RENAISSANCE ZARAGOZA WP2 : Monitoring and analysis. 7th RENAISSANCE meeting- Lyon 28/04/2009. Rodrigo Vásquez Technical Coordinator & UdZ- RENAISSANCE. WP 2. Objectives Verification of Design hypothesis (WP 2.2 & WP 5.1) Analysis of local weather variations (WP 2.1 & WP 2.2 & WP 5.1) - PowerPoint PPT Presentation
Citation preview
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
1
RENAISSANCE ZARAGOZA
WP2 : Monitoring and analysis
7th RENAISSANCE meeting- Lyon 28/04/2009
Rodrigo VásquezTechnical Coordinator & UdZ- RENAISSANCE
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
2
WP 2
ObjectivesVerification of Design hypothesis (WP 2.2 & WP 5.1)Analysis of local weather variations (WP 2.1 & WP 2.2 & WP 5.1)Energy certification studies (WP 2.1 & WP 2.2 & WP 5.1)Human behaviour impact verification (WP 1.5 & WP 2.2 & WP 2.3)
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
3
ZAR-Design verification
In order to verify the bioclimatic design UdZ has developed several activities that allow obtaining the necessary data.
Getting the first data from Block through of optical digital network (Telemando) (WP 2.1)Meeting with Endesa company (EDE) to define the way to get measures from electrical meters (WP 2.1 & WP 2.3) Meeting with GasAragon in order to define the appropriated gas meter devices. (WP 2.1 & WP 2.3) Installation finished of sensors to measure the renewable energies contribution. (WP 2.1 & WP 2.2 & WP 2.3)
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
4
ZAR-local weather analysis
Acquisition of weather variables in order to analyze the local weather impact.
Sensors distributed in Valdespartera to collect data of temperature, humidity and wind.
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
5
ZAR-Energy certification
Follow a schema of activities in order to develop a methodology of energy certification. The procedure includes:
Blocks simulation and energy evaluationBlocks ThermographyHeat transfer through the building envelope (equipment in purchase process)Blower door testsTechnical inspection to heating system (in process)
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
ZAR-Human behaviour
Human behavior impact the performance of buildings (WP 1.5)
Inadequate ventilation, curtain and blinds in greenhouse, high temperature set have a high influence in dwelling thermal behavior
0
5
10
15
20
25
03:5
606
:26
08:5
611
:26
13:5
616
:26
18:5
621
:26
23:5
602
:26
04:5
607
:26
09:5
612
:26
14:5
617
:26
19:5
622
:26
00:5
603
:26
05:5
608
:26
10:5
613
:26
15:5
618
:57
21:2
423
:54
Salon
Habitacion
Invernadero
0
5
10
15
20
25
30
35
1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106
113
120
127
134
141
148
155
162
169
176
183
190
197
204
211
218
225
232
239
246
253
260
267
274
Salon
Habitacion
Invernadero
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
7
Activities UdZ (local leader on Monitoring)
Detailed presentation of WP2.1, 2.2 + WP2.3 = done with Lyon
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
8
WP 2
SummaryWP 2.1: Integrated Energy NetworkWP 2.2: Quality Control and Performance AnalysisWP 2.3: Common Monitoring and Analysis (included LYON’s activities)
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
9
WP 2.1: Integrated Energy Network
State of progress 6 first months Report action taken with reference to project work plan
Specification establishment in order to get data in the demonstrative building (construction finalization in June) Final meeting with Power companies to define all data they provide, acquisition software, amount and frequency of dataEquipment installation finished in 10 blocksFirst data acquired blocks 21 & 29 trough digital network, data from p12 & p14 locallyBlocks simulations (TSBI3 & EnergyPlus). Blocks : P13, P14, P20, P21, P27Thermography laboratory test to analyses several materials and wall thicknessHighlight achievementsStandardization of data from several sourcesBlock connection to digital networkData acquisition from Valdespartera offices (this equipment to be changed to demonstrative building)
Explain problems and deviations from planGas Equipments aren’t compatibles with automatic acquisition.Several problems of digital network (power failures)Physical connection between block and digital network wasn’t available in some cases, and by street works interrupting the Fiber Optic route
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
10
WP 2.1: Integrated Energy Network
Equipment Installation summaryFour blocks connected to digital networkData acquired from two blocks trough digital networkData acquired from two blocks with locals equipmentFive blocks in standby to connect digital network
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
12 13 14 17 18 20 21 24 27 29 32 33 41 47
Rozas Cableado Sondas Nodos Conexión Telemando*
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
11
WP 2.1: Integrated Energy Network
Analysis of progressStrong / weak points
S: Good relationships with power utilities, promoters and architectsW: Works of wiring unfinished by promoter
How to improve quality of workDemand the fulfillment of the works planned
How to exploit collaboration / networking opportunities
Explain action taken to overcome problemsmajor coordination between builders and technicians
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
12
WP 2.1: Integrated Energy Network
Plans for the next 6 monthsCalendar of action
April : Data acquisition from five blocks via digital networkSept: First tests in the demonstrative center
Overview of local work
List of deadlines
Roadmap of key events or target groups (dissemination)Connection entire blocks to digital networkGathering of gas and electricity data via automatic acquisition softwareInstallation of an acquisition server in demonstrative center
Identification of people responsible
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
13
WP 2.2: Quality Control and Performance Analysis
State of progress 6 first monthsReport action taken with reference to project work plan
Follow a schema of activities in order to develop a methodology of energy certification. The procedure includes:
Blocks simulation and energy evaluationBlocks ThermographyHeat transfer through the building envelope (equipment in purchase process)Blowerdoor testsTechnical inspection to heating systemRenewables
Highlight achievementsAir leakages detectionThermals bridge and heat flows detection
Explain problems and deviations from plan Problems to detect fails in ventilated facades with Thermography.Airflows by plugs, electrical covers and extractor hood, can modify significantly the results
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
14
WP 2.2: Quality Control and Performance Analysis
Analysis of progressStrong / weak points
S: High precision equipment availableW: Limited experience in these devices
How to improve quality of workIncrease the amount of building analized
How to exploit collaboration / networking opportunities
Explain action taken to overcome problemsWork in conjunctions with other locals partners with vast experience in thermal photography
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
15
WP 2.2: Quality Control and Performance Analysis
Plans for the next 6 monthsCalendar of action
May : Thermal photography finalizationOverview of local work
List of deadlines
Roadmap of key events or target groups (dissemination)Exposition of results analysis to architects and constructorsReport about impacts of air renovation, leakages, heat losses over consumptions and energy demands
Identification of people responsible
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
16
WP 2.3: Common Monitoring and Analysis
State of progress 6 first monthsLyon strategy :
Complete definition of monitoring techniques (done) Several Planning of phases have been defined depending on allowed extra-time (from 0 to 2 years scenario)
Zaragoza strategy:
BLowerdoor test , images with a termographic camera (done) Facilities for inside building monitoring are ready to operate and connected by digital network (done)First data from 21 reached (done)
Comparison between Lyon & ZaragossaSeveral exchanges (just start)
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
17
WP 2.3: Common Monitoring and Analysis
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
18
WP 2.3: Common Monitoring and Analysis
Energy Zaragoza Lyon
GasGlobal consumption by blocks Global measurement by block;
Detailed measurement by dwelling (boiler and cooking)
Electricity
Daily demand curve and monthly total demand by dwelling; Devices to measure individual consumptions by owner; Groups of blocks energy consumptions by CT’s (Transformation Center); Ecocity illumination consumptions; Energy consumptions of pneumatic garbage collections system
One global measurement by dwelling (detailed electricity uses) and in common part electricity use
Domestic Hot Water
Global measurement by block; solar contribution; thermal balance (p12 & p13)
Identification of the share between solar/complementary energy& heating/DHW distribution
Cold Water By block and whole urbanization
Wood Burner
Energy Consumptions
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
19
WP 2.3: Common Monitoring and Analysis
Zaragoza Lyon
Envelop
Permeability measurement (blower door); Infra-red camera diagnostic; Façade Transmittance test
Permeability measurement (blower door); Infra-red camera diagnostic
VentilationCrossing ventilation Mechanical ventilation system
comparison (hygro + double flow)
Renewable Production
One block monitored (solar hot water rate, temperature, …) Electricity production ? (wind turbine ?)
PV : electrical characteristics
Wood & solar collectors (cf. previous category)
Energy Performance
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
20
WP 2.3: Common Monitoring and Analysis
Measurement Zaragoza Lyon
TemperatureThree points per dwelling : living room – green house – bedroom north located
One point per dwelling
HumidityOne point per dwelling living room
One point per dwelling
WindSpeed inside(outside/inside blocks)
Indoor Air Quality VOC, CO2, Radon ponctual
COMFORT and Indoor Air Quality
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
21
WP 2.3: Common Monitoring and Analysis
Behaviors Zaragoza Lyon
Inadequate Ventilation
High impact in heating demand; losses by night ventilation; Excessive ventilacion, bad utilization
Curtains in the greenhouse
Decrease solar gains exterior windows
High termostate temperature set
Increase energy use
Inefficient electrical
appliances
Increase electric energy
HUMAN BEHAVIOR
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
22
WP 2.3: Common Monitoring and Analysis
Analysis of progressStrong / weak points
Lyon and Zaragoza not in phaseIndependent choice of monitoring techniques => emergence of
interesting ideas in each communityHow to improve quality of work
Multiplication of exchange has to be planedCommon database including test and measures results
• How to exploit collaboration / networking opportunities
• Explain action taken to overcome problems
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
23
WP 2.1: Integrated Energy Network
Plans for the next 6 months (end of year 3) (1 slide)• Calendar of action
• Joint evaluation of developments on innovative techniques (wall conductance UdZ, natural ventilation flow CETHIL-INSA) (next 3 months)
• Beginning of feedback on performance of the PV monitoring in Lyon (Hespul internship) (next 6 months)
• Lyon :No feedback from WP 2.2 in the next 6 months• First draft of the monitoring strategy referential (next 6
months)• Overview of local work• List of deadlines• Roadmap of key events or target groups (dissemination)
• First building delivery : September 2009 - lyon• Identification of people responsible
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europeadentro del Sexto Programa Marco
RENAISSANCE -
ZARAGOZA -SPAIN
24
Rodrigo Vásquez T.rvasquez@unizar.es
Contact
Recommended