Supply Diversion Dam Project Status Open...

Preview:

Citation preview

1

Supply Diversion DamProject Status Open House

Presented by Molly Davidson, PE – Morrison-Maierle, Inc.

2

3

• Hydraulic roller (“killer dam”)• At least 8 documented incidents since

2011 including one fatality• 8th most visited reach of river in MT• River closures between Woodside and

Tucker

Presentation Title Goes Here

4

Hydraulic Roller

5

• View looking downstream– Strong current on right, portage left– Horizon line is subtle

6

• View looking upstream

7

8

9

Project Objectives

• Delivery of irrigation water• Public safety• Aquatic benefit

10

Project History

• 2011 to current - Incidents at diversion dam• May 2014 – Preparation of Preliminary Engineer Report

and grant application• July 2015 – State DNRC funded grant through Renewable

Resource Grant Program• October 2015 – Engineer selected• November 2015 – Survey completed• February 2016 – Notification of USASE grant award

11

Project Funding

• Montana DNRC - $125,000• US Army Corps of Engineers - $300,000• Bitterroot Conservation District - $10,000• Montana FWP - $47,500• Irrigators - $50,000

12

Project Schedule

• December 2015 – today – Preliminary design• Today – Meet with interested persons• March 2016 – Permitting• April 2016 – Final design• June 2016 – Bidding • October 2016 - Construction

13

14

15

Proposed design

• Eliminates hydraulic roller• Recreators can cross dam at any point • Varying slopes over dam• Historic crossing location is less steep

– Lowest point over diversion• Varying flow conditions for aquatic life

16

17Presentation Title Goes Here

18

• 4:1 vs 20:1

19

• 4:1 vs 20:1

20

Next Steps

• Consider input from stakeholders• Proceed with permitting• Finalize design

21

???

Presentation Title Goes Here

Recommended