METRO Orange Line UpdateFebruary 21, 2017

Rebecca Fabunmi, Principal EngineerChristina Morrison, Project Manager

Natalie Westberg, Planner

1metrotransit.org/orangeline

2

Agenda

• 2016 Update

• Station renderings

• Southbound American Boulevard Station

• American Boulevard/Knox Avenue intersection

• Knox Avenue Transitway renderings and wall concepts

3

2016 Progress• Submitted project information in September to the federal Small Starts grant program

• Completed all Orange Line environmental work

• Secured an additional $39.63 million of funding in 2016

• Began engineering and completed 30% design, with all design to be completed in 2017

4

American Boulevard Station

Night view of Stations 98th Street, Bloomington

5

6

Knox Avenue Intersection - Existing Design

7

Knox Avenue Intersection - Potential Redesign

Reduces crossing distances by 30-50% in each segment, improving pedestrian safety

8

Southtown Existing Conditions

9

Knox Avenue Transitway Visualization

10

Southtown Existing Conditions

11

Knox Avenue Transitway Visualization

12

Knox Avenue Existing Conditions

13

Knox Avenue Transitway Visualization

14

Knox Avenue Transitway Visualization

Grand Rounds – I-35W Underpass at Minnehaha Pkwy

15

Form liner precedents

16

Form liner precedents

17

Lighting precedents – Target Field Station

18

Lighting precedents – Philadelphia Garage

19

Custom wall effects – photo concrete

20

Recommended