7/25/2019 Project 2 Chilled Water Installation Corrected http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 1/26 CHILLED AND H SL No DESCRIPTION QTY  1 120 2 120 3 65 4 65 5 2 6 SUPPLY AND INSTALLATION OF GATE VALVES 1 1/2'' DIA. 2 7 Item 8 Item SUPPLY AND INSTALLATION OF FI!E" GLASS "IGID INSULATION 10 12'' #$ILLED %ATE" LINES &3'' T$( 50 11 3'' #$ILLED %ATE" LINES &2'' T$( 35 12 6'' $OT %ATE" LINES &3'' T$( 10 13 1 1/2'' $OT %ATE" LINES &2'' T$( 10 14 15 SUPPLY AND INSTALLATION OF #$ILLED %ATE" PIPES 12'' DIA. #O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+ %ELDOLET AND FLANGES Et,.+ SUPPLY AND INSTALLATION OF $OT %ATE" PIPES 6'' DIA. #O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+ %ELDOLET AND FLANGES Et,.+ SUPPLY AND INSTALLATION OF #$ILLED %ATE" PIPES 3'' DIA. #O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+ %ELDOLET AND FLANGES Et,.+ SUPPLY AND INSTALLATION OF $OT %ATE" PIPES 1 1/2'' DIA. #O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+ %ELDOLET AND FLANGES Et,.+ SUPPLY AND INSTALLATION OF GATE VALVES 3'' DIA. #O)PLETE %IT$ #OUNTE" FLANGES SUPPLY AND INSTALLATON OF "OLLE" TYPE $ANGE"S FO" !OT$ 12''#$ILLED/6'' $OT %ATE" LINES SUPPLY AND INSTALLATON OF #LIVES TYPE $ANGE"S FO" !OT$ 3''#$ILLED/1 1/2'' $OT %ATE" LINES SUPPLY AND INSTALLATION OF ALU) #LADDING FO" 12'' - 6'' PIPE LINES SUPPLY AND INSTALLATION OF #ANVAS #LADDING FO" 3'' - 1 1/2'' PIPE LINES

Project 2 Chilled Water Installation Corrected

Embed Size (px)

Citation preview

Page 1: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 1/26

CHILLED AND H

SL No DESCRIPTION QTY  

1 120

2 120

3 65

4 65

5 2

6 SUPPLY AND INSTALLATION OF GATE VALVES 1 1/2'' DIA. 2

7 Item

8 Item

SUPPLY AND INSTALLATION OF FI!E" GLASS "IGID INSULATION

10 12'' #$ILLED %ATE" LINES &3'' T$( 50

11 3'' #$ILLED %ATE" LINES &2'' T$( 35

12 6'' $OT %ATE" LINES &3'' T$( 10

13 1 1/2'' $OT %ATE" LINES &2'' T$( 10

14

15

SUPPLY AND INSTALLATION OF #$ILLED %ATE" PIPES 12'' DIA.#O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+%ELDOLET AND FLANGES Et,.+

SUPPLY AND INSTALLATION OF $OT %ATE" PIPES 6'' DIA. #O)PLETE%IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+ %ELDOLETAND FLANGES Et,.+

SUPPLY AND INSTALLATION OF #$ILLED %ATE" PIPES 3'' DIA.#O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+%ELDOLET AND FLANGES Et,.+

SUPPLY AND INSTALLATION OF $OT %ATE" PIPES 1 1/2'' DIA.#O)PLETE %IT$ ALL "E*U"IED FITTINGS EL!O%S+ TEE "EDUDE"S+%ELDOLET AND FLANGES Et,.+

SUPPLY AND INSTALLATION OF GATE VALVES 3'' DIA. #O)PLETE %IT$#OUNTE" FLANGES

SUPPLY AND INSTALLATON OF "OLLE" TYPE $ANGE"S FO" !OT$12''#$ILLED/6'' $OT %ATE" LINES

SUPPLY AND INSTALLATON OF #LIVES TYPE $ANGE"S FO" !OT$3''#$ILLED/1 1/2'' $OT %ATE" LINES

SUPPLY AND INSTALLATION OF ALU) #LADDING FO" 12'' - 6'' PIPELINES

SUPPLY AND INSTALLATION OF #ANVAS #LADDING FO" 3'' - 1 1/2''PIPE LINES

Page 2: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 2/26

162

172

SUPPLY AND INSTALLATION OF %AS$OUT VALVES 3'' DIA #O)PLETEEND #AP FO" 12'' LINES

SUPPLY AND INSTALLATION OF %AS$OUT VALVES 2'' DIA #O)PLETEEND #AP FO" 6'' LINES

Page 3: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 3/26

  T WATER PIPING SYSTEM

UNIT UNIT RATE IN KD

 TOTAL IN KDMATERIAL SERVICE

)t 55 6+555.00

)t 38 4+58.08

)t 2 1+868.75

)t 20 1+328.33

N 157.5 315.00

N 0

Lt 2+000.00

Lt 1+500.00

S*) 31.36 1+568.00

S*) 24.64 862.40

S*) 31.36 313.60

S*) 24.64 246.40

Page 4: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 4/26

N 157.5  315.00

N 52.5  105.00

21,575.56

Page 5: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 5/26

REMARKS

"ATE TAEN F"O) #SPD 2007 P"OE#T

"ATE TAEN F"O) #SPD 2007 P"OE#T

LU)PSU)

LU)PSU)

LU)PSU)

Page 6: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 6/26

Page 7: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 7/26

1

SL No

12

3

4

SL No

1

23

4

5

6

7

8

10

11

1213

1

2

3

4

5

6

2

SL No

1

Page 8: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 8/26

2

3

4

SL No

1

2

3

4

5

6

7

8

1

2

3

4

5

6

3

SL No

1

2

3

4

SL No

1

2

3

4

5

Page 9: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 9/26

6

7

8

1

2

3

4

5

6

4

SL No1

2

3

4

SL No

12

3

4

5

6

7

8

12

3

4

5

6

Page 10: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 10/26

5

SL No

1

6

SL No

1

SL No

1

2

16

SL No

1

17

10+11+12-13

Page 11: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 11/26

SL No

1

Page 12: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 12/26

DESCRIPTION

TOTAL DIA INCH

MANPOWER & EQUIPMENTS REQUIREMENTS

DESCRIPTION

MANPOWER

FO"E)AN%ELDE"

FA!"I#ATO"

FITTE"

"IGGE"

$ELPE"

TOTAL COST PER DAY 

EQUIPMENTS

!OO)T"U# 

%ELDING )A#$INE

)INIVANPI#UP

TOTAL COST PER DAY 

)ANPO%E" AND %*UIP)ENTS PE" DAY #OST

#O))ON %ELDING DIA IN#$ PE" DAY

ASSU)ED DIA IN#$ FO" 12' PIPE

DU"ATION OF T$E ASSU)ED 6)t 12'' PIPE

 TOTAL #OST FO" 6)t 12'' PIPE %ELDING

1 )ete %ELDING #OST

DESCRIPTION

SUPPLY AND INSTALLATION OF CHILLED WATER PIPES 12'' DIREDUDERS, WELDOLE

#ONSIDE" LENGT$ OF T$E PIPE 6)tNU)!E" OF OINTS

!"AN#$ %ELDING &2'' TO 6''(

D"AIN/VENT &1/2 TO 1 1/2 0

SUPPLY AND INSTALLATION OF HOT WATER PIPES "'' DIA. COMPWELDOLET AND

#ONSIDE" LENGT$ OF T$E PIPE 6)t

Page 13: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 13/26

TOTAL DIA INCH

MANPOWER & EQUIPMENTS REQUIREMENTS

DESCRIPTION

MANPOWER

FO"E)AN

%ELDE"

FA!"I#ATO"

FITTE"

"IGGE"

$ELPE"

TOTAL COST PER DAY 

TOTAL COST PER DAY WITH EQUIPMENTS

)ANPO%E" AND %*UIP)ENTS PE" DAY #OST

#O))ON %ELDING DIA IN#$ PE" DAY

ASSU)ED DIA IN#$ FO" 6'' PIPE

DU"ATION OF T$E ASSU)ED 6)t 6'' PIPE

 TOTAL #OST FO" 6)t 6'' PIPE %ELDING

1 )ete %ELDING #OST

DESCRIPTION

TOTAL DIA INCH

MANPOWER & EQUIPMENTS REQUIREMENTS

DESCRIPTION

MANPOWER

FO"E)AN

%ELDE"

FA!"I#ATO"

FITTE"

NU)!E" OF OINTS

!"AN#$ %ELDING &2'' TO 6''(

D"AIN/VENT &1/2 TO 1 1/2 (

SUPPLY AND INSTALLATION OF CHILLED WATER PIPES #'' DIREDUDERS, WELDOLE

#ONSIDE" LENGT$ OF T$E PIPE 6)t

NU)!E" OF OINTS

!"AN#$ %ELDING

D"AIN/VENT &1/2 TO 1 1/2 (

Page 14: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 14/26

"IGGE"

$ELPE"

TOTAL COST PER DAY 

TOTAL COST PER DAY WITH EQUIPMENTS

)ANPO%E" AND %*UIP)ENTS PE" DAY #OST

#O))ON %ELDING DIA IN#$ PE" DAY

ASSU)ED DIA IN#$ FO" 6'' PIPE

DU"ATION OF T$E ASSU)ED 6)t 3'' PIPE

 TOTAL #OST FO" 6)t 3'' PIPE %ELDING

1 )ete %ELDING #OST

DESCRIPTION

TOTAL DIA INCH

MANPOWER & EQUIPMENTS REQUIREMENTS

DESCRIPTION

MANPOWERFO"E)AN

%ELDE"

FA!"I#ATO"

FITTE"

"IGGE"

$ELPE"

TOTAL COST PER DAY 

TOTAL COST PER DAY WITH EQUIPMENTS

)ANPO%E" AND %*UIP)ENTS PE" DAY #OST#O))ON %ELDING DIA IN#$ PE" DAY

ASSU)ED DIA IN#$ FO" 6'' PIPE

DU"ATION OF T$E ASSU)ED 6)t 1 1/2'' PIPE

 TOTAL #OST FO" 6)t 1 1/2'' PIPE %ELDING

1 )ete %ELDING #OST

SUPPLY AND INSTALLATION OF HOT WATER PIPES 1 1$2'' DIAREDUDERS, WELDOLE

#ONSIDE" LENGT$ OF T$E PIPE 6)t

NU)!E" OF OINTS

!"AN#$ %ELDING

D"AIN/VENT &1/2 TO 1 1/2 (

Page 15: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 15/26

SUPPLY AND INSTALLATION OF GATE VALVES #'' DIA. C

DESCRIPTION

3''

SUPPLY AND INSTALLATION OF GATE VALVES 1 1)2'' DIA.

DESCRIPTION

1 1/2''

INSULATION WORK BREAK UP TAKEN FR

DESCRIPTION

2 inch thick

3 inch thick

SUPPLY AND INSTALLATION OF GATE VALVES #'' DIA. C

DESCRIPTION

3''

SUPPLY AND INSTALLATION OF GATE VALVES 1 1)2'' DIA.

Page 16: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 16/26

DESCRIPTION

2''

Page 17: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 17/26

SI+E NO OF OINTS DIA INCH REMARKS

612 2 24 EA#$ END ONE OINT

6 4 24 #ONSIDE" !IGG" DIA )ETE"

1.5 6 #ONSIDE" !IGG" DIA )ETE"

%*

QTY REMARKS

1 300 11.51 250 .6

1 220 8.5

1 180 6.

2 250 1.2

2 120 .2

"%.

1 750 28.8

1 350 13.5

1 610 23.51 500 1.2

-%. 21.25

-".2%

1%

%*

 

#2-

%%

SI+E NO OF OINTS DIA INCH REMARKS

6

  . COMPLETE WITH ALL REQURIED FITTINGS ELBOWS, TEE AND FLANGES E!.,

SALARY$ MONTH

PERDAYSALARY 

ETE WITH ALL REQURIED FITTINGS ELBOWS, TEE REDUDERS,LANGES E!.,

Page 18: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 18/26

6 2 12 EA#$ END ONE OINT

6 4 24 #ONSIDE" !IGG" DIA )ETE"

1.5 6 #ONSIDE" !IGG" DIA )ETE"

 %

QTY REMARKS

1 300 11.5

1 250 .6

1 220 8.5

1 180 6.

1 250 .6

2 120 .2

%%.#-

*"."#

*"."#

1%

 %

#

2#

#-

SI+E NO OF OINTS DIA INCH REMARKS

6

3 2 6 EA#$ END ONE OINT

3 4 12 #ONSIDE" !IGG" DIA )ETE"

1.5 8 12 #ONSIDE" !IGG" DIA )ETE"

#

QTY REMARKS

1 300 11.5

1 250 .6

1 220 8.5

1 180 6.

SALARY$ MONTH

PERDAYSALARY 

. COMPLETE WITH ALL REQURIED FITTINGS ELBOWS, TEE AND FLANGES E!.,

SALARY$ MONTH

PERDAYSALARY 

Page 19: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 19/26

2 250 1.2

2 120 .2

"%.

-".2%

-".2%

1%

#

2

1*#

2/

SI+E NO OF OINTS DIA INCH REMARKS6

1.5 2 3 EA#$ END ONE OINT

1.5 6 #ONSIDE" !IGG" DIA )ETE"

1.5 8 12 #ONSIDE" !IGG" DIA )ETE"

2

QTY REMARKS

1 300 11.5

1 250 .6

1 220 8.5

1 180 6.

1 250 .6

2 120 .2

%%.#-

*"."#

*"."#1%

2

2

12#

2

. COMPLETE WITH ALL REQURIED FITTINGS ELBOWS, TEE AND FLANGES E!.,

SALARY$ MONTH

PERDAYSALARY 

Page 20: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 20/26

  MPLETE WITH COUNTER FLANGES WITH % E(TRA

UNIT 

2 105 157.5

OMPLETE WITH COUNTER FLANGES WITH % E(TRA

UNIT 

2 35 52.5

M CSPD 2* WITH " E(TRA COST 

UNIT 

Sq.Mtr.   15.400 24.640

Sq.Mtr.   19.600 31.360

MPLETE WITH COUNTER FLANGES WITH % E(TRA

UNIT 

2 105 157.5

OMPLETE WITH COUNTER FLANGES WITH % E(TRA

FINESCORATE

 INCRESE

RATE

FINESCORATE

 INCRESE

RATE

FINESCORATE

"INCRESE

RATE

FINESCO

RATE

 INCRESE

RATE

Page 21: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 21/26

UNIT 

2 35 52.5

FINESCORATE

 INCRESE

RATE

Page 22: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 22/26

156 10.4

Page 23: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 23/26

Page 24: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 24/26

Page 25: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 25/26

1.5

1.6

1.5

Page 26: Project 2 Chilled Water Installation Corrected

7/25/2019 Project 2 Chilled Water Installation Corrected

http://slidepdf.com/reader/full/project-2-chilled-water-installation-corrected 26/26