View
214
Download
0
Category
Preview:
Citation preview
Initial Seismic StudyAlbany USD Schools and Facilities
March 20, 2012
R. P. Gallagher Associates, Inc.
Structural Engineers, Oakland
Schools and Facilities Reviewed
(1) Ocean View ES(2) Marin ES(3) Cornell ES(4) Albany MS(5) Albany HS(6) Albany Children’s Center(7) MacGregor HS(8) District Office(9) Maintenance Facility
Scope of Study
(1) Buildings
(2) Site Hazards
AB 300 Survey
• Performed by DSA staff
• Buildings built 1933-1978
• Excluded wood frame structures, portables and modular buildings
• Review of drawings
AB 300 Categories
Category
1
2
Description
Expected to perform well
Require further evaluation
Albany Category 2 Buildings
All have Type RM1 construction
Ocean View 3
Marin 7
10
Reinforced masonry
Reinforced masonry
Wall-roof separation
Wall-roof separation
Wall-roof connections
Wall-roof connections
Albany Site Hazards
Hazard_____ Finding_____
Liquefaction Unlikely
Surface faulting None
Slope Failure Possible (?) at
Children’s Center
Recommended Next Steps
1. Evaluate Category 2 buildings
2. Investigate slope at Children’s Center
3. Seek documentation for Little Theater
and portables/modular buildings
Recommended