BEACH CONVENTION CENTER DISTRICT REDEVELOPMENT PLAN / MIAMI BEACH
PLAN
NIN
G
MIAMI BEACH CONVENTION CENTER DISTRICT REDEVELOPMENT PLAN / MIAMI BEACH, FL
PLAN
NIN
G
PLAN
NIN
G
AIRPORT CITY / MIAMI, FL
PLAN
NIN
G
SOUTHSIDE BOULEVARD VISIONING STUDY/ JACKSONVILLE, FL
PLAN
NIN
G
441 CORRIDOR PLAN / HOLLYWOOD, FL
HOHHOT RUYI / CHIna
PLAN
NIN
G
SUBURBAN
PARK SQUARE DORAL, FL
SUBURBANM
IXED
USE
SUBURBANM
IXED
USE
PARK SQUARE DORAL/ DORAL, FL
SUBURBANM
IXED
USE
PARKSQUARE DORAL/ DORAL, FL
HYBRIDM
IXED
USE
METROPICA/ SUNRISE, FL
MIX
ED U
SE URBAN
MIDTOWN MIAMI MASTER PLAN / MIAMI, FL After
PRO
JEC
TS
No copies, transmissions, reproductions, or electronic revisions of any portions of these drawings in whole or in part may be made without the express written permission of Zyscovich Architects. All designs indicated in these drawings are the property of Zyscovich Architects.All copyrights reserved ©2014.
ParkSquare Aventura Aventura, Florida January 7, 2014
No copies, transmissions, reproductions, or electronic revisions of any portions of these drawings in whole or inpart be made without the express written permission of Zyscovich Architects. All designs indicated in thesedrawings are property of Zyscovich Architects. All copyrights reserved © 2014.
100 N Biscayne Blvd . 27th FlMiami . FL 33132.2304t 305.372.5222 f 305.577.4521
e [email protected] www.zyscovich.com
January 7, 2014
0 80' 160'
SCALE: 1" = 80'
40'
SITE: Roof
Site Plan
URBANM
IXED
USE
WATERWAYS / AVENTURA, FL
PRO
JEC
TS
URBANM
IXED
USE
WATERWAYS / AVENTURA, FL
LEED AND BIM
Galaxy ElEmEntary School / Boynton BEach, Fl USmc FitnESS cEntEr / camp lEjUnE, nc
LEED PLATINUM
BaptiSt hEalth SoUth Florida corporation hEadqUartErS complEx / miami, Fl
LEED CORE & SHELL STRATEGYregister projects before june 2015 under lEEd 2009 (lEEd version 4 will be more challenging)• lEEd for core and Shell allows early marketing of a pre-certified lEEd shell• there are good and bad lEEd strategies for projects• a good lEEd strategy adds more market value than the design
& construction cost premium• register project as a “campus”: common site with individual building certifications
LEED
FAU PARKING GARAGE / BOCA RATON, , FLMIAMI-DADE WOLFSON CAMPUS / MIAMI, FL
BUIL
DING
INFO
RMAT
ION
MOD
ELIN
GBENEFITS• Improved Visualization• Increased Coordination of Construction Documents• Faster Productivity• Data Extraction for Pricing• Speedier Delivery• Reduced Costs
PROJECT SITE
HYBRID URBANSUBURBAN. Horizontal Separated
.Use Oriented
.Common Shared Areas
. Integrated Horizontal + Vertical
.Lifestyle Oriented
.Maximize Value
. Horizontal Separated
. Parcel Oriented
.Centralized
. No Synergetic Value
MIX
ED U
SE
WESTERRA / SUNRISE, FLORIDA
SUNRISE BLVD.
OFFICE
RETAIL
PARKING GARAGE
RESIDENTIAL
ALL PHASES
1
3 2
2
1
4
113
3
SCH
EME
1REARRANGE PHASESPHASE 1
SCH
EME
1REARRANGE PHASES
REARRANGE PHASES
PHASE 2
REARRANGE PHASESPHASE 3
SCH
EME
1
REARRANGE PHASESPHASE 4
SCH
EME
1
SCH
EME
2
CONNECTION TO OFFICECOMPLEX
INTEGRATED DESIGN
WESTERRA / SUNRISE, FLORIDA
SUNRISE BLVD.
EXISTING OFFICE
SCH
EME
2
LOOP ROADINTEGRATED DESIGN
WESTERRA / SUNRISE, FLORIDA
SUNRISE BLVD.
EXISTING OFFICE
SCH
EME
2
LOCAL STREETSINTEGRATED DESIGN
WESTERRA / SUNRISE, FLORIDA
SUNRISE BLVD.
EXISTING OFFICE
SCH
EME
2
ACTIVATING USESINTEGRATED DESIGN
OFFICE 200,000SFPHASE 2
8 STORY
OFFICE 200,000SFPHASE 3
8 STORY
RETAIL7,800SFPHASE 3
RETAIL26,850SFPHASE 2
RETAIL14,600SFPHASE 2
RESIDENTIAL4.0 ACRESPHASE 2
RESIDENTIAL4.0 ACRESPHASE 1
LAKE
RETAIL13,200SFPHASE 2
RETAIL13,200SFPHASE 1
OFFICE 200,000SFPHASE 1
8 STORY
RETAIL16,000SFPHASE 3
PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES
PHASE 1
PARKING DECK PHASE 3
1ST & 2ND: 31,800 SF / 91 SPACES 3RD-6TH : 39,600SF / 113 SPACES
SCH
EME
2
PEDESTRIAN CONNECTIONINTEGRATED DESIGN
OFFICE 200,000SFPHASE 2
8 STORY
OFFICE 200,000SFPHASE 3
8 STORY
RETAIL7,800SFPHASE 3
RETAIL26,850SFPHASE 2
RETAIL14,600SFPHASE 2
RESIDENTIAL4.0 ACRESPHASE 2
RESIDENTIAL4.0 ACRESPHASE 1
LAKE
RETAIL13,200SFPHASE 2
RETAIL13,200SFPHASE 1
OFFICE 200,000SFPHASE 1
8 STORY
RETAIL16,000SFPHASE 3
PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES
PHASE 1
PARKING DECK PHASE 3
1ST & 2ND: 31,800 SF / 91 SPACES 3RD-6TH : 39,600SF / 113 SPACES
SCH
EME
2INTEGRATED DESIGN
RETAIL14,600SFPHASE 2
RESIDENTIAL4.0 ACRESPHASE 1
LAKE
RETAIL13,200SFPHASE 1
OFFICE 200,000SFPHASE 1
8 STORY
PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES
PHASE 1
PHASE 1
SCH
EME
2INTEGRATED DESIGN
OFFICE 200,000SFPHASE 2
8 STORY
RETAIL26,850SFPHASE 2
RETAIL14,600SFPHASE 2
RESIDENTIAL4.0 ACRESPHASE 2
RESIDENTIAL4.0 ACRESPHASE 1
LAKE
RETAIL13,200SFPHASE 2
RETAIL13,200SFPHASE 1
OFFICE 200,000SFPHASE 1
8 STORY
PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES
PHASE 1
PHASE 2
SCH
EME
2INTEGRATED DESIGN
OFFICE 200,000SFPHASE 2
8 STORY
OFFICE 200,000SFPHASE 3
8 STORY
RETAIL7,800SFPHASE 3
RETAIL26,850SFPHASE 2
RETAIL14,600SFPHASE 2
RESIDENTIAL4.0 ACRESPHASE 2
RESIDENTIAL4.0 ACRESPHASE 1
LAKE
RETAIL13,200SFPHASE 2
RETAIL13,200SFPHASE 1
OFFICE 200,000SFPHASE 1
8 STORY
RETAIL16,000SFPHASE 3
PARKING DECK 1ST & 2ND: 84,000 SF / 240 SPACES 3RD-6TH : 125,000SF / 357 SPACES
PHASE 1
PARKING DECK PHASE 3
1ST & 2ND: 31,800 SF / 91 SPACES 3RD-6TH : 39,600SF / 113 SPACES
PHASE 3
BREATHE DEEPLY. LAUGH HARD. LOVE LIFE. RECYCLE.