Projects

Preview:

DESCRIPTION

A few of my projects

Citation preview

architecture of extreme environments

1arctic research facilitydate completed:2010thesis: sci arc

all rights reserved c john stone

Summer_Season_Complete_Facility

Winter_Season_Complete_Facility

Effeciency_Systems_Module_Development

Facility_Layout

Quadrant_Analysis

Q_1_Dock_Analysis

Connective_Module_Analysis

AF

A

F

AF

AB

STRUCTURAL_FRAMEMODULE_1.0

Structural_Frame_Module_Type

Shell_Membrane_Analysis

Thermal_Passive_System_Analysis

Wall_Section_Module_Detail

North_Elevation_Facility

South_Elevation_Facility

Section_View_East

Oblique_Section_Facility

architecture of extreme environments

2space habitationvirgin galactic date completed:2010

all rights reserved c john stone

Concourse_Matrix_System

Concourse_Analysis

Concourse_Variation

Interlocking_Concourse

Compressed_Concourse_Formation

Zone_Seperations

FULL_STRUCTURAL_SYSTEM

Concourse_Occupied_Space

Torus_Formations

Full_Torus_Formations

Progmatic_System_Levels

HOTEL_CORE

RESEARCH_CORE

CORE_BREAKDOWN

Level_Systems

First_Level_Facility

Second_Level_Facility

Top_Level_Facility

Cross_Section_Lower

Cross_Section_Two

Cross_Section_Top

Full_Facility_Low_Earth_Orbit

9’-9”

4 Rock 10 Ride Vehicle Ride_Specs

Exterior Shell/ material, carbon composite for lig

3D Digital Screen, and Protective Shield

6’-0”

8’-0” 9’-9”

Universal Creative 5

ght weight movements and protective shields

FIRE_FLY_RIDE_VEHICLE

6 Rock 10 Ride Vehicle Ride_Rotation

50 40 30 20 10 0

90

90

50 40 30 20 10 0

180

17

0

160

1

50

140

13

0

90

FIRE_FLY_ROTATION_ANALYSIS

Rotational Degrees for Optimal Track Performance

Universal Creative 7

LAUNCH

READY

PUSH TO

0

3

6 9 12

15

90

270

90

90

0

18

LOCK

WATER SEAL

JETT TOWER

CONTL

LONGITUDINAL

ROLL

YAWACCELERATION

OFF

ONCEL

ABORT

0 180

270

3

6

9 12

15C A B I NP R E S S U R E

90

PITCH

PSIA

50

100 150

200

C A B I N

TIME

HRS MIN SEC

FROM LAUNCH

+ F

0 0 0 3 93

HHHCCNNNUUUAAALLMMMMOOORRFRFF

FIRE_FLY_INSIDE RENDERS

8 Rock 10 Ride Vehicle Ride_Renders

1

2

Inside the Fire_Fly

Inside the Fire_Fly

Outside the Fire_Fly

Fire_Fly_ y

y

yyyyyyy

BACK

FRONTO

C

e lyl

FIRE_FLY_CONE_OF_VISION

Universal Creative 9

3

1

2

3

10 Rock 10 Ride Enclosure

1

2

5

4

3

STRUCTURAL TRUSSING

Allows maximum structural effi ciency, and for its futuristic outlook onto its architectural presence.

Allows for porosity to exist whitin its scripted digital fabric, allowing playful amounts of light and spectacle inside and outside the facility.

Prior to the entrance into the facility, the passengers enters into a launching zone, where they experience the launching process of a shuttle.

Its a light weight carbon fi bric that also has a digital scripting process which allows light and special eff ects to exist outside and inside the facility.

Mission Failed_ The capsule fi nds itself on a new planet. Exit zone.

LIGHT WEIGHT PANNELING SYSTEM

ENTRY_TAKE OFF ZONE ROOFING CANAPY

ROCK 10_ CRASH ZONE

ENCLOSURE_MATERIALS

Universal Creative 11

ENCLOSURE_SYSTEM_ROCK_10

ROCK 10PERSPECTIVE1- 0= 20 -0

77 -1045%

60%82 -8

30- 0

15%

FIRS

T T

UN

NEL

(1

)

SECO

ND

TU

NN

EL (

2) 82

%

GO

ING

DO

WN

45%

G

OIN

G U

P

FIRST GLIMPSE OF THE EARTH

EARTH 3D

MOON 3D

DOWN

15%

UP 10%

THIRD TUNNEL (3 )

EQUIPMENT STORAGE

FRICTION/LANDING

0% FLOATING

0 GR

AVIT

ATIO

N

10%80 -0

235-0

ROCK 10SITE PLAN

1- 0= 20 -0

12 Rock 10 Ride Site Plan

SITE PLAN_ROCK_10

3D ROOMROCK 10_The New Planet

BOARDINGROOM

60 -010%

UNLOADING

LOADING

ENTRANC E

ROTATION PLATFORM

VERTICAL LIFTLAUNC H

312’-0

92’-0

ROCK 10EAST ELE VATION

1- 0= 20 -0

ROCK 10SOUTH ELE VATION

1- 0= 20 -0

Universal Creative 13

ELEVATIONS_ROCK_10

65’-0”

Preparing for LaunchWarming Up the

EngineLaunching the Capsule

Landing on the New Planet

0 Gravitation

HRS MIN SEC00 00 00

HRS MIN SEC00 00 10

Gaining High Speed

HRS MIN SEC00 00 40

HRS MIN SEC00 04 40

HRS MIN SEC00 01 15

14 Rock 10 Ride Section_Diagram

4

5

LEGEND_ZONES

1 APPOLO 9h / BOARDING 2 LOADING PASSENGERS3 UNLOADING PASSENGERS4 ROLLERCOASTER TRACKS5 EQUIPMENT STORAGE6 LANDING ON THE NEW PLANET

Boarding Passengers

HRS MIN SEC00 00 00

Universal Creative 15

LEGEND_ZONES

1 APPOLO 9h / BOARDING 2 LOADING PASSENGERS3 UNLOADING PASSENGERS4 ROLLERCOASTER TRACKS5 EQUIPMENT STORAGE6

285’ - 0”

2

3

6

1

LANDING LAUNCHING

16 Rock 10 Ride Enclosure_Render

Universal Creative 17

EXTERIOR_RENDER_ROCK_10

CRICC

18 Micro_Drone_The Leaf Ride

NENE

Universal Creative 19

20 Micro_Drone_The Leaf Journey Vehicle_Specs

14’-0”

6’-0”

3’-10”

14’-0”

6’-0”

Universal Creative 21

MUSHROOM LAND WATERFALL CAVE LANDDEAD FOREST RAINFOREST

LOCATION_PLAN

ENTRANCE

EXIT

UNLOADING

LOADING

BOARDING ROOM

MUSHROOM LANDWATERFALLRAINFORESTDEAD FORESTCAVE LAND

MICRO DRONE_The Leaf JourneySITE PLAN

1’-0”= 20’-0”

22 Micro_Drone_The Leaf Journey Site Plan

MICRO DRONE_The Leaf JourneyWEST ELEVATION

1’-0”= 20’-0”

MICRO DRONE_The Leaf JourneySOUTH ELEVATION

1’-0”= 20’-0”

WE

MICRO DRONE_ThSOU

Universal Creative 23

LEGEND_PROGRAMS

1 MICRO DRONE_The Leaf Journey/ BOARDING 2 LOADING PASSENGERS3 UNLOADING PASSENGERS4 ROLLER-COASTER TRACKS5 EQUIPMENT STORAGE

24 Micro_Drone_The Leaf Journey Section

BOARDING

2

3

4

MICRO DRONE_The Leaf JourneyROOF PLAN1’-0”= 20’-0”

A

A

Universal Creative 25

26 Micro_Drone_The Leaf Journey Render_Cave

LEAF RIDE VEHICLE

Universal Creative 27

Recommended