D.O.NO.C/26/2008-MPLADS Date: 14.01.2009
Dear
The Ministry of Statistics & Programme Implementation has beenmonitoring the implementation of Member of Parliament Local AreaDevelopment Scheme (MPLADS). Hon’ble Minister for Statistics &PI (IC) hasconvened a meeting on 23 January 2009, at 2.00 PM in the ConferenceRoom No. 223 of the Ministry at Sardar Patel Bhawan, Parliament Street,New Delhi. A notice regarding the meeting has already been issued videletter of even number dated 26.12.2008. The main purpose of the meetingis to review the implementation status of MPLADS in various States/UTs.
The agenda items to be discussed during the aforementioned meetingare forwarded herewith and you are requested to participate with completeinformation to make the review meeting fruitful.
With regards,Yours sincerely,
(A.K. Choudhary)
Nodal Secretaries of all State Governments/UT Administrations
Copy to:-Chief Secretaries of all State Governments/UT Administrations
Annexure-1
POSITION OF STATES WHO HAVE GIVEN COMPLETE REPLY OF AUDITPARA FOR THE YEAR 1997 AND 2000
Audit para 1997 Audit para 2000(a) Arunachal Pradesh(b) Assam(c) Chhattisgarh(d) Goa(e) Gujrat(f) Himachal Pradesh(g) Haryana(h) Punjab(j) Sikkim(k) Tamil Nadu(l) Uttrakhand(m) Daman Dieu(n) Chandigarh(o) Dadar Nagar Haveli (DNH)(p) Delhi(q) Pondicherry
(a) Arunachal Pradesh(b) Assam(c) Chhattisgarh(d) Gujrat(e) Haryana(f) Meghalaya(g) Sikkim(h) Uttrakhand(j) West Bengal(k) Chandigarh(l) DNH(m) Daman Dieu
STATEWISE RELEASE OF FUNDS/EXPENDITURE OF MEMBER OF PARLIAMENT as on 31/12/2008
Released by G.O.I
Amount Sanctioned
Expenditure Incurred
STATE % Utilisation
over Release
Sl.No
(Rs. Crore)(Rs. Crore) (Rs. Crore)
%Sancti-oned over
Release
Amount available with Nodal District
with Interest etc.(Rs. Crore)
Unspent Balance
(Rs. Crore)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Nominated 246.97 215.931 81.4793.18265.05 267.86 51.93
Andhra Pradesh 1503.08 1353.932 90.54100.511495.45 1524.79 170.86
Arunachal Pr. 74.20 73.863 96.9997.4476.15 77.03 3.18
Assam 512.18 489.614 92.2896.54530.55 540.38 50.77
Bihar 1234.14 1143.095 83.0289.631376.90 1399.88 256.79
Goa 75.07 65.456 90.71104.0572.15 76.40 10.95
Gujarat 898.59 815.497 90.6899.92899.35 922.28 106.79
Haryana 352.95 335.738 89.7194.31374.25 381.73 45.99
Himachal Pr. 169.95 157.789 90.5297.50174.30 178.61 20.83
Jammu & Kashmir 221.20 193.7810 90.22102.98214.80 219.07 25.28
Karnataka 936.50 885.7811 93.2498.58950.00 973.38 87.60
Kerala 719.52 586.9112 92.43113.32634.95 667.16 80.25
Madhya pradesh 1013.85 945.2313 92.6199.341020.60 1041.95 96.73
Maharashtra 1650.14 1431.3614 90.89104.791574.75 1633.49 202.13
Manipur 71.37 70.1515 89.7691.3278.15 78.58 8.43
Meghalaya 71.69 70.4816 92.5694.1476.15 77.26 6.78
Mizoram 50.62 50.1917 98.2299.0651.10 51.46 1.27
Nagaland 41.10 41.1018 82.0482.0450.10 50.17 9.07
Orissa 751.83 705.4119 90.5596.51779.05 792.83 87.42
Punjab 482.44 455.2720 92.8198.35490.55 499.99 44.72
Rajasthan 876.23 822.5321 94.08100.23874.25 887.08 64.55
Sikkim 53.06 49.7222 95.44101.8452.10 52.97 3.25
Tamil Nadu 1475.33 1411.6623 96.80101.161458.35 1488.05 76.39
Tripura 72.30 69.0824 93.1697.5074.15 74.47 5.40
Uttar Pradesh 2637.83 2493.0325 89.7494.952778.20 2812.26 319.23
West Bengal 1291.95 1195.5726 89.9797.221328.85 1360.53 164.97
A & N Islands 21.55 21.5527 93.4993.4923.05 23.59 2.04
Chandigarh 27.49 22.9628 95.46114.3224.05 24.68 1.72
D & N Haveli 26.61 24.3129 97.04106.2325.05 25.69 1.38
Daman & Diu 26.39 24.1930 92.85101.3226.05 26.16 1.97
Delhi 207.73 170.4931 89.26108.76191.00 198.84 28.35
Lakshdweep 19.29 15.9132 83.51101.2419.05 20.90 4.99
Pondicherry 48.32 38.3433 93.28117.5641.10 43.74 5.40
Chhattisgarh 373.07 351.7634 91.6997.24383.65 391.07 39.30
Uttaranchal 172.56 156.3535 86.2695.20181.25 183.77 27.42
Jharkhand 411.31 388.2436 86.1391.25450.75 456.88 68.64
Total : 18818.40 17342.21 90.7298.4519115.25 19524.98 2182.77
NIC - M/O S&PI.
STATEWISE RELEASE OF FUNDS/EXPENDITURE OF MEMBER OF PARLIAMENT (LOK SABHA) as on 31/12/2008
Released by G.O.I
Amount Sanctioned
Expenditure Incurred
STATE % Utilisation
over Release
Sl.No
(Rs. Crore)(Rs. Crore) (Rs. Crore)
%Sancti-oned over
Release
Amount available with Nodal District
with Interest etc.(Rs. Crore)
Unspent Balance
(Rs. Crore)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Nominated 46.50 36.981 76.2695.8848.50 48.85 11.87
Andhra Pradesh 1075.69 973.102 91.97101.671058.05 1080.84 107.74
Arunachal Pr. 49.09 49.093 97.9997.9950.10 50.73 1.64
Assam 346.02 333.314 93.4497.01356.70 363.59 30.28
Bihar 871.81 820.105 83.3588.60983.95 1000.61 180.51
Goa 53.54 45.496 92.65109.0549.10 51.99 6.49
Gujarat 652.69 601.607 93.52101.46643.30 659.40 57.80
Haryana 241.85 234.778 91.8994.66255.50 261.52 26.75
Himachal Pr. 101.15 95.559 94.4199.95101.20 104.03 8.48
Jammu & Kashmir 137.46 122.4010 90.47101.59135.30 138.19 15.79
Karnataka 664.77 627.2211 94.2699.91665.40 684.46 57.24
Kerala 514.70 426.8112 95.48115.14447.00 471.51 44.69
Madhya pradesh 735.70 684.0413 94.04101.14727.40 743.64 59.60
Maharashtra 1212.99 1066.4614 93.28106.101143.30 1187.43 120.97
Manipur 46.16 45.5715 87.4788.6052.10 52.34 6.77
Meghalaya 48.08 47.2916 92.5494.0851.10 52.11 4.83
Mizoram 25.12 25.1217 96.4396.4226.05 26.24 1.12
Nagaland 19.05 19.0518 76.0576.0525.05 25.05 6.00
Orissa 519.35 500.7019 93.9397.43533.05 542.85 42.15
Punjab 322.05 302.6620 93.2399.20324.65 329.91 27.25
Rajasthan 645.54 607.5921 95.50101.46636.25 646.61 39.01
Sikkim 26.77 25.4122 97.52102.7826.05 26.51 1.11
Tamil Nadu 1020.02 975.9523 97.21101.601003.95 1024.70 48.75
Tripura 48.28 46.4024 92.6196.3650.10 50.34 3.94
Uttar Pradesh 1931.07 1849.1825 91.4195.462023.00 2049.87 200.69
West Bengal 947.33 882.4326 91.9298.68960.05 983.32 100.88
A & N Islands 21.55 21.5527 93.4993.4923.05 23.59 2.04
Chandigarh 27.49 22.9628 95.46114.3224.05 24.68 1.72
D & N Haveli 26.61 24.3129 97.04106.2325.05 25.69 1.38
Daman & Diu 26.39 24.1930 92.85101.3226.05 26.16 1.97
Delhi 151.17 126.1831 93.22111.69135.35 141.41 15.23
Lakshdweep 19.29 15.9132 83.51101.2419.05 20.90 4.99
Pondicherry 26.72 20.6833 93.78121.1922.05 23.41 2.73
Chhattisgarh 266.48 254.4934 93.0397.42273.55 279.38 24.89
Uttaranchal 121.61 115.9335 91.8396.32126.25 128.09 12.16
Jharkhand 315.89 303.8036 86.6390.07350.70 354.73 50.94
Total : 13305.98 12374.27 92.3499.2913401.35 13704.69 1330.41
NIC - M/O S&PI.
STATEWISE RELEASE OF FUNDS/EXPENDITURE OF MEMBER OF PARLIAMENT(RAJYA SABHA) as on 31/12/2008
Released by G.O.I
Amount Sanctioned
Expenditure Incurred
STATE % Utilisation
over Release
Sl.No
(Rs. Crore)(Rs. Crore) (Rs. Crore)
%Sancti-oned over
Release
Amount available with Nodal District
with Interest etc.(Rs. Crore)
Unspent Balance
(Rs. Crore)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Nominated 200.47 178.951 82.6492.57216.55 219.01 40.06
Andhra Pradesh 427.40 380.832 87.0797.71437.40 443.95 63.12
Arunachal Pr. 25.10 24.763 95.0596.3726.05 26.30 1.54
Assam 166.15 156.304 89.9095.57173.85 176.79 20.49
Bihar 362.33 322.995 82.2092.21392.95 399.27 76.28
Goa 21.53 19.966 86.5993.3923.05 24.42 4.46
Gujarat 245.89 213.897 83.5396.03256.05 262.88 48.99
Haryana 111.10 100.968 85.0293.56118.75 120.21 19.25
Himachal Pr. 68.80 62.239 85.1394.1173.10 74.58 12.35
Jammu & Kashmir 83.74 71.3810 89.79105.3479.50 80.88 9.49
Karnataka 271.73 258.5611 90.8595.48284.60 288.92 30.36
Kerala 204.83 160.0912 85.18108.98187.95 195.65 35.56
Madhya pradesh 278.15 261.1913 89.0894.87293.20 298.32 37.13
Maharashtra 437.15 364.9014 84.58101.32431.45 446.06 81.16
Manipur 25.21 24.5815 94.3496.7726.05 26.23 1.66
Meghalaya 23.61 23.2016 92.6194.2725.05 25.15 1.96
Mizoram 25.50 25.0717 100.08101.8025.05 25.22 0.15
Nagaland 22.05 22.0518 88.0288.0225.05 25.12 3.07
Orissa 232.47 204.7119 83.2194.50246.00 249.98 45.27
Punjab 160.39 152.6120 91.9996.68165.90 170.08 17.47
Rajasthan 230.69 214.9421 90.3196.93238.00 240.48 25.54
Sikkim 26.29 24.3222 93.35100.9026.05 26.45 2.14
Tamil Nadu 455.31 435.7123 95.89100.20454.40 463.36 27.64
Tripura 24.02 22.6824 94.3099.8924.05 24.13 1.45
Uttar Pradesh 706.77 643.8625 85.2693.59755.20 762.39 118.54
West Bengal 344.62 313.1326 84.9193.44368.80 377.22 64.08
Delhi 56.56 44.3127 79.62101.6355.65 57.43 13.12
Pondicherry 21.59 17.6628 92.69113.3519.05 20.33 2.67
Chhattisgarh 106.59 97.2729 88.3596.81110.10 111.69 14.42
Uttaranchal 50.95 40.4230 73.4992.6455.00 55.68 15.26
Jharkhand 95.43 84.4431 84.4095.38100.05 102.15 17.70
Total : 5512.43 4967.93 86.9496.475713.90 5820.30 852.36
NIC - M/O S&PI.
Release by G.O.I
Unsanctioned Balance
Actual Expenditure
Incurred Name of State
% Utilisation over ReleaseSl.No. (Rs. Crore) (Rs. Crore) (Rs. Crore)
Interest Accured
(Rs.Crore)
Total
(Rs. Crore)
Works Recommended No. Cost
(Rs.Crore)
Works Sanctioned
No. Cost(Rs. Crore)
No. of Works Completed
Transfer from OLD
MP(Rs.Crore)
SUMMARY STATEMENT FOR RELEASE/EXPENDITURE OF LOK SABHA & RAJYA SABHA MPs as on 31/12/2008
Nominated 2.81 2.31 5742 255.55 5201 4172246.97 215.93 81.471 267.86 20.89265.05Andhra Pradesh 29.34 4.57 111426 1614.01 105986 931331503.08 1353.93 90.542 1524.79 21.711495.45Arunachal Pr. 0.88 0.00 2117 86.05 1879 173274.20 73.86 96.993 77.03 2.8376.15Assam 9.83 1.51 44398 517.55 43496 39314512.18 489.61 92.284 540.38 28.20530.55Bihar 22.98 7.75 64998 1444.47 48258 424421234.14 1143.09 83.025 1399.88 165.751376.90Goa 4.25 1.76 1038 88.10 834 66775.07 65.45 90.716 76.40 1.3372.15Gujarat 22.93 1.17 103366 1013.61 88632 82108898.59 815.49 90.687 922.28 23.69899.35Haryana 7.48 1.24 34837 388.97 28825 26017352.95 335.73 89.718 381.73 28.77374.25Himachal Pr. 4.31 0.10 20502 179.16 19852 15091169.95 157.78 90.529 178.61 8.66174.30Jammu & Kashmir 4.27 0.00 13972 238.49 12981 10842221.20 193.78 90.2210 219.07 -2.13214.80Karnataka 23.38 0.06 52090 985.31 49888 43656936.50 885.78 93.2411 973.38 36.87950.00Kerala 32.21 1.66 25355 819.25 20988 18324719.52 586.91 92.4312 667.16 -52.37634.95Madhya pradesh 21.35 0.17 87286 1193.78 73106 663181013.85 945.23 92.6113 1041.95 28.101020.60Maharashtra 58.74 4.03 87074 1974.92 56687 505061650.14 1431.36 90.8914 1633.49 -16.651574.75Manipur 0.43 0.00 5378 72.76 4800 432071.37 70.15 89.7615 78.58 7.2178.15Meghalaya 1.11 0.15 5048 74.74 4810 426071.69 70.48 92.5616 77.26 5.5876.15Mizoram 0.36 0.00 4427 50.62 4427 432850.62 50.19 98.2217 51.46 0.8451.10Nagaland 0.07 0.00 1712 42.10 1682 167641.10 41.10 82.0418 50.17 9.0750.10Orissa 13.78 5.08 84469 810.36 76510 71838751.83 705.41 90.5519 792.83 41.00779.05Punjab 9.44 5.35 59821 507.64 56624 51147482.44 455.27 92.8120 499.99 17.55490.55Rajasthan 12.83 3.37 68365 932.15 64921 60470876.23 822.53 94.0821 887.08 10.85874.25Sikkim 0.87 0.17 1024 53.34 1024 97653.06 49.72 95.4422 52.97 -0.0952.10Tamil Nadu 29.70 11.03 70785 1518.27 68499 651211475.33 1411.66 96.8023 1488.05 12.721458.35Tripura 0.32 0.29 1521 73.87 1517 135172.30 69.08 93.1624 74.47 2.1774.15Uttar Pradesh 34.06 14.37 126841 2708.83 123039 1159352637.83 2493.03 89.7425 2812.26 174.432778.20West Bengal 31.68 2.32 62906 1357.52 60600 527351291.95 1195.57 89.9726 1360.53 68.581328.85A & N Islands 0.54 0.00 680 22.10 650 60621.55 21.55 93.4927 23.59 2.0423.05Chandigarh 0.63 0.00 1281 33.24 748 65827.49 22.96 95.4628 24.68 -2.8124.05D & N Haveli 0.64 0.00 1104 28.61 911 89526.61 24.31 97.0429 25.69 -0.9225.05Daman & Diu 0.11 0.00 1347 61.87 574 52526.39 24.19 92.8530 26.16 -0.2326.05Delhi 7.84 0.00 6790 212.12 6784 6330207.73 170.49 89.2631 198.84 -8.89191.00Lakshdweep 1.85 0.00 102 19.29 34 1719.29 15.91 83.5132 20.90 1.6119.05Pondicherry 2.64 2.35 1713 64.57 1104 101648.32 38.34 93.2833 43.74 -4.5741.10Chhattisgarh 7.42 1.19 37020 480.52 27702 25371373.07 351.76 91.6934 391.07 17.99383.65Uttaranchal 2.52 0.00 15014 178.63 14584 12793172.56 156.35 86.2635 183.77 11.22181.25Jharkhand 6.13 1.19 24400 471.39 20168 18316411.31 388.24 86.1336 456.88 45.56450.75TOTAL 409.73 73.18 1235949 20573.76 1098325 99500618818.40 17342.2119115.25 19524.98
Review Meeting on Implementation of MPLADSin States/UTs
23rd January, 2009 at 2.00 p.m.
under the Chairmanship of
Shri G. K. Vasan, Hon’ble MOS (IC)
AGENDA NOTE
Ministry of Statistics and Programme Implementation
CONTENTS
Sl. No. Subject Page No.
1. Follow up action on the minutes of the meeting held on10.04.2008.
2. Items for discussion
(i) MPLADS implementation status - physical and financial. 1.(ii) Pending Documents required for release of MPLADS Funds. 3.(iii) C&AG Audit Paragraphs.
(iv) Tsunami reconstruction/rehabilitation works.(v) Bihar floods reconstruction/ rehabilitation works.(vi) State level Monitoring Committees.(vii) Updation/furnishing of data on MPLADS Software.(viii) Training of District Officials.(ix) Best Practices of implementation by the State/UTs Nodal(x) Departments.(xi) Revision of Guidelines.(xii) Any other item with the permission of the Chair.
Annexure-I-A State-wise release of funds/expenditure in MPLADSincluding State-wise ranking as on 31.12.2008.
Annexure-I-B State-wise release of funds/expenditure of Member of Parliament (Lok Sabha) as on 31.12.2008
Annexure-I-C State-wise release of funds/expenditure of Member of Parliament (Rajya Sabha) as on 31.12.2008
Annexure-I-D Summary Statement for release/expenditure and works recommended/works sanctioned of both Lok Sabha and Rajya Sabha Members of Parliament as on 31.12.2008.
Annexure –II Pending Documents pertaining to release of MPLADS Funds.
Annexure –III C&AG Audit Paragraphs.Annexure –IV Tsunami reconstruction/rehabilitation worksAnnexure –V Bihar floods reconstruction/ rehabilitation works.Annexure –VI State level Monitoring Committees.Annexure –VII Updation/furnishing of data on MPLADS Software.Annexure –VIII Training of District Officials.
AGENDA NOTES
REVIEW MEETING WITH THE SECRETARIES OF THESTATE GOVERNMENTS/UNION TERRITORIES ONMPLADS AT 2.00 P.M on 23.01.2009.
Background
As per para 6.2 of the MPLADS Guidelines, the Ministry of Statistics & ProgrammeImplementation will hold meetings in the States and also at the Centre at least once in a yearto review the implementation of the MPLAD Scheme. To ensure better monitoring, theMinistry of Statistics & Programme Implementation holds review meetings at the Centretwice a year. Seven such meetings have been held on 11.7.05, 16.12.05, 28.7.06,15.12.2006, 23.07.07, 04.12.2007 and 10.04.2008.
1. FOLLOW UP ACTION ON THE MINUTES OF THEMEETING HELD ON 10.04.2008.
The deadlines fixed for completion of uploading of pending data on MPLADS website(30.06.2008) and forwarding of complete replies of CAG paras have not beencomplied with by many States. No data has been uploaded in respect of 10 districts.The data uploaded by other districts is also incomplete and not up-to-date (detailsare at Annexure-VII). The status of replies to CAG paras in respect of Audit Para1997 and 2000 are placed at Annexure-III.
The Hon’ble Minister mentioned that many States/UTS have still not conducted anytraining programme on MPLADS Guidelines. The defaulting States/UTs to send theirproposal to the Ministry for financial and other assistance for conducting thesetraining As on date-12 States/UTs viz. namely Bihar, Goa, Himachal Pradesh,Jammu & Kashmir, Manipur, Nagaland, A&N Islands, Chandigarh, D&NHaveli, Daman & Diu, Delhi and Pondicherry have not yet sent their proposals.The Hon’ble Minister also expressed his concern over the inordinate delay incompletion of the pending Tsunami works. Tsunami works are still pending in theStates of Andhra Pradesh, Tamil Nadu, Andaman & Nicobar Islands and Kerala.
The Hon’ble Minister also directed the State representatives to conduct meetingsof the State Level Monitoring Committee and send the minutes to the Ministry. SixStates/UTs have not yet constituted the said Committees (Annexure –VI).
2. ITEMS FOR DISCUSSION
(i). MPLADS IMPLEMENTATION STATUSPHYSICAL AND FINANCIAL
Physical Status – As on 31.12.2008, 12.36 lakh works have beenrecommended by the Members of Parliament and District Authorities havesanctioned 10.98 lakh works. The numbers of works completed have beenreported as 9.95 lakh. The percentage of works completed to sanctioned at thenational level is 90.59. The State-wise details are given Annexure-ID
Financial Status - As on 31.12.2008, Rs.19115.25 crore have been releasedsince inception of the Scheme and as reported from the Districts, an expenditureof Rs.17342.21 crore has been incurred. The unspent balance lying with theDistrict Authorities is Rs. 2182.77 crore. The percentage utilization over release is90.72% The ranking of the States based on percentage utilization of MPLADSfunds is indicated in the enclosed statement (Annexure-IA).The latest status (upto 31.12.2008) will be discussed in the meeting.
(ii) . Pending Documents pertaining to release of MPLADS Funds.
The Nodal Secretaries of all State/UT Governments have been requested to send the pending documents required for release of MPLADS funds. The details (Annexure-II) of pending documents are indicated in the State profiles.
(iii). C&AG Audit Paragraphs
The Comptroller and Auditor General of India has so far submitted two AuditReports on Member of Parliament Local Area Development Scheme (MPLADS),one for the period ending March 1997 and the other for the period endingMarch, 2000.
C&AG Report 1997
There are 34 audit paras in the first report. It contains the result of the reviewof implementation of the MPLAD Scheme from inception in 1993-94 to 1996-97in 24 States and 6 Union Territories through sample checks in 165 of the 488districts.
Complete replies have been received only from Arunachal Pradesh, Gujarat,Uttarakhand, Chandigarh, Dadra and Nagar Haveli, Daman & Diu, Delhi andPuducherry.
C&AG Report 2000
There are 45 audit paras in the second report, which covered the period from1997-98 to 1999-2000 and reviewed the implementation of the scheme in 26States and 4 Union Territories through sample checks in 241 out of 786constituencies.
Complete replies have been received only from Haryana, Arunachal Pradesh,Gujarat, Uttarakhand and Daman & Diu.
DG (Audit) has intimated that complete replies are to beforwarded alongwith remedial measures taken to avoidrecurrence of such lapses. As the reply to DG (Audit) canbe forwarded only on receipt of complete replies from allStates on all audit objections, the remaining paras needto be replied satisfactorily by the Districtauthorities/State/UT Govts on priority.
It is therefore requested that complete replies in respect of all pendingparas of 1997 and 2000 Reports be submitted latest by 20.02.2009.
(iv). Tsunami rehabilitation/ reconstructionworks under MPLADS
57 works to the tune of Rs.2189.30 lakh consented by Lok Sabha MPs and130 works to the tune of Rs.3134.30 lakh consented by Rajya Sabha MPswas been earmarked in the tsunami affected areas of A&N Islands, Tamil Nadu,Puducherry, Andhra Pradesh and Kerala.
As per the latest report received, 49 Lok Sabha works and 110 Rajya SabhaWorks have been completed.
7 Lok Sabha works are in progress. One Lok Sabha work to the tune of Rs.10lakh in Prakasham District (Providing PWS Scheme, Karedu) has been cancelledand the fund has been returned to the Nodal District of the MP.
19 Rajya Sabha works are in progress. One work, namely, construction of ‘newpond and drain water augmentation’ at Mulloothurai in Kanyakumari District hasbeen cancelled due to site problem.
The details of ongoing and cancelled/not yet started works are at Annexure-IV.
The concerned Nodal Secretaries of the States/UTs are requested to ensure thatthe ongoing works are completed within the targeted dates.
(v) BIHAR FLOOD REHABILITATION WORKSIn view of the extensive damage caused by the unprecedented and devastating
floods in Bihar, particularly in the districts of Madhepura, Supaul, Saharsa,Purnia, Katihar and Araria, the Ministry of Home Affairs (Disaster Management-I
Division) declared the natural calamity in the state of Bihar as a “Calamity ofsevere nature” vide letter No. 4-4/2008-NDM-I dated 2nd September, 2008.
Para 2.8 of MPLADS Guidelines provides that “In the event of “Calamity of severenature” in any part of the country, an MP can recommend works up to amaximum of Rs.50 lakh for the affected district. Whether a calamity is of severenature or not, will be decided by the Government of India. The funds in thisregard will be released by the District Authority of Nodal district of the MPconcerned to the District Authority of the affected district to get permissibleworks done. The Works Completion Report, Utilization Certificate and AuditCertificate for such works and funds will be provided by the District Authority ofthe affected districts to the respective District Authority of Nodal district fromwhom the funds were received”.
Hon’ble Chairman, Rajya Sabha and Hon’ble Speaker, Lok Sabha on 3.9.2008appealed to the MPs to contribute Rs.10 lakh each from their MPLADS funds forreconstruction projects as permissible under MPLADS Guidelines. Hon’bleMOS(IC), S&PI vide letter dated 11.9.2008 appealed to all MPs to indicate theamount they would wish to contribute for such works as permissible under theMPLADS Guidelines latest by 30th September,2008. They were also asked toindicate the specific district(s) where such works may be undertaken, if they sodesire.
In response to the aforesaid appeals, 155 Lok Sabha MPs have contributedRs.21.95 crore and 149 Rajya Sabha MPs have contributed Rs.20.46 croretowards Bihar Flood Relief so far.
The state Govt. was asked by this Ministry to furnish the list of rehabilitationworks to be undertaken in the flood affected areas with MPs contribution. TheState Government proposed the following works:-
(a) Disaster Shelter (one for every two panchayat) Total units=206
Land@ 7.5 lacs per acre and 75 lacs per unit Cost of 206 units =Rs.15450.00 lacs
(b) Multipurpose Community Center (One for each 1000 population)
Total units=2100 Land@ 7.5 lacs per acre and 45 lacs per unit
Cost of 2100 units = Rs.102375.00 lacs.
(c) Cattle Shed (one for each 1000 population) Total units=2100
Land@ 7.5 lacs per acre and 20.00 lacs per unit Cost of 2100 units =Rs. 49875.00 lacs.
Total Cost = Rs.167700.00 lacs
On noticing that cost of land (prohibited under the MPLADS Guidelines) is alsoincluded in the estimated cost, this Ministry asked the State Government tofurnish list of eligible works, vide letter dated 12.11.2008 without including thecost of land. However, the State Govt. has again submitted the same proposaleven after the visit of the Parliamentary Committee (RS) on MPLADS to Bihar.This Ministry, vide do. letter dated 15.12.2008, has asked for the list of eligibleworks under MPLADS Guidelines, as suggested by the Rajya Sabha Committee
during its visit to the State, alongwith place/location of the works and cost(excluding the cost of land) for rehabilitation and reconstruction of the floodaffected areas of Bihar, from the Govt. of Bihar. Reminder was sent on2.01.2009. However, the requisite information is still awaited from the StateGovt.
(vi). Role of the State/UT GovernmentMonitoring CommitteesIn the earlier meetings, the participants from the State Govts./UTs wererequested to intimate the status in respect of action taken in compliance of para6.3 of the Guidelines.
It is noted that 6 States/UT namely, Maharashtra, Jammu & Kashmir,Chandigarh, Dadra and Nagar Haveli, Daman & Diu and Mizoram, havenot yet constituted the Monitoring Committee for effective supervision ofMPLADS implementation in their States. Many States/UTs namely though haveconstituted the Committees but have not held any meeting of the Committees.The State-wise details are enclosed in Annexure-VI.
(vii). Work Monitoring Software
In November, 2004, the works monitoring software was launched onthe MPLADS website, i.e., www.mplads.nic.in. The requisite softwaredeveloped by NIC was supplied to all the District Authorities with therequest to upload the information pertaining to all MPLAD sanctionedworks w.e.f. 1st April, 2005. It has been observed that despitedeadlines given and agreed to by all the Nodal Secretaries/DistrictAuthorities of States and UTs, either the information has not beenuploaded or in cases where the same has been uploaded, theinformation is incomplete and not up-to-date. Due to this, the Ministryis put in a very embarrassing position at various fora as information isnot readily available to the public at large defeating the basic purposefor which this website was created.
Out of the 430 nodal districts, data has been uploaded from 420 districts. 10districts viz. Darbhanga, Khagaria, Kishanganj, Banka in Bihar, Baramullah,Kathua, Leh in Jammu & Kashmir, Imphal (East) in Manipur and Kohima inNagaland have not uploaded any data even after four years of the launch of theSoftware Manual for Monitoring of works under MPLADS.
As on 31.12.2008, data in respect of 1959 MPs have been uploaded. Of these,1474 belong to the Lok Sabha (current and previous periods), with 520belonging to the 14th Lok Sabha and 954 belonging to the previous Lok Sabha.Data in respect of 485 Rajya Sabha MPs (sitting and previous) have beenentered, of which 168 are of sitting MPs and 317 are of previous MPs. Thedetails are at Annexure-VII.
Hon’ble Minister had, in the meeting of 4th December, 2007 desired theStates/UTs to complete the uploading in the MPLADS Software by 30.06.2008.This needs to be completed on priority latest by 31.03.2009.
As this matter cannot be kept pending further because of the need andrequirement of data to be made available on this website, MOSPI
impresses upon all States/UTs to ensure that complete, accurate up-to-date information may be uploaded in the specified proformae of theworks monitoring software already available with the DistrictAuthorities by 30th June, 2008. The Guidelines do provide for utilizationof 0.5% as contingency expenses with regard to expenditure incurredon operationalisation of the works monitoring software.
(viii). Training of District Officials
Many States/UTS have still not conducted ant training programme on MPLADSGuidelines. In the last meeting held on 10.04.2008, the Hon’ble Minister askedthe defaulting States/UTs to send their proposal to the Ministry for financialand other assistance for conducting these training As on date 12 States/UTs,namely Bihar, Goa, Himachal Pradesh, Jammu & Kashmir, Manipur,Nagaland, A&N Islands, Chandigarh, D&N Haveli, Daman & Diu, Delhiand Pondicherry have not yet sent theirproposals. The details are indicated inAnnexure-VIII.
(ix) Best practices of implementation by the State/UT Nodal Departments
The MPLADS Division proposed to bring out a booklet depicting some of the“Best Works/Projects” implemented under MPLADS and “Best Practices” adoptedby the States/UTs Government for execution of these works for emulation byother States/UTs. In this regard the Nodal Secretaries of all States/UTsGovernment were requested vide letter dated 30.07.2008,(i) to furnishinformation on innovative practices/features leading to better Implementationand positive impact/perception about the Scheme among the local communityand (ii) to furnish details on ten best MPLADS works covering both big and smallworks in different sector. Despite reminders dated 30.10.2008 (p-168/C.) and08.12.2008 (P-206/C.) only following eight States/UTs have forwarded therequisite details 1. A&N Islands2 .Haryana3. Uttar Pradesh4. West Bengal5. Madhya Pradesh6. Arunachal Pradesh7 .Lakshdweep.8. Orrisa
(x). Revision of MPLADS GuidelinesThe Ministry of Statistics and Programme Implementation is administering theMember of Parliament Local Area Development Scheme (MPLADS). This Schemewas announced on 23rd December, 1993. This Scheme is governed by a set ofGuidelines issued from time to time. The first set of Guidelines was prepared bythe Ministry of Rural Development, in February 1994, who initially handled theScheme. Subsequently, the Scheme was transferred to this Ministry. ThisMinistry has revised the Guidelines in December 1994, February 1997,September 1999, April 2002 and November 2005.
During the course of review meetings taken by Hon’ble MOS (S&PI) and seniorofficers of this Ministry various suggestions were made for further amendment ofthe Guidelines. Some MPs have also requested for revision of some provisions ofthe Guidelines. An exercise has now been undertaken for further revision ofGuidelines as some clarifications have been issued from time to time and acompendium of clarifications was also brought out. In this regard, the NodalSecretaries of State/UT Governments have been requested vide letters dated 27th
May, 2008 and 26th June, 2008 to send their suggestions/views for revision ofGuidelines based upon their experience of implementation of the Scheme andinteractions/dialogues with DMs/DCs. In reply, only following 13 States/UTShave forwarded their suggestions:-1. Karnataka2. Orissa3. West Bengal4. Chandigarh5. Rajasthan6. Assam7. Arunachl Pradesh8. Himanchal Pradesh9. Madhya Pradesh10. Maharshtra11. Uttar Pradesh12. Uttranchal13. Meghalaya
(xi). Any other issue with the permission of theChair
-STATUS ON C&AG PARA on 12 January 2009
Status of Audit Paras for the yearSrNo
State/UT No ofAuditparaCAGReport 1997
No ofAuditParaCAGReport 2000
TotalNo ofAuditCAGParas
Audit Para 1997 Audit Para 2000
Completereplyreceived
Partialreplyreceived
CompleteReply
received
Partialreplyreceived
1. AndhraPradesh
14 14 28 10 04 01 13
2. Aruna ChalPradesh
03 06 09 03 - 06 -
3. Assam 11 20 31 11 - 20 -4. Bihar 10 15 25 03 07 - 155 Chattisgarh - 16 16 - - 16 -6 Goa 02 05 07 02 - 03 027 Gujarat 06 17 23 06 - 17 -8 Himachal
Pradesh07 10 17 07 - 08 02
9. Haryana 12 13 25 12 - 13 -10 J&K - 07 07 - - 03 0411 Jharkhand 08 11 19 02 06 10 0112 Karnataka 10 12 22 05 05 09 0313 Kerala 08 09 17 03 05 03 0614 Madhya
Pradesh08 16 24 07 01 11 05
15 Maharashtra 10 08 18 04 06 05 0316 Manipur 13 13 26 08 05 09 0417 Meghalaya 09 09 18 08 01 09 -18 Mizoram 09 10 19 06 03 04 0619 Nagaland 09 10 19 03 06 - 1020 Orrissa 10 19 29 05 05 16 0321 Punjab 09 09 18 09 - 06 0322 Rajasthan 09 15 24 06 03 04 1123 Sikkim 05 06 11 05 - 06 -24 Tamil Nadu 13 14 27 13 - 12 0225 Tripura 09 11 20 07 02 09 02
26 Utter Pradesh 13 11 24 12 01 09 0227 Uttrakhand 08 04 12 08 - 4 -
28 West Bengal 13 14 27 12 01 14 -
29 A&N Islands 03 08 11 02 01 07 0130 Chandigarh 03 13 16 03 - 13 -31 D&N Haveli 05 02 07 05 - 02 -32 Damn & Diu 03 - 03 03 - - -33 Delhi 05 05 10 05 - 04 01
*34 Lakshdweep - - - - - - -
35 Pondicherry 13 09 22 13 - 08 01Total 270 361 631 208 62 261 100
• Lakshdweep did not figure in the CAG report.
Tsunami rehabilitation/reconstruction works under MPLADS(Lok Sabha)
As on 31-12-2008
Rs. inLakh
No. of worksNameof theState
District
Autho-rized
Cost Completed
Ongoing
Yetto bestarted/dropped
Expenditure
Nellore 3 22 3 -- -- 12.15
Prakasam 2 15 1 -- 1* 5.00
Guntur 1 18 1 -- -- 17.98
East Godavari 6 9 6 -- -- 9.00
West Godavari 1 20 1 -- -- 19.42
AndhraPradesh
Krishna 2 20 1 1 -- 9.50
Total 15 104 13 1 1 73.05
Kollam 1 100 -- 1 -- 30.15Kerala
Alappuzha 1 18 -- 1 -- --
Total 2 118 -- 2 -- 30.15
Kanyakumari 2 270 1 1 -- 232.50
Cuddalore 6 308 6 -- -- 306.90
Nagapattinam 21 289.5 20 1 -- 247.67
TamilNadu
Ramanathapuram
1 20 1 -- -- 20.00
Total 30 887.5 28 2 --807.07
A&N A&N Islands 5 854.80 3 2 -- 394.94
Puducherry
Puducherry 5 225 5 -- -- 225.00
Grand Total 57 2189.3 49 7 1 1530.2
0 1
*Project cancelled and the amount returned to DC, Karim Nagar.
(Rajya Sabha)As on 31-12-2008
Rs. in lakh
No. of worksNameof theState
District
Authorized
Cost Completed
Ongoing
Yet tobestarted/dropped
Expenditure
Nellore 6 24.0 4 2 -- 16.30
Prakasam 2 20.0 2 -- -- 16.95
WestGodavari
7 45.0 5 2 -- 39.93
AndhraPradesh
Krishna 6 60.0 1 5 -- 24.95
Total 21 149.0 12 9 -- 98.13
Kollam 1 45.0 -- 1 -- --
Alappuzha 2 75.0 1 1 -- 30.65
Kerala
Ernakulam 1 35.0 1 -- -- 20.89
Total 4 155.0 2 2 -- 51.54
Kanyakumari 11 250.5 10 -- 1 190.80
Cuddalore 10 397.5 9 1 -- 237.20
Nagapattinam
19 337.5 19 -- -- 337.50
Kancheepuram
1 45.0 1 -- -- 42.33
TamilNadu
Villupuram 45 204.0 45 -- -- 203.88
Total 86 1,234.5
84 1 11011.7
1
A&N A&N Islands 13 1,278. 6 7 -- 690.22
Pending Tsunami works authorized under MPLADS as on 31.12.2008
Andhra Pradesh
Out of 36 (15-LS & 21-RS) authorised Tsunami works under MPLADS,25 (13-LS & 12-RS) works have been completed. 1 work has beendropped while 10 works are under process.
Krishna DistrictRs. in Lakh
Sl.No.
Work Place Cost Statusof thework
Expenditure
1. Construction ofCyclone sheltercum UP Schoolbuilding
Gollapudum 10 Ongoing*
0.00
2. -do- Padatadika ofKruthivennu
10 Ongoing*
2.50
3. -do- Yesupuram ofNagayalanka
10 Ongoing*
2.50
4. -do- Krishnapuram ofNagayalanka
10 Ongoing*
2.65
5. -do- ZinkapalemofNagayalanka
10 Ongoing*
2.70
6. -do- Brahmarahgarimula ofNagayalanka
10 Ongoing*
5.00
* The executive agency could not take up the on-going work. Target date was30-06-2008. Expected date of completion was Nov.-Dec., 2008. No status reportsince July, 2008
Nellore DistrictRs. in Lakh
Sl.No.
Work Place Cost Status of thework
Expenditure
1. 5 Construction ofNet Mendingcentre
Bogole(Audinarayanapuram)
4 Ongoing *80% completed
1.21
2. 8 -do- Vakadu 4 Ongoing *80% completed
0.00
* Target date was 30-06-2008. Expected date of completion was report as30.9.2008. No status report since August, 2008.
West Godavari DistrictRs. in Lakh
Sl.No.
Work Place Cost Statusof thework
Expenditure
1&2 Constructionof CommunityHalls (2 ) –Rs.5 lakh each
1. Chinamynavanilanka
2. Pedamynavanilanka
55
Ongoing*Ongoing*
2.502.50
* Target date was 30-06-2008. Works got delayed due to rain. However,expected date of completion is 31-10-2008. No status report after August, 2008.
Kerala
6 works (2-LS & 4 –RS) were authorized in Kerala under MPLADS. Only2 works have been completed.
Kollam District (31-07-2008)Rs. in Lakh
Sl.No.
Work Place Cost
Status of the work Expenditure
1 C/o DisasterResistanceBuilding ofthe CHC atAlappad(Kollam)
Alappad
100 Ongoing *
40% completed.Out of 55 columns, 30 reached upto grade beam level. The site iswater logged. Pile cap & gradebeam to be constructed afterdewatering.
30.15
2 Old ageHome
Alappad
45 Ongoing
The work was held up due tointerruption of access to the worksite by the owner of the land dueto non-payment of cost ofapproach road. Now the paymenthas been effected. Work is inprogress and is expected to becompleted by 31.12.2008.
Notreporte
d
* Target date was 30-06-2008. Expected date of completion is 31.10.08. Nostatus report after July, 2008.
Alappuzha District (31-10-2008)Rs. in Lakh
Sl.No.
Work Place Cost
Status of the work Expenditure
1 Additional block forPublic Health Center
Arattupuzha
18 Ongoing *
Foundationcompleted. Brickwork started.
Notreported
Laying 3.2 Kms of 300sq. mm 11 KV XLPE UG
Alappuzha
40 80% workcompleted
Notreporte
cable from AlappuzhaSub Station toAlappuzha MedicalCollege Hospital situatedin the Tsunami affectedarea of ElectricalSection, AlappuzhaTown for providing astandby 11 KV feeder tothe Medical CollegeHospital.
(Due to price hike ofcable and labourcharges, theestimated cost hasbeen raised to Rs.61lakhs, for whichRs.21 lakhs havebeen pooled fromnormaldevelopmental fundof KSEB).
d
* Expected date of completion not reported. Target date was 30-06-2008.
Tamil Nadu
Out of 116 works (30-LS & 86-RS), 112 works have been completed,while one work has been cancelled.
Cuddalore District (30-07-2008)Rs. in Lakh
Sl.No.
Work Place Cost Status of the work Expenditure
1 Putting up HighLevel Bridge
UppanarBack water,Nochikadu
150.00
Ongoing*
7th call of tender fixedon 14.8.08. It is inretender stage.
0.00
*No status report after July, 2008.
Kanyakumari district (31-07-2008)Rs. in Lakh
Sl.No.
Work Place Cost Status ofthe work
Expenditure
1 Construction of fishlanding centre with RCCJetty atEnayamputhenthurai inKanniyakumari District
Simon Colony,EnayamPuthenthurai
150 Ongoing * 112.50
* Expected date of completion is 30.9.2008. Target date was 30-06-2008. Nostatus report after July,2008.
Nagapattinam District (31-03-2008)Rs. in Lakh
Sl.No.
Work Place Cost Status ofthe work
Expenditure
1 Construction of servicehome exclusively fortsunami victims
Nagapattinam,Sirkali
30 Ongoing * 0.00
*Target date was 30-04-2008. No status report after March, 2008.
A&N Islands
18 works (5-LS & 13-RS) were authorized in A&N Islands. 9 workshave been completed, while 9 works are under execution.
A&N Islands (31-10-2008) Rs. in Lakh
Sl.No.
Work Place Cost Statusof thework
Expenditure
1. Model Sr. Sec. Schoolhaving classes from I toXII with Hostel.
Kamorta Island 600.00
Ongoing,35%work iscompleted. #
243.78
2. Community Hall Joginder Nagar,Campbell Bay
68.34 15%completed.Foundation inprogress.Work isheld upfor wantof supplyof stall byANIDCO.
0.00
3. Transit Hostel for 50persons at Kamorta
Nancowry Groupof Islands
125.76
Ongoing,35%completed.
23.12
4. Transit Hostel atCampbell Bay
Great NicobarIslands
82.18 Ongoing,77%completed.
51.05
5. Model Sr. Sec. Schoolhaving classes from I toXII with hostel facility
Diglipur 554.60
Ongoing,33%completed.
250.86
6. Development ofPanchayat Fish Market
Bambooflat,Andaman District
10.09 Ongoing,80%completed. *
8.98
7. Construction of WorkShed
Hut Bay, LittleAndaman.
77.03 Ongoing,80%complete
16.03
d.8. Construction of Work
ShedNamunagharunderNamunagharGram Panchayat.
45.67 Ongoing,95%completed *IEI &flooringworks areleft, Workheld updue tostay byHighCourt.
45.67
9. Construction of WorkShed
Bambooflat JettyArea/BambooflatBazar underBambooflat GramPanchayat.
67.59 Ongoing,45%completed. *
1.52
# The probable date of completion is 31-07-2009. Tentative target date ofcompletion is 31-07-2009.* Target date and Expected date of completion is 31-09-2009.(*) Expected date of completion is 31-07-2009. Target date is 31-03-2009.
Puducherry
All works (11) authorized under MPLADS have been completed.
natural calamity in the state of Bihar as a “Calamity of severe nature” vide letterNo. 4-4/2008-NDM-I dated 2nd September, 2008.
Para 2.8 of MPLADS Guidelines provides that “ In the event of “Calamityof severe nature” in any part of the country, an MP can recommend works up toa maximum of Rs.50 lakh for the affected district. Whether a calamity is ofsevere nature or not, will be decided by the Government of India. The funds inthis regard will be released by the District Authority of Nodal district of the MPconcerned to the District Authority of the affected district to get permissibleworks done. The Works Completion Report, Utilization Certificate and AuditCertificate for such works and funds will be provided by the District Authority ofthe affected districts to the respective District Authority of Nodal district fromwhom the funds were received”.
Hon’ble Chairman, Rajya Sabha and Hon’ble Speaker, Lok Sabha on3.9.2008 appealed to the MPs to contribute Rs.10 lakh each from their quota ofMPLADS funds for reconstruction projects as permissible under MPLADSGuidelines. Hon’ble MOS(IC), S&PI vide letter dated 11.9.2008 appealed to allMPs to indicate the amount they would wish to contribute for such works aspermissible under the MPLADS Guidelines latest by 30th September,2008. Theywere also asked indicate the specific district(s) where such works may beundertaken, if they so desire.
In response to the aforesaid appeals, 155 Lok Sabha MPs havecontributed Rs.21.95 crore and 149 Rajya Sabha MPs have contributed Rs.20.46crore towards Bihar Flood Relief so far.
The state Govt. was asked by this Ministry to furnish the list ofrehabilitation works to be undertaken in the flood affected areas with MPscontribution. The State Govt has proposed the following works for examinationand submitting the recommendation of the Ministry to the Committee forconsideration:-
(a) Disaster Shelter(one for every two panchayat) Total units=206
Land@ 7.5 lacs per acre and 75 lacs per unit Cost of 206 units=Rs.15450.00 lacs(b) Multipurpose Community Center ( one for each 1000 population )
Total units=2100 Land@ 7.5 lacs per acre and 45 lacs per unit
Cost of 2100 units = Rs.102375.00lacs.(c) Cattle Shed (one for each 1000 population)
Total units=2100 Land@ 7.5 lacs per acre and 20.00 lacs per unit
Cost of 2100 units =Rs. 49875.00 lacs.
Total Cost =Rs.167700.00 lacs
On noticing that cost of land (prohibited under the MPLADSGuidelines) is also included in the estimated cost, this Ministry has intimated theposition to the State Govt. and asked them to furnish list of eligible works, videletter dated 12.11.2008. However, the State Govt. has again submitted thesame proposal subsequent to the visit of the Parliamentary Committee (RS) onMPLADS to Bihar. This Ministry, vide do. letter dated 15.12.2008, has asked forthe list of eligible works under MPLADS Guidelines, as suggested by the RajyaSabha Committee during its visit to the State, alongwith place/location of theworks and cost (excluding the cost of land) for rehabilitation and reconstructionof the flood affected areas of Bihar, from the Govt. of Bihar. Reminder was senton 2.01.2009. However, the requisite information is still awaited from the StateGovt.
Agenda Item No. (ii) & (iii) : On-line Month Progress Reports (MPR) and WorkMonitoring System
II. Online Monthly Progress Reports (MPRs) - The present MPLAD systemenvisages release of funds by MOSPI on the basis of MPRs being submitted bythe District Authorities containing financial and physical performance of MPLADworks and monitoring of works through the data being uploaded by the DistrictAuthrities on the work monitoring software. However, the late and incompletereceipt of MPRs results in delay in release of funds. Further, the present MPRsenable availability of only cumulative information on MPLADS both physical andfinancial information.
Many a times, the Ministry does require information with regard to releases,expenditure, work details (recommended, sanctioned, completed, not started,discontinued) year-wise, constituency/MP-wise, House-wise, State-wise, etc. totalas well as separately for Scheduled Castes and Scheduled Tribes (SCs/STs). Theabove information is also required for replying Parliament Questions and variousother queries raised by Ministries/Committees.As per the existing system, the hard copies of the MPRs are received fromDistrict Authorities. The cumulative data on physical and financial aspects arepunched in this Ministry for the purpose of release of funds and generation ofvarious reports. However, this does not meet the various requirements of thisMinistry as mentioned above.
Keeping these aspects in view, and the need for availability of on-line informationthrough MPRs, the Ministry has modified the existing MPR proforma andproposes to host the same on the MPLADS website with the request to all the
District Authorities to upload the data especially for the release of funds by theMinistry and also to have information (both physical and financial) pertaining toSC/ST areas. This would facilitate the faster release of funds and availability ofsome information as indicated above. However, the success would depend uponthe uploading of up-to-date complete information both present and past by theDistrict Authorities. While uploading the information, the District Authorities alsohave to ensure that the information is also consistent with the information beingfurnished by them till now.
Since the new system of submission of on-line MPR is likely to take some time,the MOSPI is constrained to continue with the existing system till the new systembecomes fully operationalized throughout the country.
In order to operationalize the new system at the earliest, the Ministry would liketo request all the Nodal Secretaries of States/UTs to ensure that all DistrictAuthorities must submit the accurate and complete information in the new MPRproforma w.e.f. 1st June, 2008 in hard copy and post this information on-linew.e.f. 1st September, 2008.
With a view to ensure that the system becomes fully operational on-line, theMinistry proposes to release funds only on the basis of on-line MPRs containingall information i.e. the Ministry would not release funds after 1st September, 2008on the basis of hard copies of MPRs and the entire responsibility of non-releaseof funds in such cases will lie with the concerned Secretaries/District Authoritiesof States/UTs. (Copy of the modified MPR is enclosed)
III. Work Monitoring Software
In November, 2004, work monitoring software was launched on theMPLADS website, i.e., www.mplads.nic.in. The requisite softwaredeveloped by NIC was supplied to all the District Authorities with therequest to upload the information pertaining to all MPLAD sanctionedworks w.e.f. 1st April, 2005. It has been observed that despitedeadlines given and agreed to by all the Nodal Secretaries/DistrictAuthorities of States and UTs, either the information has not beenuploaded or in cases where the same has been uploaded, theinformation is incomplete and not up-to-date. Due to this, the Ministryis put in a very embarrassing position at various fora as informationare not readily available to the public at large defeating the basicpurpose for which this website was created. This issue was alsodiscussed in the last meeting of the Demands For Grants of thisMinistry held in February, 2008.
Out of the 430 nodal districts, data has been uploaded from 420 districts. 10districts viz. Darbhanga, Khagaria, Kishanganj, Banka in Bihar, Baramullah,Kathua, Leh in Jammu & Kashmir, Imphal (East) in Manipur and Kohima inNagaland have not uploaded any data even after lapse of four years of thelaunch of Software Manual for Monitoring of works under MPLADS.
As on 31.03.2008, data in respect of 1686 MPs have been uploaded. Of these,1274 belong to the Lok Sabha (current and previous periods), with 513belonging to the 14th Lok Sabha and 761 belonging to previous Lok Sabha. Datain respect of 412 Rajya Sabha MPs (sitting and previous) have been entered,
of which 247 are of sitting MPs and 165 are of previous MPs. The details are atAnnexure-IB
Hon’ble Minister had, in the meeting of 4th December, 2007 desired theStates/UTs to complete the uploading in the MPLADS Software by 31.01.2008.But only four districts have uploaded the data since the last meeting. This needsto be completed immediately.
As this matter cannot be kept pending further because of the need andrequirement of data to be made available to this website, MOSPI impresses uponall States/UTs to ensure that the complete accurate up-to-date information maybe uploaded in the specified proformae of the work monitoring software alreadyavailable with the District Authorities by 30th June, 2008. It is also imperative tomention that the Guidelines do provide utilization of 0.5% as contingencyexpenses with regard to expenditure incurred on opertionalization of workmonitoring software.
Annexure - III
List of ongoing works and target dates reported
A. Lok Sabha Works
I. Andhra Pradesh
Nellore DistrictRs. in Lakh
Sl.No.
Work Place Cost Status of the work Target dateof ongoingworks
1 Completion of incomplete PWSScheme to Dugarajapatnam Villageof Vakadu Mandal.
Durgarajapatnam Vakadu
12 Ongoing --
Prakasam District
Sl.No.
Work Place Cost Status of the work Target dateof ongoingworks
1 Providing PWS Scheme toAlagayapalem and Alagayappattapupalem hamlets of Karedu Village ofUlavapadu Mandal’.
Karedu 10 Cancelled --
Krishna District
Sl.No.
Work Place Cost Status ofthe work
Target dateof ongoingworks
1 Construction of Cyclone shelter cumUP School building
Gollapudum 10 Ongoing 31.3.2008
2 Construction of Cyclone shelter cumCommunity Hall
Malakayalanka 10 Ongoing 31.3.2008
II. KeralaKollam District
Sl.No.
Work Place Cost Status of thework
Targetdate ofongoingworks
1 C/o Disaster Resistance Building ofthe CHC at Alappad (Kollam)
Alappad 100 Ongoing June, 2008
Alappuzha District (29.2.2008)
Sl.No.
Work Place Cost Status of thework
Targetdate ofongoingworks
1 Additional block for Public HealthCenter
Arattupuzha 18 Ongoing June, 2008
III. Tamil Nadu
Kanyakumari
Sl.No.
Work Place Cost Status of thework
Expenditure
1 Drediging of Chinnamuttom FishingHarbour and restoring ofinfrastructure facilities like generatorroom, water supply arrangements,aution hall, etc.
Chinnamuttom 120 Ongoing 31.1.2008
2 Construction of fish landing centrewith RCC Jetty atEnayamputhenthurai inKanniyakumari District
Simon Colony 150 Ongoing 3.4.2008
Nagapattinam District
Sl.No.
Work Place Cost Status of thework
Expenditure
1 Construction of service homeexclusively for tsunami victims
Nagapattinam 30 Ongoing 31.3.2008
2 Construction of orphanage buildingand shelter home for old agepersons
Nagapattinam 50 Ongoing 31.3.2008
IV. A&N Islands
Rs. in LakhSl.No.
Work Place Cost Status of thework
Targetdate ofongoingworks
1 Model Sr. Sec. School having classesfrom I to XII with Hostel.
Kamorta Island 592.62 Ongoing 31.07.2009
2 Community Hall Joginder Nagar, CampbellBay
68.34 Just started 31.12.2008
V. Puducherry
Sl.No.
Work Place Cost Status of thework
Targetdate ofongoingworks
1 Cyclone/ Tsunami Shelter Kilinjelmedu 45 Ongoing 28.2.2008
B. Rajya Sabha Works
I. Andhra Pradesh
Nellore District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
3. Construction of Net Mendingcentre
Bogole 4 Ongoing 31.3.2008
4. -do- Indukurpet 4 Ongoing 31.3.20085. -do- Mathukur 4 Ongoing 31.3.20086. -do- Vakadu 4 Ongoing 31.3.2008
West Godavari District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 to 5 Construction ofCommunity Halls (5 )– Rs.5 lakh each
3. Chinamynavanilanka4. Sarudukodapa5. Biyyaputhippa6. Pedamynavanilanka7. Vemuladeevi (Est.)
25 Ongoing 31.3.2008
Krishna District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
7. -do- Padatadika of Kruthivennu 10 Ongoing 31.3.20088. -do- Yesupuram of Nagayalanka 10 -do- 31.3.20089. -do- Krishnapuram of Nagayalanka 10 -do- 31.3.200810. -do- Zinkapalemof Nagayalanka 10 -do- 31.3.200811. -do- Brahmarahgarimula of
Nagayalanka10 -do- 31.3.2008
II. Kerala
Kollam District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 Old age Home Alappad 45 Ongoing 31.7.2008
Alappuzha District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 Old age Home Arattupuzha 35 Ongoing 31.3.20082 Laying 3.2 Kms of 300 sq. mm 11 KV
XLPE UG cable from Alappuzha SubStation to Alappuzha Medical CollegeHospital situated in the Tsunamiaffected area of Electrical Section,Alappuzha Town for providing astandby 11 KV feeder to the MedicalCollege Hospital.
Alappuzha 40 Not yetstarted
30.4.2008
Ernakulam District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 Old age Home Edavanakad 35 Ongoing 31.3.2008
III. Tamil Nadu
Kanyakumari district
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 Construction of new pond andrain water augmentation
Mulloorthurai 20 Discontinued*
--
2 Widening of Chempatti Odai forrecharge of ground water.Initial Cost = Rs.50 lakhRevised Estimates = Rs.16lakhSaving = Rs.34 lakh
From Champakulam toRajakkamangalam thurai
16 Ongoing January,2008
*Alternate works have been recommended by the State Government.
Cuddalore District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 Putting up High Level Bridge Uppanar Back water,Nochikadu
150.00 Ongoing September,2008
Villupuram District
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 Construction of CommunityHall
Kottakuppam. 11 Ongoing 31.3.2008
2 Anganwadi Buildings Rahgmath Nagar 10 Ongoing 10.3.2008
IV. A&N Islands
A&N Islands
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 Transit Hostel for 50 persons atKamorta
Nancowry Group of Islands 125.76 Ongoing 31.03.2009
2 Transit Hostel at Campbell Bay Great Nicobar Islands 82.2 Ongoing 31.06.20083 Model Sr. Sec. School having
classes from I to XII with hostelfacility
Diglipur 554.60 Ongoing 31.03.2009
4 Development of Panchayat FishMarket
Bambooflat, Andaman District 10.08 Ongoing 31.03.2008
5 Construction of Work Shed Hut Bay, Little Andaman. 77.03 Ongoing 30.08.20086 Construction of Work Shed Burmanallah, South
Andaman.65.58 Ongoing 310.3.2008
7 Construction of Work Shed Collinpur under TushnahadGram Panchayat.
56.79 Ongoing 31.04.2008
8 Construction of Work Shed Namunaghar underNamunaghar GramPanchayat.
45.67 Ongoing 31.03.2008
9 Construction of Work Shed Bambooflat JettyArea/Bambooflat Bazar under
67.59 Ongoing 30.06.2008
Bambooflat Gram Panchayat.10 Construction of Work Shed. Sippighat village under
Sippighat Gram Panchayat46.23 Ongoing 31.03.2008
V. Puducherry
Sl.No.
Work Place Cost(Rs. inLakh)
Status of thework
Targetdate ofongoingworks
1 One Fisheries Training Institute Karaikal 92.50 Ongoing 28.2.2008
BIHAR FLOOD REHABILITATION WORKS
In view of the extensive damage caused by theunprecedented and devastating floods due to breach in the Kosi river’sembankments in the state of Bihar, particularly in the districts ofMadhepura, Supaul, Saharsa, Purnia, Katihar and Araria, the Ministryof Home Affairs(Disaster Management-I Division) declared the
Information regarding compliance of the Guidelines regardingConstitution of the Monitoring Committee
and review of the Scheme as per para 6.4(vi) of the Guidelines onMPLADS
(As on 12-01-2009)
State/UT
WhetherMonitoringCommitteeconstituted ornot
No. andDatesof themeeting held
Minutesreceivedor not
WhetherMP wasinvitedor notand No.of MPsattendedmeeting
No. ofDistrictfollowingpara6.4(vi)
Districtwise No.ofmeetingheld atDistrictlevel
WhetherMP wasinvitedor notand No.of MPsattendedmeeting
Actiontakenagainstdefaulting DistrictAuthorities notfollowing para6.4(vi)
(Pont1)
(Pont2)
(Pont 3) (Pont 4) (Pont 5A) (Pont5B)
(Pont5C)
(Pont 6)
AndhraPradesh
Yes -- -- - - - - -
ArunachalPradesh
Yes No No - - - - -
Assam Yes 21.03.2007(I)
13.02.2008(II)
--Yes
-Yes
- - - -
Bihar Yes 21-02-2008
Yes Yes - - - -
Chattisgarh
Yes - - - - - - -
Goa Yes 04-09-2006
14.11.2007
YesYes
Yes/2Yes/2
22
(NorthGoa-12South
Goa-15)
(Yes/2) Noadversereportrecd.AgainstDistt.Authorities
Gujarat
Yes - - - - - - -
Haryana
Yes - - - - - - -
HimachalPradesh
Yes - No - - - - -
J&K No - - - - - - -Jharkhand
Yes - No - - - - -
Karnataka
Yes - - - - - - -
Kerala Yes 23.07.2007
04-07-2008
YesYes
No-
All District Thiruvananthapuram-3,Kollam-3,Pathanamthitta-5,
Yes/Distt.MPs areattendingthemeetings
-
Statewise Summary of Receipt of Full or Partial data from Nodal districts againstthe total no. of Districts as on 12/12/2008
Data ReceivedSl Total No. Data Data Not Total LS Total 14th LS Sitting
No. State of Districts Received Received MP's RS MP's MP's RS MP's
1 Andhra Pradesh 23 23 0 95 53 38 142 Arunachal Pr. 3 3 0 10 1 2 03 Assam 14 14 0 58 8 14 44 Bihar 32 28 4 50 18 35 95 Goa 2 2 0 8 3 2 16 Gujarat 22 21 1 74 13 25 57 Haryana 11 11 0 24 9 10 38 Himachal Pr. 4 4 0 9 7 3 29 J & K 6 3 3 3 3 3 2
10 Karnataka 25 25 0 52 17 28 711 Kerala 13 13 0 60 21 18 412 Madhya pradesh 29 29 0 63 18 28 1013 Maharashtra 34 34 0 159 40 46 1414 Manipur 2 1 1 1 1 1 115 Meghalaya 2 2 0 10 5 2 016 Mizoram 1 1 0 1 1 1 117 Nagaland 1 0 1 0 0 0 018 Orissa 21 21 0 76 23 21 819 Punjab 11 11 0 67 25 13 720 Rajasthan 24 24 0 69 14 23 421 Sikkim 1 1 0 1 1 1 022 Tamil Nadu 30 30 0 65 51 39 1623 Tripura 2 2 0 2 2 2 124 Uttar Pradesh 63 63 0 248 87 80 2825 West Bengal 18 18 0 171 34 42 1326 A & N Islands 1 1 0 2 0 1 027 Chandigarh 1 1 0 5 0 1 028 D & N Haveli 1 1 0 1 0 1 029 Daman & Diu 1 1 0 1 0 1 030 Delhi 1 1 0 9 6 7 331 Lakshdweep 1 1 0 2 0 1 032 Pondicherry 1 1 0 3 3 1 133 Chhattisgarh 10 10 0 28 7 11 434 Uttaranchal 5 5 0 8 5 5 335 Jharkhand 14 14 0 39 9 14 3
430 420 10 1474 485 520 168NIC-MPI
Training of District Officials under MPLADSS.No State from which
proposal receivedCost of theTraining(Rs. Inlakh)
Date ofsanction
Whetherfunds sent
Whethertrainingconducted
2005-061 Andhra Pradesh 2.00 13.3.06 Yes Yes2 Chattisgarh 1.60 .3.06 Yes Yes3 Uttar Pradesh 1.20 24.3.06 Yes Yes
Total (2005-06)
4.80
2006-074 Maharashtra 3.23 28.4.06 Yes Yes5 Rajasthan 0.77 25.7.06 Yes Yes6 Haryana 2.00 25.9.06 Yes Yes7 Mizoram 0.2128 29.3.07 Yes Yes8 Tamil Nadu 2.00 5.2.07 Yes Yes9 Gujarat 0.81 28.2.07 Yes Yes10 Assam 2.00 29.3.07 Yes Yes11 Punjab 0.3184 29.3.07 Yes Yes12 Kerala 0.815 29.3.07 Yes Yes
Total (2006-07)
12.1562
2007-0813 West Bengal 0.3552 19.7.07 Yes Yes14 Meghalaya 0.28 5.12.07 Yes Yes15 Tripura 0.39878 5.12.07 Yes No(Lr. Sent
on 18.9.08asking toconducttraining)
16 Jharkhand 1.74500 5.12.07 Yes Yes17 Sikkim 0.61 21.1.08 Yes Yes18 Orissa 1.60 26.3.08 Yes(3.4.08) No19 Madhya
Pradesh0.65675 17.3.08 Yes No
Total (2007-08)
5.64573
2008-0920 Uttarakhand 0.50000 9.5.08 Yes
(17.6.08)No(Lr. Senton 18.9.08asking toconducttraining)
21 Karnataka 0.75000 4.6.08 Yes 17.6.08 Yes22 Arunachal
Pradesh0.86500 4.6.08 Yes 17.6.08 Yes
23 Lakshadweep 0.41000 4.6.08 Yes 17.6.08 Yes23A West Bengal
(second time)0.37,046 25.6.08 Yes Yes
23B Rajasthan(second time)
0.57840 22.8.08 23.9.08 No
List of states from which proposals for training have not beenreceived
Name of State Letter asking for furnishingproposal for training sent on
1 Bihar 25.08.2008
2 Goa -do-
3 Himachal Pradesh -do-
4 Jammu & Kashmir -do-
5 Manipur -do-
6 Nagaland -do-
7 A & N Islands -do-
8 Chandigarh -do-
9 D & N Haveli -do-
10 Daman & Diu -do-
11 Delhi -do-
12 Pondicherry -do-
States/UTs who have constituted MonitoringCommittees in view of para 6.3 of guidelines
States/UTs who have formed MonitoringCommittees
States/UTs who are yet to form MonitoringCommittees
States UTs. States UTs.Assam Lakshdweep Maharashtra Dadar & Nagar
HaveliArunachal Pr. Puducherry Mizoram Daman & DiuGujarat Delhi Jammu & Kashmir ChandigarhGoa A & N IslandHaryanaJharkhandKarnatakaKeralaMadhya PradeshOrissaNagalandPunjabSikkimTamil NaduTripuraUttar PradeshChhatisgarhHimachal PradeshMeghalayaManipurRajasthanUttrakhandBiharWest BengalAndhra Pradesh
Information regarding compliance of the Guidelines regardingConstitution of the Monitoring Committee
and review of the Scheme as per para 6.4(vi) of the Guidelines onMPLADS
(As on 12-01-2009)
State/UT
WhetherMonitoringCommitteeconstituted ornot
No. andDatesof themeeting held
Minutesreceivedor not
WhetherMP wasinvitedor notand No.of MPsattendedmeeting
No. ofDistrictfollowingpara6.4(vi)
Districtwise No.ofmeetingheld atDistrictlevel
WhetherMP wasinvitedor notand No.of MPsattendedmeeting
Actiontakenagainstdefaulting DistrictAuthorities notfollowing para6.4(vi)
(Pont1)
(Pont2)
(Pont 3) (Pont 4) (Pont 5A) (Pont5B)
(Pont5C)
(Pont 6)
AndhraPradesh
Yes -- -- - - - - -
ArunachalPradesh
Yes No No - - - - -
Assam Yes 21.03.2007(I)
13.02.2008(II)
--Yes
-Yes
- - - -
Bihar Yes 21-02-2008
Yes Yes - - - -
Chattisgarh
Yes - - - - - - -
Goa Yes 04-09-2006
14.11.2007
YesYes
Yes/2Yes/2
22
(NorthGoa-12South
Goa-15)
(Yes/2) Noadversereportrecd.AgainstDistt.Authorities
Gujarat
Yes - - - - - - -
Haryana
Yes - - - - - - -
HimachalPradesh
Yes - No - - - - -
J&K No - - - - - - -Jharkhand
Yes - No - - - - -
Karnataka
Yes - - - - - - -
Kerala Yes 23.07.2007
04-07-2008
YesYes
No-
All District Thiruvananthapuram-3,Kollam-3,Pathanamthitta-5,
Yes/Distt.MPs areattendingthemeetings
-
State/UT
WhetherMonitoringCommitteeconstitutedor not
No. andDates of themeetingheld
Minutesreceivedor not
WhetherMP wasinvited ornot and No.of MPsattendedmeeting
No. ofDistrictfollowingpara6.4(vi)
Districtwise No.ofmeetingheld atDistrictlevel
Whether MPwas invited ornot and No. ofMPs attendedmeeting
ActiontakenagainstdefaultingDistrictAuthoritiesnotfollowingpara 6.4(vi)
(Pont 1) (Pont 2) (Pont 3) (Pont 4) (Pont 5A) (Pont 5B) (Pont 5C) (Pont 6)Nagaland
Yes 26.09.2007 Yes - - - - -
Orissa Yes 17.12.200717.01.2008
--Yes
--
--
--
--
--
Punjab Yes 28-12-2007 Yes Yes/3 - - - -Rajathan
Yes 17.09.200709.10.2007
--Yes
- - - - -
Sikkim Yes 16-07-200730.11.2007
--Yes
Yes/Nil - - - -
TamilNadu
Yes - - - - - - -
Tripura
Yes - - - - - - -
UttarPradesh
Yes - - - 10* Meerut-12,Bagpat-3,Ghaziabad-3,Bulandsher-12,Gautambudh Nagar,Farukhabad-12,Chandauli&Aligarh-once ineverymonth,Raibereilly-6,AmbedkarNagar-6,Mainpuri-10
Yes/Distt. MPs(exceptAmbedkarNagar Distt. )are attendingthe meetingsregularly
-
Uttaranchal
Yes - - - - - - -
WestBengal
Yes 07.03.2008 Yes No - No - -
A&NIsland
Yes 22.02.200717.08.2007
YesYes
s 26.02.2008 Yes No - No - -Chandigarh
No - - - - - - -
D&NHaveli
No - - - - - - -
Daman& Diu
No - - - - - - -
Delhi Yes, butunder thechairmanship ofFin.&Planning Ministerof Govt. ofDelhi beingsingleDistrictState
- No - - N/A N/A N/A
Lakshadweep
Yes 24.05.200509.02.200708.05.2007
YesYesYes
- - - - -
Puducherry
Yes 06-02-200726.02.2008
NoYes
No - No - -
* Partial information received.
* Partial information received.
MPLADS-Lok Sabha Constituencies of Andhra Pradesh-Status of Pending Instalments
Sl.No.
Name of Constituency/Member of Parliament
Dueinstallment
Documents required forthe release of next instalment.
1) AmalapuramShri G.V. Harsha Kumar II/2008-09 ♣ MPR
2) AnkapalliShri Pappala Chalapathi Rao II/2008-09 ♣ Being released
3) BhadrachalamShri Midiyam Babu Rao II/2007-08 ♣ MPR
♣ UC 2006-07♣ AC 2005-06
4) ChittoorShri D.K. Adikesavulu II/2008-09 ♣ MPR
♣ AC 2006-07
5) CuddapahShri Y.S. VivekanandaReddy
II/2008-09 ♣ .MPR♣ UC 2007-08♣ AC 2006-07
6) HanamkondaShri B. Vinod Kumar II/2008-09 ♣ Being released
7) HyderabadShri Asaduddin Owaisi I/2008-09 ♣ Bieng released
8) KakinadaShri Mallipudi Pallam Raju II/2008-09 ♣ MPR
♣ AC 2006-07
9) Karim nagarShri K. Chandra ShekharRao II/2008-09 ♣ Being released
10) KhammamSmt. Renuka Chowdhury I/2008-09 ♣ Being released
11) KurnoolShri Jayasurva PrakashaReddy
II/2008-09♣ MPR♣ UC 2007-08♣ AC 2006-07
12) MachilipatnamShri Badiga Ramakrishna II/2008-09
♣ MPR♣ UC 2007-08♣ AC 2006-07
13) MiryalgudaShri Jaipal Reddy
II/2008-09 ♣ MPR♣ UC 2007-08
14) NalgondaShri Suravaram SudhakarReddy
II/2008-09 ♣ MPR♣ UC 2007-08
15) NandyalShri S.P.Y. Reddy
II/2008-09 ♣ MPR♣ UC 2007-08♣ AC 2006-07
16) NarasapuramShri VenkataHariramajogaiah
II/2008-09 ♣ MPR
17) NelloreMs. Panabaka Lakshmi
II/2008-09 ♣ MPR
18) NizamabadShri Goud Yaskhi I/2007-08 ♣ AC 2004-05
19) RajahmundryShri Vundavalli Arun Kumar
II/2008-09 ♣ MPR♣ AC 2006-07
20) SecunderabadShri M. Anjan Kumar Yadav II/2008-09 ♣ MPR
21) SiddipetShri Sarvey Satyanarayana II/2008-09 ♣ MPR
22) TirupathiShri Chinta Mohan I/2008-09 ♣ Being released
23) VijayawadaShri Rajagopal Lagadapati II/2008-09 ♣ MPR
♣ UC 2007-08♣ AC 2006-07
24) VishakhapatnamShri Janardhana Reddy
II/2008-09♣ Being released
25) WarangalShri Dharavath RavinderNaik
II/2008-09 ♣ MPR♣ UC 2007-08
MPLADS –Rajya Sabha MPs of Andhra Pradesh-Status of Pending Instalments
Sl.No.
Member of Parliament/Nodal District
Dueinstallment
Documents required forthe release of next instalment.
1. Dr. Dasari Narayana RaoNodal District: WestGodavari,
II/2008-09♣ MPR
2. Shri PenumalliMadhuNodal District: Hyderabad
II/2008-09 ♣ MPR
3. Shri V. Hanumantha RaoNodal District: Hyderabad II/2008-09
♣ MPR
4. Shri Jairam RameshNodal District: Adilabad
II/2007-08 ♣ MPR
5. Shri Jesuudasu Seelam,Nodal District: Guntur
II/2008-09 ♣ MPR♣ AC 2006-07
6. Shri Gireesh Kumar SanghiNodal District: Ranga Reddy
I/2007-08 ♣ Being released
8. Dr. T.Subbarami ReddiNodal District:Visakhapatnam
II/2008-09 ♣ Being released
9. Shri C. Rama ChandraiahNodal District:Cuddapah
II/2008-09 ♣ MPR
10. Shri Raashid AlviNodal District: Hyderabad
II/2008-09 ♣ MPR
11. Shri Syed Azeez PashaNodal District: Hyderabad
II/2008-09 ♣ MPR
12. Shri K Keshava RaoNodal District: Hyderabad
II/2007-08 ♣ MPR
13. Shri Mule Venkata MysuraReddyNodal District: Kadapa
II/2008-09 ♣ MPR♣ AC 2006-07
14. Shri G. Sanjeeva ReddyNodal District: Ranga Reddy
II/2007-08 ♣ Being released
15. Shri. Mohd. Ali KhanNodal District: GreaterHyderabad
II/2008-09 ♣ MPR
16. Shrimati Ratna BaiTadapatlaNodal District: East Godavari
II/2008-09 ♣ MPR
17. Shri K.V.P.Ramachandra Rao II/2008-09 ♣ MPR
18. Shri. Nandamuri Harikrishna II/2008-09 ♣ MPR
Note:-
MPR fulfilling conditions : Monthly Progress Report reflecting unsanctionedbalance less than Rs.50 lakh & unspent balance lessthan Rs.1 crore.
UC : Utilisation CertificateAC : Audit CertificateATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which areagainst the MPLADS guidelines.
Arunachal Pradesh
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Arunachal East I/2008-09II/2008-09
ATR on AC 2005-06
2 Arunachal West -- AC 2006-07
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Shri Mukut Mithi -- --
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
Assam
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 AUTONOMOUS II/2008-09 MPRUC 2007-08AC 2006-07
2 BARPETA II/2008-09 MPRUC 2007-08AC 2006-07
3 DHUBRI -- --
4 DIBRUGARH II/2008-09 MPRUC 2007-08
5 GUWAHATI -- --
6 JORHAT -- --
7 KALIABOR II/2008-09 MPRUC 2007-08AC 2006-07
8 KARIMGANHJ -- UC 2007-08
9 KOKRAJHAR II/2008-09 MPRUC 2007-08
10 LAKHIMPUR -- UC 2007-08
11 MANGALDOI II/2008-09 MPRUC 2007-08AC 2006-07
12 NOWGONG II/2008-09 MPRUC 2007-08AC 2006-07
13 SILCHAR -- --
14 TEJPUR II/2008-09 MPRUC 2007-08AC 2006-07
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Sh Silvius Condpan -- --
2 Sh Syeda Anwara Taimur II/2008-09 MPRUC 2007-08
3 Dr. Manmohan Singh --- --
4 SH Kumar Deepak Das II/2008-09 MPRUC 2007-08
5 Bhubaneswar Kalita II/2008-09 MPR
6 Birendra Prasad Baishya II/2008-09 MPR
7 Biswajit Daimary II/2008-09 MPR
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
BIHAR
Statement showing the documents required for the release of next instalmentunder MPLADS
Lok Sabha
Sl.No.
Name of theConstituency
Instalment/instalments to bereleased
Documents required to be furnished bythe DM for the release of nextinstalment
1 Araria II/2008-09 MPRUC 2007-08
2 Arrah -- ATR on clauses D, H, J and sl.No.2 of theAuditor’s Report on AC 2006-07
3 Aurangabad II/2008-09 MPR4 Bagaha -- --5 Balia -- --6 Banka -- --7 Barh II/2008-09 MPR
UC 2007-088 Begusarai -- --9 Bettiah II/2008-09 MPR10 Bhagalpur -- --11 Bikramganj II/2003-04
II/2007-08I/2008-09II/2008-09
MPR upto 13th LSMPR for 14th LSCombined MPRAC 2001-02AC 2005-06
12 Buxar II/2007-08I/2008-09II/2008-09
MPR
13 Chapra II/2007-08I/2008-09II/2008-09
MPR
14 Darbhanga II/2008-09 MPRUC 2007-08AC 2006-07
15 Gaya II/2007-08I/2008-09II/2008-09
MPRUC 2006-07AC 2005-06
16 Gopalganj II/2008-09 MPRUC 2007-08
17 Hajipur II/2008-09 MPR18 Jehanabad II/2008-09 MPR
UC 2007-0819 Jhanjharpur II/2008-09 MPR
AC 2006-07ATR on clauses (g) and (i) of the prescribedformat is required.
20 Katihar II/2008-09 MPR
21 Khagaria II/2008-09 MPRAC 06-07UC 07-08
22 Kishanganj II/2008-09 MPRUC 2007-08AC 2006-07
23 Madhepura II/2007-08I/2008-09II/2008-09
MPRUC 2006-07AC 2005-06
24 Madhubani -- ATR on missing clause (H) & (I) of theprescribed format AC 2006-07, deficiency onmaintaining Bank Reconciliation statementand on audit observation.
25 Maharajganj II/2008-09 MPR26 Monghyr II/2007-08
I/2008-09II/2008-09
MPRUC 2006-07AC 2005-06
27 Motihari II/2008-09 MPR28 Muzaffarpur I/2008-09
II/2008-09ATR on AC 2005-06 & 06-07 is required.
29 Nalanda II/2005-06I/2006-07II/2008-09
MPR upto tenure of Shri Nitish Kumar, ex-MP(LS)MPR of Sh Swaroop Singh, ex-MP(LS)Combined MPRUC 2004-05AC 2003-04
30 Nawada -- --31 Patna II/2008-09 MPR
UC 2007-0832 Rosera I/2007-08
II/2007-08I/2008-09II/2008-09
ATR on AC 04-05, 05-06, 06-07 is required.
33 Saharsa II/2008-09 MPRUC 2007-08AC 2006-07
34 Samastipur I/2008-09II/2008-09
ATR on clauses (d), (g), (h) and (l) of AC 2005-06 is required.
35 Sasaram II/2008-09 MPRATR on AC 2006-07
36 Sheohar -- --37 Sitamarhi -- --38 Siwan II/2007-08
I/2008-09II/2008-09
MPRUC 06-07AC 05-06
39 Vaishali I/2007-08II/2007-08I/2008-09II/2008-09
ATR on ACs 04-05, 05-06 & 06-07 are required.
40 Purnia II/2007-08 MPR
I/2008-09II/2008-09
UC 2007-08
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
Rajya Sabha
Sl.No.
Name of the Rajya SabhaMP
Instalment tobe released
Documents required to befurnished by the DM for therelease of next instalment
1 Shri Mahendra Prasad II/2002-03I&II/2003-04I&II/2004-05I&II/2005-06I&II/2006-07I&II/2007-08I&II/2008-09
MPRUC 2001-02AC 2000-01
2 Shri Subhash Prasad Yadav -- UC 2007-083 Shri Sharad Yadav II/2006-07
I&II/2007-08I&II/2008-09
MPRUC 2005-06AC 2004-05
4 Shri Prem Chand Gupta II/2006-07I&II/2007-08I&II/2008-09
MPR
5 R.K. Dhawan II/2005-06I&II/2006-07I&II/2007-08I&II/2008-09
MPR
6 Shri Ravi Shankar Prasad II/2008-09 MPRUC 2007-08
7 Shri Rajniti Prasad II/2008-09 MPRUC 2007-08
8 Shri Ali Anwar -- UC 2007-08
9 Shri Mahendra Sahani II/2008-09 MPRUC 2007-08AC 2006-07
10 Shri Jabir Hussain II/2008-09 MPRUC 2007-08
11 Dr. Ejaz Ali II/2008-09 MPR12 Dr. C.P. Thakur II/2008-09 MPR13 Shri Shivanand Tiwari II/2008-09 MPR14 Shri Nand Kishore Singh I/2008-09
II/2008-09Choice of Nodal District is awaitedfrom the Hon’ble MP(RS)
15 Shri Sabir Ali II/2008-09 MPR16 Shri Rajiv Pratap Rudy II/2008-09 MPR
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
OTHER PENDING ISSUES
Action may be taken to distribute Unspent Balance available in theaccount of former Rajya Sabha MPs amongst the sitting Rajya Sabha MPsat that time.
MPR, UC and AC of the amount released are required to be furnished inrespect of ex-MP(RS) whose unreleased fund are to be distributedamongst the sitting Rajya Sabha MPs.
Distribution of unspent amount of Rs.5.62 crore amongst 16 sitting RajyaSabha (MPs) in the state of Bihar, which amount to Rs.35,12,500/- perMP. However, the amount could not be transferred to Hon’ble MPs Shri(Capt.) Jai Narain Prasad Nishad, Shri Mangni Lal Mandal and ShriSubhash Prasad Yadav due to incorrect report from the District Authorityof Gopalganj and Madhubani. Necessary action may be taken.
MPR, UC and AC are not being forwarded in prescribed format by theDistrict Magistrate in many cases. Some districts are being forwardedMPR only for 14th Lok Sabha period. DM may be requested to forwardcombine MPR (10th to 14th Lok Sabha period) for the constituency forupdating the data.
Release StatusMEMBERS OF PARLIAMENT (LOK SABHA)
CHHATTISGARH
S. No CONSTITUENCY NAME OF MP MPLADSFundinstalmentnotreleased
Documentrequired forrelease of nextinstalment
Remarks
1. BASTAR (ST)L/33/01/04
SH. BALIRAMKASHYAP
II/08-09 Eligible MPRAC-06-07UC-07-08
I/08-09released on9.5.07
2. BILASPUR
L/33/2/04
SH. PUNNU LALMOHLE
II/08-09 Eligible MPRAC-06-07UC-07-08
1/08-09released on16.7.2009
3. DURGL/33/03/04
SH. TARACHANDSAHU
II/08-09 Eligible MPRAC-06-07UC-07-08
I/08-09released on22.04.2008
4. JANJGIR
L/33/04/04
SMT. KARUNASHUKLA
I/2008-09II/2008-09
I/2008-09 will bereleasedsubsequent torelease ofII/2007-08.However, forrelease ofII/2008-09 thefollowingdocuments arerequired:-
Eligible MPRAC-06-07UC-07-08
II/07-08released on13.1.2009.
5. KANER (ST)L/33/05/04
SH. SOHANPOTAI
II/08-09 Eligible MPRAC-06-07UC-07-08
I/08-09released on12.06.2008.
6. MAHASAMUND
L/33/06/04
SH AJIT JOGI II/07-08 Eligible MPRAC-05-06UC-06-07
I/07-08released on1.4.2008.
7. RAIGARH (ST)L/33/07/04
SH VISHNUDEOSAI
II/08-09 Eligible MPRAC-06-07UC-07-08
I/08-09released on24.07.2008.
8. RAIPURL/33/08/04
SH RAMESH BAIS II/08-09 Eligible MPRAC-06-07UC-07-08
1/08-09released on28.07.2008.
9. RAJNANDGAONL/33/09/04
SH. DEVWRATSINGH
II/08-09 Eligible MPRAC-06-07UC-07-08
1/08-09released on11.9.2008.
10 SARANGARH(SC)L/33/10/04
SH GUHRAMAJGALLE
II/08-09 Eligible MPRAC-06-07UC-07-08
I/08-09released on16.06.2008.
11 SARGUJA (ST)
L/33/11/04-MPLADS
SH. NAND KUMARSAI
EligibleMPR
AC-06-07 I/08-09released on22.04.2008.
12 CENTRAL-2(NOMINATED)L/00/01/04
SMT. INGRIDMCLEOD
- - II/08-09released on26.08.2008
MEMBERS OF PARLIAMENT (Rajya SABHA)CHHATTISGARH
S.No
MP Name NODAL DISTRICT MPLADSInstalmentnot released
Document requiredfor release of nextinstalment
Remarks
1. SH. DALIP SINGHJUDEVR/33/01/04
JASHPUR 1/2008-09II/2008-09
Eligible MPRAC-06-07UC-07-08
II/2007-08released on 7-01-2009.
2 SMT. MOHSINAKIDWAIR/33/04/04
RAIPUR II/2007-08 Eligible MPR-notrecdUC-06-07- receivedAC-05-06 –received
I/2007-08released on5.10.2007
3 SH RAMADHARKASHYAPR/33/06/04
BILASPUR Tenurecompleted on09.04.2008.
II/07-08 releasedon 29.02.2008
4 SH. MOTI LALVORAR/33/04/04
DURG II/08-09 Eligible MPRAC-06-07UC-07-08
I/08-09 releasedon 25.04.2008.
5 SH. SHARIGOPALVYAS
R/33/01/06
MAHASAMUND II/08-09 Eligible MPRAC-06-07UC-07-08
1/08-09 releasedon 05.06.2008.
6.
SHRI SHIVPRTAPSINGH
SURGUJA II/08-09 Eligible MPRAC-06-07UC-07-08
I/08-09 releasedon 01.05.2008.
Fund release status (DELHI)Delhi (Lok Sabha)
Sl.No.
Name of the MPNodal District
Fund tobereleased
Documents required to be furnished by theMCD for the release of next instalment
1 Delhi SadarShri Jaddsh TytlerNodal District: MCD
II/2006-07I&II/2007-
08I&II/2008-
09
Eligible MPR required UC 2005-06 & 07-08 received AC 2002-03, 03-04, 04-05, 05-06 & 06-07received but clarifications required
I&II/2003-04
Eligible MPR upto 13th Lok Sabha required forthe release of I/2003-04.
2 East DelhiShri Sandeep DikshitNodal District: MCD II/2006-07
I&II/2007-08
I&II/2008-09
Eligible MPR required UC 2005-06, 2006-07 & 2007-08 received AC 2004-05 required
3 Karol Bagh (SC)Shri Krishna TirathNodal District: MCD
I&II/2006-07
I&II/2007-08
I&II/2008-09
Eligible MPR required UC 2004-05, 2005-06 & 2006-07, 2007-08received
4 New DelhiShri Ajay MakenNodal District: MCD
II/2006-07
I&II/2007-08
I&II/2008-09
Eligible MPR received U C 2004-05, 2005-06 & 2006-07, 2007-08received
II/2003-04 Eligible MPR required ** UC 2002-03 received AC 2001-02 required **
5 Outer DelhiShri Sajjan KumarNodal District: MCD
F.No.L/30/05/2004-MPLADS
II/2005-06I&II/2006-
07I&II/2007-
08I&II/2008-
09
Eligible MPR required ** UC 2003-04, 2004-05, 2005-06 & 2006-07, 2007-08 received
6 South DelhiShri Vijay KumarMalhotraNodal District: MCD
I&II/1995-06
Eligible MPR required UC 2005-06 received (UC of Ra.100 lakhreleased towards I&II 1994-95)
II/2004-05
I&II/2005-06
I&II/2006-07
I&II/2007-08
I&II/2008-09
Eligible MPR recvd UC 2005-06, 2006-07 & 2007-08 received
I&II/1995-06
Eligible MPR required UC of Rs.105 lakh released on 6.1.2006 towardsI/1993-94 and I&II 1994-95.
II/2003-04 Eligible MPR UC 2002-03 AC 2001-02 UC 2007-08 received
7 Chandini ChowkShri Kapil SibalNodal District: MCD
II/2006-07I&II/2007-
08I&II/2008-
09
Eligible MPR required UC 2005-06 & 2006-07 received AC 2004-05 required
** letter issued for calling this information/documentDelhi (Rajya Sabha)
Sl.No.
Name of the MPNodal District
Fund tobereleased
Documents required to be furnished by theDistrict Collector for the release of nextinstalment.
1 Shri Jai Prakash AggarwalNodal District: MCD
II/2007-08I&II/2008-
09
Eligible MPR UC 2006-07 & 07-08 received
2 Shri Janardhan DwivediNodal District: MCD
II/2006-07I&II/2007-
08I&II/2008-
09
Eligible MPR UC 2005-06, 2006-07 & 2007-08 received AC 2004-05
3 Shri Karan SinghNodal District: MCD
II/2005-06I&II/2006-
07I&II/2007-
08I&II/2008-
09
AC 2002-03 received with discrepancies &ATR also recd. thereafter.
UC 2002-03 to 2006-07 & 07-08 received. AC received for 2003-04, 2004-05, 2005-06 &2006-07 with discrepancies, DFA put up.
Nominated (Rajya Sabha)
Sl.No.
Name of the MPNodal District
Fund tobereleased
Documents required tobe furnished by theDistrict Collector for therelease of nextinstalment.
Release status after 01-04-2008
1 Shri Chandan MitraNodal District: MCD
II/2005-06I&II/2006-
07I&II/2007-
08I&II/2008-
09
Eligible MPR received UC 2003-04, 2004-05,2005-06 & 2006-07, 07-08received
II/2004-05 releasedon 09-09-2008.
I/2005-06 released on30-09-2008.
2 Shobhana BharatiaNodal District: MCD
II/2006-07I&II/2007-
08I&II/2008-
09
Eligible MPR UC 2006-07 & 2007-08received
3. Kapila VatsyayanNodal District : MCD
II/07-08I&II/2008-
09
Eligible MPR
4. A. R. Kidwai, Ex-MP(RS)
UC 2006-07 & 2007-08received
3 Shri Fali S. Nariman,Ex. MP (RS)Nodal District: MCD
II/2002-03I&II/2003-
04I&II/2004-
05I/2005-06
Eligible MPR UC 2001-02 & 2002-03,2003-04, 2004-05, 2005-06, 2006-07 & 2007-08received.
II/2001-02 released on02-07-2008
I/2002-03 released on 18-07-2008
Release StatusGOA
LOK SABHA
S. No CONSTITUENCY(Nodal dist.)
NAME OF MP Instalmentto bereleased
Document requiredfor release of nextinstalment
4. MORMUGAO(South Goa)
Shri Alenmao ChurchilBraz, EX MPShri FranciscoSardinha
All released -
5. PANAJI( North Goa)
Shri Shripad Yesso Naik II/2007-08I/08-09II/08-09
Eligible MPR
UC 2006-07 recd.
AC 2005-06 recd.More than one banka/c. ATR to beobtained from thedistrict authority
RAJYA SABHA
S. No. Name of the MP Nodal District Instalments tobe released
Documents requiredfor release of nextinstalment
1 Shri Shanta Ram Naik South Goa II/07-08I/08-09II/08-09
Eligible MPRUC 2006-07AC2005-06
Gujarat
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Ahmedabad -- UC 2007-08
2 Amreli II/2007-08I/2008-09II/2008-09
MPRATR on AC 2004-05, 2005-06 & 2006-07
3 Anand II/2008-09 MPRAC 2006-07.
4 Banaskantha I/2008-09II/2008-09
AC 05-06
5 Vadodara II/2008-09 MPRATR on AC 2006-07
6 Bhavnagar II/2007-08I/2008-09II/2008-09
MPR
7 Bharuch II/2008-09 MPR
8 Bulsar II/2008-09 MPR
9 Chhotaudepur II/2008-09 MPRATR on AC 2006-07
10 Dhandhuka II/2008-09 MPRUC 2007-08
11 Dahod I/2008-09II/2008-09
MPRATR on AC 2005-06 & 2006-07
12 Gandhinagar II/2007-08I/2008-09II/2008-09
MPRUC 2006-07
13 Godhra II/2008-09 MPR
14 Jamnagar II/2008-09 MPRUC 2007-08AC 2006-07
15 Junagadh II/2008-09 MPR16 Kheda II/2008-09 MPR
UC 2007-08AC 06-07
17 Kapadvanj II/2008-09 MPRUC 2007-08AC 2006-07
18 Kachchh II/2008-09 MPRAC 2006-07
19 Mandvi II/2008-09 MPRUC 2007-08AC 2006-07
20 Mehsana I/2008-09II/2008-09
UC 2006-07AC 2005-06
21 Patan II/2008-09 UC 2007-08
22 Porbandar II/2007-08I/2008-09II/2008-09
MPRUC 2006-07
23 Rajkot -- --24 Sabarkantha II/2008-09 MPR
UC 2007-08AC 2006-07
25 Surat I/2008-09II/2008-09
UC 2006-07
26 Surendranagar -- --
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Sh. Ahmed Patel II/2007-08I&II/2008-09
MPR
2 Prof. Alkaben BalarambhaiKshatriya
II/2005-06I&II/2006-07I&II/2007-08I&II/2008-09
MPRUC 2004-05AC 2003-04
3 Sh. Arun Maharajkishan Jaitley II/2007-08I&II/2008-09
MPRAC 2005-06
4 Sh. Suryakant KrupashankarAcharya
II/2007-08I&II/2008-09
MPR
5 Sh. Surendra M. Patel II/2008-09 MPR
6 Sh. Kanjibhai Maganbhai Patel II/2008-09 MPRUC 2007-08
7 Sh. Pravinchandra SomabhaiRashtrapal
II/2008-09 MPRUC 2007-08
8 Sh. Vijaykumar Ramniklal Rupani II/2007-08I&II/2008-09
MPRUC 2006-07
9 Sh. Natuji Halaji Thakor II/2008-09 MPR
10 Sh. Parshottam KhodabhaiRupala
II/2008-09 MPR
11 Sh. Bharatsinh PrabhatsinhParmar
II/2008-09 MPR
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
Release StatusHARYANA
LOK SABHAS. No CONSTITUENCY NAME OF MP Instalment
to bereleased
Documentrequired forrelease of nextinstalment
1. BHIWANI Sh. Kuldeep Bishnoi (N) II/08-09 Eligible MPRand UC-07-08
2. FARIDABAD Sh. Avtar Singh Bhadana (N) All released -
3. HISAR Sh. Jai Prakash (N) All released -4. KARNAL Sh. Arvind Kumar Sharma(N) All released -5. KURUKSHETRA Sh. Naveen Jindal (N) All released -6. MAHENDRAGARH Sh. Inderjeet Singh Rao (N) All released -7. ROHTAK Sh. Deepender Singh Hooda (N) All released -8. SIRSA Sh. Atma Singh Gill (N) II/08-09 Eligible MPR, AC-
06-07UC-07-08
9. SONIPAT Sh. Kishan Singh Sangwan (R) All released -10. AMBALA) Smt. Kumari Selja (N) II/07-08
I/08-09II/08-09
Audit objection inAC- 05-06.Release of II/07-08 beingprocessed.
RAJYA SABHAS. No MP Name NODAL
DISTRICTInstalmentto be released
Document required forrelease of next instalment
1. SH. AJAY SINGH CHAUTALA Sirsa II/07-08I/08-09II/08-09
Eligible MPRand AC-05-06
2. DR. RAM PRAKASH Kurukshetra II/08-09 Eligible MPR and AC-06-073. SH. TRALOCHAN SINGH Kaithal II/08-09 Eligible MPR
AC-06-07UC-07-08
4. SH. HANS RAJ BHARDWAJ Rohtak II/07-08I/08-09II/08-09
Eligible MPRUC-06-07AC-Not required
5. Sh. ISHWAR SINGH Kurukshetra II/08-09 Eligible MPR
Release StatusHIMACHAL PRADESH
LOK SABHA
S. No CONSTITUENCY NAME OF MP Instalment tobe released
Document required forrelease of nextinstalment
6. HAMIRPURL-08/01/04-MPLADS
ANURAG THAKUR All released -
7. KANGRAL-08/01/04-MPLADS
PROF. CHANDERKUMAR
II/08-09 Eligible MPRAC-06-07UC-07-08
8. MANDIL-08/01/04-MPLADS
SMT. PRATIBHA SINGH II/08-09 Eligible MPRAC-06-07UC-07-08
4. SHIMLAL-08/01/04-MPLADS
SHRI (COL.) DHANIRAM SHANDIL
II/08-09 Eligible MPRAC-05-06UC-07-08 recd.
RAJYA SABHA
S. No MP Name NODAL DISTRICT Instalment tobe released
Documents required forrelease of next instalment
1 SH. ANAND SHARMA Shimla II/07-08I/08-09II/08-09
Eligible MPRUC-06-07 recd.AC-05-06 recd.
2 SMT. VIPLOVE THAKUR Kangra II/08-09 Eligible MPRAC-06-07UC-07-08
3 SHRI SHANTA KUMAR Kangra II/08-09 Eligible MPR
Release StatusJ&K
LOK SABHAS. No CONSTITUENCY NAME OF MP Instalment
to bereleased
Documentrequired forrelease of nextinstalment
11. BARAMULLAH Shri Abdul RashidShaheen
I&II/95-96II/08-09
Eligible MPRAC-06-07 recd.UC-07-08
12. SRINAGAR Shri Omar Abdullah I/08-09II/08-09
Release of I/08-09 is underprocess.
13. ANANTNAG Ms. Mehbooba Mufti II/07-08I/08-09II/08-09
Eligible MPRAC-05-06 recd.UC-06-07
14. LADAKH Shri ThupstanChhewang
I/07-08II/07-08I/08-09II/08-09
II/06-07 releasedon the conditionof submission ofAC/2004-05
15. JAMMU Shri Madan Lal Sharma II/08-09 (a) Eligible MPR(b) UC-07-08(c) AC- 06-07
16. UDHAMPUR Shri Lal Singh II/06-07I/07-08II/07-08I/08-09II/08-09
Eligible MPRAC-06-07 recd.UC-07-08 recd.
RAJYA SABHAS. No MP Name NODAL
DISTRICTInstalmentto be released
Document required forrelease of nextinstalment
6. SHRI CHOWDHARYMOHAMMED ASLAM
Poonch I/08-09 Release of I/08-09 isunder process.
7. SHRI FAROOQ ABDULLAH Srinagar I/07-08II/07-08I/08-09
UC-05-06 (revised).II/06-07 was released onrelaxation of revisedUC 2005-06
8. SHRI SAIF-UD-DIN SOZ Baramullah I/08-09 UC/2006-07AC/2005-06II/07-08 released on2.1.09 (on condition ofUC & AC)
9. SHRI TARLOK SINGH BAJWA Jammu Total enlt.released
-
Ex. MP(RS)S. No MP Name NODAL
DISTRICTTenure Instalment
to be released
Document required forrelease of nextinstalment
1. SHRI GULAMNABI AZAD
Doda 30.11.2002-29.04.2006
II/2003-04released onrelaxationI&II/2004-05I&II/2005-06
Eligible MPRUC 2002-03AC 2001-02
JHARKHAND
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Chatra II/2008-09 Eligible MPRUC 2007-08
2 Dhanbad II/2008-09 MPR
3 Dumka II/2007-08I/2008-09II/2008-09
MPR
4 Giridih II/2007-08I/2008-09II/2008-09
MPR
5 Godda -- UC 2007-08
6 Hazaribagh II/2008-09 MPRAC 2006-07
7 Jamshedpur -- UC 2007-08
8 Khunti -- UC 2007-08
9 Kodarma II/2007-08I/2008-09II/2008-09
MPR
10 Lohardaga --
11 Palamu II/2008-09 MPRAC 2006-07UC 2007-08
12 Rajmahal II/2008-09 MPR
13 Ranchi -- UC 2007-08
14 Singhbhum -- UC 2007-08
Rajya Sabha
Sl.No.
Name of the RajyaSabha MP
Instalment tobe released
Documents required to befurnished by the DM for the releaseof next instalment
1 Digvijay Singh II/2007-08I&I/2008-09
MPRUC 2006-07AC 2005-06
2 Ms. Mabel Rebello II/2007-08I&II/2008-09
Eligible MPRUC 2006-07
3 S.S. Ahluwalia II/2003-04I&II/2004-05I&II/2005-06I&II/2006-07I&II/2007-08I&II/2008-09
MPR
4 Yashwant Sinha II/2007-08I/2008-09II/2008-09
MPR
5 Jai Prakash NarayanSingh
II/2008-09 MPR
6 Parimal Nathwani II/2008-09 MPR
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATN- Action Taken Notes
Sl.No.
Member of Parliament/Nodal District
Dueinstallment
Documents required forthe release of next instalment.
1. BagalkotShri Gaddigoudar ParvataGouda
II/2008-09 ♣ MPR
2. Bangalore NorthDr. H.T. Sangliana
II/2008-09 ♣ Being released
3. Bangalore SouthShri Ananth Kumar
II/2006-07 ♣ MPR
4. BelgaumShri Suresh AngadiChanabasappa
I/2008-09 ♣ Being relesed
5. BellaryShri G. Karunakara Reddy
I/2007-08 ♣ ATN on AC 2004-05
6. BidarShri H. NarsingraoSuryawanshi
II/2006-07 ♣ MPR♣ UC 2005-06♣ AC 2004-05
7. BijapurShri Basangouda R. Patil
II/2008-09 ♣ MPR♣ UC 2007-08
8. ChamarajanagarShri M. Shivanna
II/2008-09 ♣ MPR
9. ChikkodiShri Ramesh Chandrappa
II/2008-09 ♣ MPR♣ UC 2007-08
10. ChikmagalurShri D.C. Srikantapa II/2008-09
♣ MPR♣ UC 2007-08♣ AC 2006-07
11. Dharwad NorthShri Prahlad Joshi
II/2007-08 ♣ MPR♣ UC 2006-07
12. Dharwad SouthShri Manjunath Channappa
II/2007-08 ♣ MPR
13. GulbargaShri Iqbal Ahmed Saradgi
II/2007-08 ♣ MPR♣ UC 2006-07
14. HassanShri H.D. Deve Gowda
II/2007-08 ♣ MPR
15. KanakapuraShri Tejashwini SeeRamesh
I/2008-09 ♣ UC 2006-07♣ AC 2005-06
16. KanaraShri Ananthkumar Hegde
II/2008-09 ♣ MPR♣ UC 2007-08♣ AC 2006-07
17. KolarShri K.H. Muniyappa
II/2008-09 ♣ MPR♣ AC 2006-07
18. Mandya II/2005-06 ♣ UC 2004-05
Note:-
MPR fulfilling conditions : Monthly Progress Report reflecting unsanctionedbalance less than Rs.50 lakh & unspent balance lessthan Rs.1 crore.
UC : Utilisation CertificateAC : Audit CertificateATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which areagainst the MPLADS guidelines.
MPLADS –Rajya Sabha MPs of Karnataka-Status of Pending Instalments
Sl.No.
Member of Parliament/Nodal District
Due installment Documents required forthe release of nextinstalment.
1. Shri K. Rahman KhanNodal District: Bangalore Urban
II/2008-09 ♣ MPR♣ AC 2006-07
2. Dr. Vijay MallyaNodal District: Bangalore Urban
I/2007-08 ♣ Being released
3. Shri M. Venkaiah NaiduNodal District: Bangalore Urban II/2007-08
♣ MPR♣ AC 2005-06
4. Dr. M.A.M. RamaswamyNodal District: Bangalore Urban
I/2008-09 ♣ AC 2005-06
5. Shri B.K. HariprasadNodal District: Bangalore Urban
II/2008-09 ♣ MPR
6. Shri Oscar FernandesNodal District: Udupi
II/2006-07 ♣ MPR
7. Shri K.B. ShanappaNodal District: Gulbarga
II/2008-09 ♣ MPR♣ UC 2007-08♣ AC 2005-06
8. Shri Rajeev ChandrasekharNodal District: Bangalore Urban
II/2008-09 ♣ MPR♣ AC 2006-07
9. Shri S.M.Krishna I/2008-09 ♣ District not opted
Nodal District:
10. Shri Kore PrabhakaraNodal District:
I/2008-09 ♣ District not opted
11. Shri M.Rama JoisNodal District:Bangalore Urban
II/2008-09 ♣ Being released
12. Dr. K. KasturiranganBangalore Urban
II/2007-08 ♣ MPR
MPLADS-Lok Sabha Constituencies of Kerala-Status of Pending Instalments
Sl.No.
Member of Parliament/Name of Constituency/Nodal District
Dueinstallment
Documents required forthe release of next instalment.
1 Shri Chengara Surendran
Adoor Constituency
Nodal District: Kollam
II/2008-09 MPR fulfilling conditions UC 2007-08 AC 2006-07
2 Dr. K.S. Manoj
Alappuzha Constituency
Nodal District: Alappuzha
I/2007-08 Released on Relaxation AC 2004-05
3 Adv. P. Satheedevi
Vatakara Constituency
Nodal District: Kozhikode
II/2007-08 MPR fulfilling conditions
4 Shri M.P. Veerendra Kumar
Kozhikode Constituency
Nodal District: Kozhikode
II/2006-07 MPR fulfilling conditions UC 2005-06 AC 2004-05
5 Shri A.P. Abdullakutty
Kannur Constituency
Nodal District: Kannur
II/2007-08 MPR fulfilling conditions UC 2006-07 AC 2005-06
6 Shri Varkala Radhakrishnan
Chirayinkil Constituency
Nodal District: Trivandrum
I/2006-07 Released on Relaxation ATN on AC 2003-04
7 Dr. Sebastian Paul
Ernakulam Constituency
Nodal District: Ernakulam
II/2006-07 MPR fulfilling conditions
8 Shri K. Francis George
Idukki Constituency
Nodal District: Idukki
II/2006-07 MPR fulfilling conditions ATN on AC 2004-05
9 Shri P. Karunakaran
Kasaragod Constituency
Nodal District: Kasargod
I/2007-08 .ATN on AC 2004-05
Note:-
MPR fulfilling conditions : Monthly Progress Report reflecting unsanctionedbalance less than Rs.50 lakh & unspent balance lessthan Rs.1 crore.
UC : Utilisation CertificateAC : Audit CertificateATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which areagainst the MPLADS guidelines.
MPLADS –Rajya Sabha MPs of Kerala-Status of Pending Instalments
Former MPs (RS)
1. Late Shri K.Ahmmed Haji UC 2002-03
Sl.No.
Member of Parliament/Nodal District
Dueinstallment &
Documents required forthe release of next instalment.
1. Shri P.V.V Abdul Wahab
Nodal District: MalappuramII/2007-08
MPR fulfilling conditions UC 2006-07
2. Shri A. Vijaya Raghavan
Nodal District: Malappuram
II/2006-07 MPR fulfilling conditions AC 2004-05
3. Shri. T. Balakrishna Pillai
Nodal District: Trivandrum
II/2005-06 MPR fulfilling conditions ATN on AC 2003-04
4. Shri K. Chandran Pillai
Nodal District: Ernakulam
I/2006-07 UC 2004-05 AC 2003-04
5. Shri P.J. Kurian
Nodal District: Pathanamthita
II/2008-09 MPR fulfilling conditions UC 2007-08
6. Shri Vayalar Ravi
Nodal District: Alappuzha
I/2006-07 MPR fulfilling conditions AC 2003-04
7. Shri A.K. Antony
Nodal District: Alappuzha
II/2007-08 MPR fulfilling conditions AC 2005-06
8. Shri P.R. Rajan
Nodal District: Thrissur
II/2007-08 MPR fulfilling conditions UC 2006-07
9. Shri K.E. Ismail
Nodal District: Palakkad
II/2007-08 MPR fulfilling conditions UC 2006-07
Nodal District: MalappuramI/2003-04(Rs 1 crore)
AC 2001-02
2. Shri N.K. Premachandran
Nodal District: KollamII/2005-06(Rs 1 crore)
UC 2004-05 AC 2003-04
Note:-
MPR fulfilling conditions : Monthly Progress Report reflecting unsanctionedbalance less than Rs.50 lakh & unspent balance lessthan Rs.1 crore.
UC : Utilisation CertificateAC : Audit CertificateATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which areagainst the MPLADS guidelines.
Release status MEMBERS OF PARLIAMENT (LOK SABHA)
MADHYA PRADESH
S.No
CONSTITUENCY
NAME OF MP Installmentyet tobereleased
Documents required forrelease of nextinstallment
Remarks
1 BalaghatL/12/01/04
Sh. GAURISHANKARCHATURBHUJBISEN
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on22.07.2008.
2 BATULL/12/03/04
SH HEMANTKUMAR
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on5.6.07
3 BHINDL/12/04/04
DR. RAMLAKHANSINGH
II/07-08I/2008-09II/2008-09
Eligible MPRAC-04-05 recd.UC-05-06 received.Letter dated 28.5.2008.
I/07-08 released on16.07.2008.
4 BHOPALL/12/05/04
Sh. KAILASHJOSHI
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on24.04.2008.
5 CHINDWARAL/12/07/04
Sh KAMALNATH II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on16.09.2008.
6 DAMOHA(L/12/08/04)
ShCHANDRABHANBHAIYA
II/08-09 released on14.10.2008.
7 DHAR
L/12/09/04
Sh CHHATARSINGH DARBAR
- - II/08-09 released on07.01.2009.
8 GUNA
L/12/11/04
ShJYOTIRADITYAMADHAVRAOSCINDIA
II/08-09 Eligible MPR. UC 2006-07AC-2006-07UC-2007-08
I/08-09 released on15.12.2008.
9 GWALIORL/12/12/04
SMT.YOSHODHARARAJE SCHINDIA
II/07-081/2008-09II/2008-09
Eligible MPRAC-05-06 recd.AC/UC 06-07 recd.
1/2007-08 processed on27.6.2008.
1 HOSHANGABAD
Sh SARTAJSINGH
II/2008-09
Eligible MPRUC-2007-08
1/08-09 released on11.12.2008.
L/12/13/04 AC-2006-07
1 INDORE
(L/12/14/04)
Smt. SUMITRAMAHAJAN
- - I1/08-09 released on22.09.2008.
1 JABALPUR
L/12/15/04
Sh RAKESHSINGH
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
1/2008-09 released on11.9.2008
1 JHABUA (ST)
L/12/17/04
Sh KANTILALBHURIA
II/07-081/2008-09II/2008-09
UC-06-07AC-05-06Eligible MPR – letterdated 4.6.2008.
1/07-08 released on20.12.2007
1 KHAJURAHO
L/12/19/04
DR. RAMKRISHNAKUSHMARIYA "BABA JEE "
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
1/08-09 released on24.4.2008.
1 KHANDWA
L/12/20/04
Sh NAND KUMARSINGHCHAUHAN (NANDU BHAIYA)
II/08-09 released on11.12.2008.
1 KHARGONE
L/12/21/04
Sh ARUN YADAV II/2008-09
Letter dated 3.11.2008on audit observation i.emore than one accountare being operated.
1/2008-09 released on19.06.08.
1 MANDLA (ST)
L/12/23/04
Sh FAGGANSINGH KULASTE
II/08-09 released on11.12.2008.
1 MANDSAUR
(L/12/24/04)
DRLAXMINARAYANPANDEYA
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on24.04.2008.
1 MORENA(SC)
L/12/25/04s
Sh ASHOKCHHAVIRAMARGAL
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on5.06.08.
2 RAJGARHL/12/28/04
Sh LAKSHMANSINGH
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on 16-06-08.
2 REWA
L/12/30/04
ShCHANDRAMANITRIPATHI
- - I/08-09 released on24.04.2008.
2 SAGAR (SC)L/12/31/04
Sh VIRENDRAKUMAR
II/08-09 released on20.11.2008.
2 SATNAL/12/33/04
Sh GANESHSINGH
II/08-09 released on03.12.2008.
2 SEONIL/12/34/04
Smt. NEETAPATERIYA
II/08-09 released on18.09.2008.
2 SHAHDOL(ST)
L/12/35/04
Sh DALPATSINGH PARASTE
II/08-09 released on19.11.2008.
2 SHAJAPUR(SC)
L/12/36/04
ShTHAWARCHANDGEHLOT
II/08-09 released on11.12.2008.
2 SIDHI (ST)
L/12/37/04
SH. MANIKSINGH
II/07-081/2008-09II/2008-09
Eligible MPRUC 2006-07.AC-2005-06 recd.
I/07-08 released on28.5.2008.
2 UJJAIN (SC)
L/12/39/04
DR.SATYANARAYANJATIYA
II/08-09 released on13.01.2009.
2 VIDISHAL/12/40/04
SH RAMPALSINGH
II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 released on02.05.08.
MEMBERS OF PARLIAMENT (Rajya SABHA)MADHYA PRADESH
NEXT INSTALMENT OF MPLADS KLFUNDS NOT RELEASEDDUE TO NON RECEIPT OF ELIGIBLE MPR, US AND AC
S.No
MP Name NODALDISTRICT
Installmentnot released
Documentrequired forrelease ofnextinstallment
Remarks
1. SH ARJUN SINGHR/12/01/04
BHOPAL II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 24.04.2008.
2. SMT. MAYA SINGH(R/12/06/04)
GWALIOR II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon07.08.2008.Re-elected for thenext term.
3. SH.VIKRAM VERMAR/12/10/04
DHAR II/08-09 releasedon 11.12.2008.
4. SH PYARE LALKHANDELWALR/12/11/04
CHINDWARA II/08-09 releasedon 18.12.2008.
5. SH NARAYANSINGH KESHRIR/12/12/04
INDORE - - II/08-09 releasedon 25.09.2008.
6. SH LAXMINARAYAN SHARMAR/12/13/04
BHOPAL - - II/08-09 releasedon 12.06.2008.Died on 18 Oct2008.
7. SU THIRUNAVUKKARSARR/12/14/04
GWALIOR II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/2008-09released on19.06.2008
8. SMT SHUSHMASWARAJR/12/02/06
BHOPAL II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 19.11.2008.
9. SUSRI ANUSUYAULIKER/12/01/06
CHHINDWARA - . II/08-09 releasedon 25.04.2008.
10. SHRI PRABHAT JHA GWALIOR II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/2008-09released on29.07.2008.
11. SHRIRAGHUNANDANSHARMA
BHOPAL I1/08-09 releasedon 11.12.2008.
Details of required documents for release of next due installments orMPLAD funds in respect of Lok Sabha Constituencies and Rajya Sabha MPsof Maharashtra.
Maharashtra-Lok Sabha
S. No. Name ofconstituency
Instalmentdue forrelease
Documentsfor release ofnext dueinstalment
Remarks
1 Ahmednagar II/2008-09 MPR,UC 2007-08,AC 2006-07
2 Akola II/2008-09 MPR, UC 2007-08, AC 2006-07
3 Amravati II/2008-09 MPR, UC 2007-08,AC 2006-07
4 Aurangabad II/2008-09 MPR, UC 2007-08, AC 2006-07
5 Baramati II/2008-09 MPR, UC 2007-08,AC 2006-07
6 Bhandara I/2008-09 ATR 7 Beed II/2006-07 MPR only 8 Mumbai North II/2007-08 MPR, UC 2006-
07, AC 2005-06 9 Mumbai North
CentralI/2008-09 ATR
10 Mumbai NorthEast
II/2007-08 MPR, UC 2006-07, AC 2005-06
11 Mumbai NorthWest
II/2008-09 Instalmentreleased
12 Mumbai South I/2008-09 ATR 13 Mumbai South
CentralII/2008-09 Instalment
released 14 Buldhana II/2007-08 MPR, UC 2006-
07,AC 2005-06 15 Chandrapur II/2008-09 MPR, UC 2007-
08, AC 2006-07 16 Chimur II/2008-09 Instalment
released 17 Dahanu II/2008-09 MPR, UC 2007-
08,AC 2006-07 18 Dhule II/2008-09 MPR,UC 2007-
08, AC 2006-07 19 Erandol II/2007-08 MPR, UC 2006-
07 20 Hingoli II/2008-09 MPR, UC 2007-
08, AC 2006-07 21 Ichalkaranji I/2008-09 AC for 2005-06
22 Jalgaon I/2008-09 ATR 23 Jalna II/2007-08 MPR, UC 2006-
07, AC 2005-06 24 Karad II/2008-09 MPR, UC 2007-
08, AC 2006-07 25 Khed II/2007-08 MPR,UC 2006-
07 26 Kulaba I/2007-08 ATR 27 Kolhapur II/2008-09 AC for 2005-06 28 Kopargaon II/2008-09 MPR,UC 2007-
08,AC 2006-07 29 Latur II/2008-09 MPR, UC 2007-
08, AC 2006-07 30 Malegaon II/2007-08 MPR, UC 2006-
07,AC 2005-06 31 Nagpur I/2004-05 ATR 32 Nanded II/2008-09 Instalment
released 33 Nandurbar II/2008-09 MPR, UC 2007-
08,AC 2006-07 34 Nashik II/2007-08 MPR, UC 2006-
07, AC 2005-06 35 Osmanabad II/2008-09 MPR,AC 2006-
07 36 Pandharpur II/2007-08 MPR,UC 2006-
07, AC 2005-06 37 Parbhani II/2008-09 Instalment
released 38 Pune II/2006-07 MPR only 39 Rajapur II/2006-07 MPR,UC 2005-
06,AC 2004-05 40 Ramtek II/2005-06 &
II/2007-08MPR, UC 2006-07, AC 2005-06
41 Ratnagiri II/2008-09 Instalmentreleased
42 Sangli II/2008-09 MPR, UC 2007-08,AC 2006-07
II/2007-08 andI/2008-09 beingrelased
43 Satara II/2007-08 MPR, UC 2006-07, AC 2005-06
44 Solapur II/2006-07 MPR,UC 2005-06.AC 2004-05
45 Thane II/2008-09 MPR, UC 2007-08, AC 2006-07
46 Wardha II/2008-09 MPR, UC 2007-08, AC 2006-07
47 Washim II/2008-09 MPR, UC 2007-08,AC 2006-07
48 Yavatmal II/2008-09 MPR, UC 2007-08,AC 2006-07
Rajya Sabha
S. No. Name of RajyaSabhaMP(S/Shri/Smt)
Instalmentdue forrelease
Documents forrelease of nextdueinstalment
Remarks
1 Balwant Apte II/2007-08 MPR, UC 2006-07
2 Manohar Joshi II/2008-09 Instalmentreleased
3 Murli Deora I/2008-09 UC for 2006-07and ATR
4 Praful Patel II/2006-07 MPR, UC 2005-06
5 Rahul Bajaj II/2007-08 MPR,UC 2006-07 6 Rajeev Shukla II/2007-08 MPR,UC 2006-07 7 Rajkumar Dhoot II/2008-09 MPR, UC 2007-
08,AC 2006-07 8 Sanjay Raut II/2008-09 MPR, UC 2007-
08, AC 2006-07 9 Sharad Joshi II/2008-09 MPR,UC 2007-
08,AC 2006-07 10 Shivraj Patil II/2007-08 MPR only 11 Supriya Sule II/2007-08 MPR, UC 2006-
07 12 Sushilkumar Shinde II/2007-08 MPR, UC 2006-07 13 Tariq Anwar I/2008-09 ATR 14 Prithviraj Chavan II/2007-08 MPR, UC 2006-
07 15 Vijay Darda II/2006-07 MPR only 16 Bharatkumar Raut II/2008-09 Instalment
released 17 Janardhan
WaghmareII/2008-09 MPR only MP elected from
3/4/2008. 18 Prakash Javadekar II/2008-09 MPR only MP elected from
3/4/2008 19 Yogendra Trivedi II/2008-09 Instalment
released
Manipur
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Inner Manipur -- --
2 Outer Manipur -- --
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Rishang Keishing -- --
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
Meghalaya
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Shillong -- --
2 Tura II/2008-09 MPRUC 2007-08AC 2006-07
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Shri Thomas A. Sangma II/2008-09 MPR
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
Mizoram
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Mizoram -- --
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Shri Lalhming Liana II/2008-09 MPR
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
Nagaland
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Nagaland 2008-09 AC 2006-07
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Shri Khekiho Zhimomi II/2008-09 MPR
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
ORISSA Lok Sabha S.No. Name of
constituencyInstallmentto be released
Documentsfor release ofnext dueinstallment
Remarks
1 Aska II/2007-08 MPR only 2 Balasore II/2008-09 MPR, UC 2007-
08,AC 2006-07 3 Berhampur II/2008-09 MPR, UC 2007-
08,AC 2006-07 4 Bhadrak II/2008-09 Instalment
released 5 Bhubaneshwar II/2008-09 Instalment
released 6 Bolangir II/2008-09 MPR, UC 2007-
08, AC 2006-07 7 Cuttack II/2008-09 Instalment
released 8 Deogarh II/2008-09 MPR, UC 2007-
08, AC 2006-07 9 Dhenkanal II/2008-09 Instalment
released 10 Jagatsinghpur II/2008-09 Instalment
released 11 Jajpur I/2008-09 ATR 12 Kalahandi II/2008-09 Instalment
released 13 Kendrapara II/2008-09 Instalment
released 14 Keonjhar II/2008-09 Instalment
released 15 Koraput II/2008-09 Instalment
released 16 Mayurbhanj II/2008-09 MPR, UC 2007-
08,AC 2006-07 17 Nowrangpur II/2008-09 Instalment
released 18 Phulbani II/2008-09 Instalment
released 19 Puri II/2008-09 Instalment
released 20 Sambalpur II/2008-09 Instalment
released 21 Sundargarh II/2008-09 MPR, UC 2007-
08, AC 2006-07
Rajya Sabha S.No. Name of Rajya
SabhaMP(S/Shri/Smt)
Instalmentto bereleased
Documentsfor release ofnext dueinstalment
Remarks
1 Baijyant Panda II/2008-09 Instalmentreleased
2 Bhagirathi Majhi II/2008-09 Instalmentreleased
3 Balbir Punj II/2008-09 MPR only Newly electedMP from 3-4-2008.
4 Mangala Kisan II/2008-09 MPR only Newly electedMP from 3-4-2008
5 PyarimohanMohapatra
II/2008-09 MPR, UC 2007-08, AC 2006-07
6 Radhakant Nayak II/2007-08 MPR, UC 2006-07, AC 2005-06
7 RamachandraKhuntia
II/2008-09 MPR only Newly electedMP from 3-4-2008.
8 Renubala Pradhan II/2008-09 MPR only Newly electedMP from 3-4-2008
9 Rudra Narayan Pany II/2008-09 Instalmentreleased
10 Sushila Tiriya II/2008-09 MPR, UC 2007-08, AC 2006-07
Release StatusPUNJAB
LOK SABHA
S.No
CONSTITUENCY NAME OF MP instalmentnotreleased
Document requiredfor release of nextinstalment
1. AMRITSAR Sh. Navjot Singh Sidhu (N) II/08-09 Eligible MPRUC-07-08AC-06-07
2. BATHINDA Smt. Parmjit Kaur Gulshan (N) All released -3. FARIDKOT Sh. Sukhbhir Singh Badal (N) II/08-09 - AC 06-07
- UC 07-08- Eligible MPR
4. FEROZEPUR Sh. Zora Singh Mann (R) All released -5. GURDASPUR Sh. Vinod Khanna (R) II/08-09 - AC 06-07
- UC 07-08- Eligible MPR
6. HOSHIARPUR Sh Avinash Rai Khanna (N) II/08-09 Release of II/08-09under process
7. JALANDHAR Sh. Rana Gurjeet Singh (N) II/07-08I/08-09II/08-09
Eligible MPRAC 05-06 recd. (morethan one a/c + CashBook + Eligible MPRletter issued)
8. LUDHIANA Sh. Sharanjit Singh Dhillon (N) II/08-09 - AC 06-07- UC 07-08- Eligible MPR
9. PATIALA Smt. Preneet Kaur (R) II/08-09 Eligible MPRAC-06-07UC-07-08
10. PHILLAUR Sh. Charanjit Singh Atwal (N) II/07-08I/08-09II/08-09
(a) Eligible MPR(b) AC-05-06 recd.Letter issued formore than oneaccount + CashBook + eligible MPR
11. ROPAR Sh. Sukhdev Singh Libra (N) II/08-09 Eligible MPRUC-07-08
12. SANGRUR Sh. Sukhdev Singh Dhindsa (N) All released -
13. TARAN TARAN Dr. Rattan Singh Ajnala (N) II/08-09 - AC 06-07- UC 07-08
RAJYA SABHA
S. No MP Name NODALDISTRICT
MPLADSInstalmentnot released
Document required forrelease of nextinstalment
1. Smt. Ambika Soni
R/19/1/2004-MPLADS
Hoshiarpur II/08-09 - Eligible MPR
2. Sh. Ashwani Kumar Gurdaspur II/2006-07I/2007-08II/2007-08I/2008-09II/2008-09
Eligible MPR
3. Sh. Dharam Pal Sabharwal Hoshiarpur II/2006-07I/2007-08II/2007-08I/08-09II/08-09
Eligible MPR.AC-2004-05
4. Sh. M.S. Gill Tarn Taran II/08-09 - AC 06-07- UC 07-08- Eligible MPR
5. Sh. Raj Mohinder SinghMajitha
Amritsar II/08-09 - AC 06-07- UC 07-08- Eligible MPR
6. Shri Naresh Gujral(Smt. Sukhbans KaurBhinder, Ex.MP)
Gurdaspur II/08-09 Eligible MPRAC-06-07
RELEASE STATUS MEMBERS OF PARLIAMENT (LOK SABHA)
RAJASTHAN
S.No
CONSTITUENCY
NAME OF MP Installmentyet to bereleased
Documentsrequired forRelease of nextinstallment
Remarks
1. AJMERL/20/01/2004
Prof. RasaSingh Rawat
II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2008-09 releasedon 26.05.2008
2. ALWARL/20/02/2004
Dr. KaranSingh Yadav
II/2008-09 releasedon 21.11.2008
3. BANSWARAL/20/03/2004
Shri DharmSingh Rawat
II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2008-09 releasedon 29.05.2008
4. BARMERL/20/04/2004
ShriManvendraSingh
II/08-09 released on20.11.2008
5. BAYANAL/20/05/2004
Shri RamSwroop Koli
II/2008-09 releasedon 01.01.2009
6. BHARATPURL/20/06/2004
ShriVishvendraSingh
II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/08-09 released on26.05.2008
7. BHILWARAL/20/07/2004
Shri VijendraPal Singh
II/08-09 released on07.01.2009
8. BIKANERL/20/08/2004
ShriDhermendra
II/2008-09 releasedon 18.11.2008
9. CHITTORGARHL/20/09/2004
Shri ShrichandKriplani
II/2008-09 releasedon 30.10.2008
10 CHURUL/20/10/2004
Shri RamSingh Kaswan
II/2008-09 releasedon 21.11.2008 (Rx)
11 DAUSAL/20/11/2004
Shri SachinPilot
- II/2008-09 releasedon 10.12.2008
12 GANGANAGARL/20/12/2004
Shri NihalChandMeghwal
II/2008-09 releasedon 07.11.2008
13 JAIPUR Shri Girdhari II/2008-09 Eligible MPR, I/2008-09 released
L/20/13/2004
Lal Bhargav AC-2006-07UC-2007-08
on 04.08.2008
14 JALOREL/20/14/2004
Smt. SusheelaBangaruLaxman
II/2008-09 Processedon 15.09.2008
15. JHALAWARL/20/15/2004
Shri DushyantSingh
I/2008-09II/2008-09
UC/AC are stillawaited
II/2007-08 releasedon 26.02.2008
16. JHUNJHUNUL/20/16/2004
Shri Sis RamOla
II/2008-09 releasedon 19.11.2008
17. JODHPURL/20/17/2004
Shri JaswantSingh Bishnoi
II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2008-09 releasedon 01.08.2008
18. KOTAL/20/18/2004
ShriRaghuveerSingh Kaushal
II/2008-09 releasedon 09.01.2009
19. NAGAURL/20/19/2004
Shri BhanwarSinghDangawas
II/2007-08I/2008-09II/2008-09
UC/AC are stillawaited
I/2007-08 releasedon 13.03.2008
20. PALIL/20/20/2004
Shri Pushp Jain II/2008-09 I/2008-09 releasedon 12.01.2009
21. SALUMBERL/20/21/2004
Shri MahavirBhagora
II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/08-09 released on29.05.2008
22. SWAIMADHOPURL/20/22/2004
Shri NamoNarain Meena
II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/08-09 released on09.06.2008
23. SIKARL/20/23/2004
Shri SubhashMaharia
- II/08-09 released on18.11.2008
24. TONKL/20/24/2004
Shri KailashMegwal
II/2008-09 releasedon 06.01.2009
25. UDAIPURL/20/25/2004
Smt. KiranMaheshwari
II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2008-09 releasedon 08.12.2008
MEMBERS OF PARLIAMENT (RAJYA SABHA)RAJASTHAN
NEXT INSTALMENT OF MPLADS KLFUNDS NOT RELEASEDDUE TO NON RECEIPT OF ELIGIBLE MPR, UC AND AC
S. No MP Name NODALDISTRICT
Instalmentnot released
Document required forrelease of nextinstalment
Remarks
1. Smt. Najma HeptullaR/20/01/2007
Jaipur II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/08-09 released on03.06.2008
2. Abhishekh ManuSinghR/20/02/2004
Jodhpur II/2007-08I/2008-09II/2008-09
UC(2006-07) &MPR are stillawaited
I/2007-08 released on26.12.2007
3. Dr.Gayan PrakeshPilaniaR/20/03/2004
Jaipur II/2007-08I/2008-09II/2008-09
Eligible MPRAC-2005-06UC-2006-07
I/2007-08 released on23.09.2008
4. Jaswant SinghR/20/04/2004
Barmer II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2008-09 released on07.10.2008
5. Om Prakash MathurR/20/01/2008
Pali II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2008-09 released on16.10.2008
6. Krishna Lal BalmikiR/20/02/2006
Jaipur II/2008-09 releasedon 19.11.2008
7. Lalit KishoreChaturvediR/20/06/2004
Jaipur II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2008-09 released on16.12.2008
8. Prabha ThakurR/20/08/2004
Ajmer II/08-09 released on29.09.2008
9. Ramdas AgarwalR/20/03/2003
Jaipur II/07-08I/2008-09II/2008-09
1. Eligible MPR2. UC(2006-07)
I/07-08 released on04.10.2008
10. Santosh BagrodiaR/20/10/2004
Bhilwara II/2008-09 Eligible MPR,AC-2006-07UC-2007-08
I/2007-08 released on20.10.2008
11. K. Natwar SinghR/20/05/2004(former MP)
Bharatpur II/2007-08I/2008-09II/2008-09
Eligible MPRAC-2005-06UC-2006-07
I/2007-08 released on01.04.2008
12. Narayan SinghR/00/10/2004(Nominated)
II/2007-08I/2008-09II/2008-09
Eligible MPRAC-2005-06UC-2006-07
I/2007-08 released04.08.208
Sikkim
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Sikkim -- --
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Shri O.T. Lepcha -- --
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
MPLADS-Lok Sabha Constituencies of Tamil Nadu-Status of Pending Instalments
Sl.No.
Name of Constituency Dueinstallment
Documents required forthe release of next instalment.
1 Madras Central I/2006-07 ♣ Being released♣ For II/2006-07 MPR
fulfilling conditions(unsanctioned balanceless than Rs 50 lakh &unspent balance lessthan Rs.1 crore) isrequired.
2 Madras North II/2008-09 ♣ MPR♣ UC – 2007-08♣ AC – 2006-07
3 Madras South II/2007-08 ♣ MPR♣ UC 2006-07♣ AC 2005-06
4 Madurai II/2008-09 ♣ MPR♣ AC – 2006-07
Note:-
MPR fulfilling conditions : Monthly Progress Report reflecting unsanctionedbalance less than Rs.50 lakh & unspent balance lessthan Rs.1 crore.
UC : Utilisation CertificateAC : Audit CertificateATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which areagainst the MPLADS guidelines.
MPLADS –Rajya Sabha MPs of Tamil Nadu-Status of Pending Instalments
Sl.No.
Member of Parliament/Nodal District
Dueinstallment
Documents required forthe release of next instalment.
1. Shri N. JothiNodal District: Vellore II/2006-07
♣ ATN on AC 2004-05required
2. Dr. K. Malaisamy,Nodal District: Chennai
II/2008-09 ♣ MPR♣ AC 2006-07♣ UC 007-08
3. Shri Anbumani RamdossNodal District: Villupuram
II/2008-09 ♣ MPR
4. Smt. KanimozhiNodal District-Chennai
II/2008-09 ♣ MPR♣ AC 2006-07♣ UC 2007-08
5. Prof. M.S Swaminathan-Nodal District: Chennai
II/2008-09 ♣ MPR♣ UC 2007-08 required
6. Shri N.S.Amir Ali JinnahNodal District: Chennai
II/2008-09 ♣ MPR
7. Shri T.K.RangarajanNodal District: Chennai
II/2008-09 ♣ MPR
8. Smt.Vasanthi StanleyNodal District: Chennai
II/2008-09 ♣ MPR
9. Dr. C.Rangarajan (Nom)Nodal Distirct-Kancheepuram
II/2008-09 ♣ MPR
Note:-MPR fulfilling conditions : Monthly Progress Report reflecting unsanctioned
balance less than Rs.50 lakh & unspent balance lessthan Rs.1 crore.
UC : Utilisation CertificateAC : Audit CertificateATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which areagainst the MPLADS guidelines.
Tripura
Statement showing the documents required for the release of next instalmentunder MPLADS as on 31.12.2008
Lok Sabha
Sl.No.
Name of theConstituency
Instalment tobe released
Documents required to be furnished bythe DM for the release of next instalment
1 Tripura East II/2008-09 MPRUC 2007-08AC 2006-07
2 Tripura west II/2008-09 MPRAC 2006-07
Rajya Sabha
Sl.No.
Name of the Rajya Sabha MP Instalmentto bereleased
Documents required to befurnished by the DM for therelease of next instalment
1 Sh Matilal Sarkar II/2008-09 MPRAC 2006-07
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh andunspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)AC - Audit Certificate (as at Annex – IX of the Guidelines)ATR- Action Taken Report
STATUS OF RELEASE OF MPLADS FUNDS AS ON 16 September 2008UTTAR PRADESH
LOK SABHA
S.No CONSTITUENCY
NAME OF MP(14TH Lok Sabha)
Installmentto bereleased
Documentrequired forrelease of nextinstallment ofMPLADS funds
Remarks
1. AGRA SH RAJ BABAR I1/08-09 releasedon 11.9.2008.
2. AKBARPUR(SC)
SHRI SHANKH LALMANJHI
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 23.09.2008.
3. ALIGARH SH BIJENDRASINGH
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 25.04.2008
4. ALLAHABAD KUNWAR REWATIRAMANSINGH URF MANIJI
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/2008-09released on7.8.2008.
5. AMETHI SH RAHUL GANDHI
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/08-09 releasedon 25.4.2008.
6. AMROHA SH. HARISHNAGPAL
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/08-09 releasedon 25.4.2008
7. AUNOLA KUNWAR SARVRAJSINGH
II/08-09 releasedon 09.01.2009
8. AZAMGARH SH. RAMAKANTYADAV
II/2008-09released on19.12.2008.
9. BAGPAT SH. AJIT SINGH II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 27.08.2008
10. BAHRAICH SH RUBAB SAYEDA II/08-09 releasedon 7.1.2009.
11. BALLIA SH NEERAJSEKHAR
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 26.5.2008.
12. BALRAMPUR
SH BRIJ BHUSHANSHARAN SINGH
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/2008-09released on21.7.2008
13. BANASGAO SH MAHAVEER II/2008-09 Eligible MPR I/08-09 released
N (SC) PRASAD UC-2007-08AC-2006-07
on 17.11.2008.
14. BANDA SHSHYAMACHARANGUPTA
II/07-08I/2008-09II/2008-09
Eligible MPRLetter issued on01 May 2008
1/2007-08released on24.3.2008.
15. BARABANKI(SC)
SH. KAMALAPRASAD
I1/.08-09released on11.11.2008.
16. BAREILLY SH SANTOSHGANGWAR
I1/.08-09released on18.11.2008
17. BASTI (SC) SH. LAL MANIPRASAD
I1/08-09 releasedon 17.12.2008.
18. BIJNOR(SC)
SH. MUNSHIRAM I1/08-09 releasedon 28.11.2008.
19. BILHAUR SH. ANIL SHUKLAWARSI
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/-08-09 releasedon 7.10.2008.
20. BADAUN SH. SALEEM IQBALSHERVANI
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/08-09 releasedon 29.4.2008.
21. BULANDSHER
SH. KALYANSINGH
II/07-081/2008-09II/2008-09
Eligible MPRUC-2006-07AC-2005-06
1/07-08 releasedon 23.09.2008.
22. CHAIL (SC) SH. SHAILENDRAKUMAR
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 19.12.2008.
23. CHANDOLI SH KAILASH NATHSINGH YADAV
I1/08-09 releasedon 14.11.2008.
24. DEORIA SH.MOHAN SINGH I1/08-09 releasedon 18.11.2008.
25. DOMERIAGANJ
SH. MOHD.MUQUEEM
I1/08-09 releasedon 11.11..2008.
26. ETAH KU. DEVENDRASINGH YADAV
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 25.7.2008
27. ETAWAH SH. RAGHURAJSINGH SHAKYA
II/08-09 releasedon 4.11.2008.
28. FAIZABAD SH MITRASENYADAV
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/08-09 releasedon 05.-5.2008.
29. FARUKKABAD
SH. CHANDRABHUSHAN SINGHMUNNOO BABU
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 26.5.2008.
30. FATEHPUR SH. MAHENDRAPRASAD NISHAD
I1/08-09 releasedon 28.11.2008.
31. FIROZABAD(SC)
SH. RAM JI LALSUMAN
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/08-09 releasedon 29.4.2008.
32. GHATAMPUR (SC)
SH. RADHEYSHYAM KORI
II/07-08I/2008-09II/2008-09
Letter dated5.11.2008 forUC -06-07 andMPR
I/07-08 releasedon 4.8.2008.
33. GHAZIPUR SH. AFAJALANSARI
II/08-09 releasedon 26.12.2008.
34. GHOSI SH. CHANDRADEOPRASADRAJBHAR
II/08-09 releasedon 26.11.2008.
35. GONDA SH. KIRTIVARDHAN SINGHALIAS RAJABHAIYA
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/2008-09released on29.7.2008
36. GORAKHPUR
SH. ADITYANATH
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 11-12-2008.
37. HAMIRPUR SH. RAJNARAYANBUDHOLIA ALIASRAJJU MAHRAJ
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 20.10.2008.
38. HAPUR SH. SURENDRAPRAKASH GOYAL
I1/08-09 releasedon 12.11.2008..
39. HARDOI(SC)
SH. USHA VERMA I/08-09 releasedon 9.07.2008.
40. HATHRAS(SC)
SH. KISHAN LALDILER
II/08-09 releasedon 7.1.2009.
41. JALAUN SH. BHANU II/2008-09 Eligible MPR I/2008-09
(SC) PRATAP SINGHVERMA
UC-2007-08AC-2006-07
relseaed on7.10.2008.
42. JALESAR PRO. S.P SINGHBAGHEL
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/2008-09released on25.07.2008.Membershipceased on12.9.2008.
43. JAUNPUR SH. PARASNATHYADAVA
II/08-09 releasedon 18.11.2008.
44. JHANSI SH. CHANDRAPALSINGH YADAV
II/08-09 releasedon 09.01.2009.
45. KHAIRANA SH. ANURADHACHOUDHARY
- - II/08-09 releasedon 22.10.2008.
46. KAISERGANJ
SH. BENI PRASADVERMA
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 5.05.2008.
47. KANNAUJ SH. AKHILESHYADAV
II/07-081/2008-09II/2008-09
Eligible MPRUC-2006-07AC-2005-06
1/07-08 releasedon 1.4.2008.Letter dated5.11.2008 forAC,UC andeligible MPR.
48. KANPUR SHRI PRAKASHJAISWAL
- - II/08-09 releasedon 30.09.2008.
49. KHALILAABAD
SH BHISMSHANKAR
I1/08-09 releasedon28.11.2008
50. KHERI SH. RAVIPRAKASH VERMA
II/08-09 releasedon 14.11.2008.
51. KHURJA(SC)
SH. ASHOKKUMAR PRADHAN
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 23.09.2008
52. LUCKNOW SH. ATAL BIHARIVAJPAYEE
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 23.09.2008
53. MACHLISHA SH. UMAKANT II/07-08 Eligible MPR 1/2007-08
HAR YADAV 1/2008-09II/2008-09
UC-2006-07AC-2005-06
processed on12.9.2008.
54. MAHARAJGANJ
SH. PANKAJCHAUDHARY
II/08-09 releasedon 07.01.2009.
55. MAINPURI SH.DHARMENDARAYADAV
1/2008-09II/2008-09
Eligible MPRUC-2007-08AC-2006-07
II/07-08 releasedon 6.6.2008.
56. MATHURA SH. MANVENDRASINGH
- - II/2008-09released on30.09.2008.
57. MEERUT SH. MOHD.SHAHID
II/07-08 Eligible MPRUC-06-07AC-05-06,
I/07-08 releasedon 9.10.07.Membershipceased. Henceno installment isto be released.
58. MIRJAPUR SH. RAMESH DUBEII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 10.10.2008.
59. MISRIKH(SC)
SH. ASHOKKUMAR RAWAT
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
1/2008-09released on14.10.2008.
60. MOHANLALGANJ (SC)
SH. JAI PRAKASH II/08-09 releasedon 11.09.2008.
61. MUZAFFARNAGAR
CH. MUNAWWARHASAN
- - II/08-09 releasedon 22.10.2008.
62. PADRAUNA SH. BALESHWARYADAV
II/08-09 releasedon 23.09.2008.
63. PHULPUR SH. SH ATIQUEAHMAD
II/07-081/2008-09II/2008-09
Eligible MPR-Not recd.UC 2004-05-recd.AC 2003-04-recd
1/2007-08released on23.1.2008
64. PILIBHIT SMT. MANEKAGANDHI
II/08-09 releasedon 05.12.2008.
65. PRATAPGARH
SH.AKSHAYPRATAPSINGH"GOPAL JI"
II/2008-09Eligible MPRUC-2007-08AC-2006-07
I/2008-09released on25.7.2008
66. RAIBAREILLY
SMT. SONIAGANDHI II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 25..07.2008
67. RAMPUR SMT P. JAYAPRADA NAHATA II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 29.07.2008
68. ROBERTSGANJ
SH BHAI LAL II/08-09 releasedon 19.12.2008.
69. SAHARANPUR
SH RASHEEDMASOOD
- -. II/08-09 releasedon 22.10.2008.
70. SAIDPUR(SC)
SH. TUFANI SAROJ II/08-09 releasedon 06.10.2008.
71. SALEMPUR SH. HARIKEVALPRASAD
II/08-09 releasedon 9.01.2009.
72. SAMBHAL PROf. RAM GOPALYADAV II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 11.12.2008
73. SHAHABAD SHRI ILIYASAZMI
II/2008-09 Letter dated21.10.2008 forUC and eligibleMPR
I/08-09 releasedon 12.5.2008.
74. SHAHJAHANPUR
KUNWAR JITINPRASAD II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 7.5.2008.
75. SITAPUR SH. RAJESHVERMA
II/08-09 releasedon 31.10.2008.
76. SULTANPUR SH. MOHD TAHIRII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 13.07.07
77. UNNAO SH. BRAJESHPATHAK II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 29.07.2008.
78. VARANASI DR. RAJESHKUMAR MISHRA
II/08-09 releasedon 23.09.2008.
79. MORADABAD
DR.SHAFIQURRAHMAN BARQ
II/2008-09Eligible MPRUC-2007-08AC-2006-07
I/08-09 releasedon 16.07.2008.
80. LALGANJ Sh. DAROGAPRASAD SAROJ
II/08-09 releasedon 7.01.2009.
STATUS OF RELEASE OF MPLADS FUNDS AS ON -16 September 2008
RAJYA SABHA
S.No.
MP Name NODALDISTRICT
Installementof MPLADSfund due
Documentrequired forrelease of nextinstalement ofMPLADS funds
Remarks
1 SH.AKHILESHDAS
LUCKNOW II/07-08 Eligible MPRUC-06-07AC-05-06
1/07-08released on 6-09-2007.
2 SH. AMARSINGH26.11.2002to25.11.2008
AZAMGARHII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09released on21.7.2008
3 SH. ARUNSHOURIE
KANPUR NAGAR II/08-09released on30.09.2008.
4 SH. KALRAJMISHRA
VARANASI II/2007-081/2008-09II/2008-09
Eligible MPRreqd.UC-06-07-NotreceivedAC-05-06-Notreceived.
I/07-08released on5.10.2007.
5 SH VEERSINGH26.11.2002to25.11.2008
MORADABADII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09releasedon02.07.2008
6 SH RAMNARAINSHAHU
LUCKNOWII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09releasedon21.08.2008
7 SH NANDKISHORE
AZAMGARH I/2008-09II/2008-09
Eligible MPRUC-2007-08AC-2006-07
II/07-08released on27.03.2008subject tocondition
8 SH KAMALAKHTAR
MORADABADII/2008-09
Eligible MPRUC-2007-08AC-2006-07
1/2008-09releasedon16.09.2008.
9 SHBHGWATISINGH
LUCKNOWII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09released on12.5.2008.
10 SH. SATISHCHANDERMISRA
LUCKNOW II/05-06I/06-07II/06-07I/2007-08II/2007-08I/2008-09II/2008-09
Eligible MPR-Not receivedUC 2004-05-NotreceivedAC 2003-04-Notreceived
Letter dated30.09.2008
Requireddocuments beforwarded
11 SH MURLIMANOHARJOSHI
ALLAHABAD II/07-081/2008-09II/2008-09
1/2007-08released on5.8.2008.
12 SHMAHMOODMADANI
JYOTIBAPHULENAGAR II/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09released on6.7.2008
13 SHMAHENDRAMOHAN
Kanpur Nagar II/2007-08I/2008-09II/2008-09
Eligible MPRUC-2006-07AC-2005-06
1/07-08relesed on10.10.2008..
14 SHMUNQUADALI
MEERUT II/2008-09 Eligible MPRUC-06-07AC-05-06
I/08-09released on02.07.2008
15 SH VINAYKATIYAR
FaizabadII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09released on12.5.2008.
16 SHVIRENDRABHATIA
LUCKNOWII/2008-09
Eligible MPRUC-2007-08AC-2006-07
II/08-09released on15.9.2008.
17 Shri AmirAlam khan
Muzaffar nagar II/08-09released on22.10.2008.
18 Sh.JaneshwarMishra
Lucknow II/07-08I/2008-09II/2008-09
Eligible MPRUC-06-07AC-05-06
1/2007-08released on11.08.2008
19 Smt. JayaBachchan
Azamgarh II/06-07I/07-08II/07-08I/2008-09II/2008-09
Eligible MPRMPR -03/07received.Letter dated23.09.2008.
Latest eligibleMPR as perpara 4.3 ofthe guidelinesbe forwarded.
20 Sh. Balihari AzamgarhII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09released on12.5.2008.
21 ShBanwarilalKanchchal
LucknowII/2008-09
Eligible MPRUC-2007-08AC-2006-07
I/08-09released on16.5.2008.
22 Sh. VeerpalSingh
Bareilly II/08-09released on9.01.2009
23 ShBrijbhusanTiwari
Siddharth Nagar II/07-08I/2008-09II/2008-09
Eligible MPRUC 2006-07recd.AC 2005-06
I/07-08released on22.5.07.Besides theunreleasedfund of ShriSuri i.eII/2005-06and 1/2006-07 releasedon18.09.2008.
24 Shri AmbethRajan
GautambudhNagar
II/2008-09 Eligible MPRUC-2007-08AC-2006-07
I/08-09released on12.5.2008.
25 Shri AvtarSinghKarimpuri
Ghaziabad Newly electedMP
II/2008-09released on26.12.2008
26 Smt KusumRai
Newly electedMP. NodalDistrict awaited
27 Shri Brij LalKhabri
Jaulan II/2008-09released on26.12.2008
28 Shri BrijeshPathak
Newly electedMP. NodalDistrict awaited
29 Shri RajaRam
Azamgarh Newly electedMP
II/2008-09released on13.01.2009
30 Prof RamGopal Yadav
Newly electedMP. NodalDistrict awaited
31 ShriMohmmadAdeeb
Newly electedMP. NodalDistrict awaited
List of Sitting Member of Parliament (Rajya Sabha) with Nodal District.
S.No. MP NAME NODAL DISTRICT1 SH. AKHILESH DAS LUCKNOW2 SH. AMAR SINGH AZAMGARH3 SH. ARUN SHOURI KANPUR NAGAR4 SH. GANDHI AZAD AZAMGARH5 SH. KALRAJ MISHRA VARANASI6 SH. SHAHID SIDDIQUI SAHARANPUR7 SH. UDAY PRATAP SINGH FIROZABAD8 SH VEER SINGH MORADABAD9 SH RAM NARAIN SHAHU LUCKNOW10 SH NAND KISHORE AZAMGARH11 SH KAMAL AKHTAR MORADABAD12 SH BHGWATI SINGH LUCKNOW13 SH ABU ASIM HASAN AZMI AZAMGARH14 SH. SATISH CHANDER
MISRALUCKNOW
15 SH MURLI MANOHAR JOSHI ALLAHABAD16 SH MAHMOOD MADANI JYOTIBA PHULENAGAR17 SH MAHENDRA MOHAN KANPUR NAGAR18 SH MUNQUAD ALI MEERUT19 SH VINAY KATIYAR FAIZABAD20 SH VIRENDRA BHATIA LUCKNOW21 SHRI AMIR ALAM KHAN MUZAFFAR NAGAR22 SH. JANESHWAR MISHRA LUCKNOW23 SMT. JAYA BACHCHAN AZAMGARH24 SH. MUKHTAR ABBAS NAQVI RAMPUR25 SH. BALIHARI AZAMGARH26 SH BANWARILAL
KANCHCHALLUCKNOW
27 SH ISAM SINGH SAHARANPUR28 SH. VEERPAL SINGH BAREILLY29 SH RAJNATH SINGH LUCKNOW30 SH BRIJBHUSAN TIWARI SIDDHARTH NAGAR31 SHRI AMBETH RAJAN GAUTAMBUDH NAGAR
MEMBERS OF PARLIAMENT (Lok Sabha)UTTARANCHAL
S.
No
CONSTITUENCY NAME OF MP MPLADSFundinstalmentnot released
Documentrequired forrelease of nextinstalment
Remarks
9. ALMORAL/34/01/04
SH BACHI SINGHRAWAT
II/08-09 Eligible MPRAudit Certificate2006-07UC-2007-08
1/08-09 releasedon 22.04.2008
10. GARHWALL/34/02/04
GEN BHUWANCHANDRAKHANDURI (AVSM)(RETD.
II/2008-09 Eligible MPRAudit Certificate2006-07UC-2007-08
1/2008-09released on22.4.2008.
11. HARDWAR (SC)L/34/03/04
SH. RAJENDRAKUMAR
II/08-09 releasedon 26.12.2008
12. NAINITAL L/34/04/04
SH. K.C. SINGH“BABA”
II/08-09 Eligible MPRAudit Certificate2006-07UC-2007-08Letter dated8.12.2008.
I/08-09 releasedon 14.5.2008
13. TEHRI GARWHALL/34/05/04
SH. VIJAYBAHUGUNA
II/08-09 beingreleased.
I1/08-09processed forrelease on07.01.2008
14. NominatedL/00/2/04
SH. FRANCISFANTHOME
II/08-09 Eligible MPRAudit Certificate2006-07UC-2007-08
I/08-09 releasedon 21.07.2008.
MEMBERS OF PARLIAMENT (Rajya Sabha)UTTARANCHAL
S. No MP Name NODALDISTRICT
MPLADSInstalmentnot released
Document requiredfor release of nextinstalment
Remarks
2. SH. SATISHKUMAR SHARMA
R/34/04-MPLADS
DEHRADUN II/07-08 Eligible MPRAC-2005-06UC-2006-07
I/07-08 releasedon 16.05.2008.
2. SH. SATYA VRATCHATURVEDI R/34/01/06
DEHRADUN II/08-09 Eligible MPRAudit Certificate 2006-07UC-2007-08
I/08-09 releasedon 02.05.2008.
3. SHRI BHAGATSINGHKOSHYARI
BAGESHWAR II/2008-09released on26.12.2008
West Bengal
LOK SABHA S.No. Nameof the
constituencyInstalment tobe released
Documentsrequired forrelease ofnext dueinstalment
Remarks
1 Alipurduar II/2004-05 MPR,UC 2003-04
2 Arambagh II/2008-09 MPR, UC 2007-08, AC 2006-07
3 Asansol II/2008-09 MPR, UC 2007-08, AC 2006-07
4 Balurghat II/2007-08 MPR, UC 2006-07, AC 2005-06
5 Bankura II/2008-09 Instalmentreleased
6 Barasat II/2006-07 MPR, UC 2005-06, AC 2004-05
7 Barrackpore II/2004-05 MPR, UC 2003-04, AC 2002-03
8 Basirhat II/2004-05 MPR, UC 2003-04, AC 2002-03
9 Behrampore II/2008-09 MPR, UC 2007-08, AC 2006-07
10 Birbhum I/2008-09 ATR 11 Bolpur II/2007-08 MPR, UC 2006-
07, AC 2005-06 12 Burdwan II/2008-09 MPR only 13 Kolkata N.East II/2007-08 MPR only 14 Kolkata N.West II/2003-04 MPR only 15 Kolkata N.West II/2008-09 MPR only 16 Kolkata South II/2008-09 MPR only II/2007-08 &
I/2008-09being released
17 Contai I/2007-08 ATR 18 Cooch Behar II/2008-09 Instalment
released 19 Darjeeling II/2008-09 MPR only 20 Diamond Harbour I/2005-06 ATR 21 Dum Dum II/2003-04 MPR, UC 2002-
03, AC 2001-02 22 Dum Dum II/2006-07 MPR, UC 2005-
06 23 Durgapur II/2007-08 MPR only 24 Hooghly II/2007-08 MPR, UC 2006-
07, AC 2005-06 25 Howrah II/2008-09 MPR, UC 2007-
08, AC 2006-07
26 Jadavpur I/2008-09 AC 2005-06 27 Jalpaiguri II/2005-06 MPR, UC 2004-
05 28 Jangipur II/2008-09 MPR, UC 2007-
08, AC 2006-07 29 Jhargram II/2008-09 Instalment
released 30 Joynagar II/2005-06 MPR only 31 Katwa II/2008-09 MPR, UC 2007-
08, AC 2006-07 32 Krishnagar II/2007-08 MPR, UC 2006-
07, AC 2005-06 33 Malda II/2005-06 Instalment
released 34 Malda II/2007-08 MPR, UC 2006-
07, AC 2005-06 35 Mathurapur II/2002-03 MPR, UC 2001-
02, AC 2000-01 36 Mathurapur II/2006-07 MPR, UC 2005-
06, AC 2004-05 37 Midnapore II/2008-09 MPR, UC 2007-
08, AC 2006-07 38 Murshidabad II/2008-09 Instalment
released 39 Nabadwip II/2008-09 MPR, UC 2007-
08, AC 2006-07 40 Panskura II/2008-09 Instalment
released 41 Purulia II/2007-08 MPR,AC 2005-
06 42 Raiganj II/2008-09 Instalment
released 43 Serampore II/2008-09 MPR, UC 2007-
08, AC 2006-07 44 Tamluk II/2007-08 MPR, UC 2006-
07 45 Uluberia II/2007-08 MPR, UC 2006-
07, AC 2005-06 46 Vishnupur II/2007-08 MPR, UC 2006-
07,AC 2005-06
RAJYA SABHA
S.No. Name ofRajya SabhaMP
Instalment tobe released
Documentsrequired forrelease ofnext dueinstalment
Remarks
1 Abani Roy II/2008-09 Instalment
released 2 Arjun Sengupta II/2008-09 MPR only 3 Barun
MukherjeeII/2007-08(effectivelylast instalment)
MPR, UC 2006-07
MP hasresigned fromRS on 6-5-2008and elected on18-11-2008.succeeding ShriDebabrataBiswasII/2008-09beingprocessed forrelease onopting nodaldistrict.
4 Brinda Karat II/2008-09 Instalmentreleased
5 DebabrataBiswas
I/2005-06 Previousinstalmentreleased underexemption forUC and AC. MPhas resigned on23-9-2008
7 MohammedAmin
II/2007-08 MPR only
8 Moinul HassanAhamed
II/2007-08 MPR, UC 2006-07, AC 2005-06
9 Mukul Roy II/2008-09 Instalmentunder processfor release
10 PrasanthaChatterjee
II/2007-08 MPR only
12 Saman Pathak II/2008-09 MPR only 13 Sitaram
YechuryII/2008-09 Instalment
released 14 Swapan Sadan
BoseII/2008-09 Instalment
released 15 Tapan Kumar
SenII/2008-09 MPR only
16 Tarini KantaRoy
II/2008-09 Instalmentreleased
17 Ahmed SaeedMalihabadi
II/2008-09 MPR only Newly electedMP from 3-4-2008
18 ShyamalChakraborty
II/2008-09 Instalmentreleased
UTS:-
Andaman & Nicobar Islands(Union Territory)
Name of MP(LS) Instalment to be released Documents requiredRemarks
Shri Manoranjan Bhakta II/2007-08 MPR, UC 2006-07 AC 2005-06
Chandigarh(Union Terrritory)
Name of MP(LS) Instalment to be released Documents requiredRemarks
Shri P.K. Bansal I/2008-09 ATR on audit discrepancy
Dadra & Nagar Haveli(Union Terrritory)
Name of MP(LS) Instalment to be released Documents requiredRemarks
Shri Mohan Dhelkar II/2008-09 MPR, UC 2007-08, AC 2006-07
Daman & Diu(Union Terrritory)
Name of MP(LS) Instalment to be released Documents requiredRemarks
Shri Dahyabhai Patel II/2008-09 Instalmentreleased
Lakshadweep(Union Terrritory)
Name of MP(LS) Instalment to be released Documents requiredRemarks
Shri P.P. Koya II/2003-04 MPR, UC 2002-03 AC 2001-02 II/2006-07 MPR, UC 2005-06, AC 2004-05
Pondicherry(Union Terrritory)
Name of MP(LS) Instalment to be released Documents requiredRemarks
Shri M. Ramdass I/2007-08 ATR on audit discrepancy
Name of MP(RS) Instalment to be released Documents requiredRemarks
Shri V. Narayansamy II/2005-06 MPR, UC 2004-05, AC 2003-04
Recommended