View
13
Download
0
Category
Preview:
Citation preview
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 1 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 80516 OKI BUT BUT Oxford Connector Description: Re-route US 27 within Oxford to
reduce vehicle-pedestrian conflict and maintain
connection of US 27 to SR 73 . Work Type:
New Construction Termini: US 27 to SR 73
Oxford, City of Air Quality Non-Exe DD Dtl Dsgn 2019 4R47 Federal HY20 Earmarks / High Priority $300,000 $0 $300,000 $2,453,143 2018stipID0545FDDD
Ph subtotal: $300,000 $0 $300,000 $2,453,143
ENV Env PE
Env PE
2018
2018
4R47
4R47
Federal
Federal
H640
HY20
Nt'l Cor Planning & Dev (NC
Earmarks / High Priority
$274,074
$3,176
$414,158
$414,158
$691,408
$691,408
$2,453,143
$2,453,143
2018stipID0545FDENV
2018stipID0545FDENV
Ph subtotal: $277,250 $414,158 $691,408 $2,453,143
RW Acquis
Acquis
RW Serv
2019
2019
2018
4BG
4R47
4R47
Local Match
Federal
Federal
2
HY20
HY20
Local Match
Earmarks / High Priority
Earmarks / High Priority
$18,000
$1,232,000
$200,000
$0
$0
$0
$1,450,000
$1,450,000
$1,450,000
$2,453,143
$2,453,143
$2,453,143
2018stipID0545FDRW
2018stipID0545FDRW
2018stipID0545FDRW
Ph subtotal: $1,450,000 $0 $1,450,000 $2,453,143
96452 OKI BUT BUT CR 19 1.89 Cincinnati
Dayton
Description: Widening of Cincinnati Dayton Road
within the project termini, and realignment of
Station Road with Lesourdsville West Chester
Road, to improve its currently skewed
intersection at Cincinnati Dayton Road. **This
project will include construction activitie Work
Type: Widening Termini: Cincinnati Dayton
Road (CR-19): from West Chester Road to
north of the Lesourdsville West Chester
Road/Station Road intersection.
BUTLER COUNTY
ENGINEER
Air Quality Exempt 1.36 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2018
2018
2018
2018
2018
2018
2018
4TA7
4TA7
4TC7
LNT
4TA7
4TC7
LNT
Federal
Federal
Federal
Local Match
Federal
Federal
Local Match
M230
Z230
Z301
LNTP
Z230
Z301
LNTP
STBG
STBG
TAP/Enhancements
Local Match
STBG
TAP/Enhancements
Local Match
$3,526,040
$1,893,984
$195,093
$2,970,587
$132,579
$13,657
$454,765
$0
$0
$0
$0
$0
$0
$0
$9,186,705
$9,186,705
$9,186,705
$9,186,705
$9,186,705
$9,186,705
$9,186,705
$10,496,167
$10,496,167
$10,496,167
$10,496,167
$10,496,167
$10,496,167
$10,496,167
2018stipID0546FDCO
2018stipID0546FDCO
2018stipID0546FDCO
2018stipID0546FDCO
2018stipID0546FDCO
2018stipID0546FDCO
2018stipID0546FDCO
Ph subtotal: $9,186,705 $0 $9,186,705 $10,496,167
98771 OKI BUT BUT Fairfield ITS Phase 2 Description: Upgrades to the existing Central
Traffic System with advanced technology
including: •33 intersections: Pedestrian signals
retrofitted with LED lenses & countdown
modules•10 intersections: Count down
pedestrian signal fixtures•11 intersections:
Pedestrian Work Type: Traffic Management
System Termini: City of Fairfield limits
(signalized intersections, workstation, server
locations)
FAIRFIELD Air Quality Exempt 11.17 DD Dtl Dsgn
Dtl Dsgn
2017
2017
4TB7
LNT
Federal
Local Match
M40E
LNTP
CMAQ
Local Match
$50,000
$12,500
$0
$0
$62,500
$62,500
$3,133,319
$3,133,319
2018MODID0247FDDD
2018MODID0247FDDD
Ph subtotal: $62,500 $0 $62,500 $3,133,319
ENV Env PE
Env PE
2017
2017
4TB7
LNT
Federal
Local Match
M40E
LNTP
CMAQ
Local Match
$150,000
$37,500
$0
$0
$187,500
$187,500
$3,133,319
$3,133,319
2018MODID0247FDENV
2018MODID0247FDENV
Ph subtotal: $187,500 $0 $187,500 $3,133,319
Fairfield, City of Air Quality Exempt 11.17 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4TA7
LNT
LNT
Federal
Local Match
Local Match
M230
LNTP
LNTP
STBG
Local Match
Local Match
$2,133,974
$533,494
$186,723
$0
$0
$0
$2,854,191
$2,854,191
$2,854,191
$3,121,446
$3,121,446
$3,121,446
2018stipID0547FDCO
2018stipID0547FDCO
2018stipID0547FDCO
Ph subtotal: $2,854,191 $0 $2,854,191 $3,121,446
98784 OKI BUT BUT CR 18 2.55 Princeton
Rd
Description: Widening the existing lane widths
from 10 feet to 11 feet, adjusting the vertical
profile, widening the paved shoulders to 5 feet,
and installing edgeline rumble strips. Work
Type: Widening Termini: Princeton Road
(CR-18): from east of Jayfield Drive to west of
SR-747
BUTLER COUNTY
ENGINEER
Air Quality Exempt 1.80 CO CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
4HB7
LNT
4HB7
LNT
Federal
Local Match
Federal
Local Match
MS3E
LNTP
MS3E
LNTP
Highway Safety Imp Prog
Local Match
Highway Safety Imp Prog
Local Match
$1,598,480
$399,620
$111,920
$27,980
$0
$0
$0
$0
$2,138,000
$2,138,000
$2,138,000
$2,138,000
$2,191,733
$2,191,733
$2,191,733
$2,191,733
2018stipID0548FDCO
2018stipID0548FDCO
2018stipID0548FDCO
2018stipID0548FDCO
Ph subtotal: $2,138,000 $0 $2,138,000 $2,191,733
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 2 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 98789 OKI BUT BUT CR113 1.00 Liberty
Fairfield
Description: Installation of a two-way left turn
lane (TWLTL), modification to the vertical profile
south of Moselle Drive, widening the existing
paved shoulders to 5 feet, and installation of
lighting at intersections. Work Type:
Realignment Termini: Liberty Fairfield Rd
(CR-113): from the SB left turn lane at Princeton
Rd to the NB left turn lane at Millikin Rd
BUTLER COUNTY
ENGINEER
Air Quality Exempt 0.98 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4HB7
LNT
4HB7
LNT
Federal
Local Match
Federal
Local Match
MS3E
LNTP
MS3E
LNTP
Highway Safety Imp Prog
Local Match
Highway Safety Imp Prog
Local Match
$3,128,470
$782,117
$218,993
$54,748
$0
$0
$0
$0
$4,184,328
$4,184,328
$4,184,328
$4,184,328
$4,241,684
$4,241,684
$4,241,684
$4,241,684
2018stipID0549FDCO
2018stipID0549FDCO
2018stipID0549FDCO
2018stipID0549FDCO
Ph subtotal: $4,184,328 $0 $4,184,328 $4,241,684
100632 OKI BUT BUT IR 75 5.52 Description: Microsurfacing a portion of IR 75 in
Butler County. Work Type: Preventive
Maintenance Termini: BUT IR 75: SLM 5.52 -
7.05
ODOT SPONSORING
AGENCY
Air Quality Exempt 1.53 DD Dtl Dsgn 2021 LAB State 2 Labor - State Match $0 $0 $0 $0 2018MODID0471XXDD
Ph subtotal: $0 $0 $0 $0
ENV Env PE 2021 LAB State 2 Labor - State Match $0 $0 $0 $0 2018MODID0471XXENV
Ph subtotal: $0 $0 $0 $0
103317 OKI BUT BUT CR 238 2.59 Lanes Mill
D-B
Description: Replacement of a deteriorating
bridge with a structure type to be determined by
the design-build team. Roadway will be widened
to improve safety for motorists. Work Type:
Bridge Replacement Termini: Bridge No.
BUT-CR 238-0259 (SFN: 0930334) which
carries Lanes Mill Road over Four Mile Creek
BUTLER COUNTY
ENGINEER
Air Quality Exempt 0.08 CO CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
4B87
LNT
4B87
LNT
Federal
Local Match
Federal
Local Match
Z233
LNTP
Z233
LNTP
STBG
Local Match
STBG
Local Match
$1,686,915
$88,785
$118,085
$6,215
$0
$0
$0
$0
$1,900,000
$1,900,000
$1,900,000
$1,900,000
$2,126,272
$2,126,272
$2,126,272
$2,126,272
2018stipID0550FDCO
2018stipID0550FDCO
2018stipID0550FDCO
2018stipID0550FDCO
Ph subtotal: $1,900,000 $0 $1,900,000 $2,126,272
DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2018
2018
4B87
LAB
LNT
Federal
State
Local Match
Z233
2
LNTP
STBG
Labor - State Match
Local Match
$168,692
$2,976
$8,879
$0
$0
$0
$180,546
$180,546
$180,546
$2,126,272
$2,126,272
$2,126,272
2018stipID0550FDDD
2018stipID0550FDDD
2018stipID0550FDDD
Ph subtotal: $180,546 $0 $180,546 $2,126,272
ENV Env PE 2018 LAB State 2 Labor - State Match $16,864 $27,653 $44,517 $2,126,272 2018stipID0550FDENV
Ph subtotal: $16,864 $27,653 $44,517 $2,126,272
RW RW Serv 2018 LAB State 2 Labor - State Match $1,209 $0 $1,209 $2,126,272 2018stipID0550FDRW
Ph subtotal: $1,209 $0 $1,209 $2,126,272
103371 OKI BUT BUT/WAR But-War &
Western Row Rd
Description: Improvement to the existing
intersection of Butler Warren Road with Western
Row Road/Barret Road by converting from an
existing stop-controlled intersection to a modern
roundabout. Improvements include curb and
gutter, storm drainage, geometric improvemen
Work Type: Intersection Improvement Termini:
Intersection of Butler Warren Road with Western
Row Road / Barret Road
Mason, City of Air Quality Non-Exe 0.32 CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4TB7
LNT
4TB7
LNT
Federal
Local Match
Federal
Local Match
Z400
LNTP
Z400
LNTP
CMAQ
Local Match
CMAQ
Local Match
$1,181,461
$295,365
$82,702
$20,676
$0
$0
$0
$0
$1,580,204
$1,580,204
$1,580,204
$1,580,204
$1,930,204
$1,930,204
$1,930,204
$1,930,204
2018stipID0551FDCO
2018stipID0551FDCO
2018stipID0551FDCO
2018stipID0551FDCO
Ph subtotal: $1,580,204 $0 $1,580,204 $1,930,204
RW Acquis
Acquis
RW Serv
2020
2020
2018
4TB7
LNT
LAB
Federal
Local Match
State
Z400
LNTP
2
CMAQ
Local Match
Labor - State Match
$280,000
$70,000
$1,428
$0
$0
$0
$351,428
$351,428
$351,428
$1,915,334
$1,915,334
$1,915,334
2018MODID0466FDRW
2018MODID0466FDRW
2018MODID0466FDRW
Ph subtotal: $351,428 $0 $351,428 $1,915,334
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 3 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 103754 OKI BUT BUT IR 75 5.35 Description: Improve capacity on the exit ramps
at Interstate 75 and Tylersville Road, add an
eastbound right-turn lane on Tylersville at the
southbound ramps, and provide a positive offset
for the left-turn lanes into the Speedway gas
station and Gears Florist. Work Type:
Intersection Improvement Termini: IR 75 and
Tylersville Road exit ramps (NB and SB)
BUTLER COUNTY
ENGINEER
Air Quality Exempt 0.10 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4HJ7
LNT
LNT
Federal
Local Match
Local Match
ZS30
LNTP
LNTP
Not Grouped
Local Match
Local Match
$921,590
$102,399
$71,679
$0
$0
$0
$1,095,668
$1,095,668
$1,095,668
$1,111,286
$1,111,286
$1,111,286
2018AM02ID0076FDCO
2018AM02ID0076FDCO
2018AM02ID0076FDCO
Ph subtotal: $1,095,668 $0 $1,095,668 $1,111,286
104195 OKI BUT BUT SR 129 25.00 Liberty
Way
Description: Reconfiguration of the interchange
of SR-129 with Liberty Way and IR-75. SR-129
will be extended east to tie into Cox Road, north
of Liberty Way. Existing ramps connections will
also be reconfigured. Work Type: Interchange,
Reconstruction Termini: SR-129 interchange
with Liberty Way and IR-75; Cox Road north of
Liberty Way
BUTLER COUNTY
ENGINEER
Air Quality Non-Exe 1.71 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
Bridge
Local Match
Local Match
$11,663,425
$11,663,425
$1,632,880
$0
$0
$0
$24,959,730
$24,959,730
$24,959,730
$25,426,130
$25,426,130
$25,426,130
2018AM10ID0306FDCO
2018AM10ID0306FDCO
2018AM10ID0306FDCO
Ph subtotal: $24,959,730 $0 $24,959,730 $25,426,130
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $13,056,400 2018stipID0552FDDD
Ph subtotal: $24,960 $0 $24,960 $13,056,400
ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $13,056,400 2018stipID0552FDENV
Ph subtotal: $141,440 $0 $141,440 $13,056,400
RW RW Serv 2018 LAB State 2 Labor - State Match $50,000 $0 $50,000 $13,056,400 2018stipID0552FDRW
Ph subtotal: $50,000 $0 $50,000 $13,056,400
105057 OKI BUT BUT Oxford Area Trail Description: Construction of a 10 foot wide
asphalt multi-use trail on the southeast side of
Oxford, from Peffer Park (on US-27) to SR-73,
just east of the equestrian center. Work Type:
Bikeways Termini: New alignment: from US-27
at Peffer Park to SR-73 east of the Equestrian
Center
Oxford, City of Air Quality Exempt 0.12 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TC7
LNT
LNT
Federal
Local Match
Local Match
Z302
LNTP
LNTP
TAP/Enhancements
Local Match
Local Match
$750,000
$1,110,070
$130,205
$0
$0
$0
$1,990,275
$1,990,275
$1,990,275
$2,013,159
$2,013,159
$2,013,159
2018AM11ID0362FDCO
2018AM11ID0362FDCO
2018AM11ID0362FDCO
Ph subtotal: $1,990,275 $0 $1,990,275 $2,013,159
106129 OKI BUT BUT Five Points
Roundabout
Description: Improving the existing five legged
intersection by converting to a modern
roundabout with curb and gutter, storm sewer,
and sidewalks. Work Type: Intersection
Improvement Termini: 5 Points Intersection
(Tylersville Road with Hamilton-Mason Road,
Hancock Avenue, Grand Boulevard, and Tuley
Road)
BUTLER COUNTY
ENGINEER
Air Quality Exempt 0.23 RW Acquis
Acquis
RW Serv
2020
2020
2018
4TA7
LNT
LAB
Federal
Local Match
State
Z230
LNTP
2
STBG
Local Match
Labor - State Match
$720,000
$180,000
$60,000
$0
$0
$0
$960,000
$960,000
$960,000
$2,643,533
$2,643,533
$2,643,533
2018AM11ID0363FDRW
2018AM11ID0363FDRW
2018AM11ID0363FDRW
Ph subtotal: $960,000 $0 $960,000 $2,643,533
Description: Improving the existing five legged
intersection by converting to a modern
roundabout with curb and gutter, storm sewer,
and sidewalks. Work Type: Intersection
Improvement (Safety) Termini: 5 Points
Intersection (Tylersville Road with
Hamilton-Mason Road, Hancock Avenue, Grand
Boulevard, and Tuley Road)
BUTLER COUNTY
ENGINEER
Air Quality Exempt 0.23 CO CO Contr
CO Contr
CO Contr
CO Engr
2021
2021
2021
2021
4TA7
4TC7
LNT
LNT
Federal
Federal
Local Match
Local Match
Z230
Z301
LNTP
LNTP
Bridge
TAP/Enhancements
Local Match
Local Match
$1,198,640
$47,360
$1,204,779
$171,555
$0
$0
$0
$0
$2,622,334
$2,622,334
$2,622,334
$2,622,334
$3,599,342
$3,599,342
$3,599,342
$3,599,342
2018AM15ID0521FDCO
2018AM15ID0521FDCO
2018AM15ID0521FDCO
2018AM15ID0521FDCO
Ph subtotal: $2,622,334 $0 $2,622,334 $3,599,342
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 4 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 106407 OKI BUT BUT CR 148 2.93 Description: Install multi-lane roundabout at
Wayne Madison and Hamilton Trenton Rd with
pedestrian accommodations Work Type:
Intersection Improvement Termini: BUT CR
148 at Wayne Madison and Hamilton Trenton
Road
BUTLER COUNTY
ENGINEER
Air Quality Exempt 0.01 DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2020
2020
LAB
4HJ7
LNT
State
Federal
Local Match
2
ZS30
LNTP
Labor - State Match
Highway Safety Imp Prog
Local Match
$3,769
$11,083
$2,771
$0
$0
$0
$17,623
$17,623
$17,623
$2,151,327
$2,151,327
$2,151,327
2018MODID0463FDDD
2018MODID0463FDDD
2018MODID0463FDDD
Ph subtotal: $17,623 $0 $17,623 $2,151,327
ENV Env PE
Env PE
Env PE
2018
2018
2018
4BG
4HJ7
LAB
Local Match
Federal
State
2
2
Local Match
Un-Assigned Federal
Labor - State Match
$23,450
$93,800
$141,440
$0
$0
$0
$258,690
$258,690
$258,690
$2,397,827
$2,397,827
$2,397,827
2018AM02ID0077FDENV
2018AM02ID0077FDENV
2018AM02ID0077FDENV
Ph subtotal: $258,690 $0 $258,690 $2,397,827
RW Acquis
Acquis
RW Serv
RW Serv
RW Serv
2020
2020
2018
2020
2020
4HJ7
LNT
LAB
4HJ7
LNT
Federal
Local Match
State
Federal
Local Match
ZS30
LNTP
2
ZS30
LNTP
Highway Safety Imp Prog
Local Match
Labor - State Match
Highway Safety Imp Prog
Local Match
$64,400
$16,100
$6,082
$27,600
$6,900
$0
$0
$0
$0
$0
$121,082
$121,082
$121,082
$121,082
$121,082
$2,151,327
$2,151,327
$2,151,327
$2,151,327
$2,151,327
2018MODID0464FDRW
2018MODID0464FDRW
2018MODID0464FDRW
2018MODID0464FDRW
2018MODID0464FDRW
Ph subtotal: $121,082 $0 $121,082 $2,151,327
Description: Install multi-lane roundabout at
Wayne Madison and Hamilton Trenton Rd with
pedestrian accommodations Work Type:
Intersection Improvement (Safety) Termini:
BUT CR 148 at Wayne Madison and Hamilton
Trenton Road
BUTLER COUNTY
ENGINEER
Air Quality Exempt 0.01 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4HJ7
LNT
LNT
Federal
Local Match
Local Match
ZS30
LNTP
LNTP
Highway Safety Imp Prog
Local Match
Local Match
$1,368,311
$1,591,404
$207,180
$0
$0
$0
$3,166,895
$3,166,895
$3,166,895
$3,488,106
$3,488,106
$3,488,106
2018AM13ID0456FDCO
2018AM13ID0456FDCO
2018AM13ID0456FDCO
Ph subtotal: $3,166,895 $0 $3,166,895 $3,488,106
76289 OKI CLE CLE IR 275 10.15/8.95 Description: Reconstruct the interchange of
IR275/SR32 to accommodate 20 year projected
traffic. This will include work on SR32. Phase 1
and Phase 2 (PID 82309) have been combined
for construction including Aicholz structures.
Project includes Phase 1&2 right of way Work
Type: Major Reconstruction Termini:
Approximately 1.5 miles north of SR32 to 1.0
miles south of SR32
ODOT SPONSORING
AGENCY
CO Air Quality None 5.10 RW Utl Remb
Utl Remb
2014
2014
4BD7
4BK7
State
Federal
2
L010
State Funds (002)
Interstate Maintenance
$179,273
$1,613,460
$26,725,989
$26,725,989
$28,518,723
$28,518,723
$87,448,231
$87,448,231
2018MODID0206FDRW
2018MODID0206FDRW
Ph subtotal: $1,792,734 $26,725,989 $28,518,723 $87,448,231
82370 OKI CLE CLE SR 32 2.25 Description: Improve capacity and safety on a
portion of SR 32 by adding an interchange and
eliminating several at grade intersections and
drives. The new interchange will grade separate
Bach-Buxton and SR 32 and will include
improvements on Bach-Buxton between Aicho
Work Type: Section Improvement Termini: 0.2
miles east of Eastgate Blvd to Olive Branch
Stonelick Road.
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 2.73 DD Dtl Dsgn
Dtl Dsgn
2016
2016
4BD7
4BK7
State
Federal
2
L05E
State Funds (002)
National Highway System
$360,000
$1,440,000
$63,722
$63,722
$1,863,722
$1,863,722
$63,263,784
$63,263,784
2018MODID0211FDDD
2018MODID0211FDDD
Ph subtotal: $1,800,000 $63,722 $1,863,722 $63,263,784
82552 OKI CLE CLE TR 252 Clepper Ln
Extension
Description: Reconstruction of existing Clepper
Lane from the current intersection with Gate
Drive eastward and across Gleneste
Withamsville Road. Existing Clepper Lane will be
realigned and extended further east, and will tie
in with Bach-Buxton Road, to provide acce
Work Type: New Construction Termini:
Clepper Lane: from Gate Drive to Bach-Buxton
Road
Clermont County
Commissioners
Air Quality Non-Exe 0.40 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TA7
LNT
LNT
Federal
Local Match
Local Match
M230
LNTP
LNTP
STBG
Local Match
Local Match
$5,000,000
$6,032,237
$772,257
$0
$0
$0
$11,804,494
$11,804,494
$11,804,494
$11,850,171
$11,850,171
$11,850,171
2018stipID0554FDCO
2018stipID0554FDCO
2018stipID0554FDCO
Ph subtotal: $11,804,494 $0 $11,804,494 $11,850,171
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 5 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 82557 OKI CLE CLE CR171 Old SR74
Phase 1
Description: Improvements of approximately 1.06
miles of existing Old SR-74 providing safety and
capacity upgrades. Project improvements will
provide five lanes from Glen Este Withamsville
Road to Tealtown Road and 3 lanes from
Tealtown Road to Schoolhouse Road, 2'-4’
Work Type: Minor Widening Termini: Old
SR-74: from Schoolhouse Road to
Gleneste-Withamsville Road; Glen Este
Withamsville Road: from N Meijer drive to Old
SR-74
Clermont County
Commissioners
Air Quality Non-Exe 0.81 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TA7
LNT
LNT
Federal
Local Match
Local Match
M230
LNTP
LNTP
STBG
Local Match
Local Match
$5,000,000
$8,102,137
$917,150
$0
$0
$0
$14,019,287
$14,019,287
$14,019,287
$14,065,210
$14,065,210
$14,065,210
2018stipID0555FDCO
2018stipID0555FDCO
2018stipID0555FDCO
Ph subtotal: $14,019,287 $0 $14,019,287 $14,065,210
99839 OKI CLE CLE SR 32 0.63 Bells
Ln/Old-74
Description: The project consists of upgrades to
the intersection of SR-32 with Bells Lane and
SR-32 with Old-SR 74, west of IR-275. As part
of the Aicholtz connector project (PID 82553),
the south leg of the Old SR-74 and SR-32
intersection will be closed. Traffic wi Work
Type: Intersection Improvement Termini: The
intersections of SR-32 with Bells Lane and
SR-32 with Old-SR 74 (west of IR-275)
Clermont County T.I.D. Air Quality Exempt 0.83 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4TB7
LNT
LNT
Federal
Local Match
Local Match
M400
LNTP
LNTP
CMAQ
Local Match
Local Match
$2,400,000
$1,211,185
$252,783
$0
$0
$0
$3,863,968
$3,863,968
$3,863,968
$3,900,560
$3,900,560
$3,900,560
2018AM01ID0030FDCO
2018AM01ID0030FDCO
2018AM01ID0030FDCO
Ph subtotal: $3,863,968 $0 $3,863,968 $3,900,560
103755 OKI CLE CLE SR 32 2.72 Description: Construct a third thru lane
eastbound along SR-32 from Glen Este
Withamsville Road to Olive Branch
Stonelick.Resurface and perform pavement
repair on a portion of SR 32 in Clermont County
between I-275 and the eastern Batavia corp limit.
Work Type: Section Improvement Termini:
CLE SR 32 SLM 2.72 to 4.98
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 2.26 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2019
2019
2019
2019
2019
2019
2019
4BC7
4HJ7
4PF7
4PS7
LAB
LAB
LAB
State
Federal
Federal
State
Federal
Federal
State
2
ZS30
2
ZS30
2
State Funds (002)
Not Grouped
Un-Assigned Federal
State Funds (002)
Un-Assigned Federal Labor
Highway Safety Imp Prog
Labor - State Match
$500,000
$4,500,000
$3,822,672
$955,668
$114,680
$315,000
$63,670
$0
$0
$0
$0
$0
$0
$0
$10,271,690
$10,271,690
$10,271,690
$10,271,690
$10,271,690
$10,271,690
$10,271,690
$10,317,255
$10,317,255
$10,317,255
$10,317,255
$10,317,255
$10,317,255
$10,317,255
2018AM02ID0078FDCO
2018AM02ID0078FDCO
2018AM02ID0078FDCO
2018AM02ID0078FDCO
2018AM02ID0078FDCO
2018AM02ID0078FDCO
2018AM02ID0078FDCO
Ph subtotal: $10,271,690 $0 $10,271,690 $10,317,255
103953 OKI CLE CLE CR 388 Description: Realigning Bach Buxton to align with
proposed SR32 interchange. This project will
include all clearing for PIDs 103953, 103954,
103955, & 103959. Design under PID 82370.
Work Type: Roadway Improvement (Safety)
Termini: Bach Buxton to Marina Drive
ODOT SPONSORING
AGENCY
Air Quality Exempt 4.49 RW Acquis
Acquis
RW Serv
2020
2020
2018
4BD7
4BK7
LAB
State
Federal
State
002
002
State Funds (002)
Un-Assigned Federal
Labor - State Match
$200,000
$800,000
$12,088
$0
$0
$0
$1,012,088
$1,012,088
$1,012,088
$6,182,277
$6,182,277
$6,182,277
2018AM15ID0522FDRW
2018AM15ID0522FDRW
2018AM15ID0522FDRW
Ph subtotal: $1,012,088 $0 $1,012,088 $6,182,277
103954 OKI CLE CLE 32-3.50 Description: Proposed interchange at SR32 and
Bach Buxton. Design under PID 82370. Work
Type: Interchange, New Termini: Bach Buxon
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.01 RW Acquis
Acquis
RW Serv
RW Serv
RW Serv
2019
2019
2018
2019
2019
4BD7
4BK7
LAB
4BD7
4BK7
State
Federal
State
State
Federal
2
Z001
2
2
Z001
State Funds (002)
National Hwy Performance P
Labor - State Match
State Funds (002)
National Hwy Performance P
$912,000
$3,648,000
$13,815
$90,530
$362,120
$0
$0
$0
$0
$0
$5,026,465
$5,026,465
$5,026,465
$5,026,465
$5,026,465
$26,502,466
$26,502,466
$26,502,466
$26,502,466
$26,502,466
2018AM08ID0258FDRW
2018AM08ID0258FDRW
2018AM08ID0258FDRW
2018AM08ID0258FDRW
2018AM08ID0258FDRW
Ph subtotal: $5,026,465 $0 $5,026,465 $26,502,466
103955 OKI CLE CLE CR 171 (Old SR74) Description: Old SR74 improvements to allow for
added capacity needs from the proposed
interchange. Design under PID 82370. Work
Type: Roadway Major Rehab Termini: Old SR
74 Schoolhouse to SR 32
ODOT SPONSORING
AGENCY
Air Quality Exempt 1.82 RW Acquis 2020 4BD7 State 002 State Funds (002) $150,000 $0 $755,181 $5,757,710 2018AM15ID0523FDRW
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 6 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 103955 OKI CLE CLE CR 171 (Old SR74) Description: Old SR74 improvements to allow for
added capacity needs from the proposed
ODOT SPONSORING
AGENCY
Air Quality Exempt 1.82 RW Acquis
RW Serv
2020
2018
4BK7
LAB
Federal
State
Z240
002
STBG
Labor - State Match
$600,000
$5,181
$0
$0
$755,181
$755,181
$5,757,710
$5,757,710
2018AM15ID0523FDRW
2018AM15ID0523FDRW
Ph subtotal: $755,181 $0 $755,181 $5,757,710
103956 OKI CLE CLE 32-2.65 Description: Westbound 3rd lane with concrete
barrier median. Design under PID 82370. This
is part 2 of PID 103954. Work Type: Add
Through Lane(s) Termini: Westbound 32
ODOT SPONSORING
AGENCY
Air Quality Exempt 2.33 RW Acquis
Acquis
2020
2020
4BD7
4BK7
State
Federal
002
Z001
State Funds (002)
National Hwy Performance P
$50,000
$200,000
$0
$0
$250,000
$250,000
$8,810,000
$8,810,000
2018AM15ID0524FDRW
2018AM15ID0524FDRW
Ph subtotal: $250,000 $0 $250,000 $8,810,000
103959 OKI CLE CLE 32-2.88 Description: Ramp from SR32 East Bound to
Clepper Lane. Design under PID 82370. Work
Type: Interchange Improvement (Safety)
Termini: EB 32 ramp to Clepper Lane
ODOT SPONSORING
AGENCY
Air Quality Exempt 2.10 RW Acquis
Acquis
2020
2020
4BD7
4BK7
State
Federal
002
Z001
State Funds (002)
National Hwy Performance P
$500,000
$2,000,000
$0
$0
$2,500,000
$2,500,000
$4,640,000
$4,640,000
2018AM15ID0525FDRW
2018AM15ID0525FDRW
Ph subtotal: $2,500,000 $0 $2,500,000 $4,640,000
104712 OKI CLE CLE VAR ITS Phase 3 Description: Interconnect and upgrade of traffic
signals in Clermont County including new
controllers, LED signal and pedestrian heads,
battery backup systems, video detection,
emergency vehicle preemption, and installation
of Rectangular Rapid Flashing Beacons (RRFB)
Work Type: Signals Termini: 95 signalized
intersections in Clermont County, OH
Clermont County T.I.D. Air Quality Exempt 0.74 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TB7
LNT
LNT
Federal
Local Match
Local Match
Z400
LNTP
LNTP
CMAQ
Local Match
Local Match
$1,863,136
$465,784
$163,024
$0
$0
$0
$2,491,944
$2,491,944
$2,491,944
$2,517,376
$2,517,376
$2,517,376
2018stipID0558FDCO
2018stipID0558FDCO
2018stipID0558FDCO
Ph subtotal: $2,491,944 $0 $2,491,944 $2,517,376
105055 OKI CLE CLE Pierce Twp Park Paths Description: Construction of sidewalk and
multi-use trail to extend the existing trail network
into the southwest portion of Pierce Township
Park. In addition, relocation of existing multi-use
trail along the south side of Locust Corner Road
to improve safety for user Work Type:
Bikeways Termini: Pierce Township Park (961
Locust Corner Road)
Pierce, Township of (Clermont
County)
Air Quality Exempt 0.17 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4BG
4TC7
LAB
Local Match
Federal
Local Match
2
Z301
2
Local Match
TAP/Enhancements
Labor - Local Match
$46,909
$187,635
$23,454
$0
$0
$0
$257,998
$257,998
$257,998
$257,998
$257,998
$257,998
2018stipID0559FDCO
2018stipID0559FDCO
2018stipID0559FDCO
Ph subtotal: $257,998 $0 $257,998 $257,998
106413 OKI CLE CLE SR 132 8.46 Description: Install a modern roundabout at
SR-132 and Chapel Rd. Work Type:
Intersection Improvement Termini: CLE at SR
132 and Chapel Road
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.40 CO CO Contr
CO Engr
2021
2021
4HJ7
LAB
Federal
Federal
Un-Assigned Federal
Un-Assigned Federal Labor
$1,124,502
$78,715
$0
$0
$1,203,217
$1,203,217
$1,729,020
$1,729,020
2018AM02ID0079FDCO
2018AM02ID0079FDCO
Ph subtotal: $1,203,217 $0 $1,203,217 $1,729,020
DD Dtl Dsgn
Dtl Dsgn
2018
2019
LAB
4HJ7
State
Federal
2 Labor - State Match
Un-Assigned Federal
$24,960
$49,303
$0
$0
$74,263
$74,263
$1,729,020
$1,729,020
2018AM02ID0079FDDD
2018AM02ID0079FDDD
Ph subtotal: $74,263 $0 $74,263 $1,729,020
ENV Env PE
Env PE
2018
2018
4HJ7
LAB
Federal
State 2
Un-Assigned Federal
Labor - State Match
$100,100
$141,440
$0
$0
$241,540
$241,540
$1,729,020
$1,729,020
2018AM02ID0079FDENV
2018AM02ID0079FDENV
Ph subtotal: $241,540 $0 $241,540 $1,729,020
RW Acquis
RW Serv
RW Serv
2019
2018
2019
4HJ7
LAB
4HJ7
Federal
State
Federal
2
Un-Assigned Federal
Labor - State Match
Un-Assigned Federal
$100,000
$60,000
$50,000
$0
$0
$0
$210,000
$210,000
$210,000
$1,729,020
$1,729,020
$1,729,020
2018AM02ID0079FDRW
2018AM02ID0079FDRW
2018AM02ID0079FDRW
Ph subtotal: $210,000 $0 $210,000 $1,729,020
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 7 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 107292 OKI CLE CLE US 50/SR 132
Intersections
Description: Improvement of the intersections of
US-50 with SR-132 in Owensville. Improvements
include the addition of turn lanes, curb, sidewalk,
storm sewer, curb ramps, and upgrades to the
existing traffic signals. Work Type: Intersection
Improvement Termini: Intersections of US-50
with SR-132 (two intersections)
Owensville, Village of Air Quality Exempt 0.30 DD Dtl Dsgn
Dtl Dsgn
2021
2021
4TB7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$118,800
$29,700
$0
$0
$148,500
$148,500
$1,965,154
$1,965,154
2018AM04ID0160FDDD
2018AM04ID0160FDDD
Ph subtotal: $148,500 $0 $148,500 $1,965,154
ENV Env PE
Env PE
2021
2021
4TB7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$40,000
$10,000
$0
$0
$50,000
$50,000
$1,965,154
$1,965,154
2018AM04ID0160FDENV
2018AM04ID0160FDENV
Ph subtotal: $50,000 $0 $50,000 $1,965,154
77922 CLI CLI SR 729 2.85/9.50/13.29 Description: Replace the existing superstructure
and widen Bridge No. CLI-729-1329, SFN:
1403788. Bridge carries SR 729 over Wilson
Creek in the Village of Sabina. Replace Bridges
CLI-729-0285 and CLI-729-0950. Resurface SR
729 from Lees Creek to US 22/SR 3. Work
Type: Bridge Repair Termini: At 0.53 miles
north of US 22
ODOT SPONSORING
AGENCY
Air Quality Exempt 10.69 RW Acquis
RW Serv
2019
2019
4PS7
LAB
State
State
2
2
State Funds (002)
Labor - State Match
$25,000
$40,000
$0
$0
$65,000
$65,000
$3,410,520
$3,410,520
2018stipID0618FDRW
2018stipID0618FDRW
Ph subtotal: $65,000 $0 $65,000 $3,410,520
103910 CLI CLI CR 12 0.00 Antioch
Road
Description: Reconstruction of approximately
2,000 feet of Antioch Road (CR-12) including
improving the horizontal and vertical alignment
and widening lane and shoulder widths. In
addition, new pavement markings, raised
pavement markers, Work Type: Realignment
Termini: Antioch Road (CR-12): from the
Highland County Line to approximately 250 feet
north of Moore Road
CLINTON COUNTY
ENGINEER
Air Quality Exempt 0.25 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4HB7
LNT
4HB7
LNT
Federal
Local Match
Federal
Local Match
ZS30
LNTP
ZS30
LNTP
Highway Safety Imp Prog
Local Match
Highway Safety Imp Prog
Local Match
$645,120
$161,280
$64,480
$16,120
2018MODID0424FDCO
2018MODID0424FDCO
2018MODID0424FDCO
2018MODID0424FDCO
Ph subtotal: $887,000 $0 $0 $0
Description: Reconstruction of approximately
2,000 feet of Antioch Road (CR-12) including
improving the horizontal and vertical alignment
and widening lane and shoulder widths. In
addition, new pavement markings, raised
pavement markers, and signage will be installed.
Work Type: Realignment Termini: Antioch
Road (CR-12): from the Highland County Line to
approximately 250 feet north of Moore Road
CLINTON COUNTY
ENGINEER
Air Quality Exempt 0.25 DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $3,623 $0 $3,623 $933,740 2018stipID0619FDDD
Ph subtotal: $3,623 $0 $3,623 $933,740
ENV Env PE 2018 LAB State 2 Labor - State Match $20,531 $0 $20,531 $933,740 2018stipID0619FDENV
Ph subtotal: $20,531 $0 $20,531 $933,740
RW RW Serv 2018 LAB State 2 Labor - State Match $6,044 $0 $6,044 $933,740 2018stipID0619FDRW
Ph subtotal: $6,044 $0 $6,044 $933,740
106338 CLI CLI CR 12 7.96 Antioch
Road
Description: Reconstruct approximately 3300' of
Antioch Road, improving horizontal and vertical
curves as well as widening the pavement and
berms and removing fixed objects from the clear
zone. Work includes associated striping, RPM
and signing safety improvements. Work Type:
Section Improvement Termini: Antioch Road
(CR-12): from TR 154 to 3,300 feet north of TR
154
CLINTON COUNTY
ENGINEER
Air Quality Exempt 0.63 CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4HB7
LNT
4HB7
LNT
Federal
Local Match
Federal
Local Match
ZS30
LNTP
ZS30
LNTP
Not Grouped
Local Match
Not Grouped
Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018MODID0448XXCO
2018MODID0448XXCO
2018MODID0448XXCO
2018MODID0448XXCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 8 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
Ph subtotal: $0 $0 $0 $0
FHWA 8 101018 D08 D08 OSS FY2018 Description: Overhead Sign Support Inspections
in the District. Work Type: Signs Termini:
Districtwide
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn 2018 4PS7 State 2 State Funds (002) $600,000 $0 $600,000 $600,000 2018stipID0620FDDD
Ph subtotal: $600,000 $0 $600,000 $600,000
101860 D08 D08 BS Major FY2018 Description: This project is to seal Major Bridges
within District 8. Work Type: Bridge
Maintenance/Repair (NEW) Termini: Major
Bridges in D8
ODOT SPONSORING
AGENCY
Air Quality Exempt CO CO Contr
CO Contr
CO Contr
CO Engr
2018
2018
2018
2018
4BT7
4PF7
4PS7
LAB
State
Federal
State
State
2
Z001
2
2
State Funds (002)
National Hwy Performance P
State Funds (002)
Labor - State Match
$1,995,118
$45,624
$11,406
$265,000
$0
$0
$0
$0
$2,317,148
$2,317,148
$2,317,148
$2,317,148
$2,449,648
$2,449,648
$2,449,648
$2,449,648
2018stipID0621FDCO
2018stipID0621FDCO
2018stipID0621FDCO
2018stipID0621FDCO
Ph subtotal: $2,317,148 $0 $2,317,148 $2,449,648
77793 MVRPC GRE GRE SR 4 0.89 Description: Replace the existing concrete slabs
and abutments of Bridge Nos. GRE-4-0090 L/R,
SFNs: 2900033 and 2900068. The new slabs
shall be constructed on the existing piers.
Bridges carry SR 4 over Union Rd. Work
Type: Bridge Repair Termini: At Township Rd.
168 (Union Rd.)
ODOT SPONSORING
AGENCY
Air Quality Exempt CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4PF7
4PS7
LAB
LAB
Federal
State
Federal
State
L1C0
2
L1C0
2
Bridge
State Funds (002)
Bridge
Labor - State Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018stipID0505XXCO
2018stipID0505XXCO
2018stipID0505XXCO
2018stipID0505XXCO
Ph subtotal: $0 $0 $0 $0
80468 MVRPC GRE GRE US 35 4.26 Description: Eliminate at-grade intersections at
Factory Road/Shakertown Road and Valley
Road by constructing new interchanges. Work
Type: Interchange, New Termini: US 35 at
Factory Road and US 35 at Valley Road
DISTRICT 8 PRODUCTION CO Air Quality None 0.06 DD Dtl Dsgn 2014 4B47 Federal L05E National Highway System $2,340,207 $100,779 $2,440,986 $112,267,058 2018MODID0208FDDD
Ph subtotal: $2,340,207 $100,779 $2,440,986 $112,267,058
82970 MVRPC GRE GRE US 35 2.32 Description: Microsurface a portion of US 35 in
Greene County from the Beavercreek Corp to
the US 35 By-Pass Work Type: Minor
Rehabilitation - Pavement Prmy Sys Termini:
US 35: SLM 2.32 to SLM 7.35
ODOT SPONSORING
AGENCY
Air Quality Exempt 5.03 DD Dtl Dsgn 2019 LAB State 2 Labor - State Match $16,364 $0 $16,364 $1,594,482 2018stipID0506FDDD
Ph subtotal: $16,364 $0 $16,364 $1,594,482
ENV Env PE 2019 LAB State 2 Labor - State Match $92,728 $0 $92,728 $1,594,482 2018stipID0506FDENV
Ph subtotal: $92,728 $0 $92,728 $1,594,482
87094 MVRPC GRE GRE SR 72 0.00 Description: Resurface and perform pavement
repair on SR 72 in Greene County from the
Clinton County line to north of the US 35
interchange. Work Type: Minor Rehabilitation -
Pavement Gnrl Sys Termini: GRE SR 72: from
0 to 8.71
ODOT SPONSORING
AGENCY
Air Quality Exempt 8.71 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
CO Engr
2018
2018
2018
2018
2018
2018
2018
2018
4PF7
4PF7
4PF7
4PS7
LAB
LAB
LAB
LAB
Federal
Federal
Federal
State
Federal
Federal
Federal
State
L25E
M001
M232
2
L25E
M001
M232
2
STP
National Hwy Performance P
STP
State Funds (002)
STBG
National Hwy Performance P
STBG
Labor - State Match
$1,489,994
$69,504
$31,191
$397,672
$44,700
$2,085
$936
$11,930
$0
$0
$0
$0
$0
$0
$0
$0
$2,048,012
$2,048,012
$2,048,012
$2,048,012
$2,048,012
$2,048,012
$2,048,012
$2,048,012
$2,079,148
$2,079,148
$2,079,148
$2,079,148
$2,079,148
$2,079,148
$2,079,148
$2,079,148
2018AM01ID0026FDCO
2018AM01ID0026FDCO
2018AM01ID0026FDCO
2018AM01ID0026FDCO
2018AM01ID0026FDCO
2018AM01ID0026FDCO
2018AM01ID0026FDCO
2018AM01ID0026FDCO
Ph subtotal: $2,048,012 $0 $2,048,012 $2,079,148
87185 MVRPC GRE GRE US 35 11.94 Description: Resurface and perform pavement
repair on a portion of US in Greene County
around Xenia Work Type: Minor Rehabilitation
- Pavement Prmy Sys Termini: GRE US 35:
from SLM 11.94 to 14.46
ODOT SPONSORING
AGENCY
Air Quality Exempt 2.52 DD Dtl Dsgn 2019 LAB State 2 Labor - State Match $24,960 $0 $24,960 $4,241,863 2018stipID0508FDDD
Ph subtotal: $24,960 $0 $24,960 $4,241,863
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 9 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 87185 MVRPC GRE GRE US 35 11.94 Description: Resurface and perform pavement
repair on a portion of US in Greene County
ODOT SPONSORING
AGENCY
Air Quality Exempt 2.52 ENV Env PE 2019 LAB State 2 Labor - State Match $141,440 $0 $141,440 $4,241,863 2018stipID0508FDENV
Ph subtotal: $141,440 $0 $141,440 $4,241,863
93532 MVRPC GRE GRE Sugarcreek SRTS 12
Feedwire
Description: Part 1: Extend existing path from
Intermediate School south to existing path by
water tower on east side of Upper Bellbrook
Road to connect to school sidewalk. Part 2:
Construct a shared use path along Upper
Bellbrook Road from Feedwire to Kable's Mill Dr
Work Type: Add Sidewalks Termini: Upper
Bellbrook Rd. from existing path to School and
from Feedwire to Kables Mill.
Sugarcreek, Township of Air Quality Exempt 0.80 RW Acquis
RW Serv
RW Serv
2015
2015
2015
4SC7
4SC7
LAB
Federal
Federal
State
LU2E
2
STP
Un-Assigned Federal
Labor - State Match
$6,500
$10,000
$1,727
$0
$0
$0
$18,227
$18,227
$18,227
$662,771
$662,771
$662,771
2018MODID0221FDRW
2018MODID0221FDRW
2018MODID0221FDRW
Ph subtotal: $18,227 $0 $18,227 $662,771
93536 MVRPC GRE GRE Yellow Spr. SRTS
Sidewalks
Description: Provide sidewalk along Yellow
Springs Fairfield Pike from Fair Acres Drive to
Winter St and along Winter from Pleasant to
Yellow Springs Fairfield Pike. Work Type: Add
Sidewalks Termini: Yellow Springs Fairfield
Pike from Fair Acres Drive to Winter St; Winter
from Pleasant to Yellow Springs Fairfield Pike
Yellow Springs, Village of Air Quality Exempt 0.10 CO CO Contr
CO Engr
CO Engr
2018
2018
2018
4SC7
LAB
LAB
Federal
Federal
State
LU2E
M303
2
STBG/Safe Routes to School
TAP/Enhancements
Labor - State Match
$182,000
$14,560
$3,640
$0
$0
$0
$200,200
$200,200
$200,200
$385,307
$385,307
$385,307
2018stipID0509FDCO
2018stipID0509FDCO
2018stipID0509FDCO
Ph subtotal: $200,200 $0 $200,200 $385,307
RW Acquis
RW Serv
2016
2016
4SC7
4SC7
Federal
Federal
LU2E
LU2E
STP
STP
$33,600
$55,500
$0
$0
$89,100
$89,100
$385,307
$385,307
2018MODID0222FDRW
2018MODID0222FDRW
Ph subtotal: $89,100 $0 $89,100 $385,307
94174 MVRPC GRE GRE SR 72 14.48 Description: Resurfacing and pavement repairs
on SR 72 in Greene County from the north corp
of Jamestown to the Clark County line Work
Type: Minor Rehabilitation - Pavement Gnrl Sys
Termini: GRE SR 72: SLM 14.48 to 19.01
ODOT SPONSORING
AGENCY
Air Quality Exempt 4.39 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4PF7
4PS7
LAB
LAB
Federal
State
Federal
State
M232
2
M232
2
STBG
State Funds (002)
STBG
Labor - State Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018stipID0510XXCO
2018stipID0510XXCO
2018stipID0510XXCO
2018stipID0510XXCO
Ph subtotal: $0 $0 $0 $0
94254 MVRPC GRE GRE IR 675 0.00 Description: Resurfacing and pavement repair
on a portion of I-675 in Greene County from the
Montgomery Co. line to almost North Fairfield
Road. Project also includes bridge overlays,
approach slabs, and joint work on mainline and
overhead bridges within these limits. Work
Type: Minor Rehabilitation - Pavement Prmy Sys
Termini: GRE IR 675: SLM 0 to 9.48
ODOT SPONSORING
AGENCY
Air Quality Exempt 9.58 DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $14,706 $0 $14,706 $17,317,487 2018stipID0511FDDD
Ph subtotal: $14,706 $0 $14,706 $17,317,487
ENV Env PE 2018 LAB State 2 Labor - State Match $83,333 $45,308 $128,641 $17,317,487 2018stipID0511FDENV
Ph subtotal: $83,333 $45,308 $128,641 $17,317,487
RW RW Serv 2018 LAB State 2 Labor - State Match $173 $0 $173 $17,317,487 2018stipID0511FDRW
Ph subtotal: $173 $0 $173 $17,317,487
GRE IR 675 0.00 - Pt. 1 Description: Part 1 - Resurfacing and pavement
repair on a portion of I-675 in Greene County
from the Montgomery Co. line to almost North
Fairfield Road. Project also includes bridge
overlays, approach slabs, and joint work on
mainline and overhead bridges within thes
Work Type: Minor Rehabilitation - Pavement
Prmy Sys Termini: GRE IR 675: SLM 0 to
9.48
ODOT SPONSORING
AGENCY
Air Quality Exempt 9.69 CO CO Contr
CO Contr
CO Contr
CO Engr
2020
2020
2020
2020
4CP7
4PF7
4PS7
LAB
State
Federal
State
Federal
2
M001
2
M001
State Funds (002)
National Hwy Performance P
State Funds (002)
National Hwy Performance P
$289,025
$22,203,648
$2,467,072
$1,173,709
$0
$0
$0
$0
$26,292,769
$26,292,769
$26,292,769
$26,292,769
$26,436,289
$26,436,289
$26,436,289
$26,436,289
2018AM12ID0406FDCO
2018AM12ID0406FDCO
2018AM12ID0406FDCO
2018AM12ID0406FDCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 10 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 94254 MVRPC GRE GRE IR 675 0.00 - Pt. 1 Description: Part 1 - Resurfacing and pavement
repair on a portion of I-675 in Greene County
ODOT SPONSORING
AGENCY
Air Quality Exempt 9.69 CO CO Engr 2020 LAB State 2 Labor - State Match $159,315 $0 $26,292,769 $26,436,289 2018AM12ID0406FDCO
Ph subtotal: $26,292,769 $0 $26,292,769 $26,436,289
96668 MVRPC GRE GRE US 35 20.94 Description: Microsufacing a portion of US 35 in
Greene County from the interchange with Old
US 35 to the Fayette County Line. All ramps
within the projects limits are included in the
project. Work Type: Preventive Maintenance
Termini: GRE US 35: from SLM 20.94 to 27.23
ODOT SPONSORING
AGENCY
Air Quality Exempt 6.29 DD Dtl Dsgn 2020 LAB State 2 Labor - State Match $24,960 $0 $24,960 $2,244,312 2018stipID0512FDDD
Ph subtotal: $24,960 $0 $24,960 $2,244,312
ENV Env PE 2020 LAB State 2 Labor - State Match $141,440 $0 $141,440 $2,244,312 2018stipID0512FDENV
Ph subtotal: $141,440 $0 $141,440 $2,244,312
96680 MVRPC GRE GRE US 35 1.12 Description: Minor pavement rehabilitation with
pavement repair on US 35 in Greene County
near the interchange with I-675. All ramps within
the project limits are to be included. Work
Type: Minor Rehabilitation - Pavement Prmy Sys
Termini: GRE US 35: from SLM 1.12 to 2.32
ODOT SPONSORING
AGENCY
Air Quality Exempt 1.20 DD Dtl Dsgn 2020 LAB State 2 Labor - State Match $24,960 $0 $24,960 $1,609,790 2018stipID0513FDDD
Ph subtotal: $24,960 $0 $24,960 $1,609,790
ENV Env PE 2020 LAB State 2 Labor - State Match $141,440 $0 $141,440 $1,609,790 2018stipID0513FDENV
Ph subtotal: $141,440 $0 $141,440 $1,609,790
98081 MVRPC GRE GRE US 42 10.29 Description: Project will convert the existing
intersection of US-42 (N. Columbus Street) and
E. Church Street to a modern roundabout.
Pedestrian facilities, curb and gutter, and storm
sewer system will be constructed as part of the
improvements. Work Type: Intersection
Improvement Termini: Intersection of US-42
and East Church Street
Xenia, City of Air Quality Exempt 0.30 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4BG
4TA7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
M230
38
2
Local Match
STP
STBG
Labor - Local Match
$209,663
$628,988
$44,030
$14,677
$0
$0
$0
$0
$897,356
$897,356
$897,356
$897,356
$987,003
$987,003
$987,003
$987,003
2018AM06ID0203FDCO
2018AM06ID0203FDCO
2018AM06ID0203FDCO
2018AM06ID0203FDCO
Ph subtotal: $897,356 $0 $897,356 $987,003
98125 MVRPC GRE GRE CR 46 0.00 National
Road
Description: Widening for a 400' right turn lane
from Grange Hall Rd to Colonel Glenn Hwy,
extension of the second NB thru-lane on National
Road, north of Colonel Glenn Hwy, signal
modifications at Colonel Glenn & National Road,
milling and resurfacing of the entire p Work
Type: Widening Termini: Grange Hall Rd: from
650 ft south of Col. Glenn Hwy to Col. Glenn;
National Rd from Col. Glenn to Beavercreek
northern corp. limit
Beavercreek, City of Air Quality Exempt 0.27 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4TA7
LNT
4TA7
LNT
Federal
Local Match
Federal
Local Match
M230
LNTP
M230
LNTP
STBG
Local Match
STBG
Local Match
$836,000
$209,000
$58,520
$14,630
$0
$0
$0
$0
$1,118,150
$1,118,150
$1,118,150
$1,118,150
$1,383,103
$1,383,103
$1,383,103
$1,383,103
2018stipID0515FDCO
2018stipID0515FDCO
2018stipID0515FDCO
2018stipID0515FDCO
Ph subtotal: $1,118,150 $0 $1,118,150 $1,383,103
98146 MVRPC GRE GRE CR 142 1.21
Dayton-Xenia Rd
Description: Widening of Dayton-Xenia Road
(CR-142) from East Lynn Drive to Woods Drive
to provide a center two way left turn lane,
addition of sidewalks along both sides of the
roadway, installation of curb and gutter and
storm sewer improvements. On-street parking w
Work Type: Widening Termini: Dayton-Xenia
Road (CR-142): from East Lynn Drive to Woods
Drive
Beavercreek, City of Air Quality Exempt 0.57 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TB7
LNT
LNT
Federal
Local Match
Local Match
M40E
LNTP
LNTP
CMAQ
Local Match
Local Match
$2,225,600
$1,168,189
$237,565
$0
$0
$0
$3,631,354
$3,631,354
$3,631,354
$4,145,392
$4,145,392
$4,145,392
2018AM10ID0298FDCO
2018AM10ID0298FDCO
2018AM10ID0298FDCO
Ph subtotal: $3,631,354 $0 $3,631,354 $4,145,392
RW Acquis
Acquis
2019
2019
4TB7
LNT
Federal
Local Match
M40E
LNTP
CMAQ
Local Match
$360,000
$90,000
$8,529
$8,529
$458,529
$458,529
$3,490,778
$3,490,778
2018stipID0516FDRW
2018stipID0516FDRW
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 11 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
Ph subtotal: $450,000 $8,529 $458,529 $3,490,778
FHWA 8 98157 MVRPC GRE GRE CR 1/54 3.85/2.34 Description: Conversion of the existing
intersection of Kauffman Avenue and Colonel
Glenn Highway from a signal-controlled
T-intersection to a modern roundabout (Part 1).
**This project includes construction of PID
98160 as Part 2.** Work Type: Intersection
Improvement Termini: Intersection of Kauffman
Avenue and Colonel Glenn Highway in Fairborn,
OH
Fairborn, City of Air Quality Exempt 0.32 CO CO Contr
CO Contr
CO Contr
CO Engr
2019
2019
2019
2019
4HJ7
4TA7
LNT
LNT
Federal
Federal
Local Match
Local Match
ZS30
M23E
LNTP
LNTP
Highway Safety Imp Prog
STBG
Local Match
Local Match
$300,000
$1,447,472
$2,379,284
$288,873
$0
$0
$0
$0
$4,415,629
$4,415,629
$4,415,629
$4,415,629
$4,450,896
$4,450,896
$4,450,896
$4,450,896
2018AM11ID0358FDCO
2018AM11ID0358FDCO
2018AM11ID0358FDCO
2018AM11ID0358FDCO
Ph subtotal: $4,415,629 $0 $4,415,629 $4,450,896
98158 MVRPC GRE GRE SR 444 7.53 Broad St Description: Widening of Broad Street (SR-444)
from 2 to 3 lanes to provide a center turn lane,
installation of curb and gutter and storm sewer,
and installation of sidewalk on both sides of the
roadway. Work Type: Minor Widening
Termini: Broad Street (SR-444): from Sandhill
Road to Spangler Road
Fairborn, City of Air Quality Exempt 0.51 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TA7
LNT
LNT
Federal
Local Match
Local Match
M23E
LNTP
LNTP
STBG
Local Match
Local Match
$959,365
$805,810
$123,562
$0
$0
$0
$1,888,737
$1,888,737
$1,888,737
$1,918,362
$1,918,362
$1,918,362
2018AM11ID0359FDCO
2018AM11ID0359FDCO
2018AM11ID0359FDCO
Ph subtotal: $1,888,737 $0 $1,888,737 $1,918,362
98160 MVRPC GRE GRE SR 444 2.20 Kauffman
Ave
Description: The project consists of widening
Kauffman Avenue (SR-444), from Dayton Yellow
Springs Road to Lindberg Drive, from 3 lanes to
4 lanes. Also replacement of the existing traffic
signal at Kauffman and Garland with mast arms,
re Work Type: Minor Widening Termini:
Kauffman Avenue (SR-444): from Dayton Yellow
Springs Road to Lindberg Drive
Fairborn, City of Air Quality Exempt 1.20 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4TA7
LNT
4TA7
LNT
Federal
Local Match
Federal
Local Match
M23E
LNTP
M23E
LNTP
STBG
Local Match
STBG
Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018stipID0519XXCO
2018stipID0519XXCO
2018stipID0519XXCO
2018stipID0519XXCO
Ph subtotal: $0 $0 $0 $0
98161 MVRPC GRE GRE Creekside Trail
Resurfacing
Description: Apply 1.5 inches of asphalt over the
existing surface course. Installation of a 3' wide
topsoil berm against new pavement with seed,
fertilizer, and mulch. Application of thermoplastic
pavement markings with silica sand for skid
resistance. Full depth pav Work Type:
Bikeways Termini: Creekside Trail: from Alpha
Road in Beavercreek Township to Xenia Station
in Xenia; Spur behind Xenia Town Square Mall
Greene County Park District Air Quality Exempt CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4BG
4TC7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
M301
38
2
Local Match
TAP/Enhancements
TAP/Enhancements
Labor - Local Match
$112,500
$337,500
$4,171
$13,829
$0
$0
$0
$0
$468,000
$468,000
$468,000
$468,000
$479,238
$479,238
$479,238
$479,238
2018AM02ID0067FDCO
2018AM02ID0067FDCO
2018AM02ID0067FDCO
2018AM02ID0067FDCO
Ph subtotal: $468,000 $0 $468,000 $479,238
98162 MVRPC GRE GRE Bikeway Rehab Phase
2
Description: Project will fill all cracks on bike
paths, sealcoat all asphalt sections of paths with
an approved agricultural bio-based
101-Agril-Road treatment product, and perform
full depth repairs as needed. Work Type:
Bikeways Termini: LMR Tr: Yellow Sp. Fairfield
Rd - Clark CL; X-J Conn: Washington St -
Jasper Pk; Creekside Tr: Alpha Rd to
Montgomery CL
Greene County Park District Air Quality Exempt CO CO Contr
CO Contr
CO Engr
2017
2017
2017
4BG
4TC7
LAB
Local Match
Federal
Local Match
2
M301
2
Local Match
TAP/Enhancements
Labor - Local Match
$15,948
$47,844
$2,552
$0
$0
$0
$66,344
$66,344
$66,344
$69,533
$69,533
$69,533
2018MODID0240FDCO
2018MODID0240FDCO
2018MODID0240FDCO
Ph subtotal: $66,344 $0 $66,344 $69,533
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 12 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 98576 MVRPC GRE GRE Sugarcreek SRTS 14
Feedwire
Description: Construct a shared use path along
Feedwire Road from from Eden Meadows Way
to the Middle School drive east of Adam's Place.
This section of path will also include the
installation of a crosswalk at Adam’s Place and
on Feedwire Road at the Roger Scott/Ede
Work Type: Bikeways Termini: Feedwire Road
from Eden Meadows Way to the Middle School
drive east of Adam's Place
Sugarcreek, Township of Air Quality Exempt 0.55 CO CO Contr
CO Engr
CO Engr
2019
2019
2019
4SC7
LAB
LAB
Federal
Federal
State
M300
M300
2
TAP/Enhancements
TAP/Enhancements
Labor - State Match
$225,700
$18,056
$4,514
$0
$0
$0
$248,270
$248,270
$248,270
$476,972
$476,972
$476,972
2018AM04ID0156FDCO
2018AM04ID0156FDCO
2018AM04ID0156FDCO
Ph subtotal: $248,270 $0 $248,270 $476,972
RW Acquis
RW Serv
2017
2017
4SC7
4SC7
Federal
Federal
M300
M300
TAP/Enhancements
TAP/Enhancements
$58,500
$52,500
$0
$0
$111,000
$111,000
$463,995
$463,995
2018MODID0242FDRW
2018MODID0242FDRW
Ph subtotal: $111,000 $0 $111,000 $463,995
99489 MVRPC GRE GRE SR 4 1.54 Description: Project is to replace two parallel
culverts (one Corrugated Metal Pipe = 8' 7" x 5'
11" and one Concrete pipe = 6' diameter) that
are 192' long under SR 4 near Bath Rd. The
project to install a 125' right turn lane with a 50'
taper on Bath Rd. to southbou Work Type:
Culvert Construction/Reconstr/Repair Termini:
GRE SR 4 - SLM 1.54
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.07 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2018
2018
2018
2018
2018
2018
2018
4BC7
4HJ7
4PF7
4PS7
LAB
LAB
LAB
State
Federal
Federal
State
Federal
Federal
State
2
ZS30
M001
2
M001
ZS30
2
State Funds (002)
Not Grouped
National Hwy Performance P
State Funds (002)
National Hwy Performance P
Highway Safety Imp Prog
Labor - State Match
$28,000
$112,000
$1,224,480
$306,120
$85,714
$11,200
$24,228
$0
$0
$0
$0
$0
$0
$0
$1,791,742
$1,791,742
$1,791,742
$1,791,742
$1,791,742
$1,791,742
$1,791,742
$2,084,283
$2,084,283
$2,084,283
$2,084,283
$2,084,283
$2,084,283
$2,084,283
2018AM02ID0068FDCO
2018AM02ID0068FDCO
2018AM02ID0068FDCO
2018AM02ID0068FDCO
2018AM02ID0068FDCO
2018AM02ID0068FDCO
2018AM02ID0068FDCO
Ph subtotal: $1,791,742 $0 $1,791,742 $2,084,283
100826 MVRPC GRE GRE SR 235 10.75/11.10 Description: Rehabilitate bridge GRE-235-1075
by zone painting, replacing bearings, and
updating guardrail.Rehabilitate bridge
GRE-235-1110 by replacing the existing
superstructure. Work Type: Bridge Repair
Termini: GRE-235-1075 - GRE-235-1110
ODOT SPONSORING
AGENCY
Air Quality Exempt CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4PF7
4PS7
LAB
LAB
Federal
State
Federal
State
M001
2
M001
2
National Hwy Performance P
State Funds (002)
National Hwy Performance P
Labor - State Match
$3,468,000
$867,000
$346,800
$86,700
$0
$0
$0
$0
$4,768,500
$4,768,500
$4,768,500
$4,768,500
$5,384,900
$5,384,900
$5,384,900
$5,384,900
2018stipID0523FDCO
2018stipID0523FDCO
2018stipID0523FDCO
2018stipID0523FDCO
Ph subtotal: $4,768,500 $0 $4,768,500 $5,384,900
ENV Env PE
Env PE
Env PE
2018
2018
2018
4PF7
4PS7
LAB
Federal
State
State
Z001
2
2
National Hwy Performance P
State Funds (002)
Labor - State Match
$306,000
$76,500
$141,440
$0
$0
$0
$523,940
$523,940
$523,940
$5,384,900
$5,384,900
$5,384,900
2018stipID0523FDENV
2018stipID0523FDENV
2018stipID0523FDENV
Ph subtotal: $523,940 $0 $523,940 $5,384,900
Description: Rehabilitate bridge GRE-235-1075
over Mud Run by replacing the existing
superstructure and protecting the
piling.Rehabilitate bridge GRE-235-1110 over the
Mad River by zone painting, replacing bearings,
updating guardrail, and stabilizing the stream
chann Work Type: Bridge Preservation
Termini: GRE-235-1075 - GRE-235-1110
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2020
2020
LAB
4PF7
4PS7
State
Federal
State
2
Z001
2
Labor - State Match
National Hwy Performance P
State Funds (002)
$24,960
$35,615
$8,904
$0
$0
$0
$69,479
$69,479
$69,479
$5,445,387
$5,445,387
$5,445,387
2018AM13ID0453FDDD
2018AM13ID0453FDDD
2018AM13ID0453FDDD
Ph subtotal: $69,479 $0 $69,479 $5,445,387
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 13 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 100924 MVRPC GRE GRE CR 40 1.27 Kemp Rd
Widening
Description: Widening of Kemp Road to three
lanes from Grange Hall Road to Meadowcourt
Drive. Addition of curb and gutter and storm
sewer system. An 8' wide sidewalk will be
constructed on the north side of the roadway
and a 5' wide sidewalk will be constructed on the
Work Type: Roadway Improvement (Safety)
Termini: Kemp Road: from Grange Hall Road to
Meadowcourt Drive
Beavercreek, City of Air Quality Exempt 0.45 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
Bridge
Local Match
Local Match
$987,610
$1,902,629
$202,317
$0
$0
$0
$3,092,556
$3,092,556
$3,092,556
$3,149,214
$3,149,214
$3,149,214
2018MODID0489FDCO
2018MODID0489FDCO
2018MODID0489FDCO
Ph subtotal: $3,092,556 $0 $3,092,556 $3,149,214
100925 MVRPC GRE GRE CR 36 1.13 Indian
Ripple
Description: Widening of the south side of Indian
Ripple Road from Darst Road to Marydale Drive
to extend the second eastbound through lane.
Installation of curb and gutter and storm sewer
system, lighting, and a 5' wide sidewalk along the
south side of the roadway. A Work Type:
Widening Termini: Indian Ripple Road: from
Darst Road to Marydale Drive
Beavercreek, City of Air Quality Exempt 0.20 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
Not Grouped
Local Match
Local Match
$338,250
$325,684
$66,393
$0
$0
$0
$730,327
$730,327
$730,327
$767,697
$767,697
$767,697
2018AM02ID0069FDCO
2018AM02ID0069FDCO
2018AM02ID0069FDCO
Ph subtotal: $730,327 $0 $730,327 $767,697
100929 MVRPC GRE GRE CR 71 3.51
Shakertown Rd Ext
Description: Relocation and extension of
Shakertown Road from Greystone Drive to
Factory Road and realigment of Alpha Belbrook
Road to intersect Shakertown Road west of
Factory Road. The existing intersection of
Shakertown Road and US-35 will be eliminated
as a result Work Type: New Construction
Termini: Shakertown Rd from Greystone Dr to
Factory Rd; Alpha Bellbrook Rd from 0.2 mi W of
Factory Rd to Factory Rd
Beavercreek, City of Air Quality Non-Exe 0.68 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
Not Grouped
Local Match
Local Match
$1,722,700
$1,995,117
$260,247
$0
$0
$0
$3,978,064
$3,978,064
$3,978,064
$4,725,311
$4,725,311
$4,725,311
2018AM02ID0070FDCO
2018AM02ID0070FDCO
2018AM02ID0070FDCO
Ph subtotal: $3,978,064 $0 $3,978,064 $4,725,311
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $5,950 $0 $5,950 $3,380,517 2018stipID0526FDDD
Ph subtotal: $5,950 $0 $5,950 $3,380,517
ENV Env PE 2018 LAB State 2 Labor - State Match $33,715 $0 $33,715 $3,380,517 2018stipID0526FDENV
Ph subtotal: $33,715 $0 $33,715 $3,380,517
RW Acquis
Acquis
RW Serv
2018
2018
2018
4TA7
LNT
LAB
Federal
Local Match
State
Z230
LNTP
2
STBG
Local Match
Labor - State Match
$490,000
$210,000
$7,582
$0
$0
$0
$707,582
$707,582
$707,582
$3,380,517
$3,380,517
$3,380,517
2018stipID0526FDRW
2018stipID0526FDRW
2018stipID0526FDRW
Ph subtotal: $707,582 $0 $707,582 $3,380,517
101410 MVRPC GRE GRE SR 235 7.21 Description: FY2019 Urban Paving in the city of
Fairborn on a portion of SR 235 (Xenia Dr) from
Broad St. to just past E. Dayton Drive. Work
Type: Resurfacing, Undivided System
Termini: SR 235: SLM 7.21-7.54
Fairborn, City of Air Quality Exempt 0.76 CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2019
2019
2019
2019
2019
2019
4BG
4PF7
4PF7
LAB
LAB
LAB
Local Match
Federal
Federal
Federal
Federal
Local Match
2
M001
Z240
M001
Z240
2
Local Match
National Hwy Performance P
Not Grouped
National Hwy Performance P
STBG
Labor - Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018MODID0430XXCO
2018MODID0430XXCO
2018MODID0430XXCO
2018MODID0430XXCO
2018MODID0430XXCO
2018MODID0430XXCO
Ph subtotal: $0 $0 $0 $0
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 14 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 101498 MVRPC GRE GRE CR 99 0.56 YSF Road Description: Resurfacing of Yellow Springs
Fairfield Road from Spangler Road to the
eastern Fairborn corporation limit. In addition,
construction of multi-use trail, sidewalk, curb and
gutter, addition of a traffic signal at Black Lane, a
Rectangular Rapid Flashing Be Work Type:
Mill and Fill Termini: Yellow Springs Fairfield
Road: from Spangler Road to the eastern
Fairborn corporation limit
Fairborn, City of Air Quality Exempt 0.98 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
Bridge
Local Match
Local Match
$1,163,745
$1,342,742
$186,428
$0
$0
$0
$2,692,915
$2,692,915
$2,692,915
$2,720,469
$2,720,469
$2,720,469
2018AM12ID0407FDCO
2018AM12ID0407FDCO
2018AM12ID0407FDCO
Ph subtotal: $2,692,915 $0 $2,692,915 $2,720,469
101771 MVRPC GRE GRE CR 502 1.12 Maple
Ave
Description: Widening of Maple Avenue to
provide bike lanes, pavement repair and
resurfacing, upgrade of traffic signals at two
intersections, installation of rectangular rapid
flashing beacons (RRFBs) at unsignalized
pedestrian crossings, and application of new
pavem Work Type: Minor Rehabilitation -
Pavement Gnrl Sys Termini: Maple Avenue:
from Doris Drive to Dayton Drive
Fairborn, City of Air Quality Exempt 1.14 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
STBG
Local Match
Local Match
$1,297,344
$2,516,909
$266,998
$0
$0
$0
$4,081,251
$4,081,251
$4,081,251
$4,105,871
$4,105,871
$4,105,871
2018AM11ID0360FDCO
2018AM11ID0360FDCO
2018AM11ID0360FDCO
Ph subtotal: $4,081,251 $0 $4,081,251 $4,105,871
102060 MVRPC GRE GRE US 35 6.24 Description: Add a right turn lane on the north leg
of the intersection at Valley and Trebein roads.
Work Type: Turn Lane Addition Termini: GRE
US 35 6.24
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.20 CO CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
4BC7
4HJ7
LAB
LAB
State
Federal
Federal
State
2
MS3E
MS3E
2
State Funds (002)
Highway Safety Imp Prog
Highway Safety Imp Prog
Labor - State Match
$23,647
$212,823
$21,282
$2,365
$0
$0
$0
$0
$260,117
$260,117
$260,117
$260,117
$315,271
$315,271
$315,271
$315,271
2018stipID0530FDCO
2018stipID0530FDCO
2018stipID0530FDCO
2018stipID0530FDCO
Ph subtotal: $260,117 $0 $260,117 $315,271
102421 MVRPC GRE GRE US 35 4.30 Description: Construct superstreets at the
US-35 with Factory and Orchard. Work Type:
Intersection Improvement Termini: US 35
Intersections with Factory & Orchard
ODOT SPONSORING
AGENCY
Air Quality Exempt 1.30 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
4BC7
4BG
4HJ7
4R27
4R47
4R47
4R57
4TA7
LAB
LAB
LAB
LAB
LAB
LAB
LAB
State
Local Match
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Local Match
State
2
2
ZS30
RPE9
RPF9
RPS9
RPS9
Z230
38
RPE9
RPF9
RPS9
ZS30
2
2
State Funds (002)
Local Match
Not Grouped
Not Grouped
Not Grouped
Not Grouped
Not Grouped
Not Grouped
STBG
Not Grouped
Not Grouped
Not Grouped
Highway Safety Imp Prog
Labor - Local Match
Labor - State Match
$652,500
$1,444,350
$5,872,500
$334,509
$92,240
$189,658
$1,676,870
$2,803,739
$196,261
$23,416
$129,536
$7,579
$411,075
$101,104
$45,675
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$13,981,012
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
$16,939,793
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
2018AM04ID0157FDCO
Ph subtotal: $13,981,012 $0 $13,981,012 $16,939,793
DD Dtl Dsgn
Dtl Dsgn
2019
2019
4BC7
4HJ7
State
Federal
2
ZS30
State Funds (002)
Highway Safety Imp Prog
$87,500
$787,500
$0
$0
$875,000
$875,000
$16,760,793
$16,760,793
2018stipID0531FDDD
2018stipID0531FDDD
Ph subtotal: $875,000 $0 $875,000 $16,760,793
RW Acquis
Acquis
Utl Remb
Utl Remb
2018
2018
2018
2018
4B47
STM
4BC7
4HJ7
Federal
State
State
Federal
Z001
2
2
ZS30
National Hwy Performance P
State Funds (002)
State Funds (002)
Highway Safety Imp Prog
$752,000
$188,000
$30,000
$270,000
$82,474
$82,474
$82,474
$82,474
$1,134,474
$1,134,474
$1,134,474
$1,134,474
$16,760,793
$16,760,793
$16,760,793
$16,760,793
2018stipID0531FDRW
2018stipID0531FDRW
2018stipID0531FDRW
2018stipID0531FDRW
Ph subtotal: $1,240,000 $82,474 $1,134,474 $16,760,793
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 15 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 102746 MVRPC GRE GRE US 42 0263/2021 Description: Replace Bridge GRE-42-0263 that
carries US 42 over the Little Miami Bikepath and
a private drive. Widen bridge to match approach
roadway width. Bridge length may be reduced.
Rehabilitate GRE-42-2021 over North Fork
Massies Creek by installing a rigid over Work
Type: Bridge Replacement Termini: GRE US
42 0263/2021 SFNs 2900785 & 2901080
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2019
2020
2020
LAB
4PF7
4PS7
State
Federal
State
2
Z232
2
Labor - State Match
STBG
State Funds (002)
$24,960
$56,000
$14,000
$0
$0
$0
$94,960
$94,960
$94,960
$3,027,710
$3,027,710
$3,027,710
2018stipID0532FDDD
2018stipID0532FDDD
2018stipID0532FDDD
Ph subtotal: $94,960 $0 $94,960 $3,027,710
ENV Env PE
Env PE
Env PE
2019
2020
2020
LAB
4PF7
4PS7
State
Federal
State
2
Z232
2
Labor - State Match
STBG
State Funds (002)
$141,440
$224,000
$56,000
$0
$0
$0
$421,440
$421,440
$421,440
$3,027,710
$3,027,710
$3,027,710
2018stipID0532FDENV
2018stipID0532FDENV
2018stipID0532FDENV
Ph subtotal: $421,440 $0 $421,440 $3,027,710
RW Acquis 2020 4PS7 State 2 State Funds (002) $15,000 $0 $15,000 $3,027,710 2018stipID0532FDRW
Ph subtotal: $15,000 $0 $15,000 $3,027,710
103492 MVRPC GRE GRE CR 1 1.30 Col Glenn
Streetsc
Description: Installation of decorative hardscape
elements such as a brick pavers, seating walls,
and decorative vehicular and pedestrian lighting.
Installation of a missing section of sidewalk on
the south side of Colonel Glenn Highway.
Reconstruction of the existing Work Type: Add
Sidewalks Termini: Colonel Glenn Highway
from Zink Road to 500 feet east of Presidential
Drive
Beavercreek, City of Air Quality Exempt 0.41 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TC7
LNT
LNT
Federal
Local Match
Local Match
Z301
LNTP
LNTP
TAP/Enhancements
Local Match
Local Match
$693,000
$531,000
$85,680
$0
$0
$0
$1,309,680
$1,309,680
$1,309,680
$1,342,523
$1,342,523
$1,342,523
2018AM08ID0254FDCO
2018AM08ID0254FDCO
2018AM08ID0254FDCO
Ph subtotal: $1,309,680 $0 $1,309,680 $1,342,523
103493 MVRPC GRE GRE CR 36 1.26 Sidewalks Description: Construction of an 8 foot wide side
path along the north side of Indian Ripple Road
from Harbert Drive to Grange Hall Road. In
addition, construction of a 5 foot wide sidewalk
on the south side of Indian Ripple Road from
east of Marydale Drive to Grange H Work
Type: Add Sidewalks Termini: Indian Ripple
Road: from Harbert Drive to Grange Hall Road
Beavercreek, City of Air Quality Exempt 0.42 CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4TC7
LNT
4TC7
LNT
Federal
Local Match
Federal
Local Match
Z301
LNTP
Z301
LNTP
TAP/Enhancements
Local Match
TAP/Enhancements
Local Match
$318,000
$212,000
$31,800
$21,200
$0
$0
$0
$0
$583,000
$583,000
$583,000
$583,000
$604,022
$604,022
$604,022
$604,022
2018stipID0534FDCO
2018stipID0534FDCO
2018stipID0534FDCO
2018stipID0534FDCO
Ph subtotal: $583,000 $0 $583,000 $604,022
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $2,739 $0 $2,739 $604,022 2018stipID0534FDDD
Ph subtotal: $2,739 $0 $2,739 $604,022
ENV Env PE 2018 LAB State 2 Labor - State Match $15,520 $0 $15,520 $604,022 2018stipID0534FDENV
Ph subtotal: $15,520 $0 $15,520 $604,022
RW RW Serv 2018 LAB State 2 Labor - State Match $2,763 $0 $2,763 $604,022 2018stipID0534FDRW
Ph subtotal: $2,763 $0 $2,763 $604,022
103590 MVRPC GRE GRE CR 40 0.99 Kemp
Interconnect
Description: Installation of fiber optic
interconnect cable along Kemp Road from
Grange Hall Road to Hanes Road,
reconstruction of the existing traffic signal at
Kemp Road and Turnbull Road, signal head
upgrades, installation of battery backup
systems, video vehicle d Work Type: Traffic
Control (Safety) Termini: Kemp Road: from
Grange Hall Road to Hanes Road
Beavercreek, City of Air Quality Exempt 2.06 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
Bridge
Local Match
Local Match
$429,000
$263,251
$69,225
$0
$0
$0
$761,476
$761,476
$761,476
$778,219
$778,219
$778,219
2018AM14ID0483FDCO
2018AM14ID0483FDCO
2018AM14ID0483FDCO
Ph subtotal: $761,476 $0 $761,476 $778,219
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 16 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 103676 MVRPC GRE GRE CR 54 4.82 Central
Ave
Description: Resurfacing of Central Avenue from
Slip Lane (south of Xenia Drive) to Broad Street.
Pavement repair will be performed as needed.
Work Type: Minor Rehabilitation - Pavement
Gnrl Sys Termini: Central Avenue: from Slip
Lane (south of Xenia Drive) to Broad Street
Fairborn, City of Air Quality Exempt 0.63 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
STBG
Local Match
Local Match
$518,536
$129,634
$25,927
$0
$0
$0
$674,097
$674,097
$674,097
$677,311
$677,311
$677,311
2018stipID0536FDCO
2018stipID0536FDCO
2018stipID0536FDCO
Ph subtotal: $674,097 $0 $674,097 $677,311
105661 MVRPC GRE GRE W Second St
Resurfacing
Description: Mill and resurfacing of W. Second
Street including repair of deteriorated curb and
inlets. Installation of two Rectangular Rapid
Flashing Beacons (RRFBs) at the Creekside
Trail crossing. Work Type: Mill and Fill
Termini: W. Second Street: from S. Allison
Avenue to US-42 (S. Church Street)
Xenia, City of Air Quality Exempt 0.44 DD Dtl Dsgn 2019 LAB State 2 Labor - State Match $622 $0 $622 $399,125 2018AM01ID0029FDDD
Ph subtotal: $622 $0 $622 $399,125
ENV Env PE 2019 LAB State 2 Labor - State Match $3,525 $0 $3,525 $399,125 2018AM01ID0029FDENV
Ph subtotal: $3,525 $0 $3,525 $399,125
Description: Mill and resurfacing of W. Second
Street including repair of deteriorated curb and
inlets. Installation of two Rectangular Rapid
Flashing Beacons (RRFBs) at the Creekside
Trail crossing. *This project is Part 1 and is
being bid with Part 2, PID #108002.* Work
Type: Mill and Fill Termini: W. Second Street:
from S. Allison Avenue to US-42 (S. Church
Street)
Xenia, City of Air Quality Exempt 0.44 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4TA7
LNT
4TA7
LNT
Federal
Local Match
Federal
Local Match
Z230
LNTP
Z230
LNTP
Bridge
Local Match
Bridge
Local Match
$528,569
$818,681
$7,862
$32,556
$0
$0
$0
$0
$1,387,668
$1,387,668
$1,387,668
$1,387,668
$1,395,991
$1,395,991
$1,395,991
$1,395,991
2018AM08ID0255FDCO
2018AM08ID0255FDCO
2018AM08ID0255FDCO
2018AM08ID0255FDCO
Ph subtotal: $1,387,668 $0 $1,387,668 $1,395,991
106216 MVRPC GRE GRE N Fairfield Rd
Resurfacing
Description: This project consists of milling and
resurfacing, upgrading curb ramps to ADA
compliance, repair to deteriorated curb and
sidewalk, and the installation of raised pavement
markers. Work Type: Minor Rehabilitation -
Pavement Gnrl Sys Termini: North Fairfield
Road from North Drive to Lakeview Drive
Beavercreek, City of Air Quality Exempt 1.19 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4TA7
LNT
4TA7
LNT
Federal
Local Match
Federal
Local Match
LNTP
LNTP
Un-Assigned Federal
Local Match
Un-Assigned Federal
Local Match
$638,400
$425,600
$19,152
$12,768
$0
$0
$0
$0
$1,095,920
$1,095,920
$1,095,920
$1,095,920
$1,107,539
$1,107,539
$1,107,539
$1,107,539
2018AM02ID0072FDCO
2018AM02ID0072FDCO
2018AM02ID0072FDCO
2018AM02ID0072FDCO
Ph subtotal: $1,095,920 $0 $1,095,920 $1,107,539
106217 MVRPC GRE GRE CR 36 0.00
Resurfacing
Description: This project consists of milling and
resurfacing, pavement repairs, placement of a
SAMI layer over the existing concrete base, curb
repairs, pavement markings, and the installation
of raised pavement markers. Work Type:
Minor Rehabilitation - Pavement Gnrl Sys
Termini: Indian Ripple Road from Stroop Road to
Sylvania Drive
Beavercreek, City of Air Quality Exempt 0.49 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4TA7
LNT
4TA7
LNT
Federal
Local Match
Federal
Local Match
LNTP
LNTP
Un-Assigned Federal
Local Match
Un-Assigned Federal
Local Match
$706,300
$302,700
$21,189
$9,081
$0
$0
$0
$0
$1,039,270
$1,039,270
$1,039,270
$1,039,270
$1,050,289
$1,050,289
$1,050,289
$1,050,289
2018AM02ID0073FDCO
2018AM02ID0073FDCO
2018AM02ID0073FDCO
2018AM02ID0073FDCO
Ph subtotal: $1,039,270 $0 $1,039,270 $1,050,289
106311 MVRPC GRE GRE CR 502 0.00 Maple
Ave
Description: Widening of the roadway to
accommodate 3 traffic lanes and bike lanes,
milling and resurfacing, full depth pavement
repair where necessary, new curb, gutter, and
storm sewer system, and striping. Work Type:
Widening Termini: Maple Avenue: from Dayton
Yellow Springs Road to Doris Drive
Fairborn, City of Air Quality Exempt 1.12 CO CO Contr
CO Contr
2021
2021
4TA7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$1,754,344
$1,169,563
$0
$0
$3,128,580
$3,128,580
$3,220,509
$3,220,509
2018AM02ID0074FDCO
2018AM02ID0074FDCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 17 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 106311 MVRPC GRE GRE CR 502 0.00 Maple
Ave
Description: Widening of the roadway to
accommodate 3 traffic lanes and bike lanes,
Fairborn, City of Air Quality Exempt 1.12 CO CO Engr 2021 LNT Local Match LNTP Local Match $204,673 $0 $3,128,580 $3,220,509 2018AM02ID0074FDCO
Ph subtotal: $3,128,580 $0 $3,128,580 $3,220,509
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $4,789 $0 $4,789 $3,220,509 2018AM02ID0074FDDD
Ph subtotal: $4,789 $0 $4,789 $3,220,509
ENV Env PE 2018 LAB State 2 Labor - State Match $27,140 $0 $27,140 $3,220,509 2018AM02ID0074FDENV
Ph subtotal: $27,140 $0 $27,140 $3,220,509
RW RW Serv 2018 LAB State 2 Labor - State Match $60,000 $0 $60,000 $3,220,509 2018AM02ID0074FDRW
Ph subtotal: $60,000 $0 $60,000 $3,220,509
106312 MVRPC GRE GRE CR 1 1.75 Col Glenn
Enhncmnt
Description: Installation of a shared use path,
decorative walls, gateway columns, decorative
street lighting, and landscaping. Work Type:
Bike Facility Termini: Colonel Glenn Highway:
from the west city corporation limit (near
Presidential Drive) to North Fairfield Road
Fairborn, City of Air Quality Exempt 0.76 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4TC7
LNT
LNT
Federal
Local Match
Local Match
Z301
LNTP
LNTP
TAP/Enhancements
Local Match
Local Match
$350,000
$1,585,754
$135,503
$0
$0
$0
$2,071,257
$2,071,257
$2,071,257
$2,093,045
$2,093,045
$2,093,045
2018AM13ID0454FDCO
2018AM13ID0454FDCO
2018AM13ID0454FDCO
Ph subtotal: $2,071,257 $0 $2,071,257 $2,093,045
106319 MVRPC GRE GRE CR 1 1.83 Col Glenn
Sdwk Pt1
Description: Installation of new sidewalk,
pedestrian crossings with ADA compliant curb
ramps, signal improvements, construction of
retaining walls, and installation of lighting for
pedestrian facilities.*Being constructed as a Part
1/Part 2 project. Part 2 is PID 106 Work Type:
Pedestrian Facilities Termini: Colonel Glenn
Highway: from University Boulevard to Old
Yellow Springs Road
Fairborn, City of Air Quality Exempt 1.03 CO CO Contr
CO Contr
CO Contr
CO Engr
2021
2021
2021
2021
4TB7
4TC7
LNT
LNT
Federal
Federal
Local Match
Local Match
Z400
Z301
LNTP
LNTP
CMAQ
TAP/Enhancements
Local Match
Local Match
$920,349
$350,000
$1,106,180
$166,357
$0
$0
$0
$0
$2,542,886
$2,542,886
$2,542,886
$2,542,886
$2,542,886
$2,542,886
$2,542,886
$2,542,886
2018AM15ID0518FDCO
2018AM15ID0518FDCO
2018AM15ID0518FDCO
2018AM15ID0518FDCO
Ph subtotal: $2,542,886 $0 $2,542,886 $2,542,886
106324 MVRPC GRE GRE Yellow Springs ADA
Curb Ramp
Description: Upgrading curb ramps to meet
current ADA standards at a number of crossings
in the Village of Yellow Springs. Work Type:
Add Sidewalks Termini: Elm St: Phillips St to
Winter St; Dayton St: East Enon Rd to Winter St;
South College St: East Enon Rd to High St
Yellow Springs, Village of Air Quality Exempt 0.96 CO CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
4BG
4TC7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
Z301
38
2
Local Match
Not Grouped
TAP/Enhancements
Labor - Local Match
$30,682
$92,045
$9,205
$3,068
$0
$0
$0
$0
$135,000
$135,000
$135,000
$135,000
$143,781
$143,781
$143,781
$143,781
2018AM03ID0118FDCO
2018AM03ID0118FDCO
2018AM03ID0118FDCO
2018AM03ID0118FDCO
Ph subtotal: $135,000 $0 $135,000 $143,781
107120 MVRPC GRE GRE SR 444 4.60 Description: FY2020 Urban Paving in the City of
Fairborn on a portion of SR 444 from Lindberg
St. to E. Dayton Drive. Work Type:
Resurfacing, Undivided System Termini: GRE
SR 444 SLM 4.60 to 5.15
Fairborn, City of Air Quality Exempt 0.55 CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2020
2020
2020
2020
2020
2020
4BG
4BG
4PF7
4BG
LAB
LAB
Local Match
Local Match
Federal
Local Match
Federal
Local Match
2
2
Z001
2
Z001
2
Local Match
Local Match
National Hwy Performance P
Local Match
National Hwy Performance P
Labor - Local Match
$387,324
$946,276
$242,400
$89,110
$23,205
$7,095
$0
$0
$0
$0
$0
$0
$1,695,410
$1,695,410
$1,695,410
$1,695,410
$1,695,410
$1,695,410
$1,709,333
$1,709,333
$1,709,333
$1,709,333
$1,709,333
$1,709,333
2018MODID0526FDCO
2018MODID0526FDCO
2018MODID0526FDCO
2018MODID0526FDCO
2018MODID0526FDCO
2018MODID0526FDCO
Ph subtotal: $1,695,410 $0 $1,695,410 $1,709,333
107217 MVRPC GRE GRE US 35 5.84 Description: This project is to replace the
existing US 35/Valley Trebein intersection with
an interchange of Valley Trebein over US 35.
Work Type: Interchange, New Termini: 0.50
miles west of Valley Trebein to 0.64 miles east of
Valley Trebein
Greene County
Commissioners
Air Quality Non-Exe 1.16 DD Dtl Dsgn
Dtl Dsgn
2019
2019
4B47
4BD7
Federal
State
Z001
2
National Hwy Performance P
State Funds (002)
$250,977
$200,000
$0
$0
$1,250,977
$1,250,977
$30,070,977
$30,070,977
2018AM08ID0256FDDD
2018AM08ID0256FDDD
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 18 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 107217 MVRPC GRE GRE US 35 5.84 Description: This project is to replace the
existing US 35/Valley Trebein intersection with
Greene County
Commissioners
Air Quality Non-Exe 1.16 DD Dtl Dsgn 2019 4BK7 Federal Z001 National Hwy Performance P $800,000 $0 $1,250,977 $30,070,977 2018AM08ID0256FDDD
Ph subtotal: $1,250,977 $0 $1,250,977 $30,070,977
RW Acquis
Acquis
2020
2020
4BD7
4BK7
State
Federal
2
Z001
State Funds (002)
National Hwy Performance P
$200,000
$800,000
$0
$0
$1,000,000
$1,000,000
$30,070,977
$30,070,977
2018AM10ID0303FDRW
2018AM10ID0303FDRW
Ph subtotal: $1,000,000 $0 $1,000,000 $30,070,977
108002 MVRPC GRE GRE CR 86 7.45 W.
Second St
Description: Mill and resurface of West Second
Street from South Progress Drive to Massie
Drive. Work Type: Mill and Fill Termini: W.
Second Street: from S. Progress Drive to Massie
Drive
Xenia, City of Air Quality Exempt 0.85 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TA7
LNT
LNT
Federal
Local Match
Local Match
LNTP
LNTP
Un-Assigned Federal
Local Match
Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018AM06ID0204XXCO
2018AM06ID0204XXCO
2018AM06ID0204XXCO
Ph subtotal: $0 $0 $0 $0
108836 MVRPC GRE GRE TR 215 0.86
Columbus St
Description: Replacement of Bridge No. GRE
COLUM 0020 (SFN: 2960370) which carries
Columbus Street (TR 215) over the North
Branch of Shawnee Creek with a pre-cast
concrete four-sided box culvert. Work Type:
Bridge Preservation Termini: Bridge GRE
COLUM 0020 (SFN: 2960370)
Xenia, City of Air Quality Exempt CO CO Contr
CO Engr
2021
2021
5BP7
5BP7
Federal
Federal
Z240
Z240
STBG
STBG
$597,168
$59,717
$0
$0
$656,885
$656,885
$659,292
$659,292
2018AM15ID0519FDCO
2018AM15ID0519FDCO
Ph subtotal: $656,885 $0 $656,885 $659,292
108934 MVRPC GRE GRE SR 835 0.00 Description: FY2021 Urban Paving in the City of
Beavercreek on a portion of SR 835 from the
Montgomery County line to the US 35 ramp.
Work Type: Resurfacing, Undivided System
Termini: GRE SR 835: SLM 0 - 2.08
Beavercreek, City of Air Quality Exempt 2.08 CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4PF7
LNT
4PF7
LNT
Federal
Local Match
Federal
Local Match
Z240
LNTP
Z240
LNTP
STBG
Local Match
STBG
Local Match
$987,590
$987,591
$29,628
$29,628
$0
$0
$0
$0
$2,034,437
$2,034,437
$2,034,437
$2,034,437
$2,135,171
$2,135,171
$2,135,171
$2,135,171
2018AM10ID0304FDCO
2018AM10ID0304FDCO
2018AM10ID0304FDCO
2018AM10ID0304FDCO
Ph subtotal: $2,034,437 $0 $2,034,437 $2,135,171
109170 MVRPC GRE GRE VAR Guardrail FY 20 Description: Replacement and upgrades to
existing guardrail and anchor/bridge assemblies
on various county roads in Greene County.
Work Type: Guardrail upgrade/replace
Termini: Various county roads in Greene County
GREENE COUNTY
ENGINEER
Air Quality Exempt 14.43 CO CO Contr
CO Engr
2020
2020
4HB7
LNT
Federal
Local Match
ZS30
LNTP
Highway Safety Imp Prog
Local Match
$300,000
$12,000
$0
$0
$312,000
$312,000
$314,226
$314,226
2018AM12ID0408FDCO
2018AM12ID0408FDCO
Ph subtotal: $312,000 $0 $312,000 $314,226
111002 MVRPC GRE GRE Yellow Springs SRTS
2019
Description: Install sidewalk Work Type:
Pedestrian Facilities Termini: West Limestone
Street from Mills Lawn Elementary to Dayton
Street
Yellow Springs, Village of Air Quality Exempt DD Dtl Dsgn 2021 4SC7 Federal Z303 TAP/Safe Routes to School $12,000 $0 $12,000 $460,000 2018AM13ID0455FDDD
Ph subtotal: $12,000 $0 $12,000 $460,000
ENV Env PE 2020 4SC7 Federal Z303 TAP/Safe Routes to School $68,000 $0 $68,000 $460,000 2018AM13ID0455FDENV
Ph subtotal: $68,000 $0 $68,000 $460,000
RW RW Serv 2020 LAB State 2 Labor - State Match $60,000 $0 $60,000 $460,000 2018AM13ID0455FDRW
Ph subtotal: $60,000 $0 $60,000 $460,000
111657 MVRPC GRE GRE-68-13.51 Description: Improve safety at the intersection of
US-68 and SR-235 by either constructing a
roundabout or relocating SR-235 to reduce
intersection skew. Work Type: Intersection
Improvement (Safety) Termini: Intersection of
US-68 and SR-235
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.20 ENV Env PE 2021 4HJ7 Federal ZS30 Highway Safety Imp Prog $400,000 $0 $400,000 $2,990,000 2018AM15ID0520FDENV
Ph subtotal: $400,000 $0 $400,000 $2,990,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 19 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 25349 OKI HAM HAM SR 264 10.42 Description: Remove bridge No. HAM-264-1044
(SFN: 3111547), over abandoned RR.
Reconstruct roadway on new embankment.
Work Type: Major Reconstruction Termini:
FROM 4.22 MILES NORTH OF US 50 TO 4.15
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.07 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4PF7
4PS7
LAB
LAB
Federal
State
Federal
State
L240
2
L240
2
STBG
State Funds (002)
STBG
Labor - State Match
$400,000
$100,000
$40,000
$10,000
$0
$0
$0
$0
$550,000
$550,000
$550,000
$550,000
$617,000
$617,000
$617,000
$617,000
2018stipID0560FDCO
2018stipID0560FDCO
2018stipID0560FDCO
2018stipID0560FDCO
Ph subtotal: $550,000 $0 $550,000 $617,000
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $3,750 $0 $3,750 $617,000 2018stipID0560FDDD
Ph subtotal: $3,750 $0 $3,750 $617,000
ENV Env PE 2018 LAB State 2 Labor - State Match $21,250 $1,000 $22,250 $617,000 2018stipID0560FDENV
Ph subtotal: $21,250 $1,000 $22,250 $617,000
RW Acquis
Labor
RW Serv
2018
2018
2018
4PS7
LAB
LAB
State
State
State
2
2
2
State Funds (002)
Labor - State Match
Labor - State Match
$20,000
$1,000
$20,000
$0
$0
$0
$41,000
$41,000
$41,000
$617,000
$617,000
$617,000
2018stipID0560FDRW
2018stipID0560FDRW
2018stipID0560FDRW
Ph subtotal: $41,000 $0 $41,000 $617,000
76256 OKI HAM HAM IR 75 10.10 (14.61) Description: Phase 8 project limist from 14.50 to
16.50, Glendale Milford to Kemper overpass.
Widen for a fourth lane on I75 in both directions
and auxiliary lanes from Sharon Road to
Glendale Milford Road and from Sharon Road to
IR275. Work includes improving the c Work
Type: Major Widening Termini: Glendale
Milford Road to IR275 (phase 8)
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 2.02 RW Acquis
Acquis
RW Serv
RW Serv
2016
2016
2016
2016
4BD7
4BK7
4BD7
4BK7
State
Federal
State
Federal
2
L050
2
L050
State Funds (002)
National Highway System
State Funds (002)
National Highway System
$540,000
$2,160,000
$65,400
$261,600
$203,000
$203,000
$203,000
$203,000
$3,230,000
$3,230,000
$3,230,000
$3,230,000
$57,901,053
$57,901,053
$57,901,053
$57,901,053
2018MODID0205FDRW
2018MODID0205FDRW
2018MODID0205FDRW
2018MODID0205FDRW
Ph subtotal: $3,027,000 $203,000 $3,230,000 $57,901,053
77628 OKI HAM HAM IR 71 3.81 Description: Two-Step Low-Bid Design Build:
Provide a full movement interchange at IR-71 &
MLK Drive while maintaining existing connections
to WHT and McMillan. Provide ramp metering on
the northbound entrance ramp from McMillan.
Provide a northbound auxiliary lane fr Work
Type: Interchange, Reconstruction Termini:
Cincinnati - 9 Uptown communities.
Cincinnati, City of Air Quality Non-Exe 3.56 OT Dbt Serv
Dbt Serv
Dbt Serv
Dbt Serv
2018
2019
2020
2021
4TA7
4TA7
4TA7
4TA7
Federal
Federal
Federal
Federal
M230
M230
M230
M230
STBG
STBG
STBG
STBG
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$0
$0
$0
$0
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$105,492,627
$105,492,627
$105,492,627
$105,492,627
2018stipID0562FDOTH
2018stipID0562FDOTH
2018stipID0562FDOTH
2018stipID0562FDOTH
Ph subtotal: $4,000,000 $0 $4,000,000 $105,492,627
77889 OKI HAM HAM IR 75 7.85 Description: Phase 8 of the Mill Creek
Expressway Project. Project will widen for
additional through lanes, rehabilitate existing
pavement and bridges. Reconstruct SR 562
interchange, remove the Towne Ave.
interchange, complete minor improvements to
the Paddock Road Work Type: Major
Widening Termini: Begin south of SR562
interchange and at the SR126 interchange, 7.85
to 10.30
DISTRICT 8 PRODUCTION Air Quality Non-Exe 3.45 RW Acquis
Acquis
RW Serv
RW Serv
Utl Remb
Utl Remb
2016
2016
2016
2016
2016
2016
4BD7
4BK7
4BD7
4BK7
4BD7
4BK7
State
Federal
State
Federal
State
Federal
2
L050
2
L050
2
M001
State Funds (002)
National Highway System
State Funds (002)
National Highway System
State Funds (002)
National Hwy Performance P
$381,800
$1,527,200
$33,000
$132,000
$15,000
$60,000
$0
$0
$0
$0
$0
$0
$2,149,000
$2,149,000
$2,149,000
$2,149,000
$2,149,000
$2,149,000
$135,703,578
$135,703,578
$135,703,578
$135,703,578
$135,703,578
$135,703,578
2018MODID0207FDRW
2018MODID0207FDRW
2018MODID0207FDRW
2018MODID0207FDRW
2018MODID0207FDRW
2018MODID0207FDRW
Ph subtotal: $2,149,000 $0 $2,149,000 $135,703,578
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 20 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 82288 OKI HAM HAM IR 75 12.60 Description: Phase 1&2 of the HAM-75 Corridor
Projects. Phase 1: Reconstruct the interstate
between Shepherd Lane and Glendale-Milford
Rd. Work includes the redesign of the Shepherd
Ln. interchange, removal of the collector
distributor system, and improvements to th
Work Type: Major Reconstruction Termini:
From 0.3 miles south of Shepherd Lane to 0.2
miles north of Glendale-Milford Rd.(phase 1)
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 1.84 CO CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
2018
2018
2019
2019
2020
2020
4PF7
4PS7
4PF7
4PS7
4PF7
4PS7
Federal
State
Federal
State
Federal
State
Z001
2
Z001
2
Z001
2
National Hwy Performance P
State Funds (002)
National Hwy Performance P
State Funds (002)
National Hwy Performance P
State Funds (002)
$729,510
$182,378
$1,263,274
$315,818
$1,209,570
$302,392
$6,538,500
$6,538,500
$6,538,500
$6,538,500
$6,538,500
$6,538,500
$10,541,442
$10,541,442
$10,541,442
$10,541,442
$10,541,442
$10,541,442
$123,048,053
$123,048,053
$123,048,053
$123,048,053
$123,048,053
$123,048,053
2018stipID0563FDCO
2018stipID0563FDCO
2018stipID0563FDCO
2018stipID0563FDCO
2018stipID0563FDCO
2018stipID0563FDCO
Ph subtotal: $4,002,942 $6,538,500 $10,541,442 $123,048,053
83723 OKI HAM HAM IR 75 3.85 Description: This is Phase 5 of the Hamilton 75
corridor projects. This phase was split off of the
work originally to be completed under PID
76257. Project adds a lane to I-75 and
reconfigures the I-74/75 interchange. Work
Type: Major Widening Termini: From the
Monmouth overpass to just south of Clifton Rd.
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 3.47 RW Acquis
Acquis
Utl Remb
Utl Remb
Utl Remb
Utl Remb
2014
2014
2014
2014
2015
2015
4BD7
4BK7
4BD7
4BK7
4BD7
4BK7
State
Federal
State
Federal
State
Federal
2
L050
2
L050
2
L05E
State Funds (002)
National Highway System
State Funds (002)
National Highway System
State Funds (002)
National Highway System
$170,000
$680,000
$80,000
$320,000
$400,000
$1,600,000
$567,550
$567,550
$567,550
$567,550
$567,550
$567,550
$3,817,550
$3,817,550
$3,817,550
$3,817,550
$3,817,550
$3,817,550
$176,126,375
$176,126,375
$176,126,375
$176,126,375
$176,126,375
$176,126,375
2018MODID0212FDRW
2018MODID0212FDRW
2018MODID0212FDRW
2018MODID0212FDRW
2018MODID0212FDRW
2018MODID0212FDRW
Ph subtotal: $3,250,000 $567,550 $3,817,550 $176,126,375
84492 OKI HAM HAM IR 275 39.81 Description: Resurface and perform pavement
repair on I-275 from just before Four Mile Road
to the Ohio River in Hamilton County. Project
includes minor rehabilitation to a bridge size
culvert and 5 mainline twin bridges including the
Combs Hehl Bridge over the OhioR Work
Type: Minor Rehabilitation - Pavement Prmy Sys
Termini: HAM IR 275: SLM 39.81 to 41.36
ODOT SPONSORING
AGENCY
Air Quality Exempt 1.55 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
2018
2018
4BG
4PS7
7BTB
7DG
LAB
LAB
Local Match
State
Bonds
Bonds
Local Match
State
2
2
42
45
2
2
Local Match
State Funds (002)
State Bonds
Garvee Bond-Fund 045-Lon
Labor - Local Match
Labor - State Match
$7,589,473
$5,994,692
$2,433,011
$13,654,804
$458,143
$993,749
$0
$0
$0
$0
$0
$0
$31,123,872
$31,123,872
$31,123,872
$31,123,872
$31,123,872
$31,123,872
$32,619,673
$32,619,673
$32,619,673
$32,619,673
$32,619,673
$32,619,673
2018AM03ID0120FDCO
2018AM03ID0120FDCO
2018AM03ID0120FDCO
2018AM03ID0120FDCO
2018AM03ID0120FDCO
2018AM03ID0120FDCO
Ph subtotal: $31,123,872 $0 $31,123,872 $32,619,673
86462 OKI HAM HAM/CLE SR 32F 2.50/0.00 Description: Perform Environmental analyses
and Preliminary Engineering for the following:
Consolidate and manage access points to
establish relocated SR 32 a controlled access
arterial roadway west of IR 275, including
coordination for accommodation of multi-modal
co Work Type: New Construction Termini:
From US 50 to Bells Lane
ODOT SPONSORING
AGENCY
Air Quality Exempt 5.63 ENV Env PE
Env PE
2016
2016
4BD7
4BK7
State
Federal
2
L240
State Funds (002)
STP
$1,970,673
$7,882,691
$4,175,523
$4,175,523
$14,028,887
$14,028,887
$398,478,887
$398,478,887
2018MODID0213FDENV
2018MODID0213FDENV
Ph subtotal: $9,853,364 $4,175,523 $14,028,887 $398,478,887
88124 OKI HAM HAM IR 75 10.10 Description: Add fourth lane in each direction,
add auxiliary lanes from bridge at 10.10 (over Mill
creek) to SR126, reconstruct left hand exit from
northbound IR75 to Galbraith Road as a right
hand exit and improve ramps from: eastbound
SR126 to southbound IR75, Galb Work Type:
Major Widening Termini: 1010 Bridge over Mill
creek to Galbraith Road (phase 3)
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 0.79 RW Acquis
Acquis
RW Serv
RW Serv
RW Serv
2016
2016
2016
2016
2016
4BD7
4BK7
4BD7
4BK7
LAB
State
Federal
State
Federal
State
2
M001
2
M001
2
State Funds (002)
National Hwy Performance P
State Funds (002)
National Hwy Performance P
Labor - State Match
$22,000
$88,000
$8,000
$32,000
$77,702
$0
$0
$0
$0
$0
$227,702
$227,702
$227,702
$227,702
$227,702
$50,120,606
$50,120,606
$50,120,606
$50,120,606
$50,120,606
2018MODID0214FDRW
2018MODID0214FDRW
2018MODID0214FDRW
2018MODID0214FDRW
2018MODID0214FDRW
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 21 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
Ph subtotal: $227,702 $0 $227,702 $50,120,606
FHWA 8 88129 OKI HAM HAM IR 75 11.09 Description: Replace railroad bridge prior to
widening IR75. Includes construction of
substructure for future 3rd rail line and a poriton
of the final alignment of the exit ramp to Galbraith
Road.(phase 4 TTV) Work Type: New Bridge
Termini: Railroad bridge 11.09 on southbound
IR75 in the split (phase 4)
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.02 RW Acquis
Acquis
RW Serv
RW Serv
2019
2019
2018
2018
4BD7
4BK7
4BD7
4BK7
State
Federal
State
Federal
2
M001
2
M001
State Funds (002)
National Hwy Performance P
State Funds (002)
National Hwy Performance P
$140,000
$560,000
$14,000
$56,000
$0
$0
$0
$0
$770,000
$770,000
$770,000
$770,000
$35,117,366
$35,117,366
$35,117,366
$35,117,366
2018AM02ID0081FDRW
2018AM02ID0081FDRW
2018AM02ID0081FDRW
2018AM02ID0081FDRW
Ph subtotal: $770,000 $0 $770,000 $35,117,366
88132 OKI HAM HAM IR 75 10.87 Description: Add fourth lane, auxiliary lane from
Shepherd entrance to Galbraith exit and
construct C-D for Galbraith/Anthony
Wayne(phase 5 TTV) and southbound IR75 to
westbound SR126 ramp (part of phase 7).
Work also involves work on 3 bridges. Work
Type: Major Widening Termini: Galbraith Road
to Shepherd Lane, southbound only (phase 5)
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 1.94 RW Acquis
Acquis
RW Serv
RW Serv
2019
2019
2018
2018
4BD7
4BK7
4BD7
4BK7
State
Federal
State
Federal
2
M001
2
M001
State Funds (002)
National Hwy Performance P
State Funds (002)
National Hwy Performance P
$360,000
$1,440,000
$40,000
$160,000
$0
$0
$0
$0
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$92,707,834
$92,707,834
$92,707,834
$92,707,834
2018AM02ID0082FDRW
2018AM02ID0082FDRW
2018AM02ID0082FDRW
2018AM02ID0082FDRW
Ph subtotal: $2,000,000 $0 $2,000,000 $92,707,834
88133 OKI HAM HAM IR 75 10.62 Description: Add fourth lane and auxiliary lane for
northbound IR75 between Galbraith and
Shepherd(phase 6 TTV) and westbound SR126
to northbound IR75 ramp (part of phase 7)
Work Type: Major Widening Termini: Galbraith
Road to Shepherd Lane, northbound only (phase
6)
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 1.91 RW Acquis
Acquis
RW Serv
RW Serv
2019
2019
2018
2018
4BD7
4BK7
4BD7
4BK7
State
Federal
State
Federal
2
M001
2
M001
State Funds (002)
National Hwy Performance P
State Funds (002)
National Hwy Performance P
$480,000
$1,920,000
$68,000
$272,000
$0
$0
$0
$0
$2,740,000
$2,740,000
$2,740,000
$2,740,000
$175,476,115
$175,476,115
$175,476,115
$175,476,115
2018AM02ID0083FDRW
2018AM02ID0083FDRW
2018AM02ID0083FDRW
2018AM02ID0083FDRW
Ph subtotal: $2,740,000 $0 $2,740,000 $175,476,115
89068 OKI HAM HAM IR 75 0.22 Description: Reconstruction of I-75 from Ohio
River through the Western Hills Viaduct. Brent
Spence Bridge Detailed Design, RW, and
Construction Phase Project (Ohio only).
September 2012 Programmatic Work is for R/W
plan development and Acquisition Services.
Work Type: Major Reconstruction Termini:
From the OH/KY State Line to the 3.00+/- Mile
Marker
ODOT SPONSORING
AGENCY
Air Quality Exempt 3.43 RW Acquis
Acquis
2016
2016
4BD7
4BK7
State
Federal
2
L05E
State Funds (002)
National Highway System
$24,165,280
$8,661,120
$64,334,055
$64,334,055
$120,370,455
$120,370,455
$1,154,245,085
$1,154,245,085
2018MODID0216FDRW
2018MODID0216FDRW
Ph subtotal: $32,826,400 $64,334,055 $120,370,455 $1,154,245,085
91419 OKI HAM HAM PPS FY2021 Description: Hamilton County Preventative
Maintenance on the Priority System for FY2021.
The routes is located on HAM-275 and HAM-74
Work Type: Preventive Maintenance Termini:
route to be determined
ODOT SPONSORING
AGENCY
Air Quality Exempt 13.16 CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4PF7
4PS7
LAB
LAB
Federal
State
Federal
State
Z001
2
Z001
2
National Hwy Performance P
State Funds (002)
National Hwy Performance P
Labor - State Match
$5,405,760
$600,640
$162,171
$18,019
$0
$0
$0
$0
$6,186,590
$6,186,590
$6,186,590
$6,186,590
$6,352,990
$6,352,990
$6,352,990
$6,352,990
2018stipID0566FDCO
2018stipID0566FDCO
2018stipID0566FDCO
2018stipID0566FDCO
Ph subtotal: $6,186,590 $0 $6,186,590 $6,352,990
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $6,352,990 2018stipID0566FDDD
Ph subtotal: $24,960 $0 $24,960 $6,352,990
ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $6,352,990 2018stipID0566FDENV
Ph subtotal: $141,440 $0 $141,440 $6,352,990
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 22 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 91826 OKI HAM HAM IR 71 8.42 Description: Plane and Pave a portion of IR 71 in
Hamilton County from the RR bridge north of SR
562 to SR 126. Includes deck replacement of
bridges HAM-71-1068 L/R over Stewart Rd. and
minor rehabiltiations of several other bridges
within project limits. Highway sign Work Type:
Minor Rehabilitation - Pavement Prmy Sys
Termini: HAM IR 71: from north of SR 562 to SR
126
ODOT SPONSORING
AGENCY
Air Quality Exempt 5.43 CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
2018
4BC7
4HJ7
7DG
LAB
LAB
State
Federal
Bonds
Federal
State
2
ZS30
45
ZS30
2
State Funds (002)
Not Grouped
Garvee Bond-Fund 045-Lon
Highway Safety Imp Prog
Labor - State Match
$663,300
$5,969,700
$26,526,656
$417,879
$1,449,468
$0
$0
$0
$0
$0
$35,027,003
$35,027,003
$35,027,003
$35,027,003
$35,027,003
$37,036,293
$37,036,293
$37,036,293
$37,036,293
$37,036,293
2018AM02ID0084FDCO
2018AM02ID0084FDCO
2018AM02ID0084FDCO
2018AM02ID0084FDCO
2018AM02ID0084FDCO
Ph subtotal: $35,027,003 $0 $35,027,003 $37,036,293
92638 OKI HAM HAM IR 275 28.29 Description: Construct loop ramp for northbound
US42 to westbound IR275 to replace left turn for
northbound US42. In conjunction with the loop
ramp the westbound exit ramp will be relocated
to line up with Hauck Road. Work Type:
Intersection Improvement Termini: 0.1 miles
west of US42 to 0.15 miles east of US42 on
westbound IR275
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.55 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4BC7
4HJ7
LAB
LAB
State
Federal
Federal
State
2
MS3E
MS3E
2
State Funds (002)
Highway Safety Imp Prog
Highway Safety Imp Prog
Labor - State Match
$60,625
$545,625
$54,563
$6,063
$0
$0
$0
$0
$666,875
$666,875
$666,875
$666,875
$4,392,005
$4,392,005
$4,392,005
$4,392,005
2018stipID0568FDCO
2018stipID0568FDCO
2018stipID0568FDCO
2018stipID0568FDCO
Ph subtotal: $666,875 $0 $666,875 $4,392,005
DD Dtl Dsgn
Dtl Dsgn
2018
2018
4BC7
4HJ7
State
Federal
2
MS3E
State Funds (002)
Highway Safety Imp Prog
$0
$0
$0
$0
$0
$0
$0
$0
2018stipID0568XXDD
2018stipID0568XXDD
Ph subtotal: $0 $0 $0 $0
RW Acquis
Acquis
RW Serv
RW Serv
2019
2019
2019
2019
4BC7
4HJ7
4BC7
4HJ7
State
Federal
State
Federal
2
MS3E
2
MS3E
State Funds (002)
Highway Safety Imp Prog
State Funds (002)
Highway Safety Imp Prog
$225,000
$2,025,000
$84,375
$759,375
$0
$0
$0
$0
$3,093,750
$3,093,750
$3,093,750
$3,093,750
$4,392,005
$4,392,005
$4,392,005
$4,392,005
2018stipID0568FDRW
2018stipID0568FDRW
2018stipID0568FDRW
2018stipID0568FDRW
Ph subtotal: $3,093,750 $0 $3,093,750 $4,392,005
94484 OKI HAM HAM VAR CTCS Cincinnati Description: Installation of underground duct
bank that contains fiber optic interconnect cable.
The traffic signals will be upgraded to LED
technology. New signal controllers and signal
timing will be implemented. Work Type: Signals
Termini: 130 signalized intersections in
Cincinnati - bound by Mehring Way (S), Central
Pkwy (N), Central Ave (W), & Eggleston Ave (E)
Cincinnati, City of Air Quality Exempt 5.73 CO CO Contr
CO Contr
CO Engr
2017
2017
2017
4TB7
LNT
LNT
Federal
Local Match
Local Match
M400
LNTP
LNTP
CMAQ
Local Match
Local Match
$4,000,000
$2,415,628
$449,094
$0
$0
$0
$6,864,722
$6,864,722
$6,864,722
$6,875,465
$6,875,465
$6,875,465
2018MODID0227FDCO
2018MODID0227FDCO
2018MODID0227FDCO
Ph subtotal: $6,864,722 $0 $6,864,722 $6,875,465
94491 OKI HAM HAM ORT Salem to Sutton Description: Construction of a combination of 10'
wide bike path and existing and new 5' wide side
path along the west side of Kellogg Avenue to
connect the existing trail system at Salem Road
and Sutton Road. Retaining walls will be
constructed to accommodate grading Work
Type: Bikeways Termini: Kellogg Avenue: from
the existing bike path at Salem Road to the
existing Anderson Twp bike path at Sutton Road
Cincinnati, City of Air Quality Exempt 2.17 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TB7
LNT
LNT
Federal
Local Match
Local Match
Z400
LNTP
LNTP
Not Grouped
Local Match
Local Match
$3,163,442
$790,860
$276,801
$0
$0
$0
$4,231,103
$4,231,103
$4,231,103
$4,765,691
$4,765,691
$4,765,691
2018MODID0383FDCO
2018MODID0383FDCO
2018MODID0383FDCO
Ph subtotal: $4,231,103 $0 $4,231,103 $4,765,691
RW Acquis
Acquis
RW Serv
2018
2018
2018
4TB7
LNT
LAB
Federal
Local Match
State
M400
LNTP
2
CMAQ
Labor - State Match
Labor - State Match
$400,000
$100,000
$7,481
$0
$0
$0
$507,481
$507,481
$507,481
$4,765,691
$4,765,691
$4,765,691
2018MODID0382FDRW
2018MODID0382FDRW
2018MODID0382FDRW
Ph subtotal: $507,481 $0 $507,481 $4,765,691
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 23 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 94518 OKI HAM HAM Cincy Barge & Rail
Terminal
Description: Renovation and expansion of an
existing intermodal port to improve the existing
footprint with updated safety, solar energy,
conveyor, handlers, paving, security, crane, and
dock apparatus on-site. Work Type:
Inter-modal Facility Termini: The Cincinnati
Barge and Rail Terminal located at 1707
Riverside Drive, Cincinnati, OH 45202
OHIO RAIL
DEVELOPMENTAL
COMMISSION
Air Quality Exempt 0.40 CO CO Contr
CO Contr
CO Engr
2016
2016
2016
4TB7
LNT
LNT
Federal
Local Match
Local Match
M400
LNTP
LNTP
CMAQ
Local Match
Local Match
$1,320,000
$330,000
$115,500
$0
$0
$0
$1,765,500
$1,765,500
$1,765,500
$1,765,500
$1,765,500
$1,765,500
2018MODID0229FDCO
2018MODID0229FDCO
2018MODID0229FDCO
Ph subtotal: $1,765,500 $0 $1,765,500 $1,765,500
94519 OKI HAM HAM Cincinnati Bulk
Terminals
Description: The project entails construction of a
new 3,673? siding from Milepost 3.4 to 4.1
located between the existing King-Wade Siding
and the mainline. The siding will be used to
support local switching operations when serving
nearby customers. Work Type: Railroad
Improvements & Rehabilitation Termini:
Cincinnati Bulk Terminals Facility at 895 West
Mehring Way, Cincinnati, OH 45203
Ohio Rail Development
Commission
Air Quality Exempt 0.20 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TB7
LNT
LNT
Federal
Local Match
Local Match
Z003
LNTP
LNTP
CMAQ
Local Match
Local Match
$1,128,706
$282,176
$121,180
$0
$0
$0
$1,410,882
$1,410,882
$1,410,882
$1,410,882
$1,410,882
$1,410,882
2018MODID0484FDCO
2018MODID0484FDCO
2018MODID0484FDCO
Ph subtotal: $1,532,062 $0 $1,410,882 $1,410,882
94741 OKI HAM HAM IR 71 6.86 Description: Widening northbound IR-71 to
provide three continuous through lanes through
the SR-562 interchange. Removing the North
bound Ridge Road exit and adding a North
bound exit to Kennedy. Part 1 HAM-71-8.42 PID
91826 Part 2 HAM-71-6.86 PID 94741 Work
Type: Widening Termini: 0.1 mi south of
Williams Avenue Overpass to 0.04 mi north of
Red Bank (SLM 6.86-9.74)
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 3.09 RW Acquis
Acquis
2018
2018
4BC7
4HJ7
State
Federal
2
ZS30
State Funds (002)
Highway Safety Imp Prog
$26,700
$240,300
$0
$0
$267,000
$267,000
$1,867,197
$1,867,197
2018stipID0570FDRW
2018stipID0570FDRW
Ph subtotal: $267,000 $0 $267,000 $1,867,197
95282 OKI HAM HAM CR 73 0.00 Cheviot Rd Description: Pavement rehabilitation of the entire
roadway within the project limits, repair of curb,
storm water inlets, and sidewalk, widening of the
pavement for an additional northbound lane from
just north of Tallahasee Drive to Jessup Road,
and profile and align Work Type: Minor
Widening Termini: Cheviot Road: from North
Bend Road to Jessup Road
HAMILTON COUNTY
ENGINEER
Air Quality Exempt 0.64 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4TA7
LNT
LNT
Federal
Local Match
Local Match
M230
LNTP
LNTP
STBG
Local Match
Local Match
$2,212,624
$948,267
$221,262
$0
$0
$0
$3,382,153
$3,382,153
$3,382,153
$5,700,712
$5,700,712
$5,700,712
2018stipID0571FDCO
2018stipID0571FDCO
2018stipID0571FDCO
Ph subtotal: $3,382,153 $0 $3,382,153 $5,700,712
97782 OKI HAM HAM OKI 2018 Rideshare Description: OKI FY 2018 Rideshare Program
Work Type: Rideshare Termini: 0
OKI Air Quality Exempt SP Planning 2018 4TE7 Federal M400 CMAQ $171,749 $0 $171,749 $171,749 2018stipID0572FDSP
Ph subtotal: $171,749 $0 $171,749 $171,749
97783 OKI HAM HAM OKI 2019 Rideshare Description: OKI FY 2019 Rideshare Program
Work Type: Rideshare Termini: 0
OKI Air Quality Exempt SP Planning 2019 4TE7 Federal M40E CMAQ $172,366 $0 $172,366 $172,366 2018stipID0573FDSP
Ph subtotal: $172,366 $0 $172,366 $172,366
97784 OKI HAM HAM OKI 2020 Rideshare Description: OKI FY 2020 Rideshare Program
Work Type: Rideshare Termini: 0
OKI Air Quality Exempt SP Planning 2020 4TE7 Federal Z400 CMAQ $212,609 $0 $212,609 $212,609 2018stipID0574FDSP
Ph subtotal: $212,609 $0 $212,609 $212,609
97785 OKI HAM HAM OKI 2018 AQ Program Description: OKI FY 2018 Air Quality
ProgramOKI plans to use Contributed Services
for the local match Work Type: Air Quality
Planning Termini: 0
OKI Air Quality Exempt SP Planning 2018 4TE7 Federal M400 CMAQ $192,981 $0 $192,981 $192,981 2018stipID0575FDSP
Ph subtotal: $192,981 $0 $192,981 $192,981
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 24 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 97786 OKI HAM HAM OKI 2019 AQ Program Description: OKI FY 2019 Air Quality
ProgramOKI plans to use Contributed Services
for the local match Work Type: Air Quality
Planning Termini: 0
OKI Air Quality Exempt SP Planning
Planning
2019
2019
4TE7
LNT
Federal
Local Match
M40E
LNTP
CMAQ
Local Match
$246,955
$61,739
$0
$0
$308,694
$308,694
$308,694
$308,694
2018stipID0576FDSP
2018stipID0576FDSP
Ph subtotal: $308,694 $0 $308,694 $308,694
97788 OKI HAM HAM OKI 2020 AQ Program Description: OKI FY 2020 Air Quality
ProgramOKI plans to use Contributed Services
for the Local Match Work Type: Air Quality
Planning Termini: 0
OKI Air Quality Exempt SP Planning
Planning
2020
2020
4TE7
LNT
Federal
Local Match
Z001
LNTP
National Hwy Performance P
Local Match
$297,624
$74,406
$0
$0
$372,030
$372,030
$372,030
$372,030
2018stipID0577FDSP
2018stipID0577FDSP
Ph subtotal: $372,030 $0 $372,030 $372,030
98109 OKI HAM HAM Elmore to Central
Pkwy Conn
Description: As part of changes to the I-74/75
interchange of the Mill Creek Expressway
project. Traffic patterns have changed.
Preliminary Engineering is being undertaken to
evaluate this connection. The project will
Construct a new roadway to connect Elmore
Stree Work Type: New Bridge Termini:
Elmore Street west of IR-74 (near Dirr Street) to
Central Parkway (near Cincinnati State
Technical College)
CINCINNATI Air Quality Exempt DD Dtl Dsgn
Dtl Dsgn
2016
2016
4BG
LU27
Local Match
Federal
2 Local Match
Un-Assigned Federal
$0
$0
$0
$0
$0
$0
$0
$0
2018MODID0238XXDD
2018MODID0238XXDD
Ph subtotal: $0 $0 $0 $0
ENV Env PE 2016 LU27 Federal LY10 Earmarks / High Priority $0 $0 $0 $0 2018MODID0238XXENV
Ph subtotal: $0 $0 $0 $0
98764 OKI HAM HAM CR 279 0.00
Sycamore Rd
Description: Improvements to three intersections
along Sycamore Road: (1) Kenwood Road, (2)
Blue Ash Road, and (3) Plainfield Road. Work
includes conversion of the Sycamore Road and
Plainfield Road intersection to a modern
roundabout, vertical profile improvements at
Work Type: Intersection Improvement Termini:
Sycamore Road: from Plainfield Road to
Kenwood Road
SYCAMORE TOWNSHIP OF
HAMILTON COUNTY
Air Quality Exempt 0.70 CO CO Contr
CO Contr
CO Contr
CO Engr
2019
2019
2019
2019
4TA7
4TC7
LNT
LNT
Federal
Federal
Local Match
Local Match
M230
M301
LNTP
LNTP
STBG
TAP/Enhancements
Local Match
Local Match
$4,950,120
$49,880
$1,410,256
$448,718
$0
$0
$0
$0
$6,858,974
$6,858,974
$6,858,974
$6,858,974
$7,928,932
$7,928,932
$7,928,932
$7,928,932
2018stipID0578FDCO
2018stipID0578FDCO
2018stipID0578FDCO
2018stipID0578FDCO
Ph subtotal: $6,858,974 $0 $6,858,974 $7,928,932
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $5,525 $0 $5,525 $7,928,932 2018stipID0578FDDD
Ph subtotal: $5,525 $0 $5,525 $7,928,932
ENV Env PE 2018 LAB State 2 Labor - State Match $31,311 $0 $31,311 $7,928,932 2018stipID0578FDENV
Ph subtotal: $31,311 $0 $31,311 $7,928,932
RW Acquis
Acquis
RW Serv
2018
2018
2018
4TA7
LNT
LAB
Federal
Local Match
State
M230
LNTP
2
STBG
Local Match
Labor - State Match
$800,000
$225,641
$7,481
$0
$0
$0
$1,033,122
$1,033,122
$1,033,122
$7,928,932
$7,928,932
$7,928,932
2018stipID0578FDRW
2018stipID0578FDRW
2018stipID0578FDRW
Ph subtotal: $1,033,122 $0 $1,033,122 $7,928,932
98767 OKI HAM HAM SR 4 4.31 City of
Wyoming
Description: Pavement rehabilitation, curb
replacement, upgrades to the storm sewer
system, traffic signal replacement/upgrades,
implementation of "road diet" measures, addition
of bike lanes. Work Type: Minor Rehabilitation
- Pavement Prmy Sys Termini: SR-4
(Springfield Pike): from the southern corp. limit to
the northern corp. limit in Wyoming
Wyoming, City of Air Quality Exempt 1.69 RW Acquis
Acquis
RW Serv
2017
2017
2017
4BG
4TA7
LAB
Local Match
Federal
State
2
M230
2
Local Match
STP
Labor - State Match
$6,000
$24,000
$200,000
$0
$0
$0
$230,000
$230,000
$230,000
$8,260,000
$8,260,000
$8,260,000
2018MODID0245FDRW
2018MODID0245FDRW
2018MODID0245FDRW
Ph subtotal: $230,000 $0 $230,000 $8,260,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 25 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 98767 OKI HAM HAM SR 4 4.31 City of
Wyoming
Description: Pavement rehabilitation, curb
replacement, upgrades to the storm sewer
system, traffic signal replacement/upgrades,
implementation of "road diet" measures, addition
of shared use lanes (sharrows). Work Type:
Minor Rehabilitation - Pavement Prmy Sys
Termini: SR-4 (Springfield Pike): from the
southern corp. limit to the northern corp. limit in
Wyoming
Wyoming, City of Air Quality Exempt 1.69 CO CO Contr
CO Contr
CO Contr
CO Engr
2018
2018
2018
2018
4BG
4TA7
4TC7
4BG
Local Match
Federal
Federal
Local Match
2
M230
M301
2
Local Match
STBG
TAP/Enhancements
Local Match
$1,460,000
$4,640,000
$1,200,000
$511,000
$0
$0
$0
$0
$7,811,000
$7,811,000
$7,811,000
$7,811,000
$8,223,300
$8,223,300
$8,223,300
$8,223,300
2018stipID0579FDCO
2018stipID0579FDCO
2018stipID0579FDCO
2018stipID0579FDCO
Ph subtotal: $7,811,000 $0 $7,811,000 $8,223,300
98769 OKI HAM HAM CR 251 0.64 Blue Ash
Road
Description: Rehabilitation and repair of the
existing pavement, storm water improvements,
water quality features, on-street parking
reconfiguration, installation of lighting, sidewalks,
bus shelters, and traffic signal/RR pre-emption
improvements. Work Type: Minor
Rehabilitation - Pavement Gnrl Sys Termini:
CR-251 (Blue Ash Road): from Duneden Road
to Galbraith Road
DEER PARK Air Quality Exempt 0.25 CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
2019
4BG
4TA7
4TC7
4BG
LAB
Local Match
Federal
Federal
Local Match
Local Match
2
M230
M301
2
2
Local Match
STBG
TAP/Enhancements
Local Match
Labor - Local Match
$2,054,900
$3,770,800
$448,800
$369,215
$70,000
$0
$0
$0
$0
$0
$6,713,715
$6,713,715
$6,713,715
$6,713,715
$6,713,715
$7,159,477
$7,159,477
$7,159,477
$7,159,477
$7,159,477
2018stipID0580FDCO
2018stipID0580FDCO
2018stipID0580FDCO
2018stipID0580FDCO
2018stipID0580FDCO
Ph subtotal: $6,713,715 $0 $6,713,715 $7,159,477
ENV Env RW S
Env RW S
2017
2017
4BG
4TA7
Local Match
Federal
2
M230
Local Match
STP
$15,000
$60,000
$250,000
$250,000
$325,000
$325,000
$6,068,715
$6,068,715
2018MODID0246FDENV
2018MODID0246FDENV
Ph subtotal: $75,000 $250,000 $325,000 $6,068,715
RW Acquis
Acquis
2018
2018
4BG
4TA7
Local Match
Federal
2
M230
Local Match
STBG
$20,000
$80,000
$0
$0
$100,000
$100,000
$7,159,477
$7,159,477
2018stipID0580FDRW
2018stipID0580FDRW
Ph subtotal: $100,000 $0 $100,000 $7,159,477
98772 OKI HAM HAM CR 239 5.18 Winton
Road
Description: Rehabilitation of pavement; widening
of pavement to provide left-turn lanes at several
locations; rehab/repair and, as necessary,
replacement of curbs, storm sewer system, and
sidewalks; traffic signal improvements. Work
Type: Turn Lane Addition Termini: CR-239
(Winton Road): from Fleming Road to Sarbrook
Drive
HAMILTON COUNTY
ENGINEER
Air Quality Exempt 0.52 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4TA7
LNT
LNT
Federal
Local Match
Local Match
M230
LNTP
LNTP
STBG
Local Match
Local Match
$3,464,000
$866,000
$303,100
$0
$0
$0
$4,633,100
$4,633,100
$4,633,100
$5,170,289
$5,170,289
$5,170,289
2018stipID0581FDCO
2018stipID0581FDCO
2018stipID0581FDCO
Ph subtotal: $4,633,100 $0 $4,633,100 $5,170,289
99525 OKI HAM HAM OKI 2018 Reg Plng -
FIAM
Description: OKI FY 2018 Regional
Transportation Planning - FIAM Work Type:
Planning & Research Termini: 0
OKI Air Quality Exempt SP Planning 2018 4TD7 Federal M450 Metro Planning $119,725 $0 $119,725 $119,725 2018stipID0582FDSP
Ph subtotal: $119,725 $0 $119,725 $119,725
99526 OKI HAM HAM OKI 2019 Reg Plng -
FIAM
Description: OKI FY 2019 Regional
Transportation Planning - FIAM Work Type:
Planning & Research Termini: 0
OKI Air Quality Exempt SP Planning
Planning
2019
2019
4TD7
LNT
Federal
Local Match
M450
LNTP
Metro Planning
Local Match
$80,653
$20,163
$0
$0
$100,816
$100,816
$100,816
$100,816
2018stipID0583FDSP
2018stipID0583FDSP
Ph subtotal: $100,816 $0 $100,816 $100,816
99527 OKI HAM HAM OKI 18 Reg Trans
Plng - LU
Description: OKI FY 2018 Regional
Transportation Planning - Land Use Work
Type: Planning & Research Termini: 0
OKI Air Quality Exempt SP Planning 2018 4TD7 Federal M450 Metro Planning $309,049 $0 $309,049 $309,049 2018stipID0584FDSP
Ph subtotal: $309,049 $0 $309,049 $309,049
99528 OKI HAM HAM OKI 19 Reg Trans
Plng - LU
Description: FY 2019 OKI Regional
Transportation Planning - Land Use Work
Type: Planning & Research Termini: 0
OKI Air Quality Exempt SP Planning 2019 4TD7 Federal M450 Metro Planning $328,975 $0 $411,219 $411,219 2018stipID0585FDSP
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 26 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 99528 OKI HAM HAM OKI 19 Reg Trans
Plng - LU
Description: FY 2019 OKI Regional
Transportation Planning - Land Use Work
OKI Air Quality Exempt SP Planning 2019 LNT Local Match LNTP Local Match $82,244 $0 $411,219 $411,219 2018stipID0585FDSP
Ph subtotal: $411,219 $0 $411,219 $411,219
99837 OKI HAM HAM US 22 7.16 Description: Reconstruction of Montgomery
Road (US-22/SR-3) from the Norwood corp. line
to the Silverton corp. line. The existing typical
section (two 16' wide shared parking/thru lanes
and two 9' thru lanes) will be re-striped to provide
a five lane section (two thru Work Type:
Signals Termini: Montgomery Road
(US-22/SR-3): Norwood corp. line (near
Cypress Way) to Silverton corp. line (near
Coleridge Avenue)
Cincinnati, City of Air Quality Exempt 2.03 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TB7
LNT
LNT
Federal
Local Match
Local Match
M40E
LNTP
LNTP
CMAQ
Local Match
Local Match
$2,000,000
$500,000
$175,000
$0
$0
$0
$2,675,000
$2,675,000
$2,675,000
$2,695,851
$2,695,851
$2,695,851
2018stipID0586FDCO
2018stipID0586FDCO
2018stipID0586FDCO
Ph subtotal: $2,675,000 $0 $2,675,000 $2,695,851
100031 OKI HAM HAM Harrison Ave Bikepath Description: Construction of a 12 foot wide
multi-use path along an abandoned rail corridor,
that loosely parallels Harrison Avenue (on the
west side). Work Type: Bikeways Termini:
Old rail corridor (west of Harrison Avenue): from
approximately Lee Court to Hutchinson Road
GREEN TOWNSHIP OF
HAMILT0N COUNTY
Air Quality Exempt 0.31 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4BG
4TC7
LAB
Local Match
Federal
Local Match
2
Z301
2
Local Match
TAP/Enhancements
Labor - Local Match
$497,500
$497,500
$99,500
$0
$0
$0
$1,094,500
$1,094,500
$1,094,500
$1,144,251
$1,144,251
$1,144,251
2018stipID0587FDCO
2018stipID0587FDCO
2018stipID0587FDCO
Ph subtotal: $1,094,500 $0 $1,094,500 $1,144,251
100032 OKI HAM HAM SR 264 6.02 Sidewalk Description: Construction of new sidewalk, curb,
and storm sewer system on the south side of
SR-264. Work Type: Add Sidewalks Termini:
SR-264 (Bridgetown Road): from the Public
Library to Markay Court.
GREEN TOWNSHIP OF
HAMILT0N COUNTY
Air Quality Exempt 0.55 CO CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
4BG
4TC7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
M301
17
2
Local Match
TAP/Enhancements
TAP/Enhancements
Labor - Local Match
$285,028
$285,028
$28,500
$28,500
$0
$0
$0
$0
$627,055
$627,055
$627,055
$627,055
$762,245
$762,245
$762,245
$762,245
2018stipID0588FDCO
2018stipID0588FDCO
2018stipID0588FDCO
2018stipID0588FDCO
Ph subtotal: $627,055 $0 $627,055 $762,245
100046 OKI HAM HAM ORT West Segment 1 Description: Construction of a 10' wide multi-use
trail from the Evans Recreation Area to State
Street. Work Type: Bikeways Termini: Evans
Recreation Area (near the Mill Creek) to State
Street
Cincinnati, City of Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $4,081 $0 $4,081 $482,707 2018stipID0589FDDD
Ph subtotal: $4,081 $0 $4,081 $482,707
ENV Env PE 2018 LAB State 2 Labor - State Match $23,127 $0 $23,127 $482,707 2018stipID0589FDENV
Ph subtotal: $23,127 $0 $23,127 $482,707
RW RW Serv 2018 LAB State 2 Labor - State Match $374 $0 $374 $482,707 2018stipID0589FDRW
Ph subtotal: $374 $0 $374 $482,707
HAM ORT West Segment 1
- Part 1
Description: Construction of a 10' wide multi-use
trail from the Evans Recreation Area to State
Street.Part 2 - HAM ORT West Segment 2
Work Type: Bikeways Termini: Evans
Recreation Area (near the Mill Creek) to State
Street
Cincinnati, City of Air Quality Exempt CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
2020
4TB7
4TB7
LNT
4TB7
LNT
Federal
Federal
Local Match
Federal
Local Match
Z400
LNTP
LNTP
Un-Assigned Federal
Not Grouped
Local Match
Un-Assigned Federal
Local Match
$714,000
$316,630
$449,441
$14,370
$101,109
$0
$0
$0
$0
$0
$1,595,550
$1,595,550
$1,595,550
$1,595,550
$1,595,550
$1,623,132
$1,623,132
$1,623,132
$1,623,132
$1,623,132
2018MODID0442FDCO
2018MODID0442FDCO
2018MODID0442FDCO
2018MODID0442FDCO
2018MODID0442FDCO
Ph subtotal: $1,595,550 $0 $1,595,550 $1,623,132
100047 OKI HAM HAM ORT West Segment 2 Description: Construction of a 10' shared use
path from Fairbanks Avenue (near Boldface
Park) to the Gilday Riverside Playfield. Work
Type: Bikeways Termini: Fairbanks Avenue
(near Boldface Park) to the Gilday Reserve
Playfield
Cincinnati, City of Air Quality Exempt CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TB7
LNT
LNT
Federal
Local Match
Local Match
Z400
LNTP
LNTP
CMAQ
Local Match
Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$34,689
$34,689
$34,689
2018MODID0442FDCO
2018MODID0442FDCO
2018MODID0442FDCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 27 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
Ph subtotal: $0 $0 $0 $34,689
FHWA 8 100047 OKI HAM HAM ORT West Segment 2 Description: Construction of a 10' shared use
path from Fairbanks Avenue (near Boldface
Cincinnati, City of Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $4,081 $0 $4,081 $1,005,814 2018stipID0590FDDD
Ph subtotal: $4,081 $0 $4,081 $1,005,814
ENV Env PE 2018 LAB State 2 Labor - State Match $23,127 $0 $23,127 $1,005,814 2018stipID0590FDENV
Ph subtotal: $23,127 $0 $23,127 $1,005,814
RW RW Serv 2018 LAB State 2 Labor - State Match $7,481 $0 $7,481 $34,689 2018MODID0445FDRW
Ph subtotal: $7,481 $0 $7,481 $34,689
101019 OKI HAM HAM OSS FY 2019 Description: Overhead Sign Support Inspections
in Hamilton County. Work Type: Signs
Termini: Hamilton County
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn 2019 4PS7 State 2 State Funds (002) $600,000 $0 $600,000 $600,000 2018stipID0591FDDD
Ph subtotal: $600,000 $0 $600,000 $600,000
101578 OKI HAM HAM US 42 12.96 Reading
Road
Description: Repair and resurfacing of Reading
Road (US-42) from Inwood Drive to the northern
Village corp. line (north of McSwain Drive). Also
included is driveway reconstruction, drainage
improvements, replacement of existing
deteriorated concrete sidewalk, replacem
Work Type: Major Rehabilitation Termini:
Reading Road (US-42): from Inwood Drive to the
northern Village corp. limit (north of McSwain
Drive)
EVENDALE, VILLAGE OF Air Quality Exempt 1.10 CO CO Contr
CO Contr
CO Engr
CO Engr
2017
2017
2017
2017
4BG
4TA7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
2
Local Match
Un-Assigned Federal
Un-Assigned Federal Labor
Labor - Local Match
$459,974
$441,935
$44,194
$45,997
$0
$0
$0
$0
$992,100
$992,100
$992,100
$992,100
$1,019,158
$1,019,158
$1,019,158
$1,019,158
2018MODID0256FDCO
2018MODID0256FDCO
2018MODID0256FDCO
2018MODID0256FDCO
Ph subtotal: $992,100 $0 $992,100 $1,019,158
101886 OKI HAM HAM Cincinnati CTCS Zone
9
Description: The project includes installation of
fiber optic interconnect cable. Traffic signals will
be upgraded to LED technology. New signal
controllers will be installed and new signal timing
implemented. Work Type: Signals Termini:
City of Cincinnati Traffic Signal Zone 9 (includes
Paddock and Reading Road corridors S of the
I-75 split)
Cincinnati, City of Air Quality Exempt 6.83 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4TB7
LNT
LNT
Federal
Local Match
Local Match
Z400
LNTP
LNTP
CMAQ
Local Match
Local Match
$3,200,000
$800,000
$280,000
$0
$0
$0
$4,280,000
$4,280,000
$4,280,000
$4,288,298
$4,288,298
$4,288,298
2018stipID0592FDCO
2018stipID0592FDCO
2018stipID0592FDCO
Ph subtotal: $4,280,000 $0 $4,280,000 $4,288,298
103358 OKI HAM HAM Banks Variable
Message Signs
Description: Installation of cantilever style
dynamic message signs in four interstate
locations. Signs will be connected into the central
control system by tying into existing fiber optic
cable and coordinated with OHGO system to
ensure regional coordination. Work Type:
Misc. Traffic Cont. Termini: IR-75 NB at MM
191; IR-75 SB at MM 1.5; IR-71 SB at MM 2.7;
IR-471 NB at MM 4.2
HAMILTON COUNTY
ENGINEER
Air Quality Exempt CO CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
4BG
4TA7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
Z230
17
2
Local Match
STBG
Bridge
Labor - Local Match
$139,894
$559,578
$55,958
$13,989
$0
$0
$0
$0
$769,419
$769,419
$769,419
$769,419
$788,635
$788,635
$788,635
$788,635
2018stipID0593FDCO
2018stipID0593FDCO
2018stipID0593FDCO
2018stipID0593FDCO
Ph subtotal: $769,419 $0 $769,419 $788,635
103392 OKI HAM HAM US 22 12.38
Sidewalks
Description: Construction of new sidewalk on the
west side of Montgomery Road from Dearwester
Drive to tie into existing sidewalk approximately
375 feet south of Pinehurst Lane. Work Type:
Add Sidewalks Termini: Montgomery Road
(US-22/SR-3): from Dearwester Dr to ex.
sidewalk 375' S of Pinehurst Ln
SYCAMORE TOWNSHIP OF
HAMILTON COUNTY
Air Quality Exempt 0.38 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4TB7
LNT
4TB7
LNT
Federal
Local Match
Federal
Local Match
Z400
LNTP
Z400
LNTP
CMAQ
Local Match
CMAQ
Local Match
$859,838
$214,960
$1,256
$106,224
$0
$0
$0
$0
$1,182,278
$1,182,278
$1,182,278
$1,182,278
$1,306,134
$1,306,134
$1,306,134
$1,306,134
2018AM10ID0307FDCO
2018AM10ID0307FDCO
2018AM10ID0307FDCO
2018AM10ID0307FDCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 28 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
Ph subtotal: $1,182,278 $0 $1,182,278 $1,306,134
FHWA 8 103392 OKI HAM HAM US 22 12.38
Sidewalks
Description: Construction of new sidewalk on the
west side of Montgomery Road from Dearwester
SYCAMORE TOWNSHIP OF
HAMILTON COUNTY
Air Quality Exempt 0.38 RW Acquis
Acquis
2019
2019
4TB7
LNT
Federal
Local Match
Z400
LNTP
CMAQ
Local Match
$80,000
$20,000
$0
$0
$100,000
$100,000
$961,094
$961,094
2018stipID0594FDRW
2018stipID0594FDRW
Ph subtotal: $100,000 $0 $100,000 $961,094
103416 OKI HAM HAM Plainfield Rd
Roundabouts
Description: Conversion of three signalized
intersections to multi-lane modern roundabouts.
Work Type: Intersection Improvement
Termini: Intersections of Plainfield Road with (1)
EB SR-126 ramps (2) Hunt Road, and (3)
Peppermill Ln/Reed Hartman Hwy
BLUE ASH Air Quality Exempt 0.47 CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
2021
4HJ7
4TB7
LNT
4TB7
LNT
Federal
Federal
Local Match
Federal
Local Match
ZS30
Z400
LNTP
Z400
LNTP
Highway Safety Imp Prog
CMAQ
Local Match
CMAQ
Local Match
$5,000,000
$3,738,318
$1,490,135
$261,682
$454,309
$0
$0
$0
$0
$0
$10,944,444
$10,944,444
$10,944,444
$10,944,444
$10,944,444
$13,933,953
$13,933,953
$13,933,953
$13,933,953
$13,933,953
2018stipID0595FDCO
2018stipID0595FDCO
2018stipID0595FDCO
2018stipID0595FDCO
2018stipID0595FDCO
Ph subtotal: $10,944,444 $0 $10,944,444 $13,933,953
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $16,754 $0 $16,754 $13,933,953 2018stipID0595FDDD
Ph subtotal: $16,754 $0 $16,754 $13,933,953
ENV Env PE 2018 LAB State 2 Labor - State Match $94,940 $0 $94,940 $13,933,953 2018stipID0595FDENV
Ph subtotal: $94,940 $0 $94,940 $13,933,953
RW Acquis
Acquis
RW Serv
2020
2020
2018
4TA7
LNT
LAB
Federal
Local Match
State
Z230
LNTP
2
Bridge
Local Match
Labor - State Match
$2,014,470
$863,344
$3,799
$0
$0
$0
$2,881,613
$2,881,613
$2,881,613
$13,860,907
$13,860,907
$13,860,907
2018MODID0467FDRW
2018MODID0467FDRW
2018MODID0467FDRW
Ph subtotal: $2,881,613 $0 $2,881,613 $13,860,907
104116 OKI HAM D08 PO FY2019 (Hamilton
Co.)
Description: District 8 PO for Hamilton County
issues in FY 2019. Work Type: Maintenance
Contracts (Interstate, etc.) Termini: Hamilton
County
ODOT SPONSORING
AGENCY
Air Quality Exempt OT Oth Remb 2019 4CP7 State 2 State Funds (002) $1,226,000 $0 $1,226,000 $1,226,000 2018stipID0596FDOTH
Ph subtotal: $1,226,000 $0 $1,226,000 $1,226,000
104409 OKI HAM HAM Banks VMS Phase 2 Description: Installation of cantilever style
dynamic message signs (DMS). Signs will be
connected to the Cincinnati central control
system by tying into existing fiber optic and
coordinated with the current OHGO system to
ensure regional coordination. Work Type:
Misc. Traffic Cont. Termini: Second Street,
Third Street, and US-50 in downtown Cincinnati
HAMILTON COUNTY
ENGINEER
Air Quality Non-Exe 0.40 CO CO Contr
CO Contr
CO Engr
CO Engr
2018
2018
2018
2018
4TA7
LNT
4TA7
LNT
Federal
Local Match
Federal
Local Match
Z230
LNTP
Z230
LNTP
STBG
Local Match
STBG
Local Match
$3,600,000
$900,000
$400,000
$100,000
$0
$0
$0
$0
$5,000,000
$5,000,000
$5,000,000
$5,000,000
$5,000,000
$5,000,000
$5,000,000
$5,000,000
2018stipID0597FDCO
2018stipID0597FDCO
2018stipID0597FDCO
2018stipID0597FDCO
Ph subtotal: $5,000,000 $0 $5,000,000 $5,000,000
104667 OKI HAM HAM IR 75 3.84 Description: This is Phase 5A of the Hamilton 75
corridor projects (MCE). This phase was split
off of the work originally to be completed under
PID 83723. Project adds a lane to I-75 SB,
provides 4-lane continuity NB, and reconfigures
the I-74 EB ramps to I-75. Env Work Type:
Major Widening Termini: From the Monmouth
overpass to just south of Clifton Rd.
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 1.71 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
2019
2019
2019
2019
2019
2019
2019
2019
2019
2020
2020
2021
4BD7
4BK7
4PF7
4PS7
7PM
4PF7
4PS7
LAB
LAB
4PF7
4PS7
4PF7
State
Federal
Federal
State
Bonds
Federal
State
Federal
State
Federal
State
Federal
2
Z001
Z001
2
45
Z001
2
Z001
2
Z001
2
Z001
State Funds (002)
National Hwy Performance P
National Hwy Performance P
State Funds (002)
Garvee Bond-Fund 045-Lon
National Hwy Performance P
State Funds (002)
National Hwy Performance P
Labor - State Match
National Hwy Performance P
State Funds (002)
National Hwy Performance P
$6,200,000
$24,800,000
$9,000,000
$1,000,000
$39,000,000
$209,516
$23,280
$2,366,000
$3,234,000
$1,204,292
$133,810
$1,178,010
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$88,479,798
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
$98,185,471
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
2018stipID0598FDCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 29 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 104667 OKI HAM HAM IR 75 3.84 Description: This is Phase 5A of the Hamilton 75
corridor projects (MCE). This phase was split
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 1.71 CO CO Engr 2021 4PS7 State 2 State Funds (002) $130,890 $0 $88,479,798 $98,185,471 2018stipID0598FDCO
Ph subtotal: $88,479,798 $0 $88,479,798 $98,185,471
DD Dtl Dsgn
Dtl Dsgn
2019
2019
4BD7
4BK7
State
Federal
2
Z001
State Funds (002)
National Hwy Performance P
$1,600,000
$6,400,000
$197,890
$197,890
$8,197,890
$8,197,890
$98,185,471
$98,185,471
2018stipID0598FDDD
2018stipID0598FDDD
Ph subtotal: $8,000,000 $197,890 $8,197,890 $98,185,471
104668 OKI HAM HAM IR 74 18.01 Description: This is Phase 5B of the Hamilton
MCE 75 corridor projects. This phase was split
off of the work originally to be completed under
PID 83723. Project addresses work on I-74 as
part of the I-74/75 interchange reconstruction.
In addition, will improve the Work Type: Major
Widening Termini: From just west of Colerain
interchange with I-74 to I-75
ODOT SPONSORING
AGENCY
Air Quality Non-Exe 1.47 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4BD7
4BK7
LAB
LAB
State
Federal
Federal
State
2
Z001
Z001
2
State Funds (002)
National Hwy Performance P
National Hwy Performance P
Labor - State Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$100,730,569
$100,730,569
$100,730,569
$100,730,569
2018stipID0599XXCO
2018stipID0599XXCO
2018stipID0599XXCO
2018stipID0599XXCO
Ph subtotal: $0 $0 $0 $100,730,569
DD Dtl Dsgn
Dtl Dsgn
2020
2020
4BD7
4BK7
State
Federal
2
Z001
State Funds (002)
National Hwy Performance P
$0
$0
$0
$0
$0
$0
$100,730,569
$100,730,569
2018stipID0599XXDD
2018stipID0599XXDD
Ph subtotal: $0 $0 $0 $100,730,569
104934 OKI HAM HAM US 22 14.74 Montg
Sidewalks
Description: Construction of a 7' wide sidewalk
on the east side of Montgomery Road from
School House Lane to Radabaugh Drive. Work
Type: Add Sidewalks Termini: US-22
(Montgomery Road): from School House Lane to
Radabaugh Drive
Montgomery, City of Air Quality Exempt 0.49 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4TC7
LNT
LNT
Federal
Local Match
Local Match
Z301
LNTP
LNTP
TAP/Enhancements
Local Match
Local Match
$359,480
$89,870
$44,935
$0
$0
$0
$494,285
$494,285
$494,285
$593,192
$593,192
$593,192
2018stipID0600FDCO
2018stipID0600FDCO
2018stipID0600FDCO
Ph subtotal: $494,285 $0 $494,285 $593,192
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $736 $0 $736 $593,192 2018stipID0600FDDD
Ph subtotal: $736 $0 $736 $593,192
ENV Env PE 2018 LAB State 2 Labor - State Match $4,171 $0 $4,171 $593,192 2018stipID0600FDENV
Ph subtotal: $4,171 $0 $4,171 $593,192
RW Acquis
Acquis
RW Serv
2020
2020
2018
4TC7
LNT
LAB
Federal
Local Match
State
Z301
LNTP
2
TAP/Enhancements
Local Match
Labor - State Match
$27,200
$6,800
$60,000
$0
$0
$0
$94,000
$94,000
$94,000
$593,192
$593,192
$593,192
2018stipID0600FDRW
2018stipID0600FDRW
2018stipID0600FDRW
Ph subtotal: $94,000 $0 $94,000 $593,192
104936 OKI HAM HAM SR 126/US 22
20.00/13.19
Description: Construction of a multi-lane modern
roundabout to replace/modify the existing partial
clover interchange at SR-126 and US-22.
Work Type: Intersection Improvement Termini:
SR-126 & US-22 Interchange
Montgomery, City of Air Quality Non-Exe 0.63 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
STBG
Local Match
Local Match
$6,000,000
$2,571,429
$600,000
$0
$0
$0
$9,171,429
$9,171,429
$9,171,429
$9,325,029
$9,325,029
$9,325,029
2018stipID0601FDCO
2018stipID0601FDCO
2018stipID0601FDCO
Ph subtotal: $9,171,429 $0 $9,171,429 $9,325,029
104942 OKI HAM HAM Reading Signal
Upgrades
Description: Retrofit existing traffic signal heads
at 26 signalized intersections within the City of
Reading, OH with LED signal heads. Existing
pedestrian heads will be retrofitted with LED
lenses. Existing school flashers will be replaced.
Battery backup systems wi Work Type:
Signals Termini: City of Reading, OH (26
signalized intersections)
Reading, City of Air Quality Exempt 3.87 CO CO Contr
CO Contr
CO Engr
2018
2018
2018
4BG
4TA7
LAB
Local Match
Federal
Local Match
2
Z230
2
Local Match
STBG
Labor - Local Match
$73,400
$293,600
$36,700
$0
$0
$0
$403,700
$403,700
$403,700
$495,451
$495,451
$495,451
2018stipID0602FDCO
2018stipID0602FDCO
2018stipID0602FDCO
Ph subtotal: $403,700 $0 $403,700 $495,451
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 30 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 104944 OKI HAM HAM CR 269 2.80 Kenwood
Road
Description: Addition of a southbound right turn
lane from Kenwood Road to US-22 (Montgomery
Road). In addition, a physical divider will be
constructed to separate the southbound left-turn
lane from other southbound traffic on Kenwood
Roa Work Type: Intersection Improvement
Termini: Intersection of US-22 with Kenwood
Road in Sycamore Township, OH
SYCAMORE TOWNSHIP OF
HAMILTON COUNTY
Air Quality Exempt 0.16 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
STBG
Local Match
Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018stipID0603XXCO
2018stipID0603XXCO
2018stipID0603XXCO
Ph subtotal: $0 $0 $0 $0
RW Acquis
Acquis
RW Serv
2021
2021
2021
4TA7
LNT
LAB
Federal
Local Match
Labor
Z230
LNTP
LABR
STBG
Local Match
Labor
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018stipID0603XXRW
2018stipID0603XXRW
2018stipID0603XXRW
Ph subtotal: $0 $0 $0 $0
Description: Addition of a southbound right turn
lane from Kenwood Road to US-22 (Montgomery
Road). In addition, a physical divider will be
constructed to separate the southbound left-turn
lane from other southbound traffic on Kenwood
Road. A shared use path will be c Work Type:
Intersection Improvement Termini: Intersection
of US-22 with Kenwood Road in Sycamore
Township, OH
SYCAMORE TOWNSHIP OF
HAMILTON COUNTY
Air Quality Exempt 0.16 DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $1,719 $0 $1,719 $2,244,463 2018stipID0603FDDD
Ph subtotal: $1,719 $0 $1,719 $2,244,463
ENV Env PE 2018 LAB State 2 Labor - State Match $9,742 $0 $9,742 $2,244,463 2018stipID0603FDENV
Ph subtotal: $9,742 $0 $9,742 $2,244,463
105058 OKI HAM HAM Bassett Road
Sidewalk
Description: Construction of sidewalk along
Bassett Road from Fairbanks Avenue to Elberon
Avenue. Work Type: Add Sidewalks Termini:
Bassett Road: from Fairbanks Avenue to
Elberon Avenue
Cincinnati, City of Air Quality Exempt CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4TC7
LNT
4TC7
LNT
Federal
Local Match
Federal
Local Match
Z301
LNTP
LNTP
Not Grouped
Local Match
Un-Assigned Federal
Local Match
$504,000
$126,000
$56,000
$14,000
$0
$0
$0
$0
$700,000
$700,000
$700,000
$700,000
$700,000
$700,000
$700,000
$700,000
2018MODID0443FDCO
2018MODID0443FDCO
2018MODID0443FDCO
2018MODID0443FDCO
Ph subtotal: $700,000 $0 $700,000 $700,000
105162 OKI HAM HAM CR 665 0.39 Auburn
Avenue
Description: Widening of Auburn Avenue to five
lanes between Dorchester and Gilman Avenues.
The intersection of Auburn Avenue with
Huntington Place and the entrance to the
Hamilton County Juvenile Detention Center will
be realigned. Improvements to the Auburn
Avenue i Work Type: Widening Termini:
Auburn Avenue: from Dorchester Avenue to
Gilman Avenue
Cincinnati, City of Air Quality Non-Exe 0.28 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4TA7
LNT
LNT
Federal
Local Match
Local Match
Z230
LNTP
LNTP
STBG
Local Match
Local Match
$2,500,800
$625,200
$218,820
$0
$0
$0
$3,344,820
$3,344,820
$3,344,820
$5,188,956
$5,188,956
$5,188,956
2018stipID0605FDCO
2018stipID0605FDCO
2018stipID0605FDCO
Ph subtotal: $3,344,820 $0 $3,344,820 $5,188,956
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $5,120 $0 $5,120 $5,188,956 2018stipID0605FDDD
Ph subtotal: $5,120 $0 $5,120 $5,188,956
ENV Env PE 2018 LAB State 2 Labor - State Match $29,016 $0 $29,016 $5,188,956 2018stipID0605FDENV
Ph subtotal: $29,016 $0 $29,016 $5,188,956
RW Acquis
Acquis
RW Serv
2020
2020
2018
4TA7
LNT
LAB
Federal
Local Match
State
Z230
LNTP
2
STBG
Local Match
Labor - State Match
$1,400,000
$350,000
$60,000
$0
$0
$0
$1,810,000
$1,810,000
$1,810,000
$5,188,956
$5,188,956
$5,188,956
2018stipID0605FDRW
2018stipID0605FDRW
2018stipID0605FDRW
Ph subtotal: $1,810,000 $0 $1,810,000 $5,188,956
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 31 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 105168 OKI HAM HAM Wasson Way Trail
Phase 2a
Description: Construction of a 12'-14' foot
shared-use path and parallel 6'-8' wide
pedestrian path to extend the proposed Wasson
Way Trail network from Tamarack Avenue to the
west, across the existing RR bridge over IR-71,
terminating near the intersection of Floral Work
Type: Bikeways Termini: Floral Avenue and
Elsmere Avenue intersection to Tamarack
Avenue (tie into proposed Wasson Way Trail)
Cincinnati, City of Air Quality Exempt CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TC7
LNT
LNT
Federal
Local Match
Local Match
Z301
LNTP
LNTP
Not Grouped
Local Match
Local Match
$944,000
$1,337,515
$159,706
$0
$0
$0
$2,441,221
$2,441,221
$2,441,221
$2,461,817
$2,461,817
$2,461,817
2018AM04ID0161FDCO
2018AM04ID0161FDCO
2018AM04ID0161FDCO
Ph subtotal: $2,441,221 $0 $2,441,221 $2,461,817
105181 OKI HAM HAM Hauck Road Widening Description: Widening of Hauck Road to three
lanes to add a center two way left turn lane. In
addition curb and gutter will be constructed,
replacement of the storm sewer system, and
construction of a sidewalk on the north side of
Hauck Road. Work Type: Roadway
Improvement (Safety) Termini: Hauck Road:
from 80' west of the Norfolk Southern crossing
(near Reading Road) to 500' west of US-42
(Lebanon Road)
Sharonville, City of Air Quality Exempt ENV Env RW S
Env RW S
2020
2020
4TA7
LNT
Federal
Local Match
Z230
LNTP
Bridge
Local Match
$66,300
$44,200
$166,400
$166,400
$110,500
$110,500
$5,137,801
$5,137,801
2018MODID0497FDENV
2018MODID0497FDENV
Ph subtotal: $110,500 $166,400 $110,500 $5,137,801
Description: Widening of Hauck Road to three
lanes to add a center two way left turn lane. In
addition curb and gutter will be constructed,
replacement of the storm sewer system, and
construction of a sidewalk on the north side of
Hauck Road. Work Type: Widening Termini:
Hauck Road: from 80' west of the Norfolk
Southern crossing (near Reading Road) to 500'
west of US-42 (Lebanon Road)
Sharonville, City of Air Quality Exempt CO CO Contr
CO Contr
CO Contr
CO Engr
2021
2021
2021
2021
4BG
4TA7
4TC7
LAB
Local Match
Federal
Federal
Local Match
2
Z230
Z301
2
Local Match
STBG
TAP/Enhancements
Labor - Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,161,042
$1,161,042
$1,161,042
$1,161,042
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
Ph subtotal: $0 $0 $0 $1,161,042
RW Acquis
Acquis
2020
2020
4TA7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$348,300
$232,200
$60,000
$60,000
$640,500
$640,500
$5,137,801
$5,137,801
2018stipID0607FDRW
2018stipID0607FDRW
Ph subtotal: $580,500 $60,000 $640,500 $5,137,801
105184 OKI HAM HAM CR 266 12.42 Kemper
Bikepath
Description: Construction of a shared use path
along Kemper Road from US-42 to the Sharon
Woods Park, Lakeview Lodge driveway, where it
will connect with the Sharon Woods trail
network. Work Type: Bike Facility Termini:
Kemper Road: from US 42 to the Sharon Woods
Park - Lakeview Lodge driveway
Sharonville, City of Air Quality Exempt 0.74 ENV Env PE
Env RW S
Env RW S
2018
2020
2020
LAB
4TC7
LNT
State
Federal
Local Match
2
Z301
LNTP
Labor - State Match
TAP/Enhancements
Local Match
$12,260
$47,760
$31,840
$0
$0
$0
$91,860
$91,860
$91,860
$674,224
$674,224
$674,224
2018MODID0498FDENV
2018MODID0498FDENV
2018MODID0498FDENV
Ph subtotal: $91,860 $0 $91,860 $674,224
Description: Construction of a shared use path
along Kemper Road from US-42 to the Sharon
Woods Park, Lakeview Lodge driveway, where it
will connect with the Sharon Woods trail
network. Work Type: Bikeways Termini:
Kemper Road: from US 42 to the Sharon Woods
Park - Lakeview Lodge driveway
Sharonville, City of Air Quality Exempt 0.74 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4BG
4TC7
LAB
Local Match
Federal
Local Match
2
Z301
2
Local Match
TAP/Enhancements
Labor - Local Match
$199,320
$298,980
$49,830
$0
$0
$0
$548,130
$548,130
$548,130
$709,630
$709,630
$709,630
2018stipID0608FDCO
2018stipID0608FDCO
2018stipID0608FDCO
Ph subtotal: $548,130 $0 $548,130 $709,630
RW Acquis
Acquis
2020
2020
4TC7
LNT
Federal
Local Match
Z301
LNTP
TAP/Enhancements
Local Match
$49,140
$32,760
$0
$0
$81,900
$81,900
$709,630
$709,630
2018stipID0608FDRW
2018stipID0608FDRW
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 32 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
Ph subtotal: $81,900 $0 $81,900 $709,630
FHWA 8 105214 OKI HAM HAM MICRO FY2024 Description: Microsurfacing in Hamilton County
in FY2024 Work Type: Preventive
Maintenance Termini: HAM SR 32 SLM 1.79 to
4.58
ODOT SPONSORING
AGENCY
Air Quality Exempt 2.79 DD Dtl Dsgn 2020 LAB State 2 Labor - State Match $0 $0 $0 $724,786 2018stipID0609XXDD
Ph subtotal: $0 $0 $0 $724,786
ENV Env PE 2020 LAB State 2 Labor - State Match $0 $0 $0 $724,786 2018stipID0609XXENV
Ph subtotal: $0 $0 $0 $724,786
105314 OKI HAM HAM WHV Western
Approach
Description: Western Hills Viaduct (WHV) Phase
1: Acquisition of parcels and structure demolition
of right of way required for the western approach
of the new WHV. Removal of the western plaza
to the extent possible while maintaining traffic. Fill
and grade the wester Work Type: Bridge
Demolition Only Termini: Western approach to
the Western Hills Viaduct (roughly from
Moellering Avenue to State Avenue)
Cincinnati, City of Air Quality Exempt 0.25 RW Acquis
Acquis
2018
2018
4BK7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$520,000
$130,000
$1,270,000
$1,270,000
$1,920,000
$1,920,000
$14,099,000
$14,099,000
2018stipID0610FDRW
2018stipID0610FDRW
Ph subtotal: $650,000 $1,270,000 $1,920,000 $14,099,000
105315 OKI HAM HAM WHV Eastern
Approach
Description: Western Hills Viaduct (WHV) Phase
2: Acquisition of parcels and structure demolition
on the eastern approach to the new WHV. Fill
and grade the eastern approach and construct
new retaining walls where practical and where
they can be constructed in a manne Work
Type: Bridge Demolition Only Termini: Eastern
approach to the Western Hills Viaduct (roughly
Spring Grove Avenue to Central Parkway)
Cincinnati, City of Air Quality Exempt 0.20 RW Acquis
Acquis
2019
2019
4BK7
LNT
Federal
Local Match
Z001
LNTP
Not Grouped
Local Match
$2,400,000
$600,000
$0
$0
$3,000,000
$3,000,000
$9,900,000
$9,900,000
2018AM06ID0207FDRW
2018AM06ID0207FDRW
Ph subtotal: $3,000,000 $0 $3,000,000 $9,900,000
105347 OKI HAM HAM WHV Mill Creek Bridge
& RR
Description: Western Hills Viaduct (WHV) Phase
6: Construction of a new bridge over the Mill
Creek, south of the WHV to provide contractor
access for future construction. In addition,
relocation of the bypass track on the east bank
of the Mill Creek further east, to c Work Type:
New Bridge Termini: Rail yard below WHV and
Mill Creek crossing south of WHV (from State
Avenue to the rail yard)
Cincinnati, City of Air Quality Exempt 0.20 RW Acquis
Acquis
2021
2021
4BK7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$800,000
$200,000
$0
$0
$1,000,000
$1,000,000
$7,600,000
$7,600,000
2018AM06ID0208FDRW
2018AM06ID0208FDRW
Ph subtotal: $1,000,000 $0 $1,000,000 $7,600,000
105349 OKI HAM HAM WHV New Viaduct
Construction
Description: Western Hills Viaduct (WHV) Phase
8: Construction of the new Western Hills Viaduct
including construction of tower piers, approach
bridge substructure, large span and approach
span superstructures and decks, and remaining
approach roadway. Work Type: New Bridge
Termini: Western Hills Viaduct and approaches
(near Moellering Ave on west side to east of
Central Pkwy along W McMillan St on east side)
Cincinnati, City of Air Quality Exempt 1.06 DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2018
2020
4BK7
LNT
LNT
Federal
Local Match
Local Match
LNTP
LNTP
Un-Assigned Federal
Local Match
Local Match
$1,270,729
$317,682
$1,911,589
$0
$0
$0
$3,500,000
$3,500,000
$3,500,000
$259,900,000
$259,900,000
$259,900,000
2018MODID0262FDDD
2018MODID0262FDDD
2018MODID0262FDDD
Ph subtotal: $3,500,000 $0 $3,500,000 $259,900,000
ENV PE Engr
PE Engr
PE Engr
PE Engr
2017
2017
2017
2017
4BK7
4R27
4R47
LNT
Federal
Federal
Federal
Local Match LNTP
Un-Assigned Federal
Un-Assigned Federal
Un-Assigned Federal
Local Match
$3,729,271
$1,500,942
$1,337,469
$932,318
$932,318
$932,318
$932,318
$932,318
$8,432,318
$8,432,318
$8,432,318
$8,432,318
$259,900,000
$259,900,000
$259,900,000
$259,900,000
2018MODID0262FDENV
2018MODID0262FDENV
2018MODID0262FDENV
2018MODID0262FDENV
Ph subtotal: $7,500,000 $932,318 $8,432,318 $259,900,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 33 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 105763 OKI HAM HAM CR 457 12.68
Harrison Ave
Description: Widening the roadway to increase
lane widths, mill and fill of pavement with spot
repairs where needed. Installation of a retaining
wall where a slide exists on the east side of the
roadway, installation of sidewalk where it
currently does not exist, and Work Type:
Widening Termini: Harrison Ave: from
Wesselmen Rd to the Harrison Greene
Shopping Center
GREEN TOWNSHIP OF
HAMILT0N COUNTY
Air Quality Exempt 1.02 CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2020
2020
2020
2020
2020
2020
4TA7
4TC7
LNT
4TA7
4TC7
LNT
Federal
Federal
Local Match
Federal
Federal
Local Match
LNTP
LNTP
Un-Assigned Federal
Un-Assigned Federal
Local Match
Un-Assigned Federal
Un-Assigned Federal
Local Match
$2,933,685
$411,215
$2,736,736
$205,358
$28,785
$191,572
$0
$0
$0
$0
$0
$0
$6,507,351
$6,507,351
$6,507,351
$6,507,351
$6,507,351
$6,507,351
$9,007,351
$9,007,351
$9,007,351
$9,007,351
$9,007,351
$9,007,351
2018AM01ID0031FDCO
2018AM01ID0031FDCO
2018AM01ID0031FDCO
2018AM01ID0031FDCO
2018AM01ID0031FDCO
2018AM01ID0031FDCO
Ph subtotal: $6,507,351 $0 $6,507,351 $9,007,351
RW Acquis
Acquis
2019
2019
4TA7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$1,375,000
$1,125,000
$0
$0
$2,500,000
$2,500,000
$9,007,351
$9,007,351
2018AM01ID0031FDRW
2018AM01ID0031FDRW
Ph subtotal: $2,500,000 $0 $2,500,000 $9,007,351
105831 OKI HAM HAM Deer Park Bike/Ped
Connector
Description: Pavement replacement and
resurfacing on St. John's Terrace, Blue Ash
Road, and Orchard Lane. Replacement of curb
and gutter, drive aprons, installation of signage
and pavement markings. Existing RR crossing at
the south side of Chamberlain Park will be re
Work Type: Add Sidewalks Termini: St. Johns
Ter: Plainfield Rd to Chamberlain Park; Blue Ash
Rd: from the park to Orchard; Orchard: Blue
Ash Rd to Sycamore Twp
DEER PARK Air Quality Exempt 0.06 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4BG
4TC7
LAB
Local Match
Federal
Local Match
2
2
Local Match
Un-Assigned Federal
Labor - Local Match
$1,114,012
$750,000
$130,481
$0
$0
$0
$1,994,493
$1,994,493
$1,994,493
$2,040,233
$2,040,233
$2,040,233
2018AM08ID0259FDCO
2018AM08ID0259FDCO
2018AM08ID0259FDCO
Ph subtotal: $1,994,493 $0 $1,994,493 $2,040,233
105851 OKI HAM HAM IR 75 0.22 Demo Description: This will be to demolish structures
acquired for the Brent Spence Bridge project.
(PID 89068) Work Type: Building Demolition
Termini: From the OH/KY State Line to the 3.00
+/- Mile Marker
ODOT SPONSORING
AGENCY
Air Quality Exempt 2.79 CO CO Contr
CO Engr
2018
2018
4BD7
LAB
State
State
2
2
State Funds (002)
Labor - State Match
$700,000
$70,000
$0
$0
$770,000
$770,000
$791,232
$791,232
2018AM02ID0085FDCO
2018AM02ID0085FDCO
Ph subtotal: $770,000 $0 $770,000 $791,232
106185 OKI HAM HAM Hutchinson Rd Bike
Bridge
Description: Construction of a bike path bridge
over Hutchinson Road to connect the Harrison
Avenue bike path from west of Hutchinson to
east of Hutchinson. Work Type: New Bridge
Termini: Hutchinson Road: west of Filview Circle
(at old RR bridge location)
GREEN TOWNSHIP OF
HAMILT0N COUNTY
Air Quality Exempt 0.03 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4BG
4TC7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
2
Local Match
Un-Assigned Federal
Un-Assigned Federal Labor
Labor - Local Match
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2018AM01ID0032XXCO
2018AM01ID0032XXCO
2018AM01ID0032XXCO
2018AM01ID0032XXCO
Ph subtotal: $0 $0 $0 $0
106228 OKI HAM HAM Harrison Ave Ped
Improvement
Description: On the east side of Harrison
Avenue, improve pedestrian facilities including
installation of new sidewalks, curb & gutter,
removal of existing tree planters, and installation
of lighting. Work Type: Bicycle and Pedestrian
Termini: Harrison Avenue: from Montana
Avenue to Epworth Avenue
Cincinnati, City of Air Quality Exempt 0.13 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TC7
LNT
LNT
Federal
Local Match
Local Match
Z301
LNTP
LNTP
TAP/Enhancements
Local Match
Local Match
$294,074
$73,518
$36,759
$0
$0
$0
$404,351
$404,351
$404,351
$426,964
$426,964
$426,964
2018AM12ID0409FDCO
2018AM12ID0409FDCO
2018AM12ID0409FDCO
Ph subtotal: $404,351 $0 $404,351 $426,964
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 34 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 106404 OKI HAM HAM US 27 10.39 Description: Install sidewalk on the west side of
US-27 from Banning to Brynside; painted
crosswalks at Brynside intersection and ADA
curb ramps; unsignalized crosswalk north of
Banning with concrete median island and RRFB
or PHB. Work Type: Add Sidewalks Termini:
US-27 from Banning to Brynside
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.63 DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2019
2019
LAB
4BC7
4HJ7
State
State
Federal
2
2
Labor - State Match
State Funds (002)
Un-Assigned Federal
$8,206
$2,040
$18,360
$0
$0
$0
$28,606
$28,606
$28,606
$792,482
$792,482
$792,482
2018AM02ID0086FDDD
2018AM02ID0086FDDD
2018AM02ID0086FDDD
Ph subtotal: $28,606 $0 $28,606 $792,482
ENV Env PE
Env PE
Env PE
2018
2018
2018
4BC7
4HJ7
LAB
State
Federal
State
2
2
State Funds (002)
Un-Assigned Federal
Labor - State Match
$4,142
$37,277
$46,503
$0
$0
$0
$87,922
$87,922
$87,922
$792,482
$792,482
$792,482
2018AM02ID0086FDENV
2018AM02ID0086FDENV
2018AM02ID0086FDENV
Ph subtotal: $87,922 $0 $87,922 $792,482
RW Acquis
Acquis
RW Serv
RW Serv
RW Serv
2019
2019
2018
2019
2019
4BC7
4HJ7
LAB
4BC7
4HJ7
State
Federal
State
State
Federal
2
2
2
State Funds (002)
Un-Assigned Federal
Labor - State Match
State Funds (002)
Un-Assigned Federal
$4,058
$36,522
$60,000
$6,265
$56,385
$0
$0
$0
$0
$0
$163,230
$163,230
$163,230
$163,230
$163,230
$792,482
$792,482
$792,482
$792,482
$792,482
2018AM02ID0086FDRW
2018AM02ID0086FDRW
2018AM02ID0086FDRW
2018AM02ID0086FDRW
2018AM02ID0086FDRW
Ph subtotal: $163,230 $0 $163,230 $792,482
Description: Install sidewalk on the west side of
US-27 from Banning to Brynside; painted
crosswalks at Brynside intersection and ADA
curb ramps; unsignalized crosswalk north of
Banning with concrete median island and RRFB
or PHB. Work Type: Pedestrian Facilities
Termini: US-27 from Banning to Brynside
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.63 CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2021
2021
2021
2021
2021
2021
4BC7
4BG
4HJ7
LAB
LAB
LAB
State
Local Match
Federal
Federal
Local Match
State
002
002
ZS30
ZS30
002
002
State Funds (002)
Local Match
Highway Safety Imp Prog
Highway Safety Imp Prog
Labor - Local Match
Labor - State Match
$50,870
$42,600
$457,830
$45,783
$4,260
$5,087
$0
$0
$0
$0
$0
$0
$606,430
$606,430
$606,430
$606,430
$606,430
$606,430
$1,026,261
$1,026,261
$1,026,261
$1,026,261
$1,026,261
$1,026,261
2018AM15ID0526FDCO
2018AM15ID0526FDCO
2018AM15ID0526FDCO
2018AM15ID0526FDCO
2018AM15ID0526FDCO
2018AM15ID0526FDCO
Ph subtotal: $606,430 $0 $606,430 $1,026,261
106411 OKI HAM HAM IR 275 28.29 Description: Ramp improvements at the I-275 &
US-42 interchange; Re-assigning lane usage on
US-42 through interchange and at Hauck Rd
Work Type: Intersection Improvement Termini:
HAM IR 275 & US 42 Interchange
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.33 DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2019
2019
LAB
4BC7
4HJ7
State
State
Federal
2
2
Labor - State Match
State Funds (002)
Un-Assigned Federal
$24,960
$10,143
$91,283
$0
$0
$0
$126,385
$126,385
$126,385
$2,825,595
$2,825,595
$2,825,595
2018AM02ID0087FDDD
2018AM02ID0087FDDD
2018AM02ID0087FDDD
Ph subtotal: $126,385 $0 $126,385 $2,825,595
ENV Env PE
Env PE
Env PE
2018
2018
2018
4BC7
4HJ7
LAB
State
Federal
State
2
2
State Funds (002)
Un-Assigned Federal
Labor - State Match
$20,593
$185,333
$141,440
$0
$0
$0
$347,365
$347,365
$347,365
$2,825,595
$2,825,595
$2,825,595
2018AM02ID0087FDENV
2018AM02ID0087FDENV
2018AM02ID0087FDENV
Ph subtotal: $347,365 $0 $347,365 $2,825,595
RW Acquis
Acquis
RW Serv
RW Serv
RW Serv
2019
2019
2018
2019
2019
4BC7
4HJ7
LAB
4BC7
4HJ7
State
Federal
State
State
Federal
2
2
2
State Funds (002)
Un-Assigned Federal
Labor - State Match
State Funds (002)
Un-Assigned Federal
$6,790
$61,110
$20,000
$2,910
$26,190
$0
$0
$0
$0
$0
$117,000
$117,000
$117,000
$117,000
$117,000
$2,825,595
$2,825,595
$2,825,595
$2,825,595
$2,825,595
2018AM02ID0087FDRW
2018AM02ID0087FDRW
2018AM02ID0087FDRW
2018AM02ID0087FDRW
2018AM02ID0087FDRW
Ph subtotal: $117,000 $0 $117,000 $2,825,595
HAM IR 275 28.29 - Part 1 Description: Ramp improvements at the I-275 &
US-42 interchange; Re-assigning lane usage on
US-42 through interchange and at Hauck RdPID
105181 - HAM-Hauk Road Widening - Part 2.
Work Type: Intersection Improvement (Safety)
Termini: HAM IR 275 & US 42 Interchange
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.33 CO CO Contr
CO Contr
CO Contr
CO Contr
2021
2021
2021
2021
4BC7
4BG
4HJ7
4IS7
State
Local Match
Federal
State
2
2
ZS30
2
State Funds (002)
Local Match
Highway Safety Imp Prog
State Funds (002)
$257,200
$1,542,600
$2,957,400
$80,000
$0
$0
$0
$0
$7,562,340
$7,562,340
$7,562,340
$7,562,340
$8,396,058
$8,396,058
$8,396,058
$8,396,058
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 35 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 106411 OKI HAM HAM IR 275 28.29 - Part 1 Description: Ramp improvements at the I-275 &
US-42 interchange; Re-assigning lane usage on
ODOT SPONSORING
AGENCY
Air Quality Exempt 0.33 CO CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
CO Engr
CO Engr
2021
2021
2021
2021
2021
2021
2021
4TA7
4TC7
LAB
LAB
LAB
LAB
LAB
Federal
Federal
Federal
Federal
Federal
Local Match
State
Z230
Z301
17
17
ZS30
2
2
Bridge
TAP/Enhancements
STBG
TAP/Enhancements
Highway Safety Imp Prog
Labor - Local Match
Labor - State Match
$2,130,000
$76,800
$149,100
$7,680
$226,296
$111,660
$23,604
$0
$0
$0
$0
$0
$0
$0
$7,562,340
$7,562,340
$7,562,340
$7,562,340
$7,562,340
$7,562,340
$7,562,340
$8,396,058
$8,396,058
$8,396,058
$8,396,058
$8,396,058
$8,396,058
$8,396,058
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
2018MODID0509FDCO
Ph subtotal: $7,562,340 $0 $7,562,340 $8,396,058
106412 OKI HAM HAM SR 32 5.10 Description: Study to install of a two-way left turn
lane between Little Dry Run and the Newtown
east corporation limits and a right turn lane at
Little Dry Run. Work Type: Safety Studies
Termini: HAM SR 32 between Little Dry Run &
the Newtown E CL.
Newtown, Village of Air Quality Exempt 0.90 OT Pln Stdy
Pln Stdy
2018
2018
4BG
4HJ7
Local Match
Federal
2 Local Match
Un-Assigned Federal
$4,770
$42,929
$0
$0
$47,699
$47,699
$47,699
$47,699
2018AM02ID0088FDOTH
2018AM02ID0088FDOTH
Ph subtotal: $47,699 $0 $47,699 $47,699
107130 OKI HAM HAM CR 284 1.33 Description: Construct roundabout at Pfeiffer Rd
& Deerfield Rd Work Type: Intersection
Improvement Termini: Pfeiffer Road & Deerfield
Road
Montgomery, City of Air Quality Exempt 0.33 DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2019
2019
LAB
4BG
4HJ7
State
Local Match
Federal
2
2
Labor - State Match
Local Match
Un-Assigned Federal
$1,328
$5,049
$45,441
$0
$0
$0
$51,818
$51,818
$51,818
$1,534,287
$1,534,287
$1,534,287
2018AM06ID0209FDDD
2018AM06ID0209FDDD
2018AM06ID0209FDDD
Ph subtotal: $51,818 $0 $51,818 $1,534,287
ENV Env PE
Env PE
Env PE
2018
2020
2020
LAB
4BG
4HJ7
State
Local Match
Federal
2
2
ZS30
Labor - State Match
Local Match
Highway Safety Imp Prog
$7,523
$10,251
$92,259
$0
$0
$0
$110,033
$110,033
$110,033
$1,534,287
$1,534,287
$1,534,287
2018MODID0465FDENV
2018MODID0465FDENV
2018MODID0465FDENV
Ph subtotal: $110,033 $0 $110,033 $1,534,287
RW Acquis
Acquis
RW Serv
RW Serv
RW Serv
2020
2020
2018
2020
2020
4BG
4HJ7
LAB
4BG
4HJ7
Local Match
Federal
State
Local Match
Federal
2
2
2
Local Match
Un-Assigned Federal
Labor - State Match
Local Match
Un-Assigned Federal
$3,913
$35,217
$40,000
$1,677
$15,093
$0
$0
$0
$0
$0
$95,900
$95,900
$95,900
$95,900
$95,900
$1,534,287
$1,534,287
$1,534,287
$1,534,287
$1,534,287
2018AM06ID0209FDRW
2018AM06ID0209FDRW
2018AM06ID0209FDRW
2018AM06ID0209FDRW
2018AM06ID0209FDRW
Ph subtotal: $95,900 $0 $95,900 $1,534,287
107295 OKI HAM HAM LMST Beechmont
Bridge - Pt 1
Description: Part 1 - Construction of a new
segment of the Little Miami Scenic Trail from the
existing trail along SR-32 north of Beechmont
Avenue, under the existing interchange of SR-32
with Beechmont, across the Little Miami River
(LMR) using the existing Beechmont Work
Type: Bike Facility Termini: From the ex. Little
Miami Scenic Trail on SR 32 east of the LMR to
the Lunken Trail west of the LMR - HAM SR 32
1.44 R Bridge
Hamilton County Park District Air Quality Exempt 0.50 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2021
2021
2021
2021
2021
2021
2021
4BG
4PF7
4PS7
4TB7
LAB
LAB
LAB
Local Match
Federal
State
Federal
Federal
Local Match
State
2
Z001
2
Z400
Z001
2
2
Local Match
National Hwy Performance P
State Funds (002)
CMAQ
National Hwy Performance P
Labor - Local Match
Labor - State Match
$1,131,400
$507,200
$126,800
$4,320,000
$50,720
$381,598
$12,680
$0
$0
$0
$0
$0
$0
$0
$6,530,398
$6,530,398
$6,530,398
$6,530,398
$6,530,398
$6,530,398
$6,530,398
$6,590,976
$6,590,976
$6,590,976
$6,590,976
$6,590,976
$6,590,976
$6,590,976
2018AM13ID0457FDCO
2018AM13ID0457FDCO
2018AM13ID0457FDCO
2018AM13ID0457FDCO
2018AM13ID0457FDCO
2018AM13ID0457FDCO
2018AM13ID0457FDCO
Ph subtotal: $6,530,398 $0 $6,530,398 $6,590,976
107296 OKI HAM HAM Mt. Healthy Signals Ph
2
Description: Upgrades to the existing City of Mt.
Healthy Signal System, covering 14 signalized
intersections on Compton Road and Hamilton
Avenue (US-127). Work Type: Traffic Control
(Safety) Termini: City of Mt. Healthy signals
along Compton Road and Hamilton Avenue
(US-127)
Mt. Healthy, City of Air Quality Exempt 2.24 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4BG
4TB7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
Z400
Z400
2
Local Match
CMAQ
CMAQ
Labor - Local Match
$215,721
$862,885
$60,402
$15,100
$0
$0
$0
$0
$1,154,109
$1,154,109
$1,154,109
$1,154,109
$1,320,509
$1,320,509
$1,320,509
$1,320,509
2018MODID0500FDCO
2018MODID0500FDCO
2018MODID0500FDCO
2018MODID0500FDCO
Ph subtotal: $1,154,109 $0 $1,154,109 $1,320,509
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 36 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 107301 OKI HAM HAM US 22/SR 3 9.66
Silverton
Description: Upgrades to the existing signalized
intersections of Montgomery Road with Highland
Ave, Plainfield Rd, Sampson Ln, and Elwynne
Drive. Access management improvements and
uprgrades to existing sidewalk for ADA
compliance also included. Work Type: Signals
Termini: US-22/SR-3 (Montgomery Road):
intersections with Highland Ave, Plainfield Rd,
Sampson Ln, and Elwynne Dr
Silverton, City of Air Quality Exempt 0.37 ENV Env PE
Env RW S
Env RW S
2018
2021
2021
LAB
4TB7
LNT
State
Federal
Local Match
2
LNTP
Labor - State Match
Un-Assigned Federal
Local Match
$141,440
$12,000
$3,000
$0
$0
$0
$156,440
$156,440
$156,440
$2,311,312
$2,311,312
$2,311,312
2018AM10ID0308FDENV
2018AM10ID0308FDENV
2018AM10ID0308FDENV
Ph subtotal: $156,440 $0 $156,440 $2,311,312
RW Acquis
Acquis
2021
2021
4TB7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$80,000
$20,000
$0
$0
$100,000
$100,000
$2,311,312
$2,311,312
2018AM10ID0308FDRW
2018AM10ID0308FDRW
Ph subtotal: $100,000 $0 $100,000 $2,311,312
107715 OKI HAM HAM Sycamore Twp
Intercnnect Ph2
Description: Completion of extension of fiber
optic interconnect through existing conduit to
Clete McDaniels Sports Complex and Schuler
Sports Complex, as well as finalizing fiber work
on signals along Montgomery Road, Galbraith
Road, and Kenwood Road. Work Type:
Signals Termini: Sycamore Township's signal
system, primarily along Montgomery Road,
Kenwood Road, and Galbraith Road
SYCAMORE TOWNSHIP OF
HAMILTON COUNTY
Air Quality Exempt 4.36 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4TA7
LNT
4TA7
LNT
Federal
Local Match
Federal
Local Match
LNTP
LNTP
Un-Assigned Federal
Local Match
Un-Assigned Federal
Local Match
$574,186
$574,186
$40,193
$40,193
$0
$0
$0
$0
$1,228,758
$1,228,758
$1,228,758
$1,228,758
$1,231,680
$1,231,680
$1,231,680
$1,231,680
2018AM04ID0165FDCO
2018AM04ID0165FDCO
2018AM04ID0165FDCO
2018AM04ID0165FDCO
Ph subtotal: $1,228,758 $0 $1,228,758 $1,231,680
109416 OKI HAM HAM OKI 2020 Reg Plng -
FIAM
Description: OKI State Fiscal Year 2020Fiscal
Impact Analysis Model Project Work Type:
Planning & Research Termini: 0
OKI Air Quality Exempt SP Planning 2020 4TD7 Federal Un-Assigned Federal $97,069 $0 $97,069 $97,069 2018AM11ID0364FDSP
Ph subtotal: $97,069 $0 $97,069 $97,069
109417 OKI HAM HAM OKI 20 Reg Trans
Plng - LU
Description: SFY 2020 OKI Regional
Transportation Planning - Land Use Work
Type: Planning & Research Termini: 0
OKI Air Quality Exempt SP Planning 2020 4TD7 Federal Un-Assigned Federal $411,219 $0 $411,219 $411,219 2018AM11ID0365FDSP
Ph subtotal: $411,219 $0 $411,219 $411,219
109437 OKI HAM HAM CR 376 0.61 Paddison
Sidewlk
Description: Installation of sidewalk along
Paddison Road from Beechmont Avenue to the
existing walk at Bluecrest Drive. Work Type:
Add Sidewalks Termini: Paddison Road: from
Beechmont Avenue to ex. sidewalk at Bluecrest
Drive
Anderson, Township of Air Quality Exempt 0.75 CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4BG
4TC7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
Z301
17
2
Local Match
TAP/Enhancements
TAP/Enhancements
Labor - Local Match
$211,303
$601,401
$60,140
$21,130
$0
$0
$0
$0
$893,975
$893,975
$893,975
$893,975
$984,836
$984,836
$984,836
$984,836
2018AM12ID0410FDCO
2018AM12ID0410FDCO
2018AM12ID0410FDCO
2018AM12ID0410FDCO
Ph subtotal: $893,975 $0 $893,975 $984,836
110259 OKI HAM HAM IR 71 1.34 Description: Repair stone masonry veneer
façade in the spandrels over, and the pilasters
on either side of, the portals for Lytle Tunnel.
Additionally, replace in its entirety, the
deteriorating concrete wall cap on the south
portal mainline tunnel with new reinforce Work
Type: Miscellaneous Termini: Along IR71 SLM
1.34 to 1.47
ODOT SPONSORING
AGENCY
Air Quality Exempt CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4BT7
4BU7
LAB
LAB
State
Federal
Federal
State
2
Z001
Z001
2
State Funds (002)
National Hwy Performance P
National Hwy Performance P
Labor - State Match
$96,800
$387,200
$38,720
$9,680
$0
$0
$0
$0
$532,400
$532,400
$532,400
$532,400
$631,723
$631,723
$631,723
$631,723
2018AM14ID0484FDCO
2018AM14ID0484FDCO
2018AM14ID0484FDCO
2018AM14ID0484FDCO
Ph subtotal: $532,400 $0 $532,400 $631,723
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 37 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 110519 OKI HAM HAM Cincinnati Red Bike FY
20
Description: Purchase of bike share stations and
bicycles, including electric-assist bicycles to
further expand the bike share system in
Cincinnati. Work Type: Bicycle and Pedestrian
Termini: City of Cincinnati, Hamilton County,
OH
Port of Greater Cincinnati
Development Authority
Air Quality Exempt CO CO Contr
CO Contr
2020
2020
4TC7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$500,000
$125,000
$0
$0
$625,000
$625,000
$629,637
$629,637
2018AM12ID0411FDCO
2018AM12ID0411FDCO
Ph subtotal: $625,000 $0 $625,000 $629,637
111491 OKI HAM HAM Wasson Way Phase 3 Description: Construction of a shared use path
along the Wasson Way rail corridor from
Madison Road to Marburg Avenue. Construction
of a new trailhead at Marburg Avenue. Work
Type: Shared Use Path Termini: Former
Norfok-Southern RR corridor from Madison
Road to Marburg Avenue
Cincinnati, City of Air Quality Exempt 0.02 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
2021
2021
4BC7
4HJ7
4TA7
LNT
4TA7
LNT
State
Federal
Federal
Local Match
Federal
Local Match
002
Z230
LNTP
Z230
LNTP
State Funds (002)
Un-Assigned Federal
Bridge
Local Match
Bridge
Local Match
$37,000
$333,000
$1,446,728
$482,243
$101,271
$59,657
$0
$0
$0
$0
$0
$0
$2,459,898
$2,459,898
$2,459,898
$2,459,898
$2,459,898
$2,459,898
$2,475,716
$2,475,716
$2,475,716
$2,475,716
$2,475,716
$2,475,716
2018AM15ID0527FDCO
2018AM15ID0527FDCO
2018AM15ID0527FDCO
2018AM15ID0527FDCO
2018AM15ID0527FDCO
2018AM15ID0527FDCO
Ph subtotal: $2,459,898 $0 $2,459,898 $2,475,716
111503 OKI HAM HAM CR 266 9.19 Kemper
Intrcnnct
Description: Transfer of existing fiber optic
interconnect from the current location to new
steel poles along Kemper Road between
Tri-County Parkway and Century Blvd. Transfer
of existing power services. Work Type: Traffic
Control Maintenance Termini: Kemper Road:
from Tri-County Parkway to Century Boulevard
Springdale, City of Air Quality Exempt 0.45 CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4BG
4TA7
LAB
Local Match
Federal
Local Match
002
Z230
002
Local Match
Bridge
Labor - Local Match
$25,625
$102,500
$12,813
$0
$0
$0
$140,938
$140,938
$140,938
$152,853
$152,853
$152,853
2018AM15ID0528FDCO
2018AM15ID0528FDCO
2018AM15ID0528FDCO
Ph subtotal: $140,938 $0 $140,938 $152,853
96654 PRE PRE IR 70 0.00 Description: Resurface and pavement repair on
IR 70 in Preble County from the Indiana State
line to the Montgomery County line. The
pavement work will include mainline and all
ramps within the project limits. The project will
also include mionr bridge work on appro Work
Type: Minor Rehabilitation - Pavement Prmy Sys
Termini: PRE IR 70: SLM 0.00 to 17.67
ODOT SPONSORING
AGENCY
Air Quality Exempt 17.67 DD Dtl Dsgn
Dtl Dsgn
2018
2018
4PF7
4PS7
Federal
State
Z001
2
National Hwy Performance P
State Funds (002)
$675,000
$75,000
$9,149
$9,149
$759,149
$759,149
$36,698,111
$36,698,111
2018stipID0622FDDD
2018stipID0622FDDD
Ph subtotal: $750,000 $9,149 $759,149 $36,698,111
PRE IR 70 0.00, Pt. 1 Description: Part 1 -Resurface and pavement
repair on IR 70 in Preble County from the Indiana
State line to the Montgomery County line. The
pavement work will include mainline and all
ramps within the project limits. Bridge work will
include painting and replacing Work Type:
Minor Rehabilitation - Pavement Prmy Sys
Termini: PRE IR 70: SLM 0.00 to 17.67
ODOT SPONSORING
AGENCY
Air Quality Exempt 18.63 CO CO Contr
CO Contr
CO Contr
CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2020
2020
2020
2020
2020
2020
2020
2020
2020
4BR7
4MT
4PF7
4PF7
4PS7
5MT
LAB
LAB
LAB
State
State
Federal
Federal
State
Federal
Federal
Federal
State
2
2
M001
Z232
2
Z232
M001
Z232
2
State Funds (002)
State Funds (002)
National Hwy Performance P
STBG
State Funds (002)
STBG
National Hwy Performance P
STBG
Labor - State Match
$500,000
$220,000
$21,145,520
$1,320,000
$2,679,502
$880,000
$760,366
$66,000
$115,985
$0
$0
$0
$0
$0
$0
$0
$0
$0
$27,687,373
$27,687,373
$27,687,373
$27,687,373
$27,687,373
$27,687,373
$27,687,373
$27,687,373
$27,687,373
$28,377,094
$28,377,094
$28,377,094
$28,377,094
$28,377,094
$28,377,094
$28,377,094
$28,377,094
$28,377,094
2018AM12ID0413FDCO
2018AM12ID0413FDCO
2018AM12ID0413FDCO
2018AM12ID0413FDCO
2018AM12ID0413FDCO
2018AM12ID0413FDCO
2018AM12ID0413FDCO
2018AM12ID0413FDCO
2018AM12ID0413FDCO
Ph subtotal: $27,687,373 $0 $27,687,373 $28,377,094
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 38 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 98147 MVRPC WAR WAR CR 603 0.00 Franklin
ITS
Description: Reconstruct three traffic signals in
downtown Franklin (Second Street with River,
Main, and Riley) including new mast-arm signal
poles, illuminated signs, and traffic management
cameras. The intersections will be incorporated
into a traffic-responsive clo Work Type: Traffic
Management System Termini: Second Street:
from Miami Avenue to approximately 500 feet
east of Riley Boulevard
Franklin, City of Air Quality Exempt 0.15 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4BG
4TB7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
M400
M400
2
Local Match
CMAQ
CMAQ
Labor - Local Match
$288,904
$674,108
$67,411
$28,890
$0
$0
$0
$0
$1,059,313
$1,059,313
$1,059,313
$1,059,313
$1,077,471
$1,077,471
$1,077,471
$1,077,471
2018stipID0537FDCO
2018stipID0537FDCO
2018stipID0537FDCO
2018stipID0537FDCO
Ph subtotal: $1,059,313 $0 $1,059,313 $1,077,471
100187 MVRPC WAR WAR Franklin Signals
Phase 2
Description: Reconstruction of three traffic
signals with equipment conforming to current
standards including vehicular detection and
installation of battery backup systems. The
traffic signal operation will be managed by the
City using proposed fiber optic interconne
Work Type: Signals Termini: Intersections of
Riley Boulevard with (1) East 4th Street, (2) East
6th Street; Intersection of East 6th Street with
Anderson
Franklin, City of Air Quality Exempt 0.24 CO CO Contr
CO Contr
CO Engr
CO Engr
2021
2021
2021
2021
4BG
4TB7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
M40E
M40E
2
Local Match
Not Grouped
CMAQ
Labor - Local Match
$282,000
$658,000
$65,800
$28,200
$0
$0
$0
$0
$1,034,000
$1,034,000
$1,034,000
$1,034,000
$1,051,513
$1,051,513
$1,051,513
$1,051,513
2018AM06ID0205FDCO
2018AM06ID0205FDCO
2018AM06ID0205FDCO
2018AM06ID0205FDCO
Ph subtotal: $1,034,000 $0 $1,034,000 $1,051,513
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $2,627 $0 $2,627 $1,319,436 2018stipID0538FDDD
Ph subtotal: $2,627 $0 $2,627 $1,319,436
ENV Env PE 2018 LAB State 2 Labor - State Match $14,886 $0 $14,886 $1,319,436 2018stipID0538FDENV
Ph subtotal: $14,886 $0 $14,886 $1,319,436
100188 MVRPC WAR BUT/WAR GMR Trail
Extension
Description: Construction of a 10' wide multi-use
trail to extend the existing Great Miami River
scenic trail. Project includes construction of a
retaining wall for approximately 400 feet,
installation of concrete barriers to separate bike
and vehicular traffic, and t Work Type: Bike
Facility Termini: Adjacent to SR-73: from the
current GMR Trail terminus near Breiel Blvd. to
the Baxter Drive trailhead north of SR-73.
Franklin, City of Air Quality Exempt CO CO Contr
CO Contr
CO Contr
CO Engr
CO Engr
CO Engr
2020
2020
2020
2020
2020
2020
4BG
4TB7
4TB7
LAB
LAB
LAB
Local Match
Federal
Federal
Federal
Local Match
Local Match
2
M40E
Z400
M40E
002
2
Local Match
CMAQ
CMAQ
CMAQ
Labor - Local Match
Labor - Local Match
$853,790
$923,238
$546,800
$8,242
$81,885
$72,541
$0
$0
$0
$0
$0
$0
$2,486,496
$2,486,496
$2,486,496
$2,486,496
$2,486,496
$2,486,496
$2,523,634
$2,523,634
$2,523,634
$2,523,634
$2,523,634
$2,523,634
2018MODID0527FDCO
2018MODID0527FDCO
2018MODID0527FDCO
2018MODID0527FDCO
2018MODID0527FDCO
2018MODID0527FDCO
Ph subtotal: $2,486,496 $0 $2,486,496 $2,523,634
100816 OKI WAR WAR SR 48 11.54 Description: Part 1: Rehabilitate Bridge
WAR-48-1154 (E Turtle Creek Union Rd over
SR 48) by replacing the concrete deck,
increasing vertical clearance under the bridge,
and other minor maintenance. A multi-use path
to be constructed east of Deerfield Rd. across
the n Work Type: Bridge Deck Replacement
Termini: Bridge No.: WAR-48-1154. TurtleCreek
Union Rd. from Deerfield Rd. to Cornett Rd.
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2019
2020
2020
LAB
4PF7
4PS7
State
Federal
State
2
Z001
2
Labor - State Match
National Hwy Performance P
State Funds (002)
$24,960
$41,057
$10,264
$0
$0
$0
$76,281
$76,281
$76,281
$5,000,378
$5,000,378
$5,000,378
2018AM11ID0366FDDD
2018AM11ID0366FDDD
2018AM11ID0366FDDD
Ph subtotal: $76,281 $0 $76,281 $5,000,378
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 39 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 100827 MVRPC WAR WAR SR 73 14.58/14.62 Description: Rehabilitate bridge WAR-73-1458
over the Little Miami River by replacing the
concrete deck. Replace bridge WAR-73-1462
over Corwin Nixon Rd. and the Little Miami
Bikepath. Work Type: Bridge Replacement
Termini: WAR-73-1458 - WAR-73-1462
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn
Dtl Dsgn
Dtl Dsgn
2018
2020
2020
LAB
4PF7
4PS7
State
Federal
State
2
Z001
2
Labor - State Match
National Hwy Performance P
State Funds (002)
$24,960
$42,000
$10,500
$0
$0
$0
$77,460
$77,460
$77,460
$4,689,100
$4,689,100
$4,689,100
2018stipID0541FDDD
2018stipID0541FDDD
2018stipID0541FDDD
Ph subtotal: $77,460 $0 $77,460 $4,689,100
ENV Env PE
Env PE
Env PE
2018
2018
2018
4PF7
4PS7
LAB
Federal
State
State
Z001
2
2
National Hwy Performance P
State Funds (002)
Labor - State Match
$238,000
$59,500
$141,440
$0
$0
$0
$438,940
$438,940
$438,940
$4,689,100
$4,689,100
$4,689,100
2018stipID0541FDENV
2018stipID0541FDENV
2018stipID0541FDENV
Ph subtotal: $438,940 $0 $438,940 $4,689,100
RW RW Serv 2018 LAB State 2 Labor - State Match $40,000 $0 $40,000 $4,689,100 2018stipID0541FDRW
Ph subtotal: $40,000 $0 $40,000 $4,689,100
100882 OKI WAR WAR SR 741/Parkside
Drive Impr
Description: Reconfiguration of the existing
intersection of SR-741 with Kings Mill Road and
Parkside Drive. SR-741 will become the through
movement. The Kings Mill Road approach from
the south will intersect SR-741 at a signal
controlled T-intersection. Parkside Driv Work
Type: Intersection Improvement Termini:
Intersection of SR-741 with Kings Mill Road and
Parkside Drive
Mason, City of Air Quality Exempt 0.51 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TB7
LNT
LNT
Federal
Local Match
Local Match
Z400
LNTP
LNTP
CMAQ
Local Match
Local Match
$3,531,446
$1,643,943
$362,276
$0
$0
$0
$5,537,665
$5,537,665
$5,537,665
$6,335,369
$6,335,369
$6,335,369
2018stipID0613FDCO
2018stipID0613FDCO
2018stipID0613FDCO
Ph subtotal: $5,537,665 $0 $5,537,665 $6,335,369
RW Acquis
Acquis
2019
2019
4TB7
LNT
Federal
Local Match
Z400
LNTP
CMAQ
Local Match
$600,000
$150,000
$6,907
$6,907
$756,907
$756,907
$6,335,369
$6,335,369
2018stipID0613FDRW
2018stipID0613FDRW
Ph subtotal: $750,000 $6,907 $756,907 $6,335,369
100885 OKI WAR WAR Snider Road
Roundabouts
Description: Reconstruction of the existing
intersections of Snider Road with Thornberry
Court and Mason Road into single lane modern
roundabouts. Work Type: Intersection
Improvement (Safety) Termini: Intersectionw of
Snider Road with Thornberry Court and Mason
Road
Mason, City of Air Quality Exempt 2.51 CO CO Contr
CO Contr
CO Engr
2020
2020
2020
4TB7
LNT
LNT
Federal
Local Match
Local Match
Z400
LNTP
LNTP
CMAQ
Local Match
Local Match
$1,558,544
$925,193
$173,862
$0
$0
$0
$2,657,599
$2,657,599
$2,657,599
$2,690,189
$2,690,189
$2,690,189
2018MODID0502FDCO
2018MODID0502FDCO
2018MODID0502FDCO
Ph subtotal: $2,657,599 $0 $2,657,599 $2,690,189
101201 MVRPC WAR WAR Franklin SRTS 2015 Description: Implement various
countermeasures to improve safety of kids
walking and biking to school including installing
an Rectangular Rapid Flashing Beacon (RRFB)
at Fourth & Sherman. Work Type: Signals
Termini: Various Locations in Franklin
Franklin, City of Air Quality Exempt 0.15 CO CO Contr
CO Contr
CO Engr
CO Engr
2019
2019
2019
2019
4BG
4SC7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
M3E2
M3E2
2
Local Match
Not Grouped
TAP/Enhancements
Labor - Local Match
$6,144
$75,856
$7,586
$614
$0
$0
$0
$0
$90,200
$90,200
$90,200
$90,200
$165,978
$165,978
$165,978
$165,978
2018AM03ID0119FDCO
2018AM03ID0119FDCO
2018AM03ID0119FDCO
2018AM03ID0119FDCO
Ph subtotal: $90,200 $0 $90,200 $165,978
103753 OKI WAR WAR SR 741 2.19 Description: Widening of SR-747 to 5 lanes (2
thru lanes each direction and a center turn lane)
from Spy Glass Hill to Weldon Drive in Mason.
Traffic signals at US-42 and Bethany Road will
be replaced. Other improvements include street
lighting, landscaping, a shared Work Type:
Minor Widening Termini: SR 747: from Spy
Glass Hill (SLM 2.19) to Weldon Drive (SLM
3.06)
Mason, City of Air Quality Non-Exe 0.87 CO CO Contr
CO Contr
CO Contr
CO Contr
2021
2021
2021
2021
4HJ7
4TA7
4TC7
LNT
Federal
Federal
Federal
Local Match
ZS30
Z230
Z301
LNTP
Highway Safety Imp Prog
STBG
TAP/Enhancements
Local Match
$1,000,000
$4,757,027
$320,501
$1,380,493
$0
$0
$0
$0
$7,980,083
$7,980,083
$7,980,083
$7,980,083
$8,530,436
$8,530,436
$8,530,436
$8,530,436
2018stipID0615FDCO
2018stipID0615FDCO
2018stipID0615FDCO
2018stipID0615FDCO
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 40 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 103753 OKI WAR WAR SR 741 2.19 Description: Widening of SR-747 to 5 lanes (2
thru lanes each direction and a center turn lane)
Mason, City of Air Quality Non-Exe 0.87 CO CO Engr 2021 LNT Local Match LNTP Local Match $522,062 $0 $7,980,083 $8,530,436 2018stipID0615FDCO
Ph subtotal: $7,980,083 $0 $7,980,083 $8,530,436
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $7,553 $0 $7,553 $8,530,436 2018stipID0615FDDD
Ph subtotal: $7,553 $0 $7,553 $8,530,436
ENV Env PE 2018 LAB State 2 Labor - State Match $42,800 $0 $42,800 $8,530,436 2018stipID0615FDENV
Ph subtotal: $42,800 $0 $42,800 $8,530,436
RW Acquis
Acquis
2020
2020
4TA7
LNT
Federal
Local Match
Z230
LNTP
STBG
Local Match
$400,000
$100,000
$0
$0
$500,000
$500,000
$8,530,436
$8,530,436
2018stipID0615FDRW
2018stipID0615FDRW
Ph subtotal: $500,000 $0 $500,000 $8,530,436
103848 MVRPC WAR WAR-48-0863 Description: Major Bridge Repair1.Repair the
deteriorated portions of the concrete parapet
(approximately 10%) using 519 patching and
replacement.2.Clean the scuppers and
joints.3.Patch unsound portions of the wearing
surface (less than 1%).4.Patch the unsound
portion Work Type: Bridge Repair Termini:
WAP-48-0863, SFN 8301085
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $2,517,100 2018stipID0543FDDD
Ph subtotal: $24,960 $0 $24,960 $2,517,100
ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $2,517,100 2018stipID0543FDENV
Ph subtotal: $141,440 $0 $141,440 $2,517,100
103849 MVRPC WAR WAR-22-0303 Description: Major Bridge repair1.Remove 1 1/4”
of the existing wearing surface and overlay
MSC.2.Remove and replace the existing strip
seals with a glued in compression seal or foam
expansion joints. The existing steel can remain
but should be blasted clean and metal Work
Type: Bridge Repair Termini: WAR-22-0303,
SFN 8300038
ODOT SPONSORING
AGENCY
Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $2,811,900 2018stipID0544FDDD
Ph subtotal: $24,960 $0 $24,960 $2,811,900
ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $2,811,900 2018stipID0544FDENV
Ph subtotal: $141,440 $0 $141,440 $2,811,900
OKI WAR WAR 22/48 3.03/8.63 Description: Repair Bridge WAR-22-0303 that
carries US 22 over the Little Miami River by
replacing the expansion joints, overlaying the
bridge, patching the substructure, and upgrading
the guardrail. Rehabilitate bridge WAR-48-0863
that carries SR 48 over the Little M Work
Type: Bridge Preservation Termini:
WAR-22-0303, SFN 8300038 - WAR-48-0863,
SFN 8301085
ODOT SPONSORING
AGENCY
Air Quality Exempt CO CO Contr
CO Engr
2020
2020
4BT7
LAB
State
State
2
2
State Funds (002)
Labor - State Match
$6,650,000
$465,500
$0
$0
$7,115,500
$7,115,500
$7,281,900
$7,281,900
2018MODID0481STCO
2018MODID0481STCO
Ph subtotal: $7,115,500 $0 $7,115,500 $7,281,900
104844 OKI WAR HAM/WAR IR 71 19.40/0.00 Description: Construction of an on-ramp from
southbound Mason-Montgomery Road to
southbound IR-71. Work Type: New
Construction Termini: IR-71 interchange with
Fields Ertel Road and Mason-Montgomery
Road.
Warren County TID Air Quality Non-Exe 1.20 CO CO Contr
CO Contr
CO Contr
CO Engr
2021
2021
2021
2021
4BG
4TA7
4TC7
LAB
Local Match
Federal
Federal
Local Match
2
Z230
Z301
2
Local Match
STBG
TAP/Enhancements
Labor - Local Match
$1,590,000
$3,696,000
$14,000
$500,500
$0
$0
$0
$0
$5,800,500
$5,800,500
$5,800,500
$5,800,500
$7,876,900
$7,876,900
$7,876,900
$7,876,900
2018stipID0616FDCO
2018stipID0616FDCO
2018stipID0616FDCO
2018stipID0616FDCO
Ph subtotal: $5,800,500 $0 $5,800,500 $7,876,900
DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $7,876,900 2018stipID0616FDDD
Ph subtotal: $24,960 $0 $24,960 $7,876,900
ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $191,440 $7,876,900 2018MODID0496FDENV
Ph subtotal: $141,440 $0 $191,440 $7,876,900
RW Acquis 2020 4TA7 Federal Z230 STBG $1,260,000 $0 $1,860,000 $7,876,900 2018stipID0616FDRW
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 41 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 104844 OKI WAR HAM/WAR IR 71 19.40/0.00 Description: Construction of an on-ramp from
southbound Mason-Montgomery Road to
Warren County TID Air Quality Non-Exe 1.20 RW Acquis
RW Serv
2020
2018
LNT
LAB
Local Match
State
LNTP
2
Local Match
Labor - State Match
$540,000
$60,000
$0
$0
$1,860,000
$1,860,000
$7,876,900
$7,876,900
2018stipID0616FDRW
2018stipID0616FDRW
Ph subtotal: $1,860,000 $0 $1,860,000 $7,876,900
HAM/WAR IR 71 19.83/0.00 Description: Construction of an on-ramp from
southbound Mason-Montgomery Road to
southbound IR-71. Work Type: Preliminary
Development Tasks Termini: IR-71
interchange with Fields Ertel Road and
Mason-Montgomery Road.
Warren County TID Air Quality Non-Exe 1.20 ENV Env RW S
Env RW S
2020
2020
4TA7
LNT
Federal
Local Match
Z230
LNTP
Bridge
Local Match
$35,000
$15,000
$0
$0
$191,440
$191,440
$7,876,900
$7,876,900
2018MODID0496FDENV
2018MODID0496FDENV
Ph subtotal: $50,000 $0 $191,440 $7,876,900
105175 OKI WAR WAR Mason-Lebanon Bike
Connector
Description: Construction of a shared use path
connecting the City of Mason trail system near
the Mason Sports Park to the City of Lebanon's
Countryside YMCA Trail (which has connectivity
to the Little Miami Scenic Trail). Work Type:
Bikeways Termini: Existing path near
Ambelside Meadows subdivisionon US-42 to the
existing path on the W side of Columbia Rd (N of
Kingsview Drive)
Mason, City of Air Quality Exempt CO CO Contr
CO Contr
CO Engr
2021
2021
2021
4TC7
LNT
LNT
Federal
Local Match
Local Match
Z301
LNTP
LNTP
TAP/Enhancements
Local Match
Local Match
$496,380
$124,095
$62,048
$0
$0
$0
$682,523
$682,523
$682,523
$682,523
$682,523
$682,523
2018stipID0617FDCO
2018stipID0617FDCO
2018stipID0617FDCO
Ph subtotal: $682,523 $0 $682,523 $682,523
106724 OKI WAR WAR CR 282 0.97 King Ave
Bridge
Description: Construct a new bridge over the
Little Miami River, upstream of the deteriorating
existing bridge. The project will improve safety
for motorists and pedestrians by improving the
alignment of the approach roadway, and will
grade separate the roadway from t Work
Type: Bridge Preservation Termini: From
approx 1,050' S of the LMR bridge on Grandin
(CR-150) to approx 800' N of the bridge on King
Ave (CR 282)
Warren County Engineer Air Quality Exempt 0.27 RW Acquis
Acquis
RW Serv
Utl Remb
Utl Remb
2021
2021
2019
2021
2021
4TA7
LNT
LAB
4TA7
LNT
Federal
Local Match
State
Federal
Local Match
Z230
LNTP
2
Z230
LNTP
Bridge
Local Match
Labor - State Match
Bridge
Local Match
$166,250
$71,250
$6,082
$166,250
$71,250
$0
$0
$0
$0
$0
$481,082
$481,082
$481,082
$481,082
$481,082
$15,909,091
$15,909,091
$15,909,091
$15,909,091
$15,909,091
2018AM13ID0458FDRW
2018AM13ID0458FDRW
2018AM13ID0458FDRW
2018AM13ID0458FDRW
2018AM13ID0458FDRW
Ph subtotal: $481,082 $0 $481,082 $15,909,091
107125 MVRPC WAR WAR SR 741 13.82 Description: FY2020 Urban Paving in the City of
Springboro on a portion of SR 741 from Southern
Corp to SR 73. Work Type: Resurfacing,
Undivided System Termini: WAR SR 741 SLM
13.82 to 15.67
Springboro, City of Air Quality Exempt 1.85 CO CO Contr
CO Contr
CO Engr
CO Engr
2020
2020
2020
2020
4BG
4PF7
LAB
LAB
Local Match
Federal
Federal
Local Match
2
Z240
Z240
2
Local Match
Not Grouped
STBG
Labor - Local Match
$781,600
$781,600
$23,448
$23,448
$0
$0
$0
$0
$1,610,096
$1,610,096
$1,610,096
$1,610,096
$1,677,314
$1,677,314
$1,677,314
$1,677,314
2018AM04ID0159FDCO
2018AM04ID0159FDCO
2018AM04ID0159FDCO
2018AM04ID0159FDCO
Ph subtotal: $1,610,096 $0 $1,610,096 $1,677,314
107302 OKI WAR WAR US 42 Roundabouts Description: Conversion of the existing
T-intersections of US-42 with (1) Bethany Road
and (2) Mason Morrow Millgrove Road to
modern roundabouts. Construction of a shared
use path from Bethany Road along US-42 and
connecting to the Mason Sports Park on Mason
Morrow Mi Work Type: Intersection
Improvement Termini: Intersections of US-42
with Bethany Road and Mason Morrow Millgrove
Road
Mason, City of Air Quality Exempt 0.46 RW Acquis
Acquis
2021
2021
4TB7
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
$200,000
$50,000
$0
$0
$250,000
$250,000
$3,461,533
$3,461,533
2018AM04ID0166FDRW
2018AM04ID0166FDRW
Ph subtotal: $250,000 $0 $250,000 $3,461,533
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 42 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FHWA 8 108265 MVRPC WAR WAR TR 17 1.80
Dayton-Oxford Rd
Description: Mill and fill with pavement repair
where necessary, and application of new
pavement markings. Work Type: Mill and Fill
Termini: Dayton-Oxford/Chautauqua Road: from
Fairview Drive to Cedar Lane
Carlisle, Village of Air Quality Exempt 0.34 CO CO Contr
CO Contr
CO Engr
2019
2019
2019
4TA7
LNT
LNT
Federal
Local Match
Local Match
LNTP
LNTP
Un-Assigned Federal
Local Match
Local Match
$173,996
$43,499
$8,700
$0
$0
$0
$226,195
$226,195
$226,195
$227,809
$227,809
$227,809
2018AM06ID0206FDCO
2018AM06ID0206FDCO
2018AM06ID0206FDCO
Ph subtotal: $226,195 $0 $226,195 $227,809
FTA 8 94699 OKI BUT Middletown Transit
Operating
Description: Operating Assistance Work Type:
Transit Termini: Middletown
Middletown, City of Air Quality Exempt OT Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
2018
2018
2018
2019
2019
2019
4EG
FTA
TOT
4EG
FTA
TOT
State
Federal
Local Match
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match - 0003 - Local O
GRF
5307 - Urban Formula Progr
Local Match - 0003 - Local O
30.09.03 2018 GR
30.09.03 2018
30.09.03 2018
30.09.03 2019 GR
30.09.03 2019
30.09.03 2019
$100,000
$1,150,000
$1,150,000
$100,000
$1,150,000
$1,150,000
$4,715,865
$4,715,865
$4,715,865
$4,715,865
$4,715,865
$4,715,865
$9,515,865
$9,515,865
$9,515,865
$9,515,865
$9,515,865
$9,515,865
$9,670,691
$9,670,691
$9,670,691
$9,670,691
$9,670,691
$9,670,691
2018stipID1251FDOPER
2018stipID1251FDOPER
2018stipID1251FDOPER
2018stipID1251FDOPER
2018stipID1251FDOPER
2018stipID1251FDOPER
Ph subtotal: $4,800,000 $4,715,865 $9,515,865 $9,670,691
94702 OKI BUT Middletown Transit Prev
Maint
Description: Preventive Maintenance Work
Type: Transit Termini: Middletown
Middletown, City of Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
FTA
TOT
FTA
Federal
Local Match
Federal
5307
LNTP
5307
5307 - Urban Formula Progr
Local Match - 0003 - Local O
5307 - Urban Formula Progr
11.7A.00 2018
11.7A.00 2018
11.7A.00 2019
$200,000
$50,000
$250,000
$500,000
$500,000
$500,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
2018MODID0459FDCAPT
2018MODID0459FDCAPT
2018MODID0459FDCAPT
Ph subtotal: $500,000 $500,000 $1,000,000 $1,000,000
94703 OKI BUT Middletown Transit ADA
Asst
Description: ADA Operating Assistance Work
Type: Transit Termini: Middletown
Middletown, City of Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
TOT
FTA
TOT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.7C.00 2018
11.7C.00 2018
11.7C.00 2019
11.7C.00 2019
$140,000
$35,000
$140,000
$35,000
$350,000
$350,000
$350,000
$350,000
$700,000
$700,000
$700,000
$700,000
$700,000
$700,000
$700,000
$700,000
2018stipID1253FDCAPT
2018stipID1253FDCAPT
2018stipID1253FDCAPT
2018stipID1253FDCAPT
Ph subtotal: $350,000 $350,000 $700,000 $700,000
94889 OKI BUT BCRTA Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt OT Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
TOT
FTA
TOT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
5307 - Urban Formula Progr
Local Match - 0003 - Local O
30.09.03 2018
30.09.03 2018
30.09.03 2019
30.09.03 2019
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$3,878,644
$3,878,644
$3,878,644
$3,878,644
$7,878,644
$7,878,644
$7,878,644
$7,878,644
$8,000,000
$8,000,000
$8,000,000
$8,000,000
2018stipID1210FDOPER
2018stipID1210FDOPER
2018stipID1210FDOPER
2018stipID1210FDOPER
Ph subtotal: $4,000,000 $3,878,644 $7,878,644 $8,000,000
94891 OKI BUT BCRTA Preventive
Maintenance
Description: Preventive Maintenance - STP
funds only are a flex fund transfer for UTP
Work Type: FTA Transfer Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
2019
2019
2019
FTA
TOT
4EG
4TP7
FTA
LNT
LNT
Federal
Local Match
State
Federal
Federal
Local Match
Local Match
5307
LNTP
GRF
M240
5307
LNTP
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
GRF
STBG
5307 - Urban Formula Progr
Local Match
Local Match
11.7A.00 2018
11.7A.00 2018
11.7A.00 2019 OT
11.7A.00 2019 OT
11.7A.00 5307
11.7A.00 5307
11.7A.00 2019 OT
$300,000
$75,000
$95,854
$450,000
$75,000
$18,750
$16,646
$750,000
$750,000
$750,000
$750,000
$750,000
$750,000
$750,000
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
$1,915,081
2018AM06ID0169FDCAP
2018AM06ID0169FDCAP
2018AM06ID0169FDCAP
2018AM06ID0169FDCAP
2018AM06ID0169FDCAP
2018AM06ID0169FDCAP
2018AM06ID0169FDCAP
Ph subtotal: $1,031,250 $750,000 $1,915,081 $1,915,081
94892 OKI BUT BCRTA Small Replacement
Buses
Description: Small Replacement Buses - CMAQ
portion only are flex fund transfers Work Type:
FTA Transfer Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2018
2018
2019
2019
2019
2019
FTA
FTA
TOT
TOT
FTA
FTA
LNT
TOT
Federal
Federal
Local Match
Local Match
Federal
Federal
Local Match
Local Match
5307
5339
LNTP
LNTP
5307
5339
LNTP
LNTP
5307 - Urban Formula Progr
5339 / 0002 - Bus & Bus Fac
Local Match - 0003 - Local O
Local Match - 0003 - Local O
5307 - Urban Formula Progr
5339 / 0002 - Bus & Bus Fac
Local Match
Local Match - 0003 - Local O
11.12.04 2018 - Q
11.12.04 FY2018 -
11.12.04 FY2018 -
11.12.04 2018 - Q
11.12.04 FY2019 -
11.12.04 2019 - Q
11.12.04 2019 - Q
11.12.04 FY2019 -
$225,000
$150,000
$37,500
$56,250
$225,000
$150,000
$37,500
$56,250
$1,057,830
$1,057,830
$1,057,830
$1,057,830
$1,057,830
$1,057,830
$1,057,830
$1,057,830
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
$1,995,330
2018stipID1212FDCAPT
2018stipID1212FDCAPT
2018stipID1212FDCAPT
2018stipID1212FDCAPT
2018stipID1212FDCAPT
2018stipID1212FDCAPT
2018stipID1212FDCAPT
2018stipID1212FDCAPT
Ph subtotal: $937,500 $1,057,830 $1,995,330 $1,995,330
94894 OKI BUT BCRTA Security Equipment Description: Security Equipment Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
TOT
FTA
TOT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.42.09 2018
11.42.09 2018
11.42.09 2019
11.42.09 2019
$15,000
$3,750
$15,000
$3,750
$37,500
$37,500
$37,500
$37,500
$75,000
$75,000
$75,000
$75,000
$75,000
$75,000
$75,000
$75,000
2018stipID1213FDCAPT
2018stipID1213FDCAPT
2018stipID1213FDCAPT
2018stipID1213FDCAPT
Ph subtotal: $37,500 $37,500 $75,000 $75,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 43 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 94895 OKI BUT BCRTA Shop/Office
Equipment
Description: Shop/Office Equipment Work
Type: Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
TOT
FTA
TOT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.42.20 2018
11.42.20 2018
11.42.20 2019
11.42.20 2019
$35,000
$8,750
$35,000
$8,750
$87,500
$87,500
$87,500
$87,500
$175,000
$175,000
$175,000
$175,000
$175,000
$175,000
$175,000
$175,000
2018stipID1214FDCAPT
2018stipID1214FDCAPT
2018stipID1214FDCAPT
2018stipID1214FDCAPT
Ph subtotal: $87,500 $87,500 $175,000 $175,000
94896 OKI BUT BCRTA Transit
Enhancements
Description: Transit Enhancements Work
Type: Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
TOT
FTA
TOT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.32.00 2018
11.32.00 2018
11.32.20 2019
11.32.20 2019
$15,000
$3,750
$15,000
$3,750
$37,500
$37,500
$37,500
$37,500
$75,000
$75,000
$75,000
$75,000
$75,000
$75,000
$75,000
$75,000
2018stipID1215FDCAPT
2018stipID1215FDCAPT
2018stipID1215FDCAPT
2018stipID1215FDCAPT
Ph subtotal: $37,500 $37,500 $75,000 $75,000
94897 OKI BUT BCRTA Large Replacement
Buses
Description: 35' Replacement Buses Work
Type: FTA Transfer Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.12.02 - Qty 4
11.12.02 - Qty 4
$0
$0
$0
$0
$0
$0
$0
$0
2018stipID1216XXCAPT
2018stipID1216XXCAPT
Ph subtotal: $0 $0 $0 $0
97835 OKI BUT BCRTA ADA Operating
Service
Description: ADA Operating Assistance Work
Type: Transit Termini: Butler County
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
TOT
FTA
TOT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.7C.00 2018
11.7C.00 2018
11.7C.00 2019
11.7C.00 2019
$150,000
$37,500
$150,000
$37,500
$750,000
$750,000
$750,000
$750,000
$1,125,000
$1,125,000
$1,125,000
$1,125,000
$1,125,000
$1,125,000
$1,125,000
$1,125,000
2018stipID1217FDCAPT
2018stipID1217FDCAPT
2018stipID1217FDCAPT
2018stipID1217FDCAPT
Ph subtotal: $375,000 $750,000 $1,125,000 $1,125,000
99799 OKI BUT BCRTA Bus Replacements Description: Bus Replacements Work Type:
FTA Transfer Termini: Butler County
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2019
2019
2019
2019
4TB7
4TB7
TOT
TOT
Federal
Federal
Local Match
Local Match
M400
M400
LNTP
LNTP
CMAQ
CMAQ
Local Match - 0003 - Local O
Local Match - 0003 - Local O
11.12.04 - Qty 5
11.12.02 - Qty 2
11.12.02 - Qty 2
11.12.04 - Qty 5
$392,958
$902,000
$225,500
$98,240
$444,850
$444,850
$444,850
$444,850
$2,063,548
$2,063,548
$2,063,548
$2,063,548
$2,063,548
$2,063,548
$2,063,548
$2,063,548
2018stipID1218FDCAPT
2018stipID1218FDCAPT
2018stipID1218FDCAPT
2018stipID1218FDCAPT
Ph subtotal: $1,618,698 $444,850 $2,063,548 $2,063,548
99800 OKI BUT BCRTA Bus Replacements Description: Bus Replacements Work Type:
FTA Transfer Termini: Butler County
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2018
2018
4TB7
4TB7
TOT
TOT
Federal
Federal
Local Match
Local Match
M400
M400
LNTP
LNTP
CMAQ
CMAQ
Local Match - 0003 - Local O
Local Match - 0003 - Local O
11.12.02 - Qty 2
11.12.04 - Qty 1
11.12.02 - Qty 2
11.12.04 - Qty 1
$922,000
$78,000
$230,500
$19,500
$0
$0
$0
$0
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
2018stipID1219FDCAPT
2018stipID1219FDCAPT
2018stipID1219FDCAPT
2018stipID1219FDCAPT
Ph subtotal: $1,250,000 $0 $1,250,000 $1,250,000
103348 OKI BUT BCRTA Bus Replacements Description: Bus replacements using MPO
CMAQ funds as a flex fund transfer Work
Type: FTA Transfer Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
4TB7
LNT
Federal
Local Match
M400
LNTP
CMAQ
Local Match
11.12.03 - Qty 9
11.12.03 - Qty 9
$893,565
$223,391
$0
$0
$1,116,956
$1,116,956
$1,116,956
$1,116,956
2018MODID0446FDCAPT
2018MODID0446FDCAPT
Ph subtotal: $1,116,956 $0 $1,116,956 $1,116,956
104272 OKI BUT BCRTA Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2020
2021
2021
2021
4EG
FTA
LNT
4EG
FTA
LNT
State
Federal
Local Match
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match
GRF
5307 - Urban Formula Progr
Local Match
30.09.03 FY2020
30.09.03 FY2020
30.09.03 FY2020
30.09.03 FY2021
30.09.03 FY2021
30.09.03 FY2021
$100,000
$1,000,000
$900,000
$100,000
$1,000,000
$900,000
$0
$0
$0
$0
$0
$0
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
2018stipID1221FDTR
2018stipID1221FDTR
2018stipID1221FDTR
2018stipID1221FDTR
2018stipID1221FDTR
2018stipID1221FDTR
Ph subtotal: $4,000,000 $0 $4,000,000 $4,000,000
104280 OKI BUT BCRTA Prev Maintenance Description: Preventive Maintenance Work
Type: Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.7A.00 FY2020
11.7A.00 FY2020
11.7A.00 FY2021
11.7A.00 FY2021
$600,000
$150,000
$600,000
$150,000
$0
$0
$0
$0
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
2018AM05ID0151FDTR
2018AM05ID0151FDTR
2018AM05ID0151FDTR
2018AM05ID0151FDTR
Ph subtotal: $1,500,000 $0 $1,500,000 $1,500,000
104379 OKI BUT Middletown Transit
Operating
Description: Operating Assistance Work Type:
Transit Termini: Middletown
Middletown, City of Air Quality Exempt TR Transit Su
Transit Su
Transit Su
2020
2020
2020
4EG
FTA
LNT
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match
30.09.03 2020 GR
30.09.03 2020 530
30.09.03 2020 Loc
$100,000
$1,200,000
$1,100,000
$0
$0
$0
$4,800,000
$4,800,000
$4,800,000
$4,800,000
$4,800,000
$4,800,000
2018stipID1254FDTR
2018stipID1254FDTR
2018stipID1254FDTR
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 44 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 104379 OKI BUT Middletown Transit
Operating
Description: Operating Assistance Work Type:
Transit Termini: Middletown
Middletown, City of Air Quality Exempt TR Transit Su
Transit Su
Transit Su
2021
2021
2021
4EG
FTA
LNT
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match
30.09.03 2021 GR
30.09.03 2021 530
30.09.03 2021 Loc
$100,000
$1,200,000
$1,100,000
$0
$0
$0
$4,800,000
$4,800,000
$4,800,000
$4,800,000
$4,800,000
$4,800,000
2018stipID1254FDTR
2018stipID1254FDTR
2018stipID1254FDTR
Ph subtotal: $4,800,000 $0 $4,800,000 $4,800,000
104381 OKI BUT Middletown Transit Prev
Maint
Description: Preventive Maintenance Work
Type: Transit Termini: Middletown
Middletown, City of Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.7A.00 2020
11.7A.00 2020
11.7A.00 2021
11.7A.00 2021
$200,000
$50,000
$200,000
$50,000
$0
$0
$0
$0
$500,000
$500,000
$500,000
$500,000
$500,000
$500,000
$500,000
$500,000
2018stipID1255FDTR
2018stipID1255FDTR
2018stipID1255FDTR
2018stipID1255FDTR
Ph subtotal: $500,000 $0 $500,000 $500,000
104382 OKI BUT Middletown Transit ADA
Asst
Description: ADA Operating Assistance Work
Type: Transit Termini: Middletown
Middletown, City of Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.7C.00 2020
11.7C.00 2020
11.7C.00 2021
11.7C.00 2021
$140,000
$35,000
$140,000
$35,000
$0
$0
$0
$0
$350,000
$350,000
$350,000
$350,000
$350,000
$350,000
$350,000
$350,000
2018stipID1256FDTR
2018stipID1256FDTR
2018stipID1256FDTR
2018stipID1256FDTR
Ph subtotal: $350,000 $0 $350,000 $350,000
104384 OKI BUT BCRTA ADA Operating Description: ADA Operating Assistance Work
Type: Transit Termini: Butler County
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.7C.00 FY2020
11.7C.00 FY2020
11.7C.00
11.7C.00
$150,000
$37,500
$150,000
$37,500
$0
$0
$0
$0
$375,000
$375,000
$375,000
$375,000
$375,000
$375,000
$375,000
$375,000
2018stipID1223FDTR
2018stipID1223FDTR
2018stipID1223FDTR
2018stipID1223FDTR
Ph subtotal: $375,000 $0 $375,000 $375,000
104389 OKI BUT BCRTA Security Equipment Description: Security Equipment Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.49.09 FY2020
11.49.09 FY2020
11.49.09 FY2021
11.49.09 FY2021
$15,000
$3,750
$15,000
$3,750
$0
$0
$0
$0
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
2018stipID1224FDTR
2018stipID1224FDTR
2018stipID1224FDTR
2018stipID1224FDTR
Ph subtotal: $37,500 $0 $37,500 $37,500
104394 OKI BUT BCRTA Shop/Office
Equipment
Description: Shop/Office Equipment Work
Type: Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.42.20 FY2020
11.42.20 FY2020
11.42.20 FY2021
11.42.20 FY2021
$35,000
$8,750
$35,000
$8,750
$0
$0
$0
$0
$87,500
$87,500
$87,500
$87,500
$87,500
$87,500
$87,500
$87,500
2018stipID1225FDTR
2018stipID1225FDTR
2018stipID1225FDTR
2018stipID1225FDTR
Ph subtotal: $87,500 $0 $87,500 $87,500
104398 OKI BUT BCRTA Software/Hardware Description: Technology Updates Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2018
2018
2019
2019
2020
2020
2021
2021
FTA
LNT
FTA
LNT
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.42.08 FY2018
11.42.08 FY2018
11.42.08 FY2019
11.42.08 FY2019
11.42.08 FY2020
11.42.08 FY2020
11.42.08 FY2021
11.42.08 FY2021
$150,000
$30,000
$120,000
$30,000
$120,000
$30,000
$120,000
$30,000
$0
$0
$0
$0
$0
$0
$0
$0
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
$630,000
2018AM05ID0152FDTR
2018AM05ID0152FDTR
2018AM05ID0152FDTR
2018AM05ID0152FDTR
2018AM05ID0152FDTR
2018AM05ID0152FDTR
2018AM05ID0152FDTR
2018AM05ID0152FDTR
Ph subtotal: $630,000 $0 $630,000 $630,000
104400 OKI BUT BCRTA Transit
Enhancements
Description: Transit Enhancements Work
Type: Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.32.00 FY2020
11.32.00 FY2020
11.32.00 FY2021
11.32.00 FY2021
$15,000
$3,750
$15,000
$3,750
$0
$0
$0
$0
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
2018AM05ID0153FDTR
2018AM05ID0153FDTR
2018AM05ID0153FDTR
2018AM05ID0153FDTR
Ph subtotal: $37,500 $0 $37,500 $37,500
104401 OKI BUT BCRTA Small Bus
Replacement
Description: Small Replacement Buses - CMAQ
portion only are flex fund transfers Work Type:
FTA Transfer Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2020
2020
2021
2021
FTA
FTA
LNT
LNT
FTA
FTA
Federal
Federal
Local Match
Local Match
Federal
Federal
5307
5339
LNTP
LNTP
5307
5339
5307 - Urban Formula Progr
5339 / 0002 - Bus & Bus Fac
Local Match
Local Match
5307 - Urban Formula Progr
5339 / 0002 - Bus & Bus Fac
11.12.04 FY2020 -
11.12.04 2020 - Q
11.12.04 FY2020 -
11.12.04 2020 - Q
11.12.04 FY2021 -
11.12.01 2021 - Q
$225,000
$150,000
$56,250
$37,500
$225,000
$150,000
$0
$0
$0
$0
$0
$0
$937,500
$937,500
$937,500
$937,500
$937,500
$937,500
$937,500
$937,500
$937,500
$937,500
$937,500
$937,500
2018stipID1228FDTR
2018stipID1228FDTR
2018stipID1228FDTR
2018stipID1228FDTR
2018stipID1228FDTR
2018stipID1228FDTR
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 45 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 104401 OKI BUT BCRTA Small Bus
Replacement
Description: Small Replacement Buses - CMAQ
portion only are flex fund transfers Work Type:
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
2021
2021
LNT
LNT
Local Match
Local Match
LNTP
LNTP
Local Match
Local Match
11.12.01 2021 - Q
11.12.04 FY2021 -
$37,500
$56,250
$0
$0
$937,500
$937,500
$937,500
$937,500
2018stipID1228FDTR
2018stipID1228FDTR
Ph subtotal: $937,500 $0 $937,500 $937,500
104453 OKI BUT BCRTA Facility
Improvements
Description: Facility Improvements Work
Type: Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2018
2018
2019
2019
2020
2020
2021
2021
FTA
LNT
FTA
LNT
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
Federal
Local Match
Federal
Local Match
5339
LNTP
5339
LNTP
5339
LNTP
5339
LNTP
5339 / 0002 - Bus & Bus Fac
Local Match
5339 / 0002 - Bus & Bus Fac
Local Match
5339 / 0002 - Bus & Bus Fac
Local Match
5339 / 0002 - Bus & Bus Fac
Local Match
11.44.03 FY2018
11.44.03 FY2018
11.44.03 FY2019
11.44.03 FY2019
11.44.03 FY2020
11.44.03 FY2020
11.44.03 FY2021
11.44.03 FY2021
$50,000
$12,500
$150,000
$37,500
$150,000
$37,500
$150,000
$37,500
$0
$0
$0
$0
$0
$0
$0
$0
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
$625,000
2018AM05ID0154FDTR
2018AM05ID0154FDTR
2018AM05ID0154FDTR
2018AM05ID0154FDTR
2018AM05ID0154FDTR
2018AM05ID0154FDTR
2018AM05ID0154FDTR
2018AM05ID0154FDTR
Ph subtotal: $625,000 $0 $625,000 $625,000
104647 OKI BUT BCRTA Bus Replacement Description: Bus Replacement Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2020
2020
2020
2020
4TA7
4TA7
LNT
LNT
Federal
Federal
Local Match
Local Match
M230
M230
LNTP
LNTP
STBG
STBG
Local Match
Local Match
11.12.15 - Qty 5
11.12.04 - Qty 6
11.12.04 - Qty 6
11.12.15 - Qty 5
$155,968
$508,762
$127,190
$38,992
$0
$0
$0
$0
$830,912
$830,912
$830,912
$830,912
$830,912
$830,912
$830,912
$830,912
2018stipID1230FDCAPT
2018stipID1230FDCAPT
2018stipID1230FDCAPT
2018stipID1230FDCAPT
Ph subtotal: $830,912 $0 $830,912 $830,912
108504 OKI BUT BCRTA 5310 Program
Activities
Description: Mobility Management and Operating
Assistance using 5310 funds Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
FTA
LNT
Federal
Local Match
5310
LNTP
5310 - Enhanced Mobility
Local Match
11.7L.00
11.7L.00
$256,567
$64,142
$0
$0
$320,709
$320,709
$871,509
$871,509
2018AM07ID0217FDCAP
2018AM07ID0217FDCAP
Ph subtotal: $320,709 $0 $320,709 $871,509
OT Trnst/Av
Trnst/Av
2019
2019
FTA
LNT
Federal
Local Match
5310
LNTP
5310 - Enhanced Mobility
Local Match
30.09.00
30.09.00
$275,400
$275,400
$0
$0
$550,800
$550,800
$871,509
$871,509
2018AM07ID0217FDOPE
2018AM07ID0217FDOPE
Ph subtotal: $550,800 $0 $550,800 $871,509
108916 OKI BUT BCRTA Facility
Construction
Description: Construct facility Work Type:
Transit Termini: Hamilton
Butler County Regional Transit
Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2020
2020
2020
2020
2020
FTA
FTA
FTA
LNT
LNT
Federal
Federal
Federal
Local Match
Local Match
5307
5307
5339
LNTP
LNTP
5307 - Urban Formula Progr
5307 - Urban Formula Progr
5339 / 0002 - Bus & Bus Fac
Local Match
Local Match
11.43.03 5307
11.43.03 5307 TD
11.43.03 5339
11.43.03 5339
11.43.03 5307
$400,000
$2,500,000
$2,668,750
$667,188
$100,000
$0
$0
$0
$0
$0
$6,335,938
$6,335,938
$6,335,938
$6,335,938
$6,335,938
$6,335,938
$6,335,938
$6,335,938
$6,335,938
$6,335,938
2018AM07ID0218FDCAP
2018AM07ID0218FDCAP
2018AM07ID0218FDCAP
2018AM07ID0218FDCAP
2018AM07ID0218FDCAP
Ph subtotal: $6,335,938 $0 $6,335,938 $6,335,938
99239 OKI CLE CTC Capitalized
Maintenance 2018
Description: Capitalized Maintenance Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2018
2018
4EG
FTA
State
Federal
GRF
5307
GRF
5307 - Urban Formula Progr
11.7A.00
11.7A.00
$44,000
$176,000
$0
$0
$220,000
$220,000
$220,000
$220,000
2018MODID0364FDCAPT
2018MODID0364FDCAPT
Ph subtotal: $220,000 $0 $220,000 $220,000
99240 OKI CLE CTC Capitalized
Maintenance 2019
Description: Capitalized Maintenance Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.7A.00
11.7A.00
$176,000
$44,000
$0
$0
$220,000
$220,000
$220,000
$220,000
2018stipID1232FDCAPT
2018stipID1232FDCAPT
Ph subtotal: $220,000 $0 $220,000 $220,000
99241 OKI CLE CTC Operating Assistance
2018
Description: Operating Assistance Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt OT Trnst/Av
Trnst/Av
Trnst/Av
2018
2018
2018
4EQ
FTA
TOT
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match - 0003 - Local O
30.09.01 E&D
30.09.01 5307
30.09.01 Local
$33,000
$370,420
$237,420
$0
$0
$0
$640,840
$640,840
$640,840
$640,840
$640,840
$640,840
2018stipID1233FDOPER
2018stipID1233FDOPER
2018stipID1233FDOPER
Ph subtotal: $640,840 $0 $640,840 $640,840
99242 OKI CLE CTC Operating Assistance
2019
Description: Operating Assistance Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt OT Trnst/Av
Trnst/Av
Trnst/Av
2019
2019
2019
4EQ
FTA
TOT
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match - 0003 - Local O
30.09.01 E&D
30.09.01 5307
30.09.01 Local
$33,000
$370,420
$237,420
$0
$0
$0
$640,840
$640,840
$640,840
$640,840
$640,840
$640,840
2018stipID1234FDOPER
2018stipID1234FDOPER
2018stipID1234FDOPER
Ph subtotal: $640,840 $0 $640,840 $640,840
99243 OKI CLE CTC Security Equipment
2018
Description: Security Equipment Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2018
2018
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.42.09
11.42.09
$12,000
$3,000
$0
$0
$15,000
$15,000
$15,000
$15,000
2018stipID1235FDCAPT
2018stipID1235FDCAPT
Ph subtotal: $15,000 $0 $15,000 $15,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 46 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 99244 OKI CLE CTC Security Equipment
2019
Description: Security Equipment Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.42.09
11.42.09
$12,000
$3,000
$0
$0
$15,000
$15,000
$15,000
$15,000
2018stipID1236FDCAPT
2018stipID1236FDCAPT
Ph subtotal: $15,000 $0 $15,000 $15,000
99245 OKI CLE CTC Transit Enhancements
2018
Description: Transit Enhancements Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2018
2018
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.92.02
11.92.02
$12,000
$3,000
$0
$0
$15,000
$15,000
$15,000
$15,000
2018stipID1237FDCAPT
2018stipID1237FDCAPT
Ph subtotal: $15,000 $0 $15,000 $15,000
99246 OKI CLE CTC Transit Enhancements
2019
Description: Transit Enhancements Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
11.92.02
11.92.02
$12,000
$3,000
$0
$0
$15,000
$15,000
$15,000
$15,000
2018stipID1238FDCAPT
2018stipID1238FDCAPT
Ph subtotal: $15,000 $0 $15,000 $15,000
99251 OKI CLE CTC Short Range Planning
2018
Description: Short Range Planning Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt SP Planning
Planning
2018
2018
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
44.24.00
44.24.00
$8,000
$2,000
$0
$0
$10,000
$10,000
$10,000
$10,000
2018stipID1239FDPLAN
2018stipID1239FDPLAN
Ph subtotal: $10,000 $0 $10,000 $10,000
99252 OKI CLE CTC Short Range Planning
2019
Description: Short Range Planning Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt SP Planning
Planning
2019
2019
FTA
TOT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match - 0003 - Local O
44.24.00
44.24.00
$8,000
$2,000
$0
$0
$10,000
$10,000
$10,000
$10,000
2018stipID1240FDPLAN
2018stipID1240FDPLAN
Ph subtotal: $10,000 $0 $10,000 $10,000
104281 OKI CLE CTC Cap Maintenance Description: Capitalized Maintenance Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2020
2020
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.7A.00
11.7A.00
$200,000
$50,000
$0
$0
$250,000
$250,000
$250,000
$250,000
2018stipID1241FDCAPT
2018stipID1241FDCAPT
Ph subtotal: $250,000 $0 $250,000 $250,000
104356 OKI CLE CTC Cap Maintenance 2021 Description: Capitalized Maintenance Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt TR Transit Su
Transit Su
2021
2021
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.7A.00 FY21
11.7A.00 FY21
$200,000
$50,000
$0
$0
$250,000
$250,000
$250,000
$250,000
2018stipID1242FDTR
2018stipID1242FDTR
Ph subtotal: $250,000 $0 $250,000 $250,000
104369 OKI CLE CTS Op Assistance FY2020 Description: Operating Assistance Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt OT Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
2020
2020
2020
2020
4EG
4EQ
FTA
LNT
State
State
Federal
Local Match
GRF
GRF
5307
LNTP
GRF
GRF
5307 - Urban Formula Progr
Local Match
30.09.01 FY2020
30.09.01 FY2020
30.09.01 FY2020
30.09.01 FY2020
$100,000
$33,000
$370,420
$237,420
$0
$0
$0
$0
$740,840
$740,840
$740,840
$740,840
$740,840
$740,840
$740,840
$740,840
2018stipID1243FDOPER
2018stipID1243FDOPER
2018stipID1243FDOPER
2018stipID1243FDOPER
Ph subtotal: $740,840 $0 $740,840 $740,840
104371 OKI CLE CTC Operating Assistance
2021
Description: Operating Assistance Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2021
2021
2021
2021
4EG
4EQ
FTA
LNT
State
State
Federal
Local Match
GRF
GRF
5307
LNTP
GRF
GRF
5307 - Urban Formula Progr
Local Match
30.09.01 FY2021
30.09.01 FY2021
30.09.01 FY2021
30.09.01 FY2021
$100,000
$33,000
$370,420
$237,420
$0
$0
$0
$0
$740,840
$740,840
$740,840
$740,840
$740,840
$740,840
$740,840
$740,840
2018stipID1244FDTR
2018stipID1244FDTR
2018stipID1244FDTR
2018stipID1244FDTR
Ph subtotal: $740,840 $0 $740,840 $740,840
104377 OKI CLE CTC Security Equipment
2020
Description: Security Equipment Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2020
2020
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.42.09 FY2020
11.42.09 FY2020
$12,000
$3,000
$0
$0
$15,000
$15,000
$15,000
$15,000
2018stipID1245FDCAPT
2018stipID1245FDCAPT
Ph subtotal: $15,000 $0 $15,000 $15,000
104378 OKI CLE CTC Security Equipment
2021
Description: Security Equipment Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt TR Transit Su
Transit Su
2021
2021
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.42.09 FY21
11.42.09 FY21
$12,000
$3,000
$0
$0
$15,000
$15,000
$15,000
$15,000
2018stipID1246FDTR
2018stipID1246FDTR
Ph subtotal: $15,000 $0 $15,000 $15,000
104418 OKI CLE CTC Transit Enhancements
2020
Description: Transit Enhancements Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2020
2020
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.92.02 FY2020
11.92.02 FY2020
$12,000
$3,000
$0
$0
$15,000
$15,000
$15,000
$15,000
2018stipID1247FDCAPT
2018stipID1247FDCAPT
Ph subtotal: $15,000 $0 $15,000 $15,000
104421 OKI CLE CTC Transit Enhancements
2021
Description: Transit Enhancements Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt TR Transit Su 2021 FTA Federal 5307 5307 - Urban Formula Progr 11.92.02 FY2021 $12,000 $0 $15,000 $15,000 2018stipID1248FDTR
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 47 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 104421 OKI CLE CTC Transit Enhancements
2021
Description: Transit Enhancements Work
Type: Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt TR Transit Su 2021 LNT Local Match LNTP Local Match 11.92.02 FY2021 $3,000 $0 $15,000 $15,000 2018stipID1248FDTR
Ph subtotal: $15,000 $0 $15,000 $15,000
104425 OKI CLE CTC Short Range Planning
2020
Description: Short Range Planning Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt SP Planning
Planning
2020
2020
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
44.24.00 FY2020
44.24.00 FY2020
$8,000
$2,000
$0
$0
$10,000
$10,000
$10,000
$10,000
2018stipID1249FDPLAN
2018stipID1249FDPLAN
Ph subtotal: $10,000 $0 $10,000 $10,000
104429 OKI CLE CTC Short Range Planning
2021
Description: Short Range Planning Work Type:
Transit Termini: Clermont County
Clermont County
Commissioners
Air Quality Exempt TR Transit Su
Transit Su
2021
2021
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
44.24.00
44.24.00
$8,000
$2,000
$0
$0
$10,000
$10,000
$10,000
$10,000
2018stipID1250FDTR
2018stipID1250FDTR
Ph subtotal: $10,000 $0 $10,000 $10,000
106744 OKI CLE CTC Fare Collection
Equipment
Description: Acquire Mobile Fare Collection
Equipment Work Type: Transit Termini:
Clermont County
Clermont County
Commissioners
Air Quality Exempt CO Oth Remb
Oth Remb
2018
2018
FTA
LNT
Federal
Local Match
5339
LNTP
5339 / 0002 - Bus & Bus Fac
Local Match
11.42.10
11.42.10
$200,000
$50,000
$0
$0
$250,000
$250,000
$250,000
$250,000
2018AM01ID0038FDCAP
2018AM01ID0038FDCAP
Ph subtotal: $250,000 $0 $250,000 $250,000
103584 MVRPC GRE GCTB Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Xenia
Greene CATS Air Quality Exempt OT Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
2018
2018
2018
2019
2019
2019
4EG
FTA
LNT
4EG
FTA
LNT
State
Federal
Local Match
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match
GRF
5307 - Urban Formula Progr
Local Match
30.09.03 State FY
30.09.03 FY2018
30.09.03 FY2018
30.09.03 State FY
30.09.03 FY2019
30.09.03 FY2019
$90,000
$950,000
$950,000
$90,000
$950,000
$950,000
$3,800,000
$3,800,000
$3,800,000
$3,800,000
$3,800,000
$3,800,000
$7,780,000
$7,780,000
$7,780,000
$7,780,000
$7,780,000
$7,780,000
$7,901,313
$7,901,313
$7,901,313
$7,901,313
$7,901,313
$7,901,313
2018stipID1064FDOPER
2018stipID1064FDOPER
2018stipID1064FDOPER
2018stipID1064FDOPER
2018stipID1064FDOPER
2018stipID1064FDOPER
Ph subtotal: $3,980,000 $3,800,000 $7,780,000 $7,901,313
104325 MVRPC GRE GCTB Bus Replacement Description: Bus Replacement Work Type:
Transit Termini: Xenia
Greene County Transit Board Air Quality Exempt CO Oth Remb
Oth Remb
2018
2018
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.12.04 - Qty 7
11.12.04 - Qty 7
$450,000
$112,500
$0
$0
$562,500
$562,500
$562,500
$562,500
2018stipID1066FDCAPT
2018stipID1066FDCAPT
Ph subtotal: $562,500 $0 $562,500 $562,500
104326 MVRPC GRE GCTB Bus Replacement Description: Bus Replacement Work Type:
Transit Termini: Xenia
Greene County Transit Board Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.12.04 - Qty 7
11.12.04 - Qty 7
$450,000
$112,500
$0
$0
$562,500
$562,500
$562,500
$562,500
2018stipID1067FDCAPT
2018stipID1067FDCAPT
Ph subtotal: $562,500 $0 $562,500 $562,500
104328 MVRPC GRE GCTB Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Xenia
Greene CATS Air Quality Exempt OT Trnst/Av
Trnst/Av
2020
2021
4EG
4EG
State
State
GRF
GRF
GRF
GRF
30.09.03 FY2020
30.09.03 FY2021
$90,000
$90,000
$4,000,000
$4,000,000
2018stipID1065FDOPER
2018stipID1065FDOPER
Ph subtotal: $180,000 $0 $0 $4,000,000
TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2020
2021
2021
2021
4TT7
FTA
LNT
4TT7
FTA
LNT
State
Federal
Local Match
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match
GRF
5307 - Urban Formula Progr
Local Match
30.09.03
30.09.03
30.09.03
30.09.03
30.09.03 FY2021
30.09.03 FY2021
$230,062
$1,000,000
$769,938
$90,000
$1,000,000
$910,000
$0
$0
$0
$0
$0
$0
$3,769,938
$3,769,938
$3,769,938
$3,769,938
$3,769,938
$3,769,938
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
$4,000,000
2018AM10ID0285FDTR
2018AM10ID0285FDTR
2018AM10ID0285FDTR
2018AM10ID0285FDTR
2018AM10ID0285FDTR
2018AM10ID0285FDTR
Ph subtotal: $4,000,000 $0 $3,769,938 $4,000,000
104488 MVRPC GRE GCTB 2020 Bus
Replace-Prev Maint
Description: Bus Replacement and Preventive
Maintenance Work Type: Transit Termini:
Xenia
Greene County Transit Board Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2020
2020
2020
2020
FTA
FTA
LNT
LNT
Federal
Federal
Local Match
Local Match
5307
5307
LNTP
LNTP
5307 - Urban Formula Progr
5307 - Urban Formula Progr
Local Match
Local Match
11.7A.00
11.12.04
11.7A.00
11.12.04
$192,000
$340,000
$48,000
$85,000
$0
$0
$0
$0
$665,000
$665,000
$665,000
$665,000
$665,000
$665,000
$665,000
$665,000
2018AM10ID0286FDCAP
2018AM10ID0286FDCAP
2018AM10ID0286FDCAP
2018AM10ID0286FDCAP
Ph subtotal: $665,000 $0 $665,000 $665,000
104489 MVRPC GRE GCTB 2021 Bus
Replacement
Description: Bus Replacement Work Type:
Transit Termini: Xenia
Greene County Transit Board Air Quality Exempt TR Transit Su
Transit Su
2021
2021
FTA
LNT
Federal
Local Match
5307
LNTP
5307 - Urban Formula Progr
Local Match
11.12.04 FY2021
11.12.04 FY2021
$450,000
$112,500
$0
$0
$562,500
$562,500
$562,500
$562,500
2018stipID1069FDTR
2018stipID1069FDTR
Ph subtotal: $562,500 $0 $562,500 $562,500
90060 OKI HAM SORTA Capital P&R/Transit
Center
Description: Capital Park and Ride/Transit
Centers Work Type: FTA Transfer Termini:
Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb 2018 4TA7 Federal M230 STBG 11.36.04 OKI $3,480,000 $800,000 $5,150,000 $5,150,000 2018stipID1258FDCAPT
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 48 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 90060 OKI HAM SORTA Capital P&R/Transit
Center
Description: Capital Park and Ride/Transit
Centers Work Type: FTA Transfer Termini:
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb 2018 LNT Local Match LNTP Local Match 11.36.04 OKI $870,000 $800,000 $5,150,000 $5,150,000 2018stipID1258FDCAPT
Ph subtotal: $4,350,000 $800,000 $5,150,000 $5,150,000
94696 OKI HAM SORTA Preventive
Maintenance
Description: Preventive Maintenance. STP for
the Urban Transit Program is flex fund transfer
only. Work Type: FTA Transfer Termini:
Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2019
2019
2019
2019
2019
2019
4AT7
FTA
FTA
LNT
LNT
LNT
Federal
Federal
Federal
Local Match
Local Match
Local Match
M240
5307
5337
LNTP
LNTP
LNTP
STBG
5307 - Urban Formula Progr
5337 / 0001 - Fixed Guidwy
Local Match
Local Match
Local Match
11.7A.00 2019 UT
11.7A.00 2019 53
11.7A.00 2019 53
11.7A.00 2019 UT
11.7A.00 2019 53
11.7A.00 2019 53
$996,257
$12,438,414
$68,182
$249,064
$17,046
$3,109,604
$35,485,834
$35,485,834
$35,485,834
$35,485,834
$35,485,834
$35,485,834
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
$53,579,084
2018AM07ID0221FDCAP
2018AM07ID0221FDCAP
2018AM07ID0221FDCAP
2018AM07ID0221FDCAP
2018AM07ID0221FDCAP
2018AM07ID0221FDCAP
Ph subtotal: $16,878,567 $35,485,834 $53,579,084 $53,579,084
94698 OKI HAM SORTA ADA Service Description: ADA Service Work Type: Transit
Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.7C.00 2018
11.7C.00 2018
11.7C.00 2019
11.7C.00 2019
$1,025,367
$256,342
$1,025,367
$256,342
$2,570,370
$2,570,370
$2,570,370
$2,570,370
$5,133,788
$5,133,788
$5,133,788
$5,133,788
$5,133,788
$5,133,788
$5,133,788
$5,133,788
2018stipID1260FDCAPT
2018stipID1260FDCAPT
2018stipID1260FDCAPT
2018stipID1260FDCAPT
Ph subtotal: $2,563,418 $2,570,370 $5,133,788 $5,133,788
94700 OKI HAM SORTA Tire Lease Description: Tire Lease Work Type: Transit
Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.16.40 2018
11.16.40 2018
11.16.40 2019
11.16.40 2019
$589,270
$147,318
$589,270
$147,318
$1,473,176
$1,473,176
$1,473,176
$1,473,176
$2,946,352
$2,946,352
$2,946,352
$2,946,352
$2,946,352
$2,946,352
$2,946,352
$2,946,352
2018stipID1261FDCAPT
2018stipID1261FDCAPT
2018stipID1261FDCAPT
2018stipID1261FDCAPT
Ph subtotal: $1,473,176 $1,473,176 $2,946,352 $2,946,352
94705 OKI HAM SORTA Security Equipment Description: Security Equipment Work Type:
Transit Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2019
2019
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.42.09 2018
11.42.09 2018
11.42.09 2019
11.42.09 2019
$132,000
$33,000
$132,000
$33,000
$329,119
$329,119
$329,119
$329,119
$659,119
$659,119
$659,119
$659,119
$659,119
$659,119
$659,119
$659,119
2018stipID1262FDCAPT
2018stipID1262FDCAPT
2018stipID1262FDCAPT
2018stipID1262FDCAPT
Ph subtotal: $330,000 $329,119 $659,119 $659,119
95141 OKI HAM SORTA Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt OT Trnst/Av 2018 LNT Local Match LNTP Local Match 30.09.00 $77,704,288 $0 $77,704,288 $77,704,288 2018stipID1263FDOPER
Ph subtotal: $77,704,288 $0 $77,704,288 $77,704,288
95697 OKI HAM SORTA Bus Replacement
5339
Description: Bus & Bus Facilities for the
Cincinnati urbanized area Work Type: Transit
Termini: Cincinnati
ODOT SPONSORING
AGENCY
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2018
2018
2019
2019
2019
2019
2019
2019
FTA
FTA
LNT
LNT
FTA
FTA
FTA
LNT
LNT
LNT
Federal
Federal
Local Match
Local Match
Federal
Federal
Federal
Local Match
Local Match
Local Match
5339
5339
LNTP
LNTP
5339
5339
5339
LNTP
LNTP
LNTP
5339 / 0002 - Bus & Bus Fac
5339 / 0002 - Bus & Bus Fac
Local Match
Local Match
5339 / 0002 - Bus & Bus Fac
5339 / 0002 - Bus & Bus Fac
5339 / 0002 - Bus & Bus Fac
Local Match
Local Match
Local Match
11.12.04 2018 - Q
11.12.01 2018 - Q
11.12.04 2018 - Q
11.12.01 2018 - Q
11.12.04 5339 For
11.12.01 5339 Co
11.12.01 5339 For
11.12.01 5339 Co
11.12.04 5339 For
11.12.01 5339 For
$772,432
$393,600
$193,108
$98,400
$246,907
$2,668,750
$1,116,321
$889,583
$61,727
$279,080
$7,063,350
$7,063,350
$7,063,350
$7,063,350
$7,063,350
$7,063,350
$7,063,350
$7,063,350
$7,063,350
$7,063,350
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
$13,783,258
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
2018AM07ID0219FDCAP
Ph subtotal: $6,719,908 $7,063,350 $13,783,258 $13,783,258
99155 OKI HAM SORTA Bus Replacement Description: Bus replacements - CMAQ
transfers for the OTPPP Work Type: FTA
Transfer Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
4TP7
LNT
Federal
Local Match
M400
LNTP
CMAQ
Local Match
11.12.01 2019 - Q
11.12.01 2019 - Q
$825,003
$206,251
$5,203,000
$5,203,000
$11,462,763
$11,462,763
$11,462,763
$11,462,763
2018AM07ID0222FDCAP
2018AM07ID0222FDCAP
Ph subtotal: $1,031,254 $5,203,000 $11,462,763 $11,462,763
99225 OKI HAM SORTA Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt OT Trnst/Av 2019 LNT Local Match LNTP Local Match 30.09.00 Local $77,704,288 $0 $77,704,288 $77,704,288 2018stipID1265FDOPER
Ph subtotal: $77,704,288 $0 $77,704,288 $77,704,288
99801 OKI HAM SORTA Bus Replacements Description: Bus Replacements - STP funds
only are a flex fund transfer Work Type: FTA
Transfer Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
4TB7
LNT
Federal
Local Match
M400
LNTP
CMAQ
Local Match
11.12.01 - Qty 12
11.12.01 - Qty 12
$4,704,000
$1,176,000
$950,000
$950,000
$6,830,000
$6,830,000
$6,830,000
$6,830,000
2018stipID1266FDCAPT
2018stipID1266FDCAPT
Ph subtotal: $5,880,000 $950,000 $6,830,000 $6,830,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 49 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 103349 OKI HAM SORTA Bus Replacements Description: Bus replacements using MPO
CMAQ funds as a flex fund transfer Work
Type: FTA Transfer Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2021
2021
4TB7
LNT
Federal
Local Match
M400
LNTP
CMAQ
Local Match
11.12.01 - Qty 10
11.12.01 - Qty 10
$4,720,000
$1,180,000
$0
$0
$5,900,000
$5,900,000
$5,900,000
$5,900,000
2018stipID1267FDCAPT
2018stipID1267FDCAPT
Ph subtotal: $5,900,000 $0 $5,900,000 $5,900,000
104410 OKI HAM SORTA Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt TR Transit Su
Transit Su
2020
2021
LNT
LNT
Local Match
Local Match
LNTP
LNTP
Local Match
Local Match
30.09.00 2020
30.09.00 2021
$77,704,288
$77,704,288
$0
$0
$155,408,576
$155,408,576
$155,408,576
$155,408,576
2018stipID1268FDTR
2018stipID1268FDTR
Ph subtotal: $155,408,576 $0 $155,408,576 $155,408,576
104411 OKI HAM SORTA Preventive
Maintenance
Description: Preventive Maintenance. STP for
the Urban Transit Program is flex fund transfer
only. Work Type: FTA Transfer Termini:
Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb 2020 4AT7 Federal M240 STBG 11.7A.00 2020 UT $1,026,108 $33,687,270 2018stipID1269FDCAPT
Ph subtotal: $1,026,108 $0 $0 $33,687,270
TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2020
2021
2021
2021
2021
FTA
LNT
LNT
4AT7
FTA
LNT
LNT
Federal
Local Match
Local Match
Federal
Federal
Local Match
Local Match
5307
LNTP
LNTP
M240
5307
LNTP
LNTP
5307 - Urban Formula Progr
Local Match
Local Match
STBG
5307 - Urban Formula Progr
Local Match
Local Match
11.7A.00 2020 53
11.7A.00 2020 53
11.7A.00 2020 UT
11.7A.00 2021 UT
11.7A.00 2021 53
11.7A.00 2021 UT
11.7A.00 2021 53
$12,448,800
$3,112,200
$256,527
$1,026,108
$12,448,800
$256,527
$3,112,200
$0
$0
$0
$0
$0
$0
$0
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
$33,687,270
2018stipID1269FDTR
2018stipID1269FDTR
2018stipID1269FDTR
2018stipID1269FDTR
2018stipID1269FDTR
2018stipID1269FDTR
2018stipID1269FDTR
Ph subtotal: $32,661,162 $0 $33,687,270 $33,687,270
104412 OKI HAM SORTA ADA Service Description: ADA Service Work Type: Transit
Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2021
2021
FTA
LNT
FTA
LNT
Federal
Local Match
Federal
Local Match
5307
LNTP
5307
LNTP
5307 - Urban Formula Progr
Local Match
5307 - Urban Formula Progr
Local Match
11.7C.00 2020
11.7C.00 2020
11.7C.00 2021
11.7C.00 2021
$1,025,367
$256,342
$1,025,367
$256,342
$0
$0
$0
$0
$2,563,418
$2,563,418
$2,563,418
$2,563,418
$2,563,418
$2,563,418
$2,563,418
$2,563,418
2018stipID1270FDTR
2018stipID1270FDTR
2018stipID1270FDTR
2018stipID1270FDTR
Ph subtotal: $2,563,418 $0 $2,563,418 $2,563,418
104413 OKI HAM SORTA Tire Lease/Security
Equip
Description: Tire Lease Work Type: Transit
Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2020
2020
2020
2020
2021
2021
2021
2021
FTA
FTA
LNT
LNT
FTA
FTA
LNT
LNT
Federal
Federal
Local Match
Local Match
Federal
Federal
Local Match
Local Match
5307
5307
LNTP
LNTP
5307
5307
LNTP
LNTP
5307 - Urban Formula Progr
5307 - Urban Formula Progr
Local Match
Local Match
5307 - Urban Formula Progr
5307 - Urban Formula Progr
Local Match
Local Match
11.16.40 2020
11.42.09 2020
11.42.09 2020
11.16.40 2020
11.42.09 2021
11.16.40 2021
11.42.09 2021
11.16.40 2021
$589,123
$132,000
$33,000
$147,281
$132,000
$589,123
$33,000
$147,281
$0
$0
$0
$0
$0
$0
$0
$0
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
$1,802,808
2018stipID1271FDTR
2018stipID1271FDTR
2018stipID1271FDTR
2018stipID1271FDTR
2018stipID1271FDTR
2018stipID1271FDTR
2018stipID1271FDTR
2018stipID1271FDTR
Ph subtotal: $1,802,808 $0 $1,802,808 $1,802,808
104414 OKI HAM SORTA Bus Replacements Description: Bus Replacements - CMAQ funds
only are a flex fund transfer through the OTPPP
Work Type: FTA Transfer Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2020
2020
2020
2020
2020
2020
4TP7
FTA
FTA
LNT
LNT
LNT
Federal
Federal
Federal
Local Match
Local Match
Local Match
M400
5339
5339
LNTP
LNTP
LNTP
CMAQ
5339 / 0002 - Bus & Bus Fac
5339 / 0002 - Bus & Bus Fac
Local Match
Local Match
Local Match
11.12.01 OTPPP -
11.12.04 5339 - Q
11.12.01 5339 - Q
11.12.01 OTPPP -
11.12.04 5339 - Q
11.12.01 5339 - Q
$2,088,000
$1,183,104
$742,400
$522,000
$295,776
$185,600
$0
$0
$0
$0
$0
$0
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
$5,016,880
2018stipID1272FDCAPT
2018stipID1272FDCAPT
2018stipID1272FDCAPT
2018stipID1272FDCAPT
2018stipID1272FDCAPT
2018stipID1272FDCAPT
Ph subtotal: $5,016,880 $0 $5,016,880 $5,016,880
104415 OKI HAM SORTA Bus Replacements Description: Bus Replacements - CMAQ funds
only are a flex fund transfer through the OTPPP
Work Type: FTA Transfer Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
2021
2021
2021
2021
4TP7
FTA
LNT
LNT
Federal
Federal
Local Match
Local Match
M400
5339
LNTP
LNTP
CMAQ
5339 / 0002 - Bus & Bus Fac
Local Match
Local Match
11.12.01 OTPPP -
11.12.04 5339 - Q
11.12.04 5339 - Q
11.12.01 OTPPP -
$2,152,000
$1,184,960
$296,240
$538,000
$0
$0
$0
$0
$4,171,200
$4,171,200
$4,171,200
$4,171,200
$4,171,200
$4,171,200
$4,171,200
$4,171,200
2018stipID1273FDTR
2018stipID1273FDTR
2018stipID1273FDTR
2018stipID1273FDTR
Ph subtotal: $4,171,200 $0 $4,171,200 $4,171,200
104648 OKI HAM SORTA Bus Replacements Description: Bus Replacements Work Type:
FTA Transfer Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2020
2020
4TA7
LNT
Federal
Local Match
M230
LNTP
STBG
Local Match
11.12.01 - Qty 10
11.12.01 - Qty 10
$4,000,000
$1,000,000
$0
$0
$5,000,000
$5,000,000
$5,000,000
$5,000,000
2018stipID1274FDCAPT
2018stipID1274FDCAPT
Ph subtotal: $5,000,000 $0 $5,000,000 $5,000,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 50 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 106917 OKI HAM SORTA Fare Collection
Equipment
Description: Acquire mobile fare collection
equipment Work Type: FTA Transfer
Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2018
2018
4TP7
LNT
Federal
Local Match
M240
LNTP
STP
Local Match
11.42.10
11.42.10
$30,400
$7,600
$0
$0
$38,000
$38,000
$38,000
$38,000
2018AM02ID0073FDCAP
2018AM02ID0073FDCAP
Ph subtotal: $38,000 $0 $38,000 $38,000
107283 OKI HAM SORTA FY21 Bus
Replacements
Description: Bus replacements using OKI CMAQ
funds as a flex fund transfer. Work Type: FTA
Transfer Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt TR Transit Su
Transit Su
2021
2021
4TB7
LNT
Federal
Local Match
M400
LNTP
CMAQ
Local Match
11.12.01 - Qty 10
11.12.01 - Qty 10
$3,103,400
$2,156,600
$0
$0
$5,260,000
$5,260,000
$5,260,000
$5,260,000
2018AM03ID0112FDTR
2018AM03ID0112FDTR
Ph subtotal: $5,260,000 $0 $5,260,000 $5,260,000
107939 OKI HAM OKI Section 5310 Program Description: 5310 Program through the OKI
MPO using FFY2017 funds Work Type:
Transit Termini: Cincinnati
OKI Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
FTA
FTA
FTA
FTA
FTA
FTA
FTA
FTA
FTA
FTA
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Federal
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
5310
5310
5310
5310
5310
5310
5310
5310
5310
5310
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
Local Match
11.42.07
11.80.00
11.7A.00
11.12.15 - Qty 7
11.13.04 - Qty 1
11.42.09
11.7L.00
11.42.08
11.7D.02
11.12.04 - Qty 2
11.7D.02
11.42.08
11.12.15 - Qty 7
11.42.07
11.12.04 - Qty 2
11.7L.00
11.13.04 - Qty 1
11.7A.00
11.42.09
$40,000
$138,532
$8,180
$210,480
$42,170
$82,020
$767,094
$86,780
$480
$91,736
$120
$21,695
$52,620
$10,000
$22,934
$191,774
$10,543
$2,045
$20,505
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
$1,799,708
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
2018AM07ID0220FDCAP
Ph subtotal: $1,799,708 $0 $1,799,708 $1,799,708
107940 OKI HAM SORTA 5310 Program Description: 5310 Program activities through
SORTA Work Type: Transit Termini:
Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2018
2018
2018
2018
2018
2018
FTA
FTA
FTA
FTA
LNT
LNT
LNT
LNT
Federal
Federal
Federal
Federal
Local Match
Local Match
Local Match
Local Match
5310
5310
5310
5310
LNTP
LNTP
LNTP
LNTP
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
5310 - Enhanced Mobility
Local Match
Local Match
Local Match
Local Match
11.13.04 - Qty 3
11.13.15 - Qty 2
11.12.15 - Qty 2
11.12.04 - Qty 7
11.12.15 - Qty 2
11.13.04 - Qty 3
11.13.15 - Qty 2
11.12.04 - Qty 7
$151,926
$63,676
$60,454
$321,094
$15,114
$37,982
$15,919
$80,273
$0
$0
$0
$0
$0
$0
$0
$0
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
$746,438
2018AM03ID0113FDCAP
2018AM03ID0113FDCAP
2018AM03ID0113FDCAP
2018AM03ID0113FDCAP
2018AM03ID0113FDCAP
2018AM03ID0113FDCAP
2018AM03ID0113FDCAP
2018AM03ID0113FDCAP
Ph subtotal: $746,438 $0 $746,438 $746,438
107941 OKI HAM BCRTA 5310 Program Description: 5310 Program activities through
BCRTA Work Type: Transit Termini:
Cincinnati
Butler County Regional Transit
Authority
Air Quality Exempt OT Trnst/Av
Trnst/Av
2018
2018
FTA
LNT
Federal
Local Match
5310
LNTP
5310 - Enhanced Mobility
Local Match
30.09.00
30.09.00
$275,400
$275,400
$0
$0
$550,800
$550,800
$550,800
$550,800
2018AM03ID0110FDOPE
2018AM03ID0110FDOPE
Ph subtotal: $550,800 $0 $550,800 $550,800
109541 OKI HAM HAM SORTA 2020 DERG
Buses
Description: SORTA to replace five model year
2008 diesel powered transit buses with five new
diesel powered transit buses. 2019 DERG
rogram project selection. Work Type: FTA
Transfer Termini: Southwest Ohio Regional
Transit Authority
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2020
2020
4NG
LNT
Federal
Local Match LNTP
Un-Assigned Federal
Local Match
11.12.01 - Qty 5
11.12.01 - Qty 5
$1,601,304
$1,067,536
$0
$0
$2,668,840
$2,668,840
$2,668,840
$2,668,840
2018AM07ID0223FDCAP
2018AM07ID0223FDCAP
Ph subtotal: $2,668,840 $0 $2,668,840 $2,668,840
109593 OKI HAM SORTA Silverton Access
Facility
Description: Renovation of Silverton Access
Facility Work Type: Transit Termini:
Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt CO Oth Remb
Oth Remb
2019
2019
FTA
LNT
Federal
Local Match
5339
LNTP
5339 / 0002 - Bus & Bus Fac
Local Match
11.34.02
11.34.02
$180,000
$20,000
$0
$0
$200,000
$200,000
$200,000
$200,000
2018AM07ID0224FDCAP
2018AM07ID0224FDCAP
Ph subtotal: $200,000 $0 $200,000 $200,000
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 51 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 112057 OKI HAM SORTA 2020 Bus
Replacements
Description: Bus Replacements - STBG funds
are a flex fund transfer Work Type: Flex Fund
Transfers Termini: Cincinnati
Southwest Ohio Regional
Transit Authority
Air Quality Exempt TR Transit Su
Transit Su
2020
2020
4TA7
LNT
Federal
Local Match
M230
LNTP
STBG
Local Match
11.12.01
11.12.01
$5,347,765
$2,291,899
$0
$0
$7,639,664
$7,639,664
$7,639,664
$7,639,664
2018AM11ID0320FDTR
2018AM11ID0320FDTR
Ph subtotal: $7,639,664 $0 $7,639,664 $7,639,664
112320 OKI HAM HAM SORTA 2020 DERG
Buses
Description: Southwest Ohio Regional Transit
Authority (SORTA), Hamilton County, to replace
four model year 2006 diesel powered transit
buses with new diesel powered transit buses,
#D20F-003. 2020 DERG Program project
selection. Work Type: Flex Fund Transfers
Termini: Southwest Ohio Regional Transit
Authority
Southwest Ohio Regional
Transit Authority
Air Quality Exempt TR Transit Su
Transit Su
2020
2020
4NG
LNT
Federal
Local Match
M400
LNTP
CMAQ
Local Match
11.12.01
11.12.01
$1,269,893
$892,995
$0
$0
$2,162,888
$2,162,888
$2,162,888
$2,162,888
2018AM11ID0321FDTR
2018AM11ID0321FDTR
Ph subtotal: $2,162,888 $0 $2,162,888 $2,162,888
104537 KYOVA LAW LCPA 2021 Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Lawrence County
Lawrence County Port
Authority
Air Quality Exempt TR Transit Su
Transit Su
Transit Su
2021
2021
2021
4EG
FTA
LNT
State
Federal
Local Match
GRF
5307
LNTP
GRF
5307 - Urban Formula Progr
Local Match
30.09.03 FY2021
30.09.03 FY2021
30.09.03 FY2021
$90,000
$1,000,000
$910,000
$0
$0
$0
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
2018stipID0933FDTR
2018stipID0933FDTR
2018stipID0933FDTR
Ph subtotal: $2,000,000 $0 $2,000,000 $2,000,000
99334 OKI WAR WCTS 2018 Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Lebanon
Warren County Transit Service Air Quality Exempt OT Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
2018
2018
2018
2018
4EG
4EQ
FTA
LNT
State
State
Federal
Local Match
GRF
GRF
5307
LNTP
GRF
GRF
5307 - Urban Formula Progr
Local Match
30.09.01 OPTGP
30.09.01 E&D
30.09.01 5307
30.09.01 Local
$115,200
$22,444
$571,108
$433,464
$0
$0
$0
$0
$1,142,216
$1,142,216
$1,142,216
$1,142,216
$1,142,216
$1,142,216
$1,142,216
$1,142,216
2018stipID1275FDOPER
2018stipID1275FDOPER
2018stipID1275FDOPER
2018stipID1275FDOPER
Ph subtotal: $1,142,216 $0 $1,142,216 $1,142,216
99343 OKI WAR WCTS 2018 Bus
Replacement and PM
Description: Vehicle Replacement and
Capitalized Maintenance Work Type: Transit
Termini: Lebanon
Warren County Transit Service Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2018
2018
2018
2018
FTA
FTA
LNT
LNT
Federal
Federal
Local Match
Local Match
5307
5307
LNTP
LNTP
5307 - Urban Formula Progr
5307 - Urban Formula Progr
Local Match
Local Match
11.7A.00
11.12.15 - Qty 3
11.12.15 - Qty 3
11.7A.00
$99,460
$118,332
$29,583
$24,865
$0
$0
$0
$0
$272,240
$272,240
$272,240
$272,240
$272,240
$272,240
$272,240
$272,240
2018stipID1276FDCAPT
2018stipID1276FDCAPT
2018stipID1276FDCAPT
2018stipID1276FDCAPT
Ph subtotal: $272,240 $0 $272,240 $272,240
99346 OKI WAR WCTS 2019 Operating
Assistance
Description: Operating Assistance Work Type:
Transit Termini: Lebanon
Warren County Transit Service Air Quality Exempt OT Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
2019
2019
2019
2019
4EG
4EQ
FTA
LNT
State
State
Federal
Local Match
GRF
GRF
5307
LNTP
GRF
GRF
5307 - Urban Formula Progr
Local Match
30.09.01 OPTGP
30.09.01 E&D
30.09.01 5307
30.09.01 Local
$115,200
$22,444
$571,108
$434,464
$0
$0
$0
$0
$1,143,216
$1,143,216
$1,143,216
$1,143,216
$1,143,216
$1,143,216
$1,143,216
$1,143,216
2018stipID1277FDOPER
2018stipID1277FDOPER
2018stipID1277FDOPER
2018stipID1277FDOPER
Ph subtotal: $1,143,216 $0 $1,143,216 $1,143,216
99347 OKI WAR WCTS 2019 Bus
Replacement and PM
Description: Vehicle Replacement and
Capitalized Maintenance Work Type: Transit
Termini: Lebanon
Warren County Transit Service Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
2019
2019
2019
FTA
FTA
LNT
Federal
Federal
Local Match
5307
5307
LNTP
5307 - Urban Formula Progr
5307 - Urban Formula Progr
Local Match
11.7A.00
11.12.15 - Qty 3
11.7A.00
$136,750
$186,450
$34,188
$0
$0
$0
$357,388
$357,388
$357,388
$357,388
$357,388
$357,388
2018MODID0456FDCAPT
2018MODID0456FDCAPT
2018MODID0456FDCAPT
Ph subtotal: $357,388 $0 $357,388 $357,388
104483 OKI WAR WCTS 2020 5307 Program Description: Operating assistance, vehicle
replacement, and preventive maintenance
Work Type: Transit Termini: Lebanon
Warren County Transit Service Air Quality Exempt CO Oth Remb
Oth Remb
Oth Remb
Oth Remb
2020
2020
2020
2020
FTA
FTA
LNT
LNT
Federal
Federal
Local Match
Local Match
5307
5307
LNTP
LNTP
5307 - Urban Formula Progr
5307 - Urban Formula Progr
Local Match
Local Match
11.12.15 - Qty 3
11.7A.00
11.7A.00
11.12.15 - Qty 3
$118,332
$99,460
$24,865
$29,583
$0
$0
$0
$0
$272,240
$272,240
$272,240
$272,240
$1,414,456
$1,414,456
$1,414,456
$1,414,456
2018stipID1279FDCAPT
2018stipID1279FDCAPT
2018stipID1279FDCAPT
2018stipID1279FDCAPT
Ph subtotal: $272,240 $0 $272,240 $1,414,456
OT Trnst/Av
Trnst/Av
Trnst/Av
Trnst/Av
2020
2020
2020
2020
4EG
4EQ
FTA
LNT
State
State
Federal
Local Match
GRF
GRF
5307
LNTP
GRF
GRF
5307 - Urban Formula Progr
Local Match
30.09.01 OPTGP
30.09.01 E&D
30.09.01 5307
30.09.01 Local
$115,200
$22,444
$571,108
$433,464
$0
$0
$0
$0
$1,142,216
$1,142,216
$1,142,216
$1,142,216
$1,414,456
$1,414,456
$1,414,456
$1,414,456
2018stipID1279FDOPER
2018stipID1279FDOPER
2018stipID1279FDOPER
2018stipID1279FDOPER
Ph subtotal: $1,142,216 $0 $1,142,216 $1,414,456
Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"
Page 52 of 52
STIP
AgencyDist PID
MPO/RTP
O/Large
City
Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength
(SLM)Ph Subph SFY SAC Fund Type
Billing
CodeObligation Group ALI - Qty
STIP
Phase
Estimate
Total
Phase
Encumbered
STIP
Phase
Total
Project
TotalSTIP Reference ID
FTA 8 104485 OKI WAR WCTS 5307 Program Description: Operating assistance, vehicle
replacement, and preventive maintenance
Work Type: Transit Termini: Lebanon
Warren County Transit Service Air Quality Exempt TR Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
Transit Su
2021
2021
2021
2021
2021
2021
2021
2021
4EG
4EQ
FTA
FTA
FTA
LNT
LNT
LNT
State
State
Federal
Federal
Federal
Local Match
Local Match
Local Match
GRF
GRF
5307
5307
5307
LNTP
LNTP
LNTP
GRF
GRF
5307 - Urban Formula Progr
5307 - Urban Formula Progr
5307 - Urban Formula Progr
Local Match
Local Match
Local Match
30.09.01 OTPGP
30.09.01 E&D
11.12.15 - Qty 3
30.09.01 5307
11.7A.00
11.12.15 - Qty 3
11.7A.00
30.09.01 Local
$115,200
$22,444
$118,332
$571,108
$99,460
$29,583
$24,865
$433,464
$0
$0
$0
$0
$0
$0
$0
$0
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
$1,414,456
2018stipID1280FDTR
2018stipID1280FDTR
2018stipID1280FDTR
2018stipID1280FDTR
2018stipID1280FDTR
2018stipID1280FDTR
2018stipID1280FDTR
2018stipID1280FDTR
Ph subtotal: $1,414,456 $0 $1,414,456 $1,414,456
Recommended