Salt River Project • Subdivision of the State of Arizona

• Employees = +4900

• Water Service Area = 375 sq. miles

• Electric Customers = +1M

• Electric Service Area = 2,900 sq. miles

• Peak Power System = 7,614 MW

• Service Resources = 9,159 MW

2

Insert YOUR Business Function Here:

3

4

5

GET CONNECTED

The Big Picture – Visibility of the Data

6

Visibility of the Data

• Industry Partnership With GE

– Asset Performance Management SmartSignal

– Operations Optimization

• Imagination Collaboration

7

GET INSIGHTS

The Crystal Ball – GE SmartSignal

8

GE SmartSignal

Performance Monitoring Center

– Unplanned outages to Planned

– Reduce Maintenance Costs

– Optimize Asset Life

– Ensure Reliability

– Strategic Opportunities

9

Forced Draft Fan at a Power Generation Station

10

11

GET OPTIMIZED

Connecting the Dots – Operations Optimization

12

Operations Optimization

• Fleet-wide Consistent Key Performance Indicators

• Optimized Performance Best Practices

• Improved Communications

• Validate Priorities

13

14

15

16

17

Need More Information Performance Monitoring Center Andy Johnson – Supervisor Andy.Johnson@srpnet.com 602.236.2138

Power Generation Services Brady Conrad – Senior Engineer Brady.Conrad@srpnet.com 602.236.6410

Desert Basin Generating Station May Millies – Manager, Operations & Maintenance May.Millies@srpnet.com 602.236.3756

18

General Electric Company reserves the right to make changes in specifications and features, or discontinue the product or service described at any time, without notice or obligation. These materials do not constitute a representation, warranty or documentation regarding the product or service featured. Illustrations are provided for informational purposes, and your configuration may differ. This information does not constitute

legal, financial, coding, or regulatory advice in connection with your use of the product or service. Please consult your pro fessional advisors for any such advice. No part of this document may be distributed, reproduced or posted without the express written permission of General Electric Company. GE, Predix and the GE Monogram are trademarks of General Electric Company. ©2015 General Electric Company – All rights

reserved.

ADDITIONAL INFORMATION

20

21

Monitored Assets 7 Fossil Sites 4 Hydro Sites 27 Total Units

500+ Individual Models

50k+ Tags

22

Success Adds Up

Issue Tracking Count

50% of Catches - Instrumentation Related

More reliable data feeds and operations

Move from reactionary to proactive maintenance

30% - Mechanical and Operational

Improved equipment performance

Increased efficiency

Cost savings

Nearly 1600 issues identified since inception

661 of which were “Catches”

Issue Tracking Type

23

Recommended