7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 1/26
CHILLED AND H
SL No DESCRIPTION QTY
1 120
2 120
3 65
4 65
5 2
6 SUPPLY AND INSTALLATION OF GATE VALVES 1 1/2'' DIA. 2
7 Item
8 Item
SUPPLY AND INSTALLATION OF FI!E" GLASS "IGID INSULATION
10 12'' #$ILLED %ATE" LINES &3'' T$( 50
11 3'' #$ILLED %ATE" LINES &2'' T$( 35
12 6'' $OT %ATE" LINES &3'' T$( 10
13 1 1/2'' $OT %ATE" LINES &2'' T$( 10
14
15
SUPPLY AND INSTALLATION OF #$ILLED %ATE" PIPES 12'' DIA.#O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+%ELDOLET AND FLANGES Et,.+
SUPPLY AND INSTALLATION OF $OT %ATE" PIPES 6'' DIA. #O)PLETE%IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+ %ELDOLETAND FLANGES Et,.+
SUPPLY AND INSTALLATION OF #$ILLED %ATE" PIPES 3'' DIA.#O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+%ELDOLET AND FLANGES Et,.+
SUPPLY AND INSTALLATION OF $OT %ATE" PIPES 1 1/2'' DIA.#O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+%ELDOLET AND FLANGES Et,.+
SUPPLY AND INSTALLATION OF GATE VALVES 3'' DIA. #O)PLETE %IT$#OUNTE" FLANGES
SUPPLY AND INSTALLATON OF "OLLE" TYPE $ANGE"S FO" !OT$12''#$ILLED/6'' $OT %ATE" LINES
SUPPLY AND INSTALLATON OF #LIVES TYPE $ANGE"S FO" !OT$3''#$ILLED/1 1/2'' $OT %ATE" LINES
SUPPLY AND INSTALLATION OF ALU) #LADDING FO" 12'' - 6'' PIPELINES
SUPPLY AND INSTALLATION OF #ANVAS #LADDING FO" 3'' - 1 1/2''PIPE LINES
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 2/26
162
172
SUPPLY AND INSTALLATION OF %AS$OUT VALVES 3'' DIA #O)PLETEEND #AP FO" 12'' LINES
SUPPLY AND INSTALLATION OF %AS$OUT VALVES 2'' DIA #O)PLETEEND #AP FO" 6'' LINES
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 3/26
T WATER PIPING SYSTEM
UNIT UNIT RATE IN KD
TOTAL IN KDMATERIAL SERVICE
)t 55 6+555.00
)t 38 4+58.08
)t 2 1+868.75
)t 20 1+328.33
N 157.5 315.00
N 0
Lt 2+000.00
Lt 1+500.00
S*) 31.36 1+568.00
S*) 24.64 862.40
S*) 31.36 313.60
S*) 24.64 246.40
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 4/26
N 157.5 315.00
N 52.5 105.00
21,575.56
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 5/26
REMARKS
"ATE TAEN F"O) #SPD 2007 P"OE#T
"ATE TAEN F"O) #SPD 2007 P"OE#T
LU)PSU)
LU)PSU)
LU)PSU)
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 6/26
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 7/26
1
SL No
12
3
4
SL No
1
23
4
5
6
7
8
10
11
1213
1
2
3
4
5
6
2
SL No
1
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 8/26
2
3
4
SL No
1
2
3
4
5
6
7
8
1
2
3
4
5
6
3
SL No
1
2
3
4
SL No
1
2
3
4
5
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 9/26
6
7
8
1
2
3
4
5
6
4
SL No1
2
3
4
SL No
12
3
4
5
6
7
8
12
3
4
5
6
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 10/26
5
SL No
1
6
SL No
1
SL No
1
2
16
SL No
1
17
10+11+12-13
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 11/26
SL No
1
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 12/26
DESCRIPTION
TOTAL DIA INCH
MANPOWER & EQUIPMENTS REQUIREMENTS
DESCRIPTION
MANPOWER
FO"E)AN%ELDE"
FA!"I#ATO"
FITTE"
"IGGE"
$ELPE"
TOTAL COST PER DAY
EQUIPMENTS
!OO)T"U#
%ELDING )A#$INE
)INIVANPI#UP
TOTAL COST PER DAY
)ANPO%E" AND %*UIP)ENTS PE" DAY #OST
#O))ON %ELDING DIA IN#$ PE" DAY
ASSU)ED DIA IN#$ FO" 12' PIPE
DU"ATION OF T$E ASSU)ED 6)t 12'' PIPE
TOTAL #OST FO" 6)t 12'' PIPE %ELDING
1 )ete %ELDING #OST
DESCRIPTION
SUPPLY AND INSTALLATION OF CHILLED WATER PIPES 12'' DIREDUDERS, WELDOLE
#ONSIDE" LENGT$ OF T$E PIPE 6)tNU)!E" OF OINTS
!"AN#$ %ELDING &2'' TO 6''(
D"AIN/VENT &1/2 TO 1 1/2 0
SUPPLY AND INSTALLATION OF HOT WATER PIPES "'' DIA. COMPWELDOLET AND
#ONSIDE" LENGT$ OF T$E PIPE 6)t
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 13/26
TOTAL DIA INCH
MANPOWER & EQUIPMENTS REQUIREMENTS
DESCRIPTION
MANPOWER
FO"E)AN
%ELDE"
FA!"I#ATO"
FITTE"
"IGGE"
$ELPE"
TOTAL COST PER DAY
TOTAL COST PER DAY WITH EQUIPMENTS
)ANPO%E" AND %*UIP)ENTS PE" DAY #OST
#O))ON %ELDING DIA IN#$ PE" DAY
ASSU)ED DIA IN#$ FO" 6'' PIPE
DU"ATION OF T$E ASSU)ED 6)t 6'' PIPE
TOTAL #OST FO" 6)t 6'' PIPE %ELDING
1 )ete %ELDING #OST
DESCRIPTION
TOTAL DIA INCH
MANPOWER & EQUIPMENTS REQUIREMENTS
DESCRIPTION
MANPOWER
FO"E)AN
%ELDE"
FA!"I#ATO"
FITTE"
NU)!E" OF OINTS
!"AN#$ %ELDING &2'' TO 6''(
D"AIN/VENT &1/2 TO 1 1/2 (
SUPPLY AND INSTALLATION OF CHILLED WATER PIPES #'' DIREDUDERS, WELDOLE
#ONSIDE" LENGT$ OF T$E PIPE 6)t
NU)!E" OF OINTS
!"AN#$ %ELDING
D"AIN/VENT &1/2 TO 1 1/2 (
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 14/26
"IGGE"
$ELPE"
TOTAL COST PER DAY
TOTAL COST PER DAY WITH EQUIPMENTS
)ANPO%E" AND %*UIP)ENTS PE" DAY #OST
#O))ON %ELDING DIA IN#$ PE" DAY
ASSU)ED DIA IN#$ FO" 6'' PIPE
DU"ATION OF T$E ASSU)ED 6)t 3'' PIPE
TOTAL #OST FO" 6)t 3'' PIPE %ELDING
1 )ete %ELDING #OST
DESCRIPTION
TOTAL DIA INCH
MANPOWER & EQUIPMENTS REQUIREMENTS
DESCRIPTION
MANPOWERFO"E)AN
%ELDE"
FA!"I#ATO"
FITTE"
"IGGE"
$ELPE"
TOTAL COST PER DAY
TOTAL COST PER DAY WITH EQUIPMENTS
)ANPO%E" AND %*UIP)ENTS PE" DAY #OST#O))ON %ELDING DIA IN#$ PE" DAY
ASSU)ED DIA IN#$ FO" 6'' PIPE
DU"ATION OF T$E ASSU)ED 6)t 1 1/2'' PIPE
TOTAL #OST FO" 6)t 1 1/2'' PIPE %ELDING
1 )ete %ELDING #OST
SUPPLY AND INSTALLATION OF HOT WATER PIPES 1 1$2'' DIAREDUDERS, WELDOLE
#ONSIDE" LENGT$ OF T$E PIPE 6)t
NU)!E" OF OINTS
!"AN#$ %ELDING
D"AIN/VENT &1/2 TO 1 1/2 (
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 15/26
SUPPLY AND INSTALLATION OF GATE VALVES #'' DIA. C
DESCRIPTION
3''
SUPPLY AND INSTALLATION OF GATE VALVES 1 1)2'' DIA.
DESCRIPTION
1 1/2''
INSULATION WORK BREAK UP TAKEN FR
DESCRIPTION
2 inch thick
3 inch thick
SUPPLY AND INSTALLATION OF GATE VALVES #'' DIA. C
DESCRIPTION
3''
SUPPLY AND INSTALLATION OF GATE VALVES 1 1)2'' DIA.
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 16/26
DESCRIPTION
2''
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 17/26
SI+E NO OF OINTS DIA INCH REMARKS
612 2 24 EA#$ END ONE OINT
6 4 24 #ONSIDE" !IGG" DIA )ETE"
1.5 6 #ONSIDE" !IGG" DIA )ETE"
%*
QTY REMARKS
1 300 11.51 250 .6
1 220 8.5
1 180 6.
2 250 1.2
2 120 .2
"%.
1 750 28.8
1 350 13.5
1 610 23.51 500 1.2
-%. 21.25
-".2%
1%
%*
#2-
%%
SI+E NO OF OINTS DIA INCH REMARKS
6
. COMPLETE WITH ALL REQURIED FITTINGS ELBOWS, TEE AND FLANGES E!.,
SALARY$ MONTH
PERDAYSALARY
ETE WITH ALL REQURIED FITTINGS ELBOWS, TEE REDUDERS,LANGES E!.,
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 18/26
6 2 12 EA#$ END ONE OINT
6 4 24 #ONSIDE" !IGG" DIA )ETE"
1.5 6 #ONSIDE" !IGG" DIA )ETE"
%
QTY REMARKS
1 300 11.5
1 250 .6
1 220 8.5
1 180 6.
1 250 .6
2 120 .2
%%.#-
*"."#
*"."#
1%
%
#
2#
#-
SI+E NO OF OINTS DIA INCH REMARKS
6
3 2 6 EA#$ END ONE OINT
3 4 12 #ONSIDE" !IGG" DIA )ETE"
1.5 8 12 #ONSIDE" !IGG" DIA )ETE"
#
QTY REMARKS
1 300 11.5
1 250 .6
1 220 8.5
1 180 6.
SALARY$ MONTH
PERDAYSALARY
. COMPLETE WITH ALL REQURIED FITTINGS ELBOWS, TEE AND FLANGES E!.,
SALARY$ MONTH
PERDAYSALARY
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 19/26
2 250 1.2
2 120 .2
"%.
-".2%
-".2%
1%
#
2
1*#
2/
SI+E NO OF OINTS DIA INCH REMARKS6
1.5 2 3 EA#$ END ONE OINT
1.5 6 #ONSIDE" !IGG" DIA )ETE"
1.5 8 12 #ONSIDE" !IGG" DIA )ETE"
2
QTY REMARKS
1 300 11.5
1 250 .6
1 220 8.5
1 180 6.
1 250 .6
2 120 .2
%%.#-
*"."#
*"."#1%
2
2
12#
2
. COMPLETE WITH ALL REQURIED FITTINGS ELBOWS, TEE AND FLANGES E!.,
SALARY$ MONTH
PERDAYSALARY
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 20/26
MPLETE WITH COUNTER FLANGES WITH % E(TRA
UNIT
2 105 157.5
OMPLETE WITH COUNTER FLANGES WITH % E(TRA
UNIT
2 35 52.5
M CSPD 2* WITH " E(TRA COST
UNIT
Sq.Mtr. 15.400 24.640
Sq.Mtr. 19.600 31.360
MPLETE WITH COUNTER FLANGES WITH % E(TRA
UNIT
2 105 157.5
OMPLETE WITH COUNTER FLANGES WITH % E(TRA
FINESCORATE
INCRESE
RATE
FINESCORATE
INCRESE
RATE
FINESCORATE
"INCRESE
RATE
FINESCO
RATE
INCRESE
RATE
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 21/26
UNIT
2 35 52.5
FINESCORATE
INCRESE
RATE
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 22/26
156 10.4
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 23/26
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 24/26
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 25/26
1.5
1.6
1.5
7/25/2019 Project 2 Chilled Water Installation Corrected
http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 26/26