VDOT VDOT eConstruction · On Time & On Budget. Business Process Reengineering. Complexity...

Preview:

Citation preview

VDOTeConstruction

VDOT eConstruction

I a n M i l l i k a n

A s s i s t a n t S t a t e C o n s t r u c t i o n E n g i n e e r

1

H o w d i d w e g e t h e re a n d w h e re a re w e g o i n g n ex t ?

FR

V i r g i n i a D e p a r t m e n t o f Tr a n s p o r t a t i o n

Add a footer

VDOT

• 9 Districts + Central Office• 7,500 Employees• Maintain 128,500 lane miles of

pavement:• Interstate: 5,500 lane miles• Primary: 22,000 lane miles• Secondary: 100,300 lane miles• Frontage: 650 lane miles

2

FR

V i r g i n i a D e p a r t m e n t o f Tr a n s p o r t a t i o n

Add a footer

VDOT

• $5.4 Billion annual operating budget• $1.7 Billion Construction• $2.2 Billion Maintenance• $471 Million – Regional Projects• $960 Million – Admin/Other

• MegaProjects• HRBT - $3.8 Billion• I-66 OTB - $1.89 Billion

• 300 +/- Construction projects per season

3

FR

M a i n e C o n s t r u c t i o n S t a k e h o l d e r s

Add a footer

VDOT

4

40%Avg. In-House

401In-House Construction Personnel

60%Avg. Consultants

+/- 600Avg. Consultants

+/-1,000*Owner Representatives*Not Including Contractors

TABLET BASED INSPECTION

• PlanGrid for advanced PDF tools• Headlight Pilot for Field Data

Capture

JOBSITE TECH & FURTHER RESEARCH• Headlight Data Usage• RFID• Team Member• eTicketing• Augmented Reality• 3D Printing• Further Research & Development

UNMANNED AERIAL SYSTEMS• Progress Photos• Plan Verification

• As-Builts

DOCUMENT MANAGEMENT

SYSTEMS• Submittal processes• Workflow mapping• Project Document Management

DIGITAL STRATEGY• Project Analytics and Dashboarding

• Evaluation of Current Systems• Business Process Re-development

• Seamless Integration

3D/4D MODELING• 3D engineered model linked to

project schedule (4D)• Automated Machine Guidance

(AMG)

5

eConstruction

FR

Add a footer

Key Priorities

On Time & On Budget

Business Process Reengineering

Complexity Reduction

Change Management

Strengthen Core Competencies

Digital Transformation

User Focus Reduce Fragmentation

Data Driven Decision Making

Eliminate Paper Processes

6

FR

Business Process Reengineering

7

Identifying and Prioritizing Business Needs

FR

Add a footer

Priority Business Needs

Digital Plans & Documents Punchlist Tools Progress Photos Field Collaboration

Field Data Capture ‘Single Source of Truth’ Data Integration Field Reporting

Uniform Document Management

System

Submittal Workflow Process

Cradle to Grave Solution

Process Integrations

8

FR

Add a footer

VDOT eConstruction’s Tiered Approach

ProjectWiseCentralized data and

document management system

PlanGrid PDF and collaboration tool for inspectors

AWP* Contract Management

Provide the right tools for the right ROLE

Headlight Field data collection tool

9

FR

Digital Transformation

10

A Guide to Piloting Solutions

FR

Add a footer

Digital Implementation Strategy

Pilot Potential Solution

Collect Quantitative

and Qualitative Data Through

Surveys

Calculate a Benefit Cost

AnalysisRollout Strategy

11

FR

Add a footer

Pilot Program Strategy

12

Field Test User Applications• Assess program strengths and limitations• Collect User Feedback• Identify additional areas for use

Develop Best Practices• Help set standards for larger scale use• Establish internal experts/power users

Assess Value• Formal return-on-investment analysis• Usability Assessment

FR

Add a footer

Digital Transformation TimelineiPads in Field

PlanGrid

Headlight

DMS/Submittal Workflow

Seamless Integrations

13

FR

Add a footer

Seamless Integrations

14

ProjectWise Explorer/ ProjectWise Deliverables Management

Digital Plans & DocumentsPunchlistProgress Photos

SiteManager – Contract Management/ Payment

PlanGrid HeadLightDigital Plans & DocumentsPunchlistProgress PhotosAs-Builts

Field Data Capture• Materials Testing• Daily Reports

Dashboarding/Analytics

FR

PlanGrid Pilot Program

15

FR

Add a footer

Background

16

• Grassroots effort started in field• Fredericksburg District • Consultant community

• Formalized Pilot in 2018• Start September 2018

• Research Funding, VTRC• Moving toward Statewide

Implementation in 2020

FR

Add a footer

Snapshot of the Pilot Program

17

75 Pilot Program Participants

70Projects• Design Build• I-66 OTB Mega-Project• Emergency, on-call,

schedule

8 Districts Participating

FR

Add a footer

Business Needs - Tested

Digital Plans & Documents

Mark Ups

Progress Photos Tied to Plans

Real-Time Field Collaboration

PunchList

Field Reporting

18

FR

Add a footer

Digital Documents

19

FR

Add a footer

Digital Plans

20

FR

Add a footer

Mark Ups

21

FR

Add a footer

Mark Ups

22

Arrow Tool

Text Tool

FR

Add a footer

Mark Ups

23

Highlight Tool

Measurement Tool

FR

Add a footer

Photos tied to plans

24

Photo Tool

FR

Add a footer

Photos tied to plans

25

FR

Add a footer

Photos tied to plans

26

FR

Add a footer

Punchlist

27

Task Tool

FR

Add a footer

Punchlist

28

FR

Add a footer

Real Time Field Collaboration

29

FR

Add a footer

Real Time Field Collaboration

30

PDF Package generated by PlanGrid. Email sent directly from PlanGrid

FR

Add a footer

Pilot Program Results

31

94%Users say PlanGrid makes them more efficient

87%Users view plans more frequently because of PlanGrid

FR

Add a footer

Pilot Program Results

32

3.5Total hours/week saved

2.6Additional hours/week spent on jobsite

User survey – Estimated time per week saved by PlanGrid

16 Additional photos per week

FR

Add a footer

Business Needs - Satisfied

Digital Plans & Documents

Mark Ups

Progress Photos Tied to Plans

Real-Time Field Collaboration

PunchList

Field Reporting

33

FR

HeadLight

34

Real-Time Field Data Capture Tool

FR

Add a footer

Snapshot of the Pilot Program

35

45 Users

9Projects

8 Districts

FR

Add a footer

Business Needs

36

Input field observations (weather, work activities, etc.)

Identify labor, equipment, and materials

Complete materials test reports

Develop daily diaries

Generate list of pay items completed

Programmatic level reporting

FR

Add a footer

Input Field Observations

37

FR

Add a footer

Identify Labor and Equipment

38

FR

Add a footer

Complete Materials Test Reports

39

FR

Add a footer

Develop Daily Dairies

40

FR

Add a footer

Completed Pay Items List

41

FRSurvey Highlights

42

Field Users

4.4 hoursAverage time saves per week on data entry

5.4 hours Average added time per week in field

21.4Average # of additional pictures

Office Users

13Average # additional observations

All Users

81%HeadLight Reports submitted within 24 hours

FR

ProjectWise

44

Document Management System (DMS) / Submittal Workflow

FR

Add a footer

Main Goals

Replace file cabinet

One stop shop for project documents

Improve collaboration

across Divisions

Improve review quality

Improve review time

Asset management

45

FR

Add a footer

Seamless Integrations

46

ProjectWise Explorer/ ProjectWise Deliverables Management

Digital Plans & DocumentsPunchlistProgress Photos

SiteManager – Contract Management/ Payment

PlanGrid HeadLightDigital Plans & DocumentsPunchlistProgress PhotosAs-Builts

Field Data Capture• Materials Testing• Daily Reports

Dashboarding/Analytics

FR

3D & 4D Engineered Models

47

FR

Add a footer

Main Goals

Baseline Schedule Accuracy

Constructability Reviews

Reduce Change Orders Claims Defense

48

FR

Add a footer

4D

49

FRUnmanned Aerial Systemsin Construction

50

FR

Add a footer

Main Goals

Monitoring Construction Progress

Estimating Sediment Runoff

As-Built Documentation

51

FRFABRIKAM RESIDENCES

Questions

52

eConstruction@vdot.virginia.gov

Ian Millikan

804-786-2045

Ian.Millikan@vdot.virginia.gov

Recommended