WAY TO GST SAP SYSTEM UPGRADE
ENTUNE IT CONSULTING PVT LTD
SMK GANESH
PRACTICE HEAD
SESSION – 4
DATE – 28TH FEB, 2017
Content
Typical Technical Landscape Detail
System Pre-requisite - GST
Release Notes for GST
PAM and Possible Technical Upgrade Options
Upgrade Process
Project Timelines
Q & A
System Pre-requisite - GST
Pre-requisite – SAP ECC
• ECC 6.0 Base line & above
• TAXINN Procedure
• Customer to have active AMC with SAP
SAP_APPL_RELSupport Pack
SAP ERP 6.0 (600) SP26EHP2 FOR SAP ERP 6.0 (602) SP16EHP3 FOR SAP ERP 6.0 (603) SP15EHP4 FOR SAP ERP 6.0 (604) SP16EHP5 FOR SAP ERP 6.0 (605) SP13EHP6 FOR SAP ERP 6.0 (606) SP14EHP6 FOR SAP ERP 6.0 FOR HANA (616-SAP HANA) SP08EHP7 FOR SAP ERP 6.0 (617) SP07
To view O/S, Unicode and DB
To view ECC Version
Minimum Requirement for GST for EHP4 (604)
To view Kernel version
Release Notes for GST
SAP Notes for GSTSl. No
Module Information
1 Master Data Changes to Master data-Vendor master screen changes
2 Master Data Changes to Master data-DDIC Activities
3 Master Data Error VT510 Select a document field for XXXX occurs
4 Master Data Changes to Transaction data- Data Dictionary activities
5 Master Data GST Vendor classification issue in FV11
6 MMBAdI definition for screen enhancement in Enjoy transactions of FI and MM
7 MM BAdI implementation in Enjoy transactions of FI and MM
8 MM Changes to MIRO Invoice item level screen
9 SDSales related changes for India GST for sales order creation and Invoice posting
10 SD Line item wise tax calculation for sales invoices
11 SD Utilities
Released for SANDBOX Application Only
Typical Technical Landscape Details
Business Requirement
ECC
BWUpgradeScope
• EHP • Dev, QA and PRD - ECC 6.0, EHP 0
OS and DB• O/S - MS 2012 • DB - MS SQL 2012 / DB2 (10.1)
Others
• BW• Dev, QA and PRD –7.0• O/S - MS - 2003• DB - MS SQL – 2005 / DB2 10.1
Solution Manager• Dev, QA and PRD EHP 7 • O/S - MS - 2003• DB - MS SQL /DB2 10.1
EP• Upgrade - EHP 7 , SP 15 • O/S (MS 2012) and DB (MS SQL 2012)
Possible Technical Upgrade options
Technical Upgrade Options
Support Pack
Upgrade
EHP Upgrade
OS Migration
DB Upgrade
Upgrade SP with-in EHP
Ex : EHP 0 SP 0 to 26
Perform EHP with latest -1
Ex : EHP 0 to EHP 8 with SP 4
Upgradation / migration of OSEx: Option 1 - Change MS versionOption 2 - Move MS to Linex
Upgradation / migration of DBEx: Option 1 - Upgrade from MS 2003 to 2015Option 2 - Migrate from DB2 to HANA
KernelUpgrade
Kernel Upgrade
Ex : Upgrade from 721 to 745 (Patch 400)
Unicode
Unicode : “N” to “Y” conversion
Proposed Technical snapshot
Product Availability Matrix - http://support.sap.com/pam (Central access point for all SAP software product versions)
PAM (Contd..)
PAM (Contd..)
PAM (Contd..)
PAM (Contd..)
ECC
SP Upgrade -26
Current snapshot Option 1 Option 2
ECC 6EHP 0
O/SMS 2012 No Change
DBMS SQL 2012
/ DB2 10.1
MS SQL – No Change
As-Is
Proposed
EEHP Upgrade -
8SP - 4
No Change
DB2 -Upgrade -
10.5
MS SQL – No Change
DB2 -Upgrade -
10.5
Kernel722 No Change Kernel 745
BW
No Change
Current snapshot Option 1 Option 2
NW 7.0
O/SMS 2003
O/S Migration 2012
DBMS SQL 2003
/ DB2 10.1
MS SQL upgrade
2015
As-Is
Proposed
EHP NW 7.5
DB2 -Upgrade -
10.5
DB2 -Upgrade -
10.5
O/S Migration 2012
MS SQL upgrade
2015
No ChangeKernel 722 Kernel 745
Solution Manager
Upgrade 7.4
Current snapshot Option 1 Option 2
Solution Manager 7
O/SMS 2012 No Change
DBMS SQL 2003
/ DB2 10.1
MS SQL upgrade
2015
As-Is
Proposed
Upgrade 7.4
DB2 -Upgrade -
10.5
DB2 -Upgrade -
10.5
No Change
MS SQL upgrade
2015
No ChangeKernel 722 Kernel 745
EP Portal
Upgrade 7.4
Current snapshot Option 1 Option 2
EP – EHP 7
O/SMS 2012
No Change
DBMS SQL 2012
As-Is
Proposed
Upgrade 7.4
No Change
No Change No Change
Upgrade Process
Upgrade Process – Software Update Manager
Pre-requisite• Ensure the adequate Free space available• Required media files downloaded and kept in the target system
Select & Confirm Target
• Commence the process with simadm user id• Select the Stack configuration directory• Select the target system• Following steps will be executed
o Initializationo Extractiono Configuration checkso Preprocessing (TP req lock)o Commence user down timeo Executiono Completion of user down timeo Post processing and Finalization.
Execute Process
Post upgrade activities
Configuration - Modification Adjustment - SPDD and SPAU
Data Dictionary
Adjustment(SPDD)
• Domains, Data elements, Tables, Structures, Transparent , pooled and Cluster tables, indexes of transparent tables
• Display Data dictionary compliance (Green, Yellow & Red)• Correction to be performed , to be updated through TR.
Repository Objects
Adjustment(SPAU)
• Standard Program, functional modules, notes applied etc.,•Display object compliance (Green, Yellow & Red)•Correction to be performed , to be updated through TR.
Upgrade Process – Sand Box DEV QAPRD
SANDBOXPreparation
• In Solution Manager, thru’ Tcode - MOPZ , download required XML stacks
• Build Sand Box (ECC, EP and BW)• Perform DB Upgrade through Export / Import process
SANDBOXBuild andValidate
• Upgrade Preparation (SUM (Software Update Manager) Tool)• Perform Upgrade process• Perform T-code SPDD ( Adjust ABAP dictionary objects) and
T-code - SPAU (Adjustment of repository objects enabled thru’ OSS)
• Perform User Acceptance Testing
Dev &QABuild andValidate
PRDBuild and
PGLS
Typical Project Timelines
Proposed Time line - SP Upgrade
1
2
3
4
Preparation of Sand Box – (ECC)
2 Days
Sand Box Upgrade and validate
ECC (1 Week)
Dev and QA Upgrade
ECC(2 Days)
PRD Upgrade
ECC(2 Days)
Total – 2 Weeks
Proposed Time line - EHP and DB Upgrade
1
2
3
4
Preparation of Sand Box
ECC & BW1 Week
Sand Box Upgrade and validate
ECC & BW (3 Week)
Dev and QA Upgrade
ECC & BW)(2 Weeks)
PRD Upgrade
ECC & BW(2 Weeks)
Total – 8 Weeks
Q & A
CO
NTA
CT
US
Phone: +91- 9880124252
Email: smk.ganesh@entune.co
Website: www.entune.co
AD
DR
ESS
#14, 3rd Floor, Balaji Complex
AVS Compound, 4th Block
Koramangala 80’ Feet Road
Bangalore – 560 034
THANK YOU
Your Partner for Success…
Recommended