Screentec, Pump Station Bar Screen - Aqualitec...SCREENTEC, THE PUMP STATION BAR SCREEN Lift Station...

Preview:

Citation preview

1www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

2www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion

3www.aqualitec.com

Scope of work

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

SPACE REQUIREMENTS - FOOTPRINT

Depth: 18’

Equipment Length: 25’ – 3”

Equipment Width: 1’ –3"

Height of discharge: 3’ – 11’’

Bar spacing: ½’’

Installation angle: 90°

Weight: 1,430 lbs

HYDRAULIC CONDITIONS

Influent: Raw Municipal

Peak flow: 600,000 GPD

Maximum Design flow: 2 MGD

4www.aqualitec.com

Scope of work Retrofit with minimal structural changes

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

5www.aqualitec.com

Scope of work Retrofit with minimal structural changes

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

6www.aqualitec.com

Scope of work No more expensive, manual and unsafe maintenance

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

- Remove rags, flushable wipes,towels, bed sheets…..

7www.aqualitec.com

Scope of work Protects pumps from debris

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

8www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion

9www.aqualitec.com

Screentec Solution

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

10www.aqualitec.com

Screentec Solution

Screentec, Bar Screen Solution Vertical design Integrated by pass – Lateral flanges Retrofit any structure No moving part under grade level

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

11www.aqualitec.com

Screentec Solution

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

12www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion

Installation of Screentec

13www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Installation of Screentec

14www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Installation of Screentec

15www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Installation of Screentec

16www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Installation of Screentec

17www.aqualitec.com

Previous

Current

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

18

WASTEWATER TREATMENT EQUIPENT

www.aqualitec.com

Significant savings with a small investment

SCREENTEC, THE PUMP STATION BAR SCREEN

Expensive labor Pumps are protected Unsafe environment (H2S) No below-grade maintenance Structural constraints No structural changes

19www.aqualitec.comwww.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion

20www.aqualitec.com

Screentec allows wastewater operators to protect expensive pump equipment from non-dispersible debris.

Screentec’s versatile design fits almost any application with minimal retrofit.

Screentec’s automatic operation frees operators from costly and dangerous manual maintenance.

Screentec’s simple, versatile design makes it affordable, effective, and reliable.

Keep It Simple.

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Erwan Ouattara (310) 926-3118 eouattara@aqualitec.com

Olivier Monfort(310) 703-2174 omonfort@aqualitec.com

21www.aqualitec.com

Keep It Simple.

www.aqualitec.com

SCREENTEC, THE PUMP STATION BAR SCREEN

Contact Information

Recommended