Steve Lathrop, PacifiCorp. Panel#2: A Day in the Life of Planners/Engineers. 2008 PI T&D Users Group Meeting, Atlanta, Sept 10-12. Agenda. Area Planning at PacifiCorp Infrastructure Planning Load Duration Curves – a New View of Data Non-SCADA Asset Loads SCADA Accuracy. Area Planning. - PowerPoint PPT Presentation
Citation preview
1© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Steve Lathrop, PacifiCorp
Panel#2: A Day in the Life of Panel#2: A Day in the Life of Planners/EngineersPlanners/Engineers
Panel#2: A Day in the Life of Panel#2: A Day in the Life of Planners/EngineersPlanners/Engineers
2008 PI T&D Users Group Meeting, Atlanta, Sept 10-12
2© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
AgendaAgenda
Area Planning at PacifiCorp Infrastructure Planning Load Duration Curves – a New View of Data Non-SCADA Asset Loads SCADA Accuracy
3© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Area PlanningArea Planning
Substation, sub-transmission and non-Main Grid transmission infrastructure
Future Infrastructure needs (long-range planning) Daily Operations Issues Asset load analysis Load projections Capital spending Risk-Management data
4© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Area PlanningArea Planning
Watch Lists
5© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Area PlanningArea Planning
Watch Lists
6© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Area PlanningArea Planning
Watch Lists
7© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Load / Voltage AnalysisLoad / Voltage Analysis
Alphabet soup:– Real-time– Historical– Projected– Peak– Instantaneous– Average– Changing
….the differentiator between these is…Time
8© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
Area Coincident Loads– Six transformers serve this area
• Can I accurately determine area peak load and growth?
9© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
Area Coincident Loads—Load profiles for the six:
FIREHOLE T1 MVA HR AVG.Value
FIREHOLE T2 MVA HR AVG.Value
RKS_T1_MVA 1-HR AVG.Value
RKS_T2_MVA 1-HR AVG.Value
VET T1 MVA HOURLY AVG.Value
VET T2 MVA HOURLY AVG.Value
Plot-0
7/1/2008 12:00:00 AM 8/15/2008 12:00:00 AM45.00 days
5
10
15
20
0
25
2.32103
4.61375
7.69536
7.16854
9.03582
6.88171
10© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
Area Coincident Loads—Projected loads
11© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
Area Coincident Loads—Add all loads coincidentally
FIREHOLE T1 MVA HR AVG.Value
FIREHOLE T2 MVA HR AVG.Value
RKS_T1_MVA 1-HR AVG.Value
RKS_T2_MVA 1-HR AVG.Value
VET T1 MVA HOURLY AVG.Value
VET T2 MVA HOURLY AVG.Value
RKS+FRH+VET MVA HOURLY AVG.Value
Plot-0
7/1/2008 12:00:00 AM 8/15/2008 12:00:00 AM45.00 days
10
20
30
40
50
60
70
0
75
36.5846
2.32103
4.61375
7.69536
7.16854
9.03582
6.88171
12© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
Area Coincident Loads—Projected growth of area load
13© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
14© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
15© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Infrastructure PlanningInfrastructure Planning
Load Projections– Multiple Load Duration Tool v1.1
16© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Load Duration CurvesLoad Duration Curves
Time-Series data converted to time-independent data– Simplifies analysis– Non-engineers understand it
17© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Load Duration CurvesLoad Duration Curves
Demonstrate peak loads, duration of peaks and how many hours load limits are exceeded
18© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Load Duration CurvesLoad Duration Curves
Rearrange data: load-dependent, not time-dependent
19© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Load Duration CurvesLoad Duration Curves
20© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Load Duration CurvesLoad Duration Curves
21© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Load Duration CurvesLoad Duration Curves
22© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Non-SCADA Asset LoadsNon-SCADA Asset Loads
Substation C has no electronic metering. Can I get load profile data for it?– My Power Flow suggests 1 MW losses total for line
sections 1-4 at peak load
A
B
C D1
2
3 4
?
SCADASCADA
CIS
Source
23© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Non-SCADA Asset LoadsNon-SCADA Asset Loads
Substation C load is approximated by:
Sub C = Sub A – Sub B – Sub D – 1 MW
SCADASCADA
CIS
A
B
C D1
2
3 4
~
Source
24© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Non-SCADA Asset LoadsNon-SCADA Asset Loads
CHAPPEL-BIG PINEY LINE 78.Value
PINEDALE AVG MW.Value
BIG PINEY CALC, 1-HR AVG.Value
Plot-0
1/1/2008 12:00:00 AM 7/1/2008 12:00:00 AM181.96 days
5
10
15
20
25
30
35
0
40
4.90707
5.206
11.1131
Black trace is my ‘pseudo-SCADA’ load profile
25© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Verify SCADA AccuracyVerify SCADA Accuracy
Transformer appeared to be overloaded
PLATTE #4 T-3532_SINC_MVA 1-HR AVG.Value
Plot-0
7/8/2007 12:00:00 AM 7/15/2007 12:00:00 AM7.00 days
5
10
15
20
25
0
3019.6244
20-MVA loading guideline
105% loading
26© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Verify SCADA AccuracyVerify SCADA Accuracy
PLT 115KV MW SUM HOURLY AVG.Value
PLT T-3513, 230-115 MVA HOURLY AVG.Value
PLT 115KV ERROR MVA.Value
Plot-0
7/8/2007 12:00:00 AM 7/15/2007 12:00:00 AM7.00 days
10
20
30
40
50
60
70
0
80
6.13779
62.7938
68.9315
27© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Verify SCADA AccuracyVerify SCADA Accuracy
PLT 115KV MW SUM HOURLY AVG.Value
PLT T-3513, 230-115 MVA HOURLY AVG.Value
PLT 115KV ERROR MVA.Value
PLATTE #4 T-3532_SINC_MVA 1-HR AVG.Value
Plot-0
7/8/2007 12:00:00 AM 7/22/2007 12:00:00 AM14.00 days
10
20
30
40
50
60
70
0
80
10.9807
-0.03728
29.1733
29.1360
‘Problem’ surfaced
Error ‘Tag’ built
Transducer Change-out
Error goes to zero
28© 2008 OSIsoft, Inc. – All Rights ReservedPI T&D Users Group
Verify SCADA AccuracyVerify SCADA Accuracy
Questions?