The Pfafstetter Coding System in Hydrological modeling TANG, Qiuhong

Preview:

Citation preview

The Pfafstetter Coding System in Hydrological modeling

TANG, Qiuhong

Outline

• Introduction and concept

• Methodology

• Application

Introduction and concept

• The river basin has seen as a fundamental landscape unit for water resources assessment and management.

• A natural system for delineation and codification of basins is presented.

• The system is based on topographic control and the topology of the river network. The DEM (digital elevation model) maps and GIS technique are used to reach the target automatically.

Our target

• DEM -> River basins (with relationships)

DEM River basins

Methodology (1)• From the watershed outlet, trace upstream along the main stem of

the river, and get the tributaries. • Identify the 4 greatest tributaries.

Flow accumulation file2

46

8

Sub-basins:2,4,6,8

Methodology (2)

• Inter-basins are the watersheds that contribute flow to the main stem.

2

46

8

Inter-basins:1,3,5,7,9

1

5

3

7

9

Methodology (3)• The assigned codes are then appended on to the end of the

Pfafstetter code of the next lowest level.

2123

22

25

24

26

28

2729

1113

12

15

16

18

17

19 14

2

46

8

Inter-basins:1,3,5,7,9

1

5

3

7

9

Sub-basin

Id:2

Inter-basin

Id:1

Methodology (4)

• Watershed relationships

• If we have the Pfafstetter code of the river basin, we can determine the downstream or upstream watershed easily.

1

2

3

45

67

8

9

For odd idflow to id-2

For even idFlow to id-1

Outlet (0)

Application

• Hydro1k data (the Yellow River Basin)

Dem (1k) Yellow River Pfafstetter Coding (Level 1)

F< Double-click to enter text >

Legend

1

2

3

4

5

6

7

8

90 42,000 84,000 126,000 168,00021,000

Unknown Units

Code (level 1)

Application

• Level 2 and 3

Yellow River Pfafstetter Coding (Level 2)

F< Double-click to enter text >

Legend11

12

13

14

15

16

17

18

19

21

22

23

24

25

26

27

28

29

31

32

33

34

35

36

37

38

39

41

42

43

44

45

46

47

48

49

51

52

53

54

55

56

57

58

59

61

62

63

64

65

66

67

68

69

71

72

73

74

75

76

77

78

79

81

82

83

84

85

86

87

88

89

91

92

93

94

95

96

97

98

99

0 42,000 84,000 126,000 168,00021,000Unknown Units

Code (level 2)Yellow River Pfafstetter Coding (Level 3)

F< Double-click to enter text >

Legend

wshed3

High : 999

Low : 111

0 42,000 84,000 126,000 168,00021,000Unknown Units

Code (level 3)

Application• The methodology is not limited in one river basin. It can also be

used in continental scale.

http://edcdaac.usgs.gov/gtopo30/hydro/nasub_img.asp

Further study

• Use DEM data, we can generate the river basins and describe the relationship between them.

• We can generate the TRIP automatically and easily. Now, global 3 arc second (90 meter) DEM data are available.

• The coding system will be used in runoff accumulation processes in my research.

Thank you for your attention.Thank you for your attention.

Recommended