RIJEKA AGGLOMERATIONImprovement of Water and Wastewater
Infrastructure
PROJECT LOCATION
Water supply and wastewater collection system of Rijeka and surrounding area is considered to be one of the most complex systems in the Republic of Croatia
RIJEKA – THE CITY ON WATER
Agglomerations
Water supply area: 517 km2
Number of inhabitants: 180.000AGGLOMERATION KLANAMunicipality of Klana
AGGLOMERATION RIJEKACities of Rijeka and KastavMunicipalities of Viškovo, Čavle and Jelenje
AGGLOMERATION BAKAR-KOSTRENACity of BakarMunicipality of Kostrena
AGGLOMERATION KRALJEVICACity of Kraljevica
„AGGLOMERATION RIJEKA” PROJECT PREPARATION
Preparation of the study-project documentation (started in 2010.)
• Feasibility study and the project application Jaspers issued The Completion note for the project
• Environmental Impact Assessment of Wastewater collection system Decision on acceptability issued by Ministry of Environment and Energy
• Conceptual design and main design for reconstruction, upgrade and extension of wastewater collection system on the territory of the agglomeration Rijeka
In the final phase of obtaining remaining building permits (out of the 118 projects, 96% permits were obtained)
Property-legal preparationSolving land ownership issues for almost 4000 building plots
Project documentation preparation• Preparing the project documentation for the WWTP and sewage system
construction, works supervision, equipment procurement, informing and visibility,project management service – expected in the second half of 2018.
„Agglomeration Rijeka” project description
Project activities
Construction of transport pipelines and optimization of existing sewage system 33,4 km and 53 accompanying objectsExtension of wastewater collection network 184,1 km and 108 accompanying objectsReconstruction of parts of the water supply system 100 kmConstruction of the WWTP Rijeka capacity 200.000 PE (population equivalent) with secondary treatment (biological stage)
Other activities related to construction of sewage systemEqupiment procurementWorks supervision for sewage installation WWTP construction supervisionVisibility and informingProject management
Tenders Type Total value
Works supervision Service 47.142.000 HRK
Project management Service 28.330.000 HRK
Network construction Works 860.173.000 HRK
WWTP design and construction Works 549.946.000 HRK
Equipment Goods 76.293.000 HRK
Visibility Service 6.737.000 HRK
„Agglomeration Rijeka” tender documentation
Legend:
PVC/PE/PP SEWER PIPES
PES/DUCTIL SEWER PIPES
II. PROTECTION AREA
„Agglomeration Rijeka” wastewater collection network
Type of the contract: FIDIC RED BOOK
Estimated time of construction: begining of 2019. – 31.12.2023.
Network supervision - carried out by 12 supervising engineers and 7 chief
engineers
2 types of gravity sewer pipes:-polyester pipelines (SN 10, SN 15)
- thermoplastic pipes (PEHD, PP,PVC)
126 pumping stations 3000 small pumping stations
Wet well and dry well pumping station
Water pipes – ductil, 100 km length
General information
SOURCES OF PROJECT FUNDING TOTAL
(HRK)
PARTICIPATION
EU assistance 1.256.548 71,3%
- EU funding 1.256.548 71,3%
Domestic public sector 505.015 28,7%
- Local component 134.687 7,6%
- Croatian water 185.164 10,5%
- HR budget 185.164 10,5%
Total funds 1.761.563 100,0%
PROJECT FUNDING SOURCES
EU FUND71,3%
Domestic public sector
28,7%
Nonrefundable grants (1,26 billion HRK) National sector
(505 million HRK)
PRESENTATION OF CONSTRUCTION PHASES
Legend:
phase 0phase 1phase 2phase 3
RIJEKA GATEWAY PROJECT
Delta area• located in the town center• planned content: main town park, corridor of the main town road and the town railway through Delta, mixed use area (modern
nautical and passenger terminal for accepting ferry boats and cruisers, different commercial, business, cultural and public events),utility and service use area for WWTP location
Existing conditions Delta South The Urban Renewal of the Delta area
NEW WASTEWATER TREATMENT PLANT OF „AGGLOMERATION RIJEKA”
EXISTING WWTP
NEW WWTP
The land on which has been planned to build WWTP Rijeka -> situated on cadastral plots in proprerty of the Republic of Croatia
WWTP Rijeka -> defined by the Spatial Plan of the Primorsko-goranska region and the Spatial plan of the City of Rijeka and the Spatial Plan of the Primorje-Gorski kotar County
Urbanistic solution of WWTP –> defined by Rijeka Gateway Project
Expected contracting works - > end of 2019.
1 year for design, 2 years for construction and 1 year for WWTP test work
Estimated deadline for design: 2019. Estimated deadline for construction and test work: end of 2023.
Existing WWTP (mechanical pretreatment) will be removed form the location
Type of the contract: FIDIC YELLOW BOOK
WWTP capacity: 200.000 PE
WWTP type: SECONDARY TREATMENT
Required surface: 21 880 m²
Surface defined as maritime domain (embankment)
Absence of Sewage Sludge Directive in the Republic of Croatia
Treated sewage sludge from WWTP Rijeka will be transported to the HOLCIM Hrvatska d.o.o. Koromačno
General information
SLUDGE MANAGEMENT
WASTEWATER TREATMENT PLANT OF „AGGLOMERATION RIJEKA” VISUALIZATION ACCORDING TO THE CONCEPTUAL DESIGN
New WWTP
BENEFITS OF EU PROJECT:
Compliance with the Urban Wastewater Treatment Directive Grants in the amount of 1,25 billion HRK Higher utility standard Clean environment and protected drinking water Reduced losses and improved efficiency of the water supply system
68 %
Existing connection rate SITUATION AFTER EU PROJECT
Connection to the public sewer
system for approx. 92% of population
Thank you very much for the attention!