61
Engineering, Procurement, Industrial Construction and Maintenance with specialty in Electromechanical, Infrastructure and Civil Engineering Projects ATMOSPHERIC TANKS SPHERICAL TANKS PROCESS PIPING AND EQUIPMENT RIGHT OF WAY PIPELINES METAL STRUCTURES CONCRETE FOUNDATIONS ISO 9001:2015 CERTIFIED

LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

Engineering, Procurement, Industrial Construction and Maintenancewith specialty in

Electromechanical, Infrastructure and Civil Engineering Projects

ATMOSPHERIC TANKS SPHERICAL TANKS

PROCESS PIPING AND EQUIPMENTRIGHT OF WAY PIPELINES

METAL STRUCTURESCONCRETE FOUNDATIONS

ISO 9001:2015 CERTIFIED

Page 2: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

SUCCESSFUL STORIES

Page 3: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

A

PROJECT: CONSTRUCTION OF THE TV-4 MOLTEN SULFUR STORAGE TANK IN THE GASPROCESSING COMPLEX OF COATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #PGPB-SP-GRM-0053/2012

2012-2013

IN PROCESS DONE

Page 4: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

A

2012-2013

REMOVAL OF OUT OF SERVICE STORAGE TANK (TV-4)

Page 5: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

CONSTRUCTION OF CONCRETE FOUNDATIONS FOR THE TV-4 SULFUR STORAGE TANK

A

2012-2013

Page 6: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

A

2012-2013

Page 7: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

B

2012-2014

PROJECT: CONSTRUCTION OF THE TV-105 LIGHT NAPHTHA STORAGE TANK (100,000BARRELS) IN THE CANGREJERA GAS PROCESSING COMPLEX IN COATZACOALCOS, VER.THE PROJECT INCLUDES REMOVAL OF OUT OF SERVICE TANK AND CONSTRUCTION OFTHE NEW TANK WITH A GEODESIC DOME.CLIENT: PEMEXCONTRACT #PGPB-ZC-LN-0022/2012

BEFORE AFTER

Page 8: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

REMOVAL OF OUT OF SERVICE STORAGE TANK (TV-105)

B

2012-2014

Page 9: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

B

2012-2014

CONSTRUCTION OF THE NEW TV-105 TANK (100,000 BARRELS)

Page 10: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

GEODESIC DOME INSTALLATION IN TV-105 SOTORAGE TANK (100,000 BLS)

2012-2014

B

Page 11: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

B

2012-2014

Page 12: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: REHABILITATION OF DAMAGED SECTIONS OF A 20” LPG PIPELINE, FOUNDWITH THE USE OF SPECIALTY EQUIPMENT AND LOCATED WITH GPS. DIRECTIONALDRILLING AND INSTALLATION OF A 20” LPG PIPELINE.CLIENT: PEMEXCONTRACT #PGPB-SD-GRM-0007/2010

C

2010-2011

THE DAMAGED SECTIONS WERE REMOVED AND REPLACED. INSPECTION OF THE COATING WAS PERFORMED

Page 13: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

DIRECTIONAL DRILLING LENGTH: 14,387 Meters. DIRECTIONAL DRILLING DEPTH: 15 Meters.

C

Page 14: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

DIRECTIONAL DRILLING. LENGTH = 1,437 Meters, DEPTH = 15 MetersC

Page 15: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

C

Page 16: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

WELDING OF 20” WT .500” PIPE USING SEMIAUTOMATIC WELDING. C

Page 17: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

20” PIPELINE INSTALLATIONC

Page 18: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

CONSTRUCTION OF THE JOB SITE FOR PIPELINES FABRICATIONC

Page 19: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

DPROJECT: FABRICATION AND INSTALLATION OF CRUDE SUCTION AND DISCHARGEPIPELINES IN CANGREJERA PETROCHEMICAL PLANT.CLIENT: PEMEXREF GCPGPC-AD-CO-01/2018

2018

Page 20: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

D

2018

Page 21: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: REHABILITATION TO RESTORE THE MECHANICAL INTEGRITY OF THE DA-3201ATMOSPHERIC DISTILLATION TOWER (SF-119/2006) OF A CCR (CONTINUOUS CATALYTICREFORMING) PLANT.CLIENT: PEMEXCONTRACT #5200008365

2017

E

Page 22: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2017

E

INSTALLED PYROGEL INSULATION

Page 23: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2017

E

Page 24: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: FABRICATION AND INSTALLATION OF PIPING AND ACCESORIES REPAIR JOBS INCIRCUIT #6 OF THE BTX REFORMING PLANT IN THE CANGREJERA PETROCHEMICALCOMPLEX.CLIENT: PEMEXCONTRACT #CPGAC-SC-003/09

2009

F

Page 25: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2009

F

Page 26: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: REHABILITATION OF THE TV-1, TV-3 AND TV-5 STORAGE TANK THERMALINSULATION AND IN THE GAS PROCESSING COMPLEX IN COATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #CPGAC-SC-003/09

2009

G

INSTALLED PYROGEL INSULATION

Page 27: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

REPAIR OF THE TV-1 TANK BOTTOM

2009

G

Page 28: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

HPROJECT: REHABILITATION OF THE TV-57 AND TV-58 STORAGE TANKS (55,000BARRELS) IN THE SALINA CRUZ, OAX. REFINERY.CLIENT: PEMEXCONTRACT #DCPA-OP-SCC-SPR-CPEG-L-23-15

2015-2016

Page 29: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: REHABILITATION OF THE TV-2 STORAGE TANK INSULATION AND REPAIROF THE FURNACE SHEDS ROOF IN THE GAS PROCESSING COMPLEX INCOATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #PGPB-SPRO-GAC-CO-002/2014

I

2014

INSTALLED PYROGEL INSULATION

Page 30: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: REHABILITATION, INSPECTION AND CERTIFICATIONS OF SPHERICALPRESSURE VESSELS IN THE GAS PROCESSING COMPLEX IN COATZACOALCOS, VER.CLIENT: PEMEXCONTRACT #PGPB-SP-GRAF-025/10

J

2010-2011

Page 31: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: CONSTRUCTION OF FOUNDATIONS F2, F5 AND F8 FOR THE 20-H-2107 FURNACE IN A PETROCHEMICAL PLANT.CLIENT: BRASKEM/IDESACONTRACT #4600017928

2018

K

Page 32: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2018

K

Page 33: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: REHABILITATION OF PIPELINES IN SALINA CRUZ. PIPELINES WEREUNCOVERED AND DAMAGED DUE TO A LANDSLIDE.CLIENT: PEMEX

2014

L

Page 34: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2014

L

Page 35: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

PROJECT: INSTALLATION OF THE EA-10 HEAT EXCHANGER IN THE CRYOGENICPLANT OF THE GAS PROCESSING COMPLEX IN LA VENTA, TAB.CLIENT: PEMEXCONTRACT #PGPB-SP-GRAF-011/11

M

2011

Page 36: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2011

M

Page 37: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2011

M

Page 38: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

NPROJECT: REHABILITATION OF CIVIL WORKS, PROCURE AND MOUNTING OFTHE 42” GOV-5211 VALVE IN THE U-2 SUCTION LINE OF THE COMPRESSORSTATION #3 IN CHINAMECA, VER.CLIENT: PEMEXCONTRACT #PGPB-SD-GRAF-008/11

2011-2012

Page 39: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

2011-2012

N

Page 40: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

Fast Track Braskem 2019Foundations, metal structures and concrete pavements for trucks.

etano discharge

Page 41: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

Sistema Energéticos CYDSAScrubbers Foundations for turbocompressors

Page 42: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

WORKSHOP

WAREHOUSE

Page 43: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

LAND: 5,200 M2 (56,000 FT2)LOCATION: MINATITLÁN, VERACRUZ.

PREFABRICATION SHOPHEAVY EQUIPMENTWELDING EQUIPMENTCUTTING EQUIPMENTHAND TOOLS

Page 44: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

H E A V Y E Q U I P M E N T

W E L D I N G E Q U I P M E N T

C U T T I N G E Q U I P M E N T

H A N D T O O L S

Page 45: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

EXCAVATORSCAT 320 C EXCAVATOR, No. 1 CAT 320 C EXCAVATOR, No. 2

CAT 324D-LME EXCAVATOR, No. 3

Page 46: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

CRANES15 TON TITAN TELESCOPIC TRUCK CRANE

24 TON-M HIAB TRUCK LOADER CRANE

Page 47: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

TEREX 44 TON RT555 TELESCOPIC CRANE 20 TON P&H OMEGA CRANE

CRANES

Page 48: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

TRUCK CRANES VIEW

CRANES

Page 49: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

BACKHOES

580M CASE BACKHOE WITH HYDRAULIC HAMMER ACCESORY CAT 416E BACKHOE

Page 50: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

MOTOR GRADER

CAT 135H MOTOR GRADER

Page 51: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

MACHINERY TRANSPORTATIONINTERNATIONAL TRUCK

PLATFORM

Page 52: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

GENERATORS, COMPRESSORS, LIGHTS

CAT 3 PHASE, 220KW, CONTINUOUS USE POWER GENERATOR

TEREX 4 LIGHT TOWERINGERSOLL RAND 750cfm COMPRESSOR

Page 53: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

OTHERS:• WELDING EQUIPMENT AND ACCESORIES• CUTTING EQUIPMENT AND ACCESORIES• PERSONAL PROTECTIVE EQUIPMENT• HAND TOOLS

MILLER TRAILBLAZER WELDERSFOR MIG WELDING, SEMI-AUTOMATIC WELDER

WELDERS, OTHERS

Page 54: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

CASE 580M BACKHOE, EXCAVATION FOR THE INSTALLATION OF THE MOLTEN SULFUR STORAGE TANK´S CATHODIC PROTECTION

OUR EQUIPMENT IN ACTION

Page 55: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

P&H 20 TON CRANE MOUNTING PROCESS PIPING ON A COOLING TOWER IN “LA VENTA” GAS PROCESSING COMPLEX

OUR EQUIPMENT IN ACTION

Page 56: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

TEREX 55 TON CRANE AND TITAN 15 TON CRANE IN THE “CACTUS” GAS PROCESSING COMPLEX

OUR EQUIPMENT IN ACTION

Page 57: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

TEREX 55 TON CRANE MOUNTING METAL STRUCTURES IN “CACTUS” GAS PROCESSING COMPLEX

OUR EQUIPMENT IN ACTION

Page 58: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

CASE 580M BACKHOE DEMOLISHING CONCRETE WITH HYDRAULIC HAMMER IN “CANGREJERA” PETROCHEMICAL COMPLEX

OUR EQUIPMENT IN ACTION

Page 59: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

HEAVY EQUIPMENT WORKING ON THE REHABILITATION OF THE TV-106 TANK (100,000 BARRELS) IN “CANGREJERA” PETROCHEMICAL COMPLEX

OUR EQUIPMENT IN ACTION

Page 60: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

OUR EQUIPMENT IN ACTION

HEAVY EQUIPMENT USED IN THE REHABILITATION OF 30” TO 36” PIPELINES OF A COMPRESSOR STATION IN LAS PALOMAS, VER.

Page 61: LMVAGA PRESENTATION REV2 · 2020. 6. 10. · o } u Z v ] o U / v ( µ µ v ] À ] o v P ] v ] v PW } i dDK^W, Z/ d E d E

THANK YOU

ISO 9001:2015 CERTIFIED

MORE DETAILS ABOUT PROJECTS AVAILABLE UPON REQUEST

This presentation is for the exclusive use of the individual or entity to which it is addressed. It contains information that is privileged,confidential and exempt from disclosure under applicable law. If the reader of this message is not intended recipient, you are herebynotified that distribution or copying of this communication is strictly prohibited. If you have received this communication by mistake,please notify us immediately.