National Geo Spatial Eco System – Road Ahead

Reliance ADA - GIS Applications

24th Dec 2010--------------------Uday KaleVice President (IT)Reliance EnergyIndia

Impact of Geo Spatial Technology on Reliance ADA Group :Power, Telecom, Infrastructure sectors

Reliance ADA Group and Business Sectors

Geo Spatial Technology Penetration in ADA Group

What’s NSDI Means to us now and in future- Business Applications perspective

confidential3 confidentialconfidential

RELIANCE ADA Group

Reliance Infrastructure

Reliance Power

Reliance Communications

Reliance Natural Resources

Reliance Capital

Reliance Big Entertainment

4confidential

Reliance Infrastructure Ltd. – The New Structure

Reliance Infrastructure(Listed Company)

Reliance

InfraVentures

Road, Metro, SEZ,

Real estate, and

future

infrastructure

projects

Reliance

InfraProjects

EPC projects

Reliance

Power

Transmission

Reliance

Energy

Trading

Reliance

Power

Power

GenerationTransmission

projects

Energy

trading arm

Mumbai distribution, 500MW Dahanu TPS, 220 MW Samalkot

PP, 48 MW Goa PP

Reliance

Natural

Resource

Ltd.

CBM (45%)

Oil Blocks (70%)

Coal Field

Delhi & Orissa distribution, 165 MW BSES Kerala PP

Larger canvas to innovate, perform & deliver

5confidential

Power Generation Projects

Reliance Power developing Reliance Power developing Reliance Power developing Reliance Power developing power projects with power projects with power projects with power projects with

combined planned installed combined planned installed combined planned installed combined planned installed capacity of 28200 MWcapacity of 28200 MWcapacity of 28200 MWcapacity of 28200 MW

• Rosa Phase – I, Uttar Pradesh (600 MW)

• Rosa Phase – II, Uttar Pradesh (600 MW)

• Butibori, Maharashtra (300 MW)

• Sasan, Madhya Pradesh (3960 MW)

• Krishnapatanam, Andhra Pradesh (4000 MW)

• M P Power, Madhya Pradesh (3960 MW)

• Shahapur Coal & Shahapur Gas, Maharashtra

(4000 MW)

• Dadri, Uttar Pradesh (7480 MW)

• Urthing Sobla, Uttarakhand (400 MW)

• Siyom, Arunachal Pradesh (1000 MW)

• Tato –II, Arunachal Pradesh (700 MW)

6confidential

Current Power Projects

Power projects are Power projects are Power projects are Power projects are planned to be diverse in planned to be diverse in planned to be diverse in planned to be diverse in geographic location, fuel geographic location, fuel geographic location, fuel geographic location, fuel

type, fuel source and offtype, fuel source and offtype, fuel source and offtype, fuel source and off----taketaketaketake

Location of Power projects

� Western India (12,220 MW),

� Northern India (9,080 MW)

� Northeastern India (2,900 MW)

� Southern India (4,000 MW).

7confidential

Current Power Projects

Diversity in Fuel Types

� Coal-fired projects (14,620 MW)

� Gas-fired projects (10,280 MW)

� Hydroelectric projects (3,300 MW)Each project is planned to Each project is planned to Each project is planned to Each project is planned to

be strategically located be strategically located be strategically located be strategically located near an available fuel near an available fuel near an available fuel near an available fuel supply or load centersupply or load centersupply or load centersupply or load center

8confidential

� Integrated National Grid by 2012

� Inter-regional power transfer capacity of

37,150 MW by 2012 from existing 17,000 MW

� Rs.2 Cr./MW required for transmission

� Total Investments estimated at ~ Rs 1,35,000

crore (2008-2012)

� Central Sector Investment �Rs 75,000 Cr.

� State Sector Investment � Rs 65,000 Cr.

Reliance Power Transmission – National Plan

100% Private Participation

allowed

9confidential

Power Transmission Opportunity

11th Plan Estimates

Central Sector INR 75,000 Crs.

State Sector INR 65,000 Crs.

-----------------------------------------------------------------------

Total INR 1,40,000 Crs

12th Plan EstimatesCentral Sector INR 1,40,000 Crs.State Sector INR 1,00,000 Crs

---------------------------------------------------------------------------------Total INR 2,40,000 Crs

.

Possible Private Participation Estimates ( Till 2017 )--------------------------------------------------------------------------------

Total ( Central and State Sector ) INR 1,26,000 Crs .

10confidential

NESCO

WESCO

SOUTHCO(Orissa discos)

Reliance Energy- Distribution Business

Reliance Infrastructure

Limited

BSES Rajdhani

+

BSES Yamuna(Delhi discos)

51%51%

Reliance Energy(Mumbai Business)

100%

500MW Dahanu TPS, 220 MW Samalkot PP,

48 MW Goa P

11confidential

Largest customer base for a Private Sector Utility in India

Largest Private Sector DistributorLargest Private Sector Distributorof Electricityof Electricity

� Serving over 6 million customers in Mumbai, Delhi and Orissa

� Powering 2 out of 3 homes in Mumbai & Delhi and 3 out of 4 homes in Orissa

� Distributing over 5,000 MW – the largest in India

� Employs more than 30,000 personnel

� Industrial, commercial and residential urban consumers

Mumbai Delhi Orissa

12confidential

BSES Delhi DistributionBSES Delhi Distribution…….Snapshot .Snapshot

� Privatized in 2002

� Distributing to over 2.3 million customers

- 2,644 MW of peak demand

- Adding 0.2 million customers every year

� AT&C losses reduction of >24% (since takeover)

- In BRPL from 51% to 27%

- In BYPL from 63% to 29%

� Which is 5% reduction per year, as against National

Average of <1%.

� Major improvement across quality of supply, customer care, technology infusion & reliability

� BSES invested Rs 3,240 crore [USD 810 million] in first 6 years

� Delhi Government saved more than Rs 14,000 crore[USD 3.5 billion] during this period.

13confidential

Reliance InfraVenturesExisting Infrastructure Projects

Reliance InfraVentures(wholly owned by Reliance Infrastructure Ltd.)

5 projects in

Tamil Nadu totaling

401 km,

Project Cost

Rs. 3,150 crore

Hyderabad Trade Tower

& CBD in 80 acres of

area

Project Cost

Rs. 7,000 crore

Metro projects in

Mumbai & Delhi

covering 35 kms

Project Cost

Rs. 4,900 crore

RoadUrban

Infrastructure

SEZs in NOIDA &

DAKC with saleable

area of 185 mn sq ft.

Project Cost

Rs. 31,000 crore

SEZsReal Estate

9 projects in hand with aggregate outlay of Rs 16,000 Crore

Geo Spatial Technology Penetration in ADA Group

15confidential

RELIANCE GENERAL INSURANCE

------------------------------------------------

BUILDING, MOTOR, HEALTH

GLOBAL WIND POWER

----------------------------------

WIND POWER

RELIANCE CEMENTATION

-------------------------------------

CEMENT

RELIANCE NATURAL RESOURCES

------------------------------------------------

OIL & GAS, CBM

RELIANCE INFRASTRUCTURES

----------------------------------------------

ROADS, SEZ, IT PARKS

RELIANCE COMMUNICATION-------------------------------------------

MOBILECOMMUNICATION

MUMBAI METRO ONE

--------------------------------

METRO RAIL

RELIANCE ENERGY

------------------------------

TRANSMISSION

&

DISTRIBUTION

RELIANCE POWER

----------------------------

GENERATION

CONGLOMERATE

ADAG

SITE SUITABILITY

ENVIRONMENTAL IMPACT ANALYSIS

CHANGE DETECTION

GEO SPATIAL & 3D ANALYSIS

HAZARD MAPPING & ANALYSIS

GEOCODING

SURVEYING

LAND USE /COVER ANALYSIS

GEO MORPHOLOGICAL ANALYSIS

EXCAVATION & EXPLORATION ANALYSIS

ASSET MANAGEMENT

HYDROLOGICAL ANALYSIS

LOCATION BASED SERVICES

NETWORK TRACE

LOGISTICAL ANALYSIS

PROJECT PLANNING

CORRIDOR MAPPING

EMERGENCY EVACUATION

Use of GIS in Reliance ADA Group

16confidential

GIS Maturity Stage

Pre GIS

GIS being recognized

GIS becomesEssential

GIS becomesEnterprise wide

GIS becomesStrategic Tool

TIME

Business Benefit

2003 2004 2005 2006 2007 2008 2009

We have come a long way but still lot to do . . .

2002

Geo Spatial Technology for Our Elec. Distribution Business

18confidential

Utility Challenges and complexity

Scale Factors

� Ever increasing Demand ( Installed capacity 140,000 MW

� By 2030-40 the demand > 800,000 MW

� Need uninterrupted ,affordable and reliable quality supply

� India per capita consumption 700 KWh as against world avg 2600 KWh

� All India AT&C Losses – Range 18% to 62%

� India Avg AT&C Loss approx. 33% - 60,000Crs

19confidential

Utility Challenges and Complexity

Scope Factors

� Tariff Policy & Structure – subsidy -25000 Crs.

� Open Access

� Pricing – ABT, ToD

� Need for Clean Fuel – Solar, Wind, Nuclear

confidential20 confidential

Kirchhoff’s Father will find it difficult to solve the network….

confidential21 confidential

2 Life Cycle Management Utility Business

PlanningBusiness

Development

Commercial

OMS

System Control

SCADA

Metering &

Bill Distribution

HT / LT

Maintenance

R&D

Energy Audit

Elec.

Utility

GIS helps in managingthe entire Utility Life Cycle

22confidential

Various IT Systems in Utility

AMRAMR

SAP

PM, MM, HR, FICO

SAP

PM, MM, HR, FICO

OMSOMS

SCADA

DMS

SCADA

DMS

SAP Billing & CRM

IS-U CCS

SAP Billing & CRM

IS-U CCS

SASSAS

GISGIS

Network

Analysis

Network

Analysis

IT SystemsIT Systems

confidential23 confidential

6 Business Benefits by Integrated Approach

SCADA,DMSISU-CCS

AMR

Network

Analysis

ERP

SAP PM/R3

OMS

GISEntire Network Mapping

Asset Management Maintenance

History

Network

Data

Analysis

Result

Customer Info. &

Billing Data

Load Profile

Status

Probable Location

of Failure

Switch Position

Fault Data

SAS

Sort Term

Load Forecast

confidential24 confidential

Data Captured in GIS

� Generation Equipments

� Bus Bar

� Capacitor Bank

� Circuit Breaker

� Communication Cable

� Conduit System

� Distribution Transformer

� EHV Station

� Fault History Location

� Fuse

� HT Cable

� HT Consumer

� Joint

� LT Cable

� OH Conductor

� REL Facility

� Ring Main Unit

� Riser

� Span Guy

� Stay

� Street Light Bank

� Substation

� Support Structure

� Switch

� Transmission Tower Structure

� Underground Structure

� Voltage Regulator

� Pillar

� Power Transformer

� Service Point (Customers )

Features …- Visible in Map

confidential25 confidential

Objects …- Not Visible in Map

� DT LOSS

� Substation Loss

� Battery Cell

� Battery Charger

� Battery Set

� Bracket

� Capacitor Control

� Capacitor Unit

� Circuit Source

� Conductor Info

� DT Load

� DT Energy Consumption

� Duct Definition

� Duct Edge Object

� Equipment Fault History

� Fire Fighting System

� Foreign Attachment

� Fuse Unit

� Inspection History

� Demand Info

GIS - DATA Capture

REL GIS Dashboard

Edit Database

Electric Tracing

Locating Asset

Querying GIS COTS

Functionalities

SLD Generation

HT / LT SLD

OMS

Outage Management

WEB GIS

GIS Portal

I

N

T

E

G

R

A

T

I

O

N

S

SAP

PM,MM,IS-U-CCS

ABB

SCADA/DMS

CYME

CYMDIST

Custom Tools

Energy Auditing & Revenue Analysis

Net work Loss calculation

Street Light Proposal & Pole Numbering

GIS Viewer

Proposals, Workflow

Planning Tool

Conduits, Ducts

UG Facilities

Fault Locator

E

xt

e

n

s

I

o

n

s AutoCAD

SLD (HT / LT)

SAS

GIS ApplicationsGIS –SAP R3 Integration.

DT,PT monthly and yearly peak load

Customer InformationHT,LT Maintenance HistoryW/O and Notification creation

GIS – SCADA Intg.Real Time Analog Values

Real Time Switch StatusOMS Intg.Transmission line Fault locatorSCADA Control Room – Toggling bet SLD and GIS Map

GIS - CYMELoad Flow Analysis

Short Ckt. AnalysisVoltage Drop Analysis

GIS Applications (contd.)

GIS – Energy AuditGIS – LT Fault LocatorGIS-- Feeder Loss CalculationGIS-- Distribution Sys. Capacity Planning N-1 criteria – relational group

GIS-- Outage Management SystemGIS-- LT Cable Section and Pillar Load Calculations GIS – SAS short Term ForecastingGIS – Street Light Techno Commercial Proposal Preparation

Many more . . . .Strategy is to take GIS to Blue Collar staff on the field

confidential29 confidential

Buffer Analysis – Find suitable DTs within 100 Meter

Proposed

Load

List of DTs

Buffer

Query

confidential30 confidential

LT Network Management

� Linking of LT Single Line Diagram (SLD) with Geo-schematic elements

31confidential

Network Adapter Interface

Reliance

Network AdapterCYME

(CYMEDIST)

Network Analysis Tool

( Short Circuit,

Voltage Drop,

Contingency,

Switching Optimization )

Interfacing Tool

GIS

(GDB)Geo-spatial

Network

SAP DATA

( Static Data )SCADA DATA

( Real Time )

confidential32 confidential

Energy Audit - Locating Loss Area – GIS Solution

Huge dependency on latest, updated ,accurate land base

RS-01 RS-02 RS-03 RS-19RS-04 o o o o o o o o o o o o o

Prediction / Heuristic Analysis

GIS Interface for RS Engineers

Assigning / Management of Maintenance Crew

Reports Creation

CustomersCustomers

SCADA

IVR System

GIS Based

-OMS-

REPONDER

SAP - PM

SAP – ISU/CCS

Outage Calls

Large Area Outage

Trigger

Customer Data Updation

CSR

Outage Calls

Notification / SO Creation –––– Incident Closure

- GIS Based - Integrated - Outage Management System –

Retrieve Consumer Data

1-800- CA#

CYMEContingency Analysis

All this

is poss

ible onl

y if

we have

good G

IS Data

34confidential

R-APDRP

� Min of Power and Power Finance Corporation Ltd.

� MTotal Programme size is about Rs 50,000 Cr

� GoI Grant component for Part-A Rs.10,000 Cr

� GoI Grant component for Part-B Rs.20,000 Cr

35confidential

R –APDRP Framework

INR 10,000 Crs ( US$ 2.08 Bn)

RelianceReliance

Geo Spatial Technology forOur Cementation Business( Reliance Cementation Pvt. Ltd.)We have two Lime Stone mining lease in Maihar (MP) and 14MTPA Cement plants( MP, Maharashtra)

Our Cementation Applications1 Site Suitability Analysis2 Environmental Impact Analysis3 Excavation and Exploration Analysis4 Logistical Analysis

Geo Spatial Technology for Our Transmission Business (Reliance Power Transmission Pvt. Ltd.)

Pre Bid Phase

Bidding Phase

Operations and Maintenance Phase

38confidential

Origin

Jabalpur

Destination

Dharamjaygarh

Bee Line Distance of 360 Km

Pre Bid Phase : Transmission Business

Need:Quicker, accurate, comprehensive Techno Commercial Estimation.Each amounting to around 600 -700 Crs.

39confidential

Road NetworkOverlay

40confidential

Rail NetworkOverlay

41confidential

Major RiversOverlay

42confidential

Minor RiversOverlay

43confidential

Water BodiesOverlay

44confidential

Place Name

45confidential

Superimpose Wind Zone DataAnd Seismic data

46confidential

Elevation

47confidential

Contours with Elevation

48confidential

Land Use Land Cover Map

49confidential

Angle Point Towers

50confidential

Optimum Transmission Corridor

51confidential

Optimum Transmission Corridor

52confidential

This GIS Data is fed to Tower Design Software – PLS CAD / i Tower

53confidential

Tower Design and Foundation Details

This Entire Process helps in preparing the Techno CommercialProposals very quickly and accurately.

But of course there is lot of dependency on data from various sourcese. g. Forest Cover, Wind and Seismic data , Counter data, Land use, road and rail

Geo Spatial Technology for Reliance Metro Rail Business(Mumbai Metro One Pvt. Ltd.)

2 Projects in Mumbai 1 Project in Delhi

55confidential

55 of 19

Objective of having Centralized Geo-Database

Data management and collaboration helps organizations to leverage the power of its

distributed workforce and competencies in a centralized and unified manner, fostering quicker

turn-around times and better productivity, allowing the organizations to better plan their growth

strategies.

confidential56 confidential

Various Stakeholders

Reliance

Mumbai Municipality

Tata Power

Mahanagar Gas

MMRD

Maharashtra State

Govt.

MTNL

Telephone Companies

Need

Common

Landbase

57confidential

57 of 19

- Centralized Data:

� Alleviates redundant data

� Maintains all data in a central store

� Consolidates data in one foundation, providing a "single version of the truth" that all users

can access

- Portability:

� Provides a single interface between users and the information

� Use the same application across various different devices (Pdas, mobiles)

� Manageability:

� Integrate and maintain data from multiple sources and formats (SAP, RDBMS, CAD,

Spreadsheets, Bitmaps etc.)

� Currency:

� Changes reflected real-time

� Allows updated data to be of use more quickly

Benefits of having Centralized Geo-Database

58confidential

58 of 19

ISSUES DUE TO IMPROPER INPUTS

� All the Inputs received will have different scale and Projection System

� Cannot be accurately overlaid on the existing Land Base

� Improper Inputs will lead to errors during Construction Stage

� Attribute Data Mismatch between different Input Data

59confidential

59 of 19

Case In Point: Data from Resource 1

60confidential

60 of 19

Case In Point: Data from Resource 2

61confidential

61 of 19

Case In Point: Data Overlay causing discrepancy

As can be seen Geo Spatial Technology is being used in the

entire Power Sector Value chain –“Pit Head To Wall Socket “

Today , We in Reliance ADA Group spend more than 50-60% of our efforts in creating spatial data.

Actually we should be focusing more on Business Applications, System Integrations and BPR. Because only this would help us in addressing strategic challenges thro’decision support system.

Conclusion:

Is Geo Spatial Technology

Transforming “Common Man” or . . .

Uday KaleVice President (IT)Reliance EnergyIndia

ऐट�त

65confidential

Make it Affordable

66confidential

Make it plain and Simple

Learning from WIKI : When it started people laughed at the business model of Mr. Jimmy Wale the founder of WIKI, whose vision is “. . . Every one gets free access to the sum of all human knowledge”

Today WIKI is followed by Millions and Millions people.

68confidential

GIS for Common Man

Need To Change

Mind Set

Need To Change

Mind Set

PrivatizationPrivatization

AffordableAffordable

Simple To UseSimple To Use

Attract Young BloodAttract Young Blood

InnovativeInnovative

Thank You