Welcome to the new Reading Branch Library

Ground was broken on April 21, 2014.

In June, 2014, work officially began. The first job was to drill the geothermal well.

July, 2014 ‒ Workers install reinforcing bars for the branch foundation.

Glass containers were unearthed at the site including (left to right) a 1920 Nu-Grape soda bottle, a WT Wagner bottle, and a cottage cheese container.

August, 2014 ‒ The foundations are finished and the under slab electric and plumbing are nearly complete.

September, 2014 ‒ Steel columns are installed and cranes are used to lift the frame into place.

October, 2014 ‒ Exterior stud walls are installed and sheathing is attached.

November, 2014‒ Masons begin to install brick and stone on the exterior facade.

January, 2015 ‒ The interior walls are taking shape.

February, 2015‒ More

finishing touches are

added to the interior,

including paint, tile and

flooring.

March, 2015 ‒ Glass installation begins and the branch gets new fountains and a refillable water

bottle station.

April, 2015 ‒ The interior is taking shape and work begins on the sidewalks and parking lot.

April, 2015‒ Final touches are made to the drive-thru and book drop area.

May, 2015 ‒ The branch gets carpeting and a sliding glass entry door.

June 18, 2015 ‒ Last minute preparations are made before the opening.

June 18, 2015 ‒ Last minute preparations are made before the opening.

Welcome to the new Reading Branch Library! Please explore the building and enjoy complimentary

refreshments, courtesy of the Friends of the Public Library.