View
228
Download
1
Category
Preview:
Citation preview
02/05/2014
1
Tamaulipas Energy Power
GUIDING AXLE
TAMAULIPAS STATE DEVELOPMENT PLAN 2011-2016
THESAFETY
TAMAULIPAS
THEHUMAN
TAMAULIPAS
THE SUTENTABLETAMAULIPAS
PLANNED DEVELOPMENT OF CITIES
QUALITY PUBLICSERVICES
SUSTAINABLE WATER MANAGEMENT
ENVIRONMENTAL Y SUSTAINABLE DEVELOPMENT
THECOMPETITIVETAMAULIPAS
02/05/2014
2
Objective:
Modernize patterns of energy use withlow‐impact schemes and clean energygeneration for productive, industrialand domestic sectors.
Sustainable Tamaulipas
Strategy:
Promote alternative production energysources, effective and sustainable,economic, social and environmentally
Energetic Potential
4TH PLACE IN ASSOCIATED GAS
PRODUCTION 74.51 MILLIONS CUBIC FEET
PER DAY
4TH PLACE IN ASSOCIATED GAS
PRODUCTION 74.51 MILLIONS CUBIC FEET
PER DAYSABINAS SHALE GAS
BASIN IN NUEVO LAREDO & TAMPICO-
MISANTLA, EXPLORATION WORKS
SABINAS SHALE GAS BASIN IN NUEVO
LAREDO & TAMPICO-MISANTLA,
EXPLORATION WORKS
REFINING117,500 BARIELS
PER DAY 10.1% NATIONAL
REFINING117,500 BARIELS
PER DAY 10.1% NATIONAL
1ST NATIONAL PLACENON
ASSOCIATE GAS (37.28
%)
1ST NATIONAL PLACENON
ASSOCIATE GAS (37.28
%)
COAST DEEP WATER POTENTIAL:
10 BILLIONS BARIELS
COAST DEEP WATER POTENTIAL:
10 BILLIONS BARIELS
PEMEXPEMEX
2ND PLACE IN NATIONAL PRODUCTION ENERGY
32,958,569 MW/HR,12.65% NATIONAL
PRODUCTION ENERGY
2ND PLACE IN NATIONAL PRODUCTION ENERGY
32,958,569 MW/HR,12.65% NATIONAL
PRODUCTION ENERGY
CFECFE
SOLAR RADIATION 4.8 kWH/m2
TAMAULIPAS ETHANOL NORTH PLANT POTENTIAL:
200 MILLION LTS PER YEAR
ENERGY PRODUCTION FROM URBAN WASTES
59.1 MILLIONS KWH PER YEAR
ENERGY PRODUCTION FROM URBAN WASTES
59.1 MILLIONS KWH PER YEAR
27 PROJECTS IN DEVELOPMENT
CAPACITY2,706.20 MW
EOLIC GENERATION POTENTIAL: 21 GW
CONVENTIONALCONVENTIONAL
02/05/2014
3
Strategic Location
Guadalajara
Aguascalientes
TolucaLázaro Cárdenas
Mazatlán
Saltillo
Durango
Monterrey
300 km
900 km
600 km
U.S.ATEXAS
Puebla
Silao
SLP
Roads13,803 km / 8,577 miles
Railroads936.7 km / 582 miles
InternationalAirports5
Water Ports2
International Crossing Borders17
1 (project)
Strategic Bonded Areas22 (project)
INFRASTRUCTURE
02/05/2014
4
FALCÓN
3.3 mmbtu/dí
a
Burgos Basin• Pipelines 1,363 km (848 miles).
• Oil Duct & Polyduct 481 km (299 miles).
• Processing Plants.• 4 Cryogenic Plants
InfrastructureNatural Gas & Oil
Refinery
Storage and Distrubution Terminal
Collection Station
Pumping Station
Marine Terminal
Coast
• Instalaciones
FALCON
RÍO BRAVO I,II,III, IV y V
ALTAMIRAI,II,III, IV y V
• 11 Energy Plants.
• 12.65 % Nacional Production (2012)
• Actual Generation (Capacity): 5,776 MW
Central Station. Power Lines.
InfrastructureWind Power
02/05/2014
5
ENERGETIC
POTENTIAL
Fuente: Secretaría de Energía , SENER.
Wind Power Map
Source: Instituto de Investigaciones Eléctricas, IIEEstadística Nacional anual de velocidad del viento a 80 m de altura
Tamaulipas estimated potential: 21 GW
Wind Power @ 80m (262.5 ft)
TULA
ALDAMA
CASAS
SAN FERNANDO
SOTO LA MARINA
LLERA
REYNOSA
GONZALEZ
MATAMOROS
MENDEZ
JAUMAVE
HIDALGO
SAN CARLOS
BURGOS
GUERRERO
JIMENEZ
ABASOLO
OCAMPO
CRUILLAS
MIER
EL MANTE
ALTAMIRA
VICTORIA
PADILLA
GÜEMEZ
VILLAGRAN
BUSTAMANTE
CAMARGO
NUEVO LAREDO
MIQUIHUANA
XICOTENCATL
MAINERO
RIO BRAVO
VALLE HERMOSO
PALMILLAS
MIGUEL ALEMAN
SAN NICOLAS
GOMEZ FARIAS
ANTIGUO MORELOS
GUSTAVO DIAZ ORDAZ
NUEVO MORELOS
TAMPICOCIUDAD MADERO
02/05/2014
6
Solar Potential Map
Source: Instituto de Investigaciones Eléctricas, IIEEstadística Nacional anual de irradiación solar
Oil Potential Map
The exploration and exploitation of the project“Cinturón Pegado Perdido" in deep waters offTamaulipas coasts represent significant provenoil reserves of the country. According to theNational Hydrocarbons Commission, the drillingof 47 exploratory wells is expected.
State Surface: 80,249 km2 (49,875 sq mi)
Oil Potential: 59%
02/05/2014
7
PROJECTS IN
DEVELOPMENT
Wind Power Projects in DevelopmentNo. Empresa Capacidad (MW)
1 Parque Eólico de Fenicias, S.A. de C.V. 137.5
2 Energías Limpias de Ixtaltepec S. de R.L. de C.V. 140.25
3 ENERGEO - Los Molinos S.A.P.I. de C.V. 140.25
4 Parque Eólico Intavan México Reynosa I, S.A. de C.V. 60
5 Parque Eólico Intavan México Reynosa II, S.A. de C.V. 60
6 Parque Eólico Intavan México Reynosa III, S.A. de C.V. 57
7 Parque Eólico Intavan México Reynosa IV, S.A. de C.V. 57
8 Parque Eólico Intavan México Reynosa V, S.A. de C.V. 87.75
9 Energía Renovable del Itsmo II, S.A. de C.V. 137.5
10 Frontera Renovable S. de R.L. de C.V. 275
11 DELARO S. de R. L. de C.V. 96.25
12 Compañía Eoloeléctrica de Matamoros S.A. de C.V. 68.75
13 Compañía Eólica Río Bravo, S.A. de C.V. 66
14 Compañía Eólica de Reynosa, S.A. de C.V. 66
15 Compañía Eólica el Palmar, S.A. de C.V. 60
16 Compañía Eólica el Cielo, S.A. de C.V. 60
17 Compañía Eólica Casas, S.A. de C.V. 97.25
18 Compañía Eólica de Tamaulipas, S.A. de C.V. 54
19 Compañía Eólica de Ciudad Victoria, S.A. de C.V. 50
20 Compañía Eólica La Mesa, S.A. de C.V. 28
21 Compañía Eólica, San Andrés, S.A. de C.V. 26
22 Compañía Eólica Vicente Guerrero, S.A. de C.V. 60
23 Compañía Eólica Praxedis, S.A. de C.V. 58
24 Compañía Eólica Tres Mesas, S. de R.L. de C.V. 62.7
25 Grupo Soluciones en Energías Renovables Soe de Mexico 161
26 Compañía Eoloeléctrica de Matamoros, S.A. de C.V. 200
27 Compañía Eólica de Tamaulipas, S.A. de C.V. 340
TOTAL 2,706.20 MW
27 PROJECTS
CAPACITY 2,706.20 MW
02/05/2014
8
Nombre Descripción
Biofuels Production (Tamaulipas North Ethanol Plant) Tamaulipas is the largest sorghum producer in
Mexico, which consideres a potential production of 200 million liters per year (53 million galons per year).
Urban Solid Waste (USW), EnergySource
In the Zona Conurbada Sur 693 tons of USW, for which CFE has a draft plant with an incineration capacity of 209.255 metric tonnes of USW/year to generate 59.1million kWh per year.
Energy Production Projects
DATASHEET
CAPACITYFIRST STAGE
SECOND STAGE
THIRD STAGE
TOTAL
GENERATION 54 MW 40 MW 32 MW 126
TURBINES 30 20 13 63
EQUIPMENT MARCA VESTAS MODELO V ‐100 1.8 MW
SURFACE 900 HA
LOCATION EJIDO EL PORVENIR, MUNICIPIO DE REYNOSA
COMPANY COMPAÑÍA EÓLICA DE TAMAULIPAS S.A DE C.V.
CONSUMER PARTNER FIRST STAGE GRUPO SORIANA
INVERSIÓN 1ª ETAPA 126 MILLION USD
TOTAL ESTIMATED INVESTMENT 264.6 MILLION USD
FIRST STAGE FINANCING INSTITUTIONS NADBank & BANORTE
Wind Power Plant “El Porvenir”
02/05/2014
9
Wind Power Demostrative Project
Tamaulipas has an estimated wind powerpotential of 21,000 MW.
Areas with abundant oil resources coincidewith the feasible areas of renewable energydevelopment which represents anopportunity for energy synergy.
CHALLENGES & OPPORTUNITIES
02/05/2014
10
Tamaulipas is called to be a Pilot State todemonstrate the harmonious developmentbetween oil resources and renewable energyto become the engine that moves to México.
CHALLENGES & OPPORTUNITIES
SUSTAINABLE TAMAULIPAS
Recommended