IT2403 - SOFTWARE PROJECT MANAGEMENT TECHNICAL QUIZ - I

Preview:

Citation preview

IT2403 - SOFTWARE PROJECT MANAGEMENT

TECHNICAL QUIZ - I

1.)Planning for the project is done in order to:

A. Decide the work that needs to be done

B. Plan the scope of the project

C. Plan the time, scope of the project

D. Understand what we need to do and plan how to do the work

2.)A plan is necessary to:

A. Organize the work

B. Define the scope of work

C. Mobilize resources.

D. All of the above

3.)Projects are undertaken to create:

A. Products and servicesB. Employment and job satisfactionC. High performing teams D. Continuity of operations and

services

4.)How much clarity should the description of the product or service being created by the project?

A. High level

B. Low level

C. Medium level

D. Reasonable

5.)Project financing is one of the step of project management

A. TrueB. False

6.)Performance is done after implementation

A. TrueB. False

7.) Project is a planned activity:

A. True

B. False

8.)Which of the following type of project interfaces with the organization

A. Information system

B. Embedded system

C. Process control system

D. Objective driven system

9.) The products handed over to the clients at the end of projects are called as:

A. Software

B. Application program

C. Deliverables

D. Intermediate products

10.)The relationship between program design and program specification can be portrayed in

A. Data flow diagram

B. Product fow diagram

C. Network diagram

D. Data flow diagram

11.)The time between start and end of a task are

A. Turnarround

B. Elapsed

C. Throughput

D. Pessimistic time

12.)The process of project planning is called:

A. Continuous

B. Iterative

C. Time consuming

D. Conventional

13.)A collection of projects that all contribute to the same overall organizational goals are called:

A. Software

B. Task

C. Programme

D. Activity

14.)The standard way of evaluating the economic benefits of any projects is to carry out a:

A. Price benefit analysis

B. Cost benefit analysis

C. Cashflowanalysis

D. Fund flow analysis

15.)The costs that include the salaries and other employment costs of the staff involved in the project development and all associated costs are called

A. Operational cost

B. Development cost

C. Setup cost

D. Direct cost

16.)The longer term benefits that are considered very difficult to quantify are called:

A. Direct benefits

B. Assessable benefits

C. Indirect benefits

D. Intangible benefits

17.)The time taken to break even or pay back the initial investment is called:

A. Back period

B. Payback period

C. Cash back period

D. Rate of return

18.)The first phase of waterfall model is

A. Analysis

B. Feasibility Study

C. Coding

D. User requirements

19.)The working model of one or more aspects of the projected system is

A. Evolutionary model

B. V-process model

C. Spiral model

D. Software prototyping

20.)Risk management consists of

A. Risk analysis and risk estimationB. Risk control and risk planningC. Risk identification and

monitoringD.Riskcontrol,planning,identificatio

nand monitoring

21.)Comparing of existing project comes under:

A. Risk analysis

B. Risk control

C. Risk identification

D. Risk evaluation

23.)RRL is:

A. Risk reduction leverage

B. Risk relax leverage

C. Risk reading letter

D. Risk resource letter

23.)Analyzing the functionality of hardware and software is called:

A. Project evaluation

B. Strategic assessment

C. Economic criteria

D. Technical assessment

24.)Recruitment and training cost falls under:

A. Development cost

B. Data cost

C. Profit cost

D. Setup cost

25.)The commonly published lists and charts are called

A. Resources

B. Work plan

C. Study plan

D. Budgets

26.)Risk reporting is essential in

A. Risk evaluationB. Risk monitoringC. Risk managementD. Risk authorities

27.)Product quality is defined as:

A.Delivering a product with correct requirement

B.Delivering a product using correct development procedures

C.Delivering a product which is developed iteratively

D.Delivering a product using high quality procedures

28.)The main goal of quality assurance is to

A. Set coding standards

B. Improve software project management

C. Reduce the technical and programmatic risks in developing the software

D. Specify corrective actions

29.)Which relates to the effort needed to make changes to the software

A. Functionality

B. Maintainablity

C. Reliability

D. Efficiency

30.)Which of the following statements is NOT true?

A.Requirement must be testable

B.Requirement must be concerned with system functionality only

C.Requirement must be complete

D.Requirement must be unambiguously stated

31.)LOC means

A. Lines of code

B. List of code

C. Length of code

D. Legend of code

32.)Production of software is characterized by

A. Planning

B. Determination and review of customer requirements

C. Requirement measurement

D. Planning, determination, review of customer requirement and measurement

33.)Software requirement analysis will identify:

A. Product

B. Job

C. Process

D. User

34.)Cost benefit analysis is done for

A. Social feasibility

B. Technical Feasibilty

C. Process feasibility

D. Economical feasibility

35.)The functional and Non-functional comes under

A. Project

B. Requirement

C. Start date

D. Risk

36.)Time behavior is the sub-characteristics of

A. Maintainability

B. Efficiency

C. Usability

D. Reliabilty

37.)The diagrammatic form for flow oriented modeling is called

A. Functional diagrams

B. ER diagrams

C. Data flow diagrams

D. System flow diagrams

38.)The capability of the software to maintain its level of performance comes under

A. Functionality

B. Maintainability

C. Reliability

D. Usability

39.)The ability of the software to interact with other systems refers to

A. Interoperability

B. Reliability

C. Functionality

D. Efficiency

40.)The part of design modeling is called

A. User interface design

B. Testing

C. Behaviour model

D. Analysis

41.)Which forms the basis for management control of software project?

A. Methods

B. Tools

C. Process

D. Quality focus

42.)Requirement engineering provides the mechanism for

A. Understanding custom needs

B. Assessing facility

C. Analyzing need

D. All of the above

43.)The key of software prototyping is to serve as a mechanism for defining

A. Data

B. Fact

C. Requirements

D. Plan

44.)Requirement analysis results in the specification of software’s :

A. Operational characteristics

B. Basic characteristics

C. Essential characteristics

D. Useful characteristics

45.)The user requirements are clarified by

A. RAD model

B. Spiral model

C. Incremental model

D. Prototyping model

46.)Selecting and training people for positions in the organization is called

A. Directing

B. Planning

C. Controlling

D. Staffing

47.)Establishing, measuring and evaluating performance of project activities comes under

A. Oraganizing

B. Directing

C. Controlling

D. Staffing

48.)Predetermining a course of action for accomplishing oraganizational objectives are called

A. Controlling

B. Directing

C. Staffing

D. Planning

49.)The process of identifying an organization’s long term goals are called

A. Economic criteria

B. Project execution

C. Strategic planning

D. Technical assessment

50.)The heart of the software development stage is called

A. Coding

B. Testing

C. Implementation

D. Design

THANK YOU…