powered by #IndustrialInternet
Making More Than Mega Watts Getting Connected, Insights, and Optimized
Salt River Project’s Journey
September, 2015
Salt River Project • Subdivision of the State of Arizona
• Employees = +4900
• Water Service Area = 375 sq. miles
• Electric Customers = +1M
• Electric Service Area = 2,900 sq. miles
• Peak Power System = 7,614 MW
• Service Resources = 9,159 MW
2
Insert YOUR Business Function Here:
3
4
5
GET CONNECTED
The Big Picture – Visibility of the Data
6
Visibility of the Data
• Industry Partnership With GE
– Asset Performance Management SmartSignal
– Operations Optimization
• Imagination Collaboration
7
GET INSIGHTS
The Crystal Ball – GE SmartSignal
8
GE SmartSignal
Performance Monitoring Center
– Unplanned outages to Planned
– Reduce Maintenance Costs
– Optimize Asset Life
– Ensure Reliability
– Strategic Opportunities
9
Forced Draft Fan at a Power Generation Station
10
11
GET OPTIMIZED
Connecting the Dots – Operations Optimization
12
Operations Optimization
• Fleet-wide Consistent Key Performance Indicators
• Optimized Performance Best Practices
• Improved Communications
• Validate Priorities
13
14
15
16
17
Need More Information Performance Monitoring Center Andy Johnson – Supervisor [email protected] 602.236.2138
Power Generation Services Brady Conrad – Senior Engineer [email protected] 602.236.6410
Desert Basin Generating Station May Millies – Manager, Operations & Maintenance [email protected] 602.236.3756
18
General Electric Company reserves the right to make changes in specifications and features, or discontinue the product or service described at any time, without notice or obligation. These materials do not constitute a representation, warranty or documentation regarding the product or service featured. Illustrations are provided for informational purposes, and your configuration may differ. This information does not constitute
legal, financial, coding, or regulatory advice in connection with your use of the product or service. Please consult your pro fessional advisors for any such advice. No part of this document may be distributed, reproduced or posted without the express written permission of General Electric Company. GE, Predix and the GE Monogram are trademarks of General Electric Company. ©2015 General Electric Company – All rights
reserved.
ADDITIONAL INFORMATION
20
21
Monitored Assets 7 Fossil Sites 4 Hydro Sites 27 Total Units
500+ Individual Models
50k+ Tags
22
Success Adds Up
Issue Tracking Count
50% of Catches - Instrumentation Related
More reliable data feeds and operations
Move from reactionary to proactive maintenance
30% - Mechanical and Operational
Improved equipment performance
Increased efficiency
Cost savings
Nearly 1600 issues identified since inception
661 of which were “Catches”
Issue Tracking Type
23