Preliminary Plans Presentation
TAKOMA PARK MIDDLE SCHOOLADDITION
Prepared forMontgomery County Board of Education
January 2018
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Takoma Park Middle School Addition7611 Piney Branch RoadSilver Spring, MD 20910
Montgomery County Board of Education
Mr. Michael A. Durso PresidentMrs. Shebra L.Evans Vice PresidentMs. Jeanette E. Dixon MemberDr. Judith Docca MemberMrs. Patricia O’Neill MemberMs. Jill Ortman-Fouse MemberMrs. Rebecca Smondrowski MemberMr. Matthew Post Student Member
Montgomery County Schools Administration
Dr. Jack R. Smith Superintendent of SchoolsMr. James C Song Director, Department of Facilities ManagementMr. Seth Adams Director, Division of ConstructionMr. Michael Shpur Architect, Division of ConstructionMr. Gary Mosesman Team Leader, Division of ConstructionMr. Rob Badstibner Project Manager, Division of ConstructionMs. Julie Morris Facility Planner, Division of Capital Planning
Preliminary Plans Presentation
1
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
InvolvementThe Preliminary Plans for the Takoma Park Middle School addition project were developed based on the educational specifi cations prepared by Montgomery County Public Schools (MCPS). Through a series of public work sessions, several design alternatives were developed and evaluated. The proposed plans presented herein were the result of reviews and subsequent modifi cations in accordance with recommendations and suggestions received during these work sessions.
Participants in Facility Advisory Process
Mr. Brian Baker Staff Takoma Park Middle SchoolMr. Aaron Barnett Assistant Principal Takoma Park Middle SchoolMr. Dale Barnhard Neighbor Takoma Park Middle SchoolMs. Mary Beth Best Staff Takoma Park Middle SchoolMs. Alicia Deeny Principal Takoma Park Middle SchoolMs. Rebecca Epling Staff Takoma Park Middle SchoolMs. Debra Feldman Staff Takoma Park Middle SchoolMs. Rosalind Grigsby Community Development Manager City of Takoma ParkMs. Alicia Grimes Parent Takoma Park Middle School Ms. Diana Kohn Commission Member Historic Takoma, Inc. Ms. Kacy Kostiuk City Council Candidate City of Takoma ParkMr. Tom Liddle Staff Takoma Park Middle SchoolMs. Heather McDonald Carver Staff Takoma Park Middle School Mr. Daniel Morales Parent Takoma Park Middle SchoolMs. Rachel Palmaira Staff Takoma Park Middle SchoolMr. Andrew Partan Parent Takoma Park Middle SchoolMs. Katya Partan Parent Takoma Park Middle School
2
Facility Advisory Process Involvement
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Participants in Facility Advisory Process (continued)
Ms. Holly Pasquale Staff Takoma Park Middle SchoolMs. Jessica Pelan Staff Takoma Park Middle SchoolMs. Laura Sabelnaus Staff Takoma Park Middle School Ms. Adrienne Tilton Staff Takoma Park Middle School Ms. Monique Tinnivlioglou Staff Takoma Park Middle SchoolMs. Maude Winsor Staff Takoma Park Middle School
Facility Advisory Process Involvement (continued)
2A
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Background / HistoryLocation: 7611 Piney Branch Road, Silver Spring, Maryland 20910
Cluster: Downcounty Consortium / Montgomery Blair
History and Square Footageof Existing Building:
1939 Construction of School 46,761 S.F.1941 Addition 8,906 S.F.1949 Addition 19,600 S.F.1956 Addition 20,530 S.F.1961 Addition 7,566 S.F.1966 Addition 4,395 S.F.
1999 Revitalized 137,348 S.F.
Total 137,348 S.F.
Site Size: 18.83 acres
Program Capacity 939
Number of Relocatable Classrooms: 4
Current Parking Spaces: 145
Takoma Park Middle school was revitalized/reopened in 1999. Due to the increasing enrollment, an addition project with core improvements was approved with a completion date of August 2020. Core space improvements include an expanded cafeteria and additional physical education spaces.
Project Information
3
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Project Information (continued)
Educational Program Objectives
3A
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
3B
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 3C
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 3D
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 3E
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Educational Program Objectives
The objective of this project is to construct an addition and renovate portions of Takoma Park Middle School to address the space and core defi ciencies and provide additional program and support spaces. The 16 stations will increase the capacity to 1,306 seats and is scheduled to be complete August 2020. In anticipation of future growth, 6 classroom shell spaces are included in the design.
The following are key elements of the project design:
• Construct an addition with the desired functional spatial relationships
• Provide an addition that will allow easy supervision of students
• Provide an addition that will compliment and improve the existing circulation
• Provide a three-story addition with a compact footprint to limit impact to site play area
• Expand cafeteria by removing stage
• Place the addition on the site to minimize impact to school operations
3F
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 3G
Teaching Stations and Spaces Provided when Complete
New ConstructionClassroomsStandard Classroom 10Standard Classroom (shell space) 6
ScienceScience Laboratory 2Preparation Room 2 Special and Alternative EducationResource Room 2 Multipurpose LaboratoryMultipurpose Technology Laboratory 1Preparation Room 1
Instructional Support AreasTeam Workroom 4ESOL Team Room 1Math Intervention Room 1ESOL Storage 1 Physical Education Fitness Weight Room 1Auxiliary Gymnasium 1Health Classroom 1Common Planning Area 1General Storage 1ICB Storage 1
Building Service Facilities Plant Equipment Operator Offi ce 1General Storage 1
Administration SuiteAssistant Principal’s Offi ce 1Assistant School Administrator Offi ce 1Administrative Secretary’s Offi ce 1Student Support Center 1Staff Development Offi ce 1Security Offi ce 1
Counseling SuiteCounselor’s Offi ce 1Itinerant Staff Offi ce 1
Replacement spaces(Existing spaces will be repurposed to accommodate connections to the addition and will be replaced in the new construction)
Instrumental Music 1Standard Classroom 4
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 3H
Site Design
Site Features:
Takoma Park Middle School is situated on a 18.83 acre site at 7611 Piney Branch Road in Silver Spring, Maryland. The school resides in the City of Takoma Park boundary and is an integral part of the local community. The school property is bounded on the west by Piney Branch Road (MD 320) and on the south by Grant Avenue. On the north and east sides, the school property is surrounded by single family residential homes and Takoma-Piney Branch Local Park. The student drop-off, bus loop, and parking lot are located on the south side (front) of the site and accessible from both Grant Avenue and Piney Branch Road. Access to the service drive occurs from the bus loop and is located on the south east side of the school building.
Site design goals include minimizing impacts to current site amenities and preserving as many trees on the site as possible. The hard play surface will be relocated to an area adjacent to the physical education program located along the north east corner of the site. The existing hillside along the back of the school will be maintained.
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 3I
Building Design
General Description:
The proposed classroom addition is a three-story, steel-framed structure with brick veneer over concrete masonry block exterior walls. The addition is located on the back, (north side) of the building and has two corridors at each of the three fl oor levels. The corridor connections at each fl oor level create a circulation loop around a new courtyard space. The addition contains 14 classrooms, two science rooms and support spaces. The addition will also include a six classroom shell space for future growth. To accommodate connections to the addition, four classrooms will be displaced in the new addition. The one-story addition located on the east side will be steel-framed with brick veneer over concrete block exterior walls. The two existing corridors that run parallel to the existing gymnasium will be connected in the addition to create a new looped circulation around the existing gymnasium. The extended corridors will link with the addition which contains the auxiliary gymnasium, fi tness weight room, health classroom and relocated music classroom. The stage will be relocated into the existing instrumental music room to allow expansion of the cafeteria and the instrumental music room will be displaced in the addition.
Classroom Technology:
The classrooms will be designed to support interactive educational technology that includes controlled wireless computer access and interactive whiteboard systems. Individual classrooms are designed to allow student seating arrangement that can be organized into small groups for project oriented teaching or students can face the teacher in a traditional method.
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 3J
Sustainability
The project will be designed and constructed with an emphasis on the environmental sustainability. The architecture and engi-neering systems will align with Montgomery County Public Schools facility management sustainability principles to ensure long-term operational effectiveness. The project will be in compliance with Leadership in Energy and Environmental Design (LEED) standards through the United States Green Building Council, but LEED certifi cation will not be pursued. The addition will comply with the 2012 International Green Construction Code (IgCC). Key features related to the sustainability include the following:
• Managing stormwater to reduce runoff quantity and improve quality • Using highly-refl ective roof surfaces to reduce heat island effect and heat gain to the building • Installing water conserving, low-fl ow plumbing fi xtures • Optimizing the energy performance of the building by providing a highly energy effi cient building envelope; lighting system; and heating, ventilation, and air conditioning systems (HVAC) • Optimizing equipment selection, installation, and operation of HVAC equipment • Adhering to construction indoor air quality management plans and using low-emitting building materials to safeguard occupant health • Providing a high level of occupant control over individual lighting and thermal comfort to promote an enhanced indoor environment in the new building • Using construction materials that are recycled and regionally manufactured • Maximizing daylight in classrooms • Minimizing background noise level from HVAC systems in classrooms and control reverberation time with suffi cient sound absorption materials
Project Information (continued)
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 4
Vicinity Map
PINE
Y BR
ANCH
RO
AD (M
D-32
0)
MARYLAND
DISTRICT OF COLUMBIA
MARYLAND
DISTRICT OF COLUMBIA
CARROLL AVE (M
D-195)
NEW
HAM
PSHI
RE A
VE (M
D-65
0)
ETHAN ALLEN AVE
PHILADELPHIA AVE (MD-410)
UNIVERSITY BLVD (MD-193)
GE
OR
GIA
AV
E (M
D-9
7)
16TH
STR
EE
T N
W (M
D-3
90)
TAKOMA PARK MIDDLE SCHOOL
N
0
250 1000
500 1500
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 5
Existing Site Plan
LEGEND
EXISTING BUILDING
N
20 80 200
40 1200
N
portables
tenniscourts
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
LEGEND
EXISTING BUILDING NEW ADDITION
N
20 80 200
40 1200
N
5A
Proposed Site Plan
HARD SURFACE PLAY AREA
ADDITIONS
hard surface play area
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 6
Existing First Floor Plan
Main Entrance
N
0
10 40 100
20 60
21
09090909
09 44090909
41
41
4251
5132
46
03 09
09
09
4949
51 51 4944
46
46
46
46
20
202020
185119
38 04 04 39
171347
34 13
1313
242447
3408
4747
47 47
40 29
47
1552
2634
34
25
47
07
45
46
33
51
51
48
34
47 05
5126
4736 37
22 47
4747 36
26
51
Main Entrance
45
N
0000000000000000000000000000000000000000000
10 40 100
2220 60
01. SECOND GYMNASIUM02. ADMINISTRATION03. ART CLASSROOM04. ASSISTANT PRINCIPAL’S OFFICE05. AUXILIARY GYMNASIUM06. BUILDING SERVICES07. CAFETERIA08. CHORAL09. CLASSROOM10. COMMUNICATION CENTER11. CONFERENCE
12. COPY ROOM13. CLASSROOM (SHELL)14. COURTYARD15. ELECTRICAL16. ELEVATOR17. FINANCIAL SECRETARY18. GUIDANCE CONFERENCE19. GUIDANCE RECORDS20. GUIDANCE OFFICE21. GUIDANCE WAITING22. GYMNASIUM
34. MUSIC OFFICE35. OPEN TO BELOW36. PHYSICAL EDUCATION OFFICE37. PLANNING ROOM38. PRINCIPAL’S OFFICE39. RECEIVING ROOM40. RECEIVING STORAGE41. SCIENCE LABORATORY42. SCIENCE PREP ROOM43. MULTIPURPOSE TECH LABORATORY
44. SPECIAL EDUCATION 45. STAGE/SCENERY46. STAIR47. STORAGE48. STUDENT SERVICE CENTER49. TEAM / PLANNING ROOM50. TECHNOLOGY FINISH ROOM51. TOILET52. TRASH53. FITNESS/WEIGHT ROOM
23. HEALTH CLASSROOM24. HEALTH ROOMS (NURSE)25. KITCHEN26. LOCKER ROOM27. RESOURCE ROOM28. MAIN MDF ROOM29. MAGNET CLASSROOM30. MEDIA CENTER31. MEDIA CENTER WORK ROOM32. MECHANICAL33. INSTRUMENTAL MUSIC
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
14
20
202020
21 18
09090909
09 4409
41
41
4251
5129
09
03 09
02
01
19
38 04 04 39
171147
34 12
1112
2424
4949
51 51 49
51
51
48
34
47 01
5126
36 37
22 47
4747 36 51
26
51
08
4747
40 32 15
52
2634
34
25
47
44
46
46
46
46
47
33
47
05
07
53
23
37 47
47
47
47
45
34
51
5151
51
43
42
0927 13 13
09
27 09 09
02
49
02
4646
0202 02
020202
13 13
Main Entrance
6A
Proposed First Floor Plan
LEGEND
NEW CONSTRUCTION
RENOVATION
NEW CORRIDOR/BATHROOM/MECH
COURTYARD
SHELL
01. SECOND GYMNASIUM02. ADMINISTRATION03. ART CLASSROOM04. ASSISTANT PRINCIPAL’S OFFICE05. AUXILIARY GYMNASIUM06. BUILDING SERVICES07. CAFETERIA08. CHORAL09. CLASSROOM10. COMMUNICATION CENTER11. CONFERENCE
12. COPY ROOM13. CLASSROOM (SHELL)14. COURTYARD15. ELECTRICAL16. ELEVATOR17. FINANCIAL SECRETARY18. GUIDANCE CONFERENCE19. GUIDANCE RECORDS20. GUIDANCE OFFICE21. GUIDANCE WAITING22. GYMNASIUM
23. HEALTH CLASSROOM24. HEALTH ROOMS (NURSE)25. KITCHEN26. LOCKER ROOM27. RESOURCE ROOM28. MAIN MDF ROOM29. MAGNET CLASSROOM30. MEDIA CENTER31. MEDIA CENTER WORK ROOM32. MECHANICAL33. INSTRUMENTAL MUSIC
34. MUSIC OFFICE35. OPEN TO BELOW36. PHYSICAL EDUCATION OFFICE37. PLANNING ROOM38. PRINCIPAL’S OFFICE39. RECEIVING ROOM40. RECEIVING STORAGE41. SCIENCE LABORATORY42. SCIENCE PREP ROOM43. MULTIPURPOSE TECH LABORATORY
44. SPECIAL EDUCATION 45. STAGE/SCENERY46. STAIR47. STORAGE48. STUDENT SERVICE CENTER49. TEAM / PLANNING ROOM50. TECHNOLOGY FINISH ROOM51. TOILET52. TRASH53. FITNESS/WEIGHT ROOM
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
N
0
10 40 100
20 60
4949
3130
47
47
3228
5010
12 34
47
5151
46
46
46
35
35
44
09090909
09090909
41
41
4251
5132 09
46
44
44
6B
Existing Second Floor Plan
29
N
0
10 40404444040 100100100100
20 60
01. SECOND GYMNASIUM02. ADMINISTRATION03. ART CLASSROOM04. ASSISTANT PRINCIPAL’S OFFICE05. AUXILIARY GYMNASIUM06. BUILDING SERVICES07. CAFETERIA08. CHORAL09. CLASSROOM10. COMMUNICATION CENTER11. CONFERENCE
12. COPY ROOM13. CLASSROOM (SHELL)14. COURTYARD15. ELECTRICAL16. ELEVATOR17. FINANCIAL SECRETARY18. GUIDANCE CONFERENCE19. GUIDANCE RECORDS20. GUIDANCE OFFICE21. GUIDANCE WAITING22. GYMNASIUM
34. MUSIC OFFICE35. OPEN TO BELOW36. PHYSICAL EDUCATION OFFICE37. PLANNING ROOM38. PRINCIPAL’S OFFICE39. RECEIVING ROOM40. RECEIVING STORAGE41. SCIENCE LABORATORY42. SCIENCE PREP ROOM43. MULTIPURPOSE TECH LABORATORY
44. SPECIAL EDUCATION 45. STAGE/SCENERY46. STAIR47. STORAGE48. STUDENT SERVICE CENTER49. TEAM / PLANNING ROOM50. TECHNOLOGY FINISH ROOM51. TOILET52. TRASH53. FITNESS/WEIGHT ROOM
23. HEALTH CLASSROOM24. HEALTH ROOMS (NURSE)25. KITCHEN26. LOCKER ROOM27. RESOURCE ROOM28. MAIN MDF ROOM29. MAGNET CLASSROOM30. MEDIA CENTER31. MEDIA CENTER WORK ROOM32. MECHANICAL33. INSTRUMENTAL MUSIC
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 6C
Proposed Second Floor Plan
LEGEND
NEW CONSTRUCTION
RENOVATION
NEW CORRIDOR/BATHROOM/MECH
COURTYARD
SHELL
09090909
090909
41
42
09
09
46 4649 09 09 09
4932
494751
5113
41
41
4251
5132 49
4909
3130
47
47
3228
5010
12 34
5151
4646
46
46
44
44
44
132222322323332322232
1313
01. SECOND GYMNASIUM02. ADMINISTRATION03. ART CLASSROOM04. ASSISTANT PRINCIPAL’S OFFICE05. AUXILIARY GYMNASIUM06. BUILDING SERVICES07. CAFETERIA08. CHORAL09. CLASSROOM10. COMMUNICATION CENTER11. CONFERENCE
12. COPY ROOM13. CLASSROOM (SHELL)14. COURTYARD15. ELECTRICAL16. ELEVATOR17. FINANCIAL SECRETARY18. GUIDANCE CONFERENCE19. GUIDANCE RECORDS20. GUIDANCE OFFICE21. GUIDANCE WAITING22. GYMNASIUM
34. MUSIC OFFICE35. OPEN TO BELOW36. PHYSICAL EDUCATION OFFICE37. PLANNING ROOM38. PRINCIPAL’S OFFICE39. RECEIVING ROOM40. RECEIVING STORAGE41. SCIENCE LABORATORY42. SCIENCE PREP ROOM43. MULTIPURPOSE TECH LABORATORY
44. SPECIAL EDUCATION 45. STAGE/SCENERY46. STAIR47. STORAGE48. STUDENT SERVICE CENTER49. TEAM / PLANNING ROOM50. TECHNOLOGY FINISH ROOM51. TOILET52. TRASH53. FITNESS/WEIGHT ROOM
23. HEALTH CLASSROOM24. HEALTH ROOMS (NURSE)25. KITCHEN26. LOCKER ROOM27. RESOURCE ROOM28. MAIN MDF ROOM29. MAGNET CLASSROOM30. MEDIA CENTER31. MEDIA CENTER WORK ROOM32. MECHANICAL33. INSTRUMENTAL MUSIC
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
N
0
10 40 100
20 60
4646
46
09090909
09 09090909
41
41
4251
5132 49
4909 32
32
49
47
6D
Existing Third Floor Plan
N
01. SECOND GYMNASIUM02. ADMINISTRATION03. ART CLASSROOM04. ASSISTANT PRINCIPAL’S OFFICE05. AUXILIARY GYMNASIUM06. BUILDING SERVICES07. CAFETERIA08. CHORAL09. CLASSROOM10. COMMUNICATION CENTER11. CONFERENCE
12. COPY ROOM13. CLASSROOM (SHELL)14. COURTYARD15. ELECTRICAL16. ELEVATOR17. FINANCIAL SECRETARY18. GUIDANCE CONFERENCE19. GUIDANCE RECORDS20. GUIDANCE OFFICE21. GUIDANCE WAITING22. GYMNASIUM
34. MUSIC OFFICE35. OPEN TO BELOW36. PHYSICAL EDUCATION OFFICE37. PLANNING ROOM38. PRINCIPAL’S OFFICE39. RECEIVING ROOM40. RECEIVING STORAGE41. SCIENCE LABORATORY42. SCIENCE PREP ROOM43. MULTIPURPOSE TECH LABORATORY
44. SPECIAL EDUCATION 45. STAGE/SCENERY46. STAIR47. STORAGE48. STUDENT SERVICE CENTER49. TEAM / PLANNING ROOM50. TECHNOLOGY FINISH ROOM51. TOILET52. TRASH53. FITNESS/WEIGHT ROOM
23. HEALTH CLASSROOM24. HEALTH ROOMS (NURSE)25. KITCHEN26. LOCKER ROOM27. RESOURCE ROOM28. MAIN MDF ROOM29. MAGNET CLASSROOM30. MEDIA CENTER31. MEDIA CENTER WORK ROOM32. MECHANICAL33. INSTRUMENTAL MUSIC
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 6E
Proposed Third Floor Plan
09090909
09 090909
41
41
4251
5132 49
4909 32
32
4646
46
47
3751
5109 13
090909
09
09
41
42
46 4649
13
LEGEND
NEW CONSTRUCTION
RENOVATION
NEW CORRIDOR/BATHROOM/MECH
COURTYARD
SHELL
01. SECOND GYMNASIUM02. ADMINISTRATION03. ART CLASSROOM04. ASSISTANT PRINCIPAL’S OFFICE05. AUXILIARY GYMNASIUM06. BUILDING SERVICES07. CAFETERIA08. CHORAL09. CLASSROOM10. COMMUNICATION CENTER11. CONFERENCE
12. COPY ROOM13. CLASSROOM (SHELL)14. COURTYARD15. ELECTRICAL16. ELEVATOR17. FINANCIAL SECRETARY18. GUIDANCE CONFERENCE19. GUIDANCE RECORDS20. GUIDANCE OFFICE21. GUIDANCE WAITING22. GYMNASIUM
34. MUSIC OFFICE35. OPEN TO BELOW36. PHYSICAL EDUCATION OFFICE37. PLANNING ROOM38. PRINCIPAL’S OFFICE39. RECEIVING ROOM40. RECEIVING STORAGE41. SCIENCE LABORATORY42. SCIENCE PREP ROOM43. MULTIPURPOSE TECH LABORATORY
44. SPECIAL EDUCATION 45. STAGE/SCENERY46. STAIR47. STORAGE48. STUDENT SERVICE CENTER49. TEAM / PLANNING ROOM50. TECHNOLOGY FINISH ROOM51. TOILET52. TRASH53. FITNESS/WEIGHT ROOM
23. HEALTH CLASSROOM24. HEALTH ROOMS (NURSE)25. KITCHEN26. LOCKER ROOM27. RESOURCE ROOM28. MAIN MDF ROOM29. MAGNET CLASSROOM30. MEDIA CENTER31. MEDIA CENTER WORK ROOM32. MECHANICAL33. INSTRUMENTAL MUSIC
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page 7
Existing Elevations
South Elevation
North Elevation
East Elevation
West Elevation
GRAPHIC SCALE
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
North Elevation
East Elevation
West Elevation
7A
South Elevation South Elevation
Proposed Elevations
GRAPHIC SCALE
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Proposed New Construction Rendering
7B
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Proposed New Construction Rendering
7C
Takoma Park Middle School AdditionSmolen ■ Emr ■ Ilkovitch Architects Page
Design Team Members
Architect:
Civil Engineer:
Structural Engineer Mechanical, Electrical and Plumbing Engineers:
Project Schedule
Preliminary Plans Presentation: Construction Documents Completed: Award Construction Contract: Project Completed:
Estimated Construction CostsSquare Footage: Existing Building: New Construction (includes shell space) Renovation: Demolition:
Total Gross Square Feet: Total Construction Cost:
8
Project Team, Schedule and Estimated Construction Costs
137,34858,39113,080
0
195,739$23,188,000
Smolen ■ Emr ■ Ilkovitch Architects
ADTEK Engineers
ADTEK EngineersJames Posey Associates
January 2018October 2018November 2018 August 2020
Recommended