Engineering, Procurement, Industrial Construction and Maintenancewith specialty in

Electromechanical, Infrastructure and Civil Engineering Projects

ATMOSPHERIC TANKS SPHERICAL TANKS

PROCESS PIPING AND EQUIPMENTRIGHT OF WAY PIPELINES

METAL STRUCTURESCONCRETE FOUNDATIONS

ISO 9001:2015 CERTIFIED

SUCCESSFUL STORIES

A

PROJECT: CONSTRUCTION OF THE TV-4 MOLTEN SULFUR STORAGE TANK IN THE GASPROCESSING COMPLEX OF COATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #PGPB-SP-GRM-0053/2012

2012-2013

IN PROCESS DONE

A

2012-2013

REMOVAL OF OUT OF SERVICE STORAGE TANK (TV-4)

CONSTRUCTION OF CONCRETE FOUNDATIONS FOR THE TV-4 SULFUR STORAGE TANK

A

2012-2013

A

2012-2013

B

2012-2014

PROJECT: CONSTRUCTION OF THE TV-105 LIGHT NAPHTHA STORAGE TANK (100,000BARRELS) IN THE CANGREJERA GAS PROCESSING COMPLEX IN COATZACOALCOS, VER.THE PROJECT INCLUDES REMOVAL OF OUT OF SERVICE TANK AND CONSTRUCTION OFTHE NEW TANK WITH A GEODESIC DOME.CLIENT: PEMEXCONTRACT #PGPB-ZC-LN-0022/2012

BEFORE AFTER

REMOVAL OF OUT OF SERVICE STORAGE TANK (TV-105)

B

2012-2014

B

2012-2014

CONSTRUCTION OF THE NEW TV-105 TANK (100,000 BARRELS)

GEODESIC DOME INSTALLATION IN TV-105 SOTORAGE TANK (100,000 BLS)

2012-2014

B

B

2012-2014

PROJECT: REHABILITATION OF DAMAGED SECTIONS OF A 20” LPG PIPELINE, FOUNDWITH THE USE OF SPECIALTY EQUIPMENT AND LOCATED WITH GPS. DIRECTIONALDRILLING AND INSTALLATION OF A 20” LPG PIPELINE.CLIENT: PEMEXCONTRACT #PGPB-SD-GRM-0007/2010

C

2010-2011

THE DAMAGED SECTIONS WERE REMOVED AND REPLACED. INSPECTION OF THE COATING WAS PERFORMED

DIRECTIONAL DRILLING LENGTH: 14,387 Meters. DIRECTIONAL DRILLING DEPTH: 15 Meters.

C

DIRECTIONAL DRILLING. LENGTH = 1,437 Meters, DEPTH = 15 MetersC

C

WELDING OF 20” WT .500” PIPE USING SEMIAUTOMATIC WELDING. C

20” PIPELINE INSTALLATIONC

CONSTRUCTION OF THE JOB SITE FOR PIPELINES FABRICATIONC

DPROJECT: FABRICATION AND INSTALLATION OF CRUDE SUCTION AND DISCHARGEPIPELINES IN CANGREJERA PETROCHEMICAL PLANT.CLIENT: PEMEXREF GCPGPC-AD-CO-01/2018

2018

D

2018

PROJECT: REHABILITATION TO RESTORE THE MECHANICAL INTEGRITY OF THE DA-3201ATMOSPHERIC DISTILLATION TOWER (SF-119/2006) OF A CCR (CONTINUOUS CATALYTICREFORMING) PLANT.CLIENT: PEMEXCONTRACT #5200008365

2017

E

2017

E

INSTALLED PYROGEL INSULATION

2017

E

PROJECT: FABRICATION AND INSTALLATION OF PIPING AND ACCESORIES REPAIR JOBS INCIRCUIT #6 OF THE BTX REFORMING PLANT IN THE CANGREJERA PETROCHEMICALCOMPLEX.CLIENT: PEMEXCONTRACT #CPGAC-SC-003/09

2009

F

2009

F

PROJECT: REHABILITATION OF THE TV-1, TV-3 AND TV-5 STORAGE TANK THERMALINSULATION AND IN THE GAS PROCESSING COMPLEX IN COATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #CPGAC-SC-003/09

2009

G

INSTALLED PYROGEL INSULATION

REPAIR OF THE TV-1 TANK BOTTOM

2009

G

HPROJECT: REHABILITATION OF THE TV-57 AND TV-58 STORAGE TANKS (55,000BARRELS) IN THE SALINA CRUZ, OAX. REFINERY.CLIENT: PEMEXCONTRACT #DCPA-OP-SCC-SPR-CPEG-L-23-15

2015-2016

PROJECT: REHABILITATION OF THE TV-2 STORAGE TANK INSULATION AND REPAIROF THE FURNACE SHEDS ROOF IN THE GAS PROCESSING COMPLEX INCOATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #PGPB-SPRO-GAC-CO-002/2014

I

2014

INSTALLED PYROGEL INSULATION

PROJECT: REHABILITATION, INSPECTION AND CERTIFICATIONS OF SPHERICALPRESSURE VESSELS IN THE GAS PROCESSING COMPLEX IN COATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #PGPB-SP-GRAF-025/10

J

2010-2011

PROJECT: CONSTRUCTION OF FOUNDATIONS F2, F5 AND F8 FOR THE 20-H-2107 FURNACE IN A PETROCHEMICAL PLANT.CLIENT: BRASKEM/IDESACONTRACT #4600017928

2018

K

2018

K

PROJECT: REHABILITATION OF PIPELINES IN SALINA CRUZ. PIPELINES WEREUNCOVERED AND DAMAGED DUE TO A LANDSLIDE.CLIENT: PEMEX

2014

L

2014

L

PROJECT: INSTALLATION OF THE EA-10 HEAT EXCHANGER IN THE CRYOGENICPLANT OF THE GAS PROCESSING COMPLEX IN LA VENTA, TAB.CLIENT: PEMEXCONTRACT #PGPB-SP-GRAF-011/11

M

2011

2011

M

2011

M

NPROJECT: REHABILITATION OF CIVIL WORKS, PROCURE AND MOUNTING OFTHE 42” GOV-5211 VALVE IN THE U-2 SUCTION LINE OF THE COMPRESSORSTATION #3 IN CHINAMECA, VER.CLIENT: PEMEXCONTRACT #PGPB-SD-GRAF-008/11

2011-2012

2011-2012

N

Fast Track Braskem 2019Foundations, metal structures and concrete pavements for trucks.

etano discharge

Sistema Energéticos CYDSAScrubbers Foundations for turbocompressors

WORKSHOP

WAREHOUSE

LAND: 5,200 M2 (56,000 FT2)LOCATION: MINATITLÁN, VERACRUZ.

PREFABRICATION SHOPHEAVY EQUIPMENTWELDING EQUIPMENTCUTTING EQUIPMENTHAND TOOLS

H E A V Y E Q U I P M E N T

W E L D I N G E Q U I P M E N T

C U T T I N G E Q U I P M E N T

H A N D T O O L S

EXCAVATORSCAT 320 C EXCAVATOR, No. 1 CAT 320 C EXCAVATOR, No. 2

CAT 324D-LME EXCAVATOR, No. 3

CRANES15 TON TITAN TELESCOPIC TRUCK CRANE

24 TON-M HIAB TRUCK LOADER CRANE

TEREX 44 TON RT555 TELESCOPIC CRANE 20 TON P&H OMEGA CRANE

CRANES

TRUCK CRANES VIEW

CRANES

BACKHOES

580M CASE BACKHOE WITH HYDRAULIC HAMMER ACCESORY CAT 416E BACKHOE

MOTOR GRADER

CAT 135H MOTOR GRADER

MACHINERY TRANSPORTATIONINTERNATIONAL TRUCK

PLATFORM

GENERATORS, COMPRESSORS, LIGHTS

CAT 3 PHASE, 220KW, CONTINUOUS USE POWER GENERATOR

TEREX 4 LIGHT TOWERINGERSOLL RAND 750cfm COMPRESSOR

OTHERS:• WELDING EQUIPMENT AND ACCESORIES• CUTTING EQUIPMENT AND ACCESORIES• PERSONAL PROTECTIVE EQUIPMENT• HAND TOOLS

MILLER TRAILBLAZER WELDERSFOR MIG WELDING, SEMI-AUTOMATIC WELDER

WELDERS, OTHERS

CASE 580M BACKHOE, EXCAVATION FOR THE INSTALLATION OF THE MOLTEN SULFUR STORAGE TANK´S CATHODIC PROTECTION

OUR EQUIPMENT IN ACTION

P&H 20 TON CRANE MOUNTING PROCESS PIPING ON A COOLING TOWER IN “LA VENTA” GAS PROCESSING COMPLEX

OUR EQUIPMENT IN ACTION

TEREX 55 TON CRANE AND TITAN 15 TON CRANE IN THE “CACTUS” GAS PROCESSING COMPLEX

OUR EQUIPMENT IN ACTION

TEREX 55 TON CRANE MOUNTING METAL STRUCTURES IN “CACTUS” GAS PROCESSING COMPLEX

OUR EQUIPMENT IN ACTION

CASE 580M BACKHOE DEMOLISHING CONCRETE WITH HYDRAULIC HAMMER IN “CANGREJERA” PETROCHEMICAL COMPLEX

OUR EQUIPMENT IN ACTION

HEAVY EQUIPMENT WORKING ON THE REHABILITATION OF THE TV-106 TANK (100,000 BARRELS) IN “CANGREJERA” PETROCHEMICAL COMPLEX

OUR EQUIPMENT IN ACTION

OUR EQUIPMENT IN ACTION

HEAVY EQUIPMENT USED IN THE REHABILITATION OF 30” TO 36” PIPELINES OF A COMPRESSOR STATION IN LAS PALOMAS, VER.

THANK YOU

ISO 9001:2015 CERTIFIED

MORE DETAILS ABOUT PROJECTS AVAILABLE UPON REQUEST

This presentation is for the exclusive use of the individual or entity to which it is addressed. It contains information that is privileged,confidential and exempt from disclosure under applicable law. If the reader of this message is not intended recipient, you are herebynotified that distribution or copying of this communication is strictly prohibited. If you have received this communication by mistake,please notify us immediately.