Sustain ~ Ability

Shahram Montazeri, B.E.Eng

DNM Solar Solution Inc.

DNMSolar Solutions Inc

Introduction

´ 20+ years of electrical engineering in High-Tech

´ 5+ years in Solar and Renewable energy solutions

´ 1.5MW+ of solar installed across Canada (about 1.9GWh production per year)

´ Grid Tied and Hybrid Systems with Lithium-Ion batteries

Agenda

´ Introduction

´ Electricity Cost

´ Solar PV

´ CoGeneration

´ Smart Tech

´ Case Study

´ Electric Car

Audience?

´ What type of buildings do you manage ? Size…

´ Do you know how much you spend in utilities ? Hydro, NG, others ?

´ How many employees ? Rooms, parking spots?

´ Who knows what these are:

´ Solar PV System…

´ CoGeneration…

´ Smart-Tech…

…Today’s Cost?Time-of-use (TOU) Prices

http://www.ontarioenergyboard.ca/OEB/Consumers/Electricity/Electricity+Prices/Historical+Electricity+Prices

Solar PV Solution

´ Solar Panels +

´ Inverter +

´ Grid Tied

´ Hybrid + Batteries´ Grid Tied or Off Grid

´ Grid Tied + Hybrid = AC Coupled

´ load

ACESA Code

FusedDisconnect

Means

265W or 320W 10 year parts 25 years 80% Power Production Approvals CSA

Main Panel

GRID

Hydrometer

Grid Tie Inverter System - Simple connection - Net Metering for cost reduction - Lower up front cost, quicker ROI

P400 Optimizer 1 per panel Rapid Shutdown CSA approved 25 year warranty

Solar Edge Inverters - 3KW - 20KW - Single and 3 phase - CSA - 12 year std upgrade to 25 year warranty

ACESA Code

FusedDisconnect

Means

Connect XW+ 6848:Approvals CSA UL1741 CSA 22.2 Anti Islanding

Connect MPPT80Approvals CSA

265W or 320W Approvals CSA

Rapid Shutdown ESA Code Approvals CSA

Rapid ShutdownESA Code Approvals CSA

AFCI ESA Code Approvals CUL Main Panel

Sub Panel

GRID

BatteryBehind the Inverter Approvals: CE CSA UL

Net Meteringcan be turnedon or off

Toronto Hydrometer

Like all other Grid Tie invertersthe Schneider Connext XW+has the same approvals

Hybrid Inverter System with Batteries - used for critical systems that have to be up 100% of the time. - 6.8KW - 80KW - single phase or 3phase - Net Metering Capable

Sustain~Abiltiy1st piece of the puzzle

CoGeneration

´ Meant for larger buildings

´ Uses NG

´ It can generate:

´ Electricity

´ Heat, steam

´ Chilled air or water

´ It can have ~92% efficiency

…CoGeneration (basic flow diagram)

Engine+

Generator

Heatrecovery Chilling

Electricity HeatingHot Water

NGheat heat

CoolingChilled Water

CO2

Green House

Sustain~Abiltiy2nd piece of the puzzle

Smart Tech

´ Use smart technology to reduce energy demand

´ Lower size and cost of renewable system

´ Room by room control or Zone Control

´ Can achieve 40%-60% reduction in energy requirement for heating and cooling.

´ LED lighting

SmartTech

Sustain~Abiltiy3rd piece of the puzzle

SmartTech

END

Case StudyResort in Caribbean

Night ~ 700KWpx 12h/day = 12.0 MWh/day

x 12h/Night = 8.4 MWh/Night

20.4 MWh/day or 20,400,000 Wh/day

+

Using the map for average solar hour radiation, USVI gives us average of 5.6 hours of full sun per day...

2 MW array x 5.6 h ~= 11.2 MW/h of power production

Calculations (estimated)

Day ~ 1MWhpConsumption:

Based on a 2MW number, then 2MW/300W panels ~= 6720 Panels

Confidential

Preferred areas for Solar PV Installation

- Fuel Tank for ground mount

- 1 & 2 = Parking area for carport

- 3 = Left Parking area for ground mount

- TE = GEN Room, are to be used for roof mount

- CB = to be used for roof mount

- A-D = to be used for roof mount if necessary

- E-H = Will not be used

- MPC = Will not be used

Confidential

Preferred areas for Solar PV Installation

- Fuel Tank layout

- 3, Left Parking area layout

2865 x 310 W = 888,150 W

3883 x 310 W = 1,203,730 W

Total achievable by these areas:

2,091,880 Wp

Heat

exhaust

Heating

Cooling

Hot Water

Cold Water

Heat Pool

Electricity

Steam

Solar

HybridInverter

ResortLoads

SolarMPPT Charger

Lithum-Ion

GENAC Multi Cluster

Solar DC Coupled + Solar and Generator AC coupled + COGEN

SolarSolar

MPPT ChargerMPPT Charger

Fixedunless load

requirements change

More Power?Only parts that will need to increase

More storage?increase only

batteries

Solar+

MicroSolar18-25K

StringInverters

Per Day numbers: ( x168 Scale )

Consumption Req = 20,328 KWh/day

Consumption Covered by Solar = 9,072 KWh/day

Consumption Covered by GEN = 7,896 KWh/day

Consumption Covered by BAT = 3,696 KWh/day = 20,664 KWh/day

+

+

One Day Predicted Power Requirement and Production

Yearly Predicted Power Requirement and Production

Per Year numbers: ( x168 Scale )

Consumption Req = 7,445,928 KWh/year

Consumption Covered by Solar = 2,700,768 KWh/year

Consumption Covered by GEN = 3,189,648 KWh/year

Consumption Covered by BAT = 1,671,768 KWh/year = 7,562,184 KWh/year

+

+

END case study

Future planning for electric cars

http://www.ieso.ca/Pages/Power-Data/default.aspx#

http://www.ieso.ca/Pages/Power-Data/default.aspx#

http://www.statcan.gc.ca/tables-tableaux/sum-som/l01/cst01/trade14b-eng.htm

Electric Car

´ 133Km with 24KWh battery

´ A 66.5Km daily trip to work and back would need 12KWh+ of battery power

´ 8,000,000 cars in ONT, ½ are daily commuters to work = 4M cars

´ Lets further say 1/2 are carpooled = 2M cars traveling daily bases to work and back.

´ Every day 12kWh x 2,000,000 = 24,000,000kWh/day or 24GWh/day has to be produced to just cover car charging.

END Future planning for electric cars

Case StudyComplete self sufficient City

BIO-MAS

Power Flow

Power Flownight

Power Flowday

Solar Powered HomesWith Batteries and

inverters

Solar Powered officesBatteries & inverters Solar Powered plants

Batteries & inverters