COMPANY OVERVIEW

COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS

De Villiers Consulting is the continuation of a proud legacy in structural engineering started in 1986. We pride ourselves in offering a personal approach to the engineering challenges on all our projects, regardless of size or scope.

We never merely settle for the obvious solution but continue to interrogate all the possible options until we are satisfied that we have balanced structural requirements with economy of design and constructability.

Lateral thinking and creativity is what differentiates us. The numerous past clients we have served in various capacities over many years can attest to a unique approach that has been adding real value to their projects.

This portfolio showcases some of these projects. IP DE VILLIERS CP DE VILLIERS

APPLIED INTELLIGENCE.INNOVATIVE SOLUTIONS.

RETAIL PROJECT EXPERIENCE

CANAL WALKSHOPPING CENTRE

Location:

Client:

Construction cost (upon completion):

Cape Town

Monex

R1bn+

Largest regional shopping centre in the Western Cape. 350,000m2 of post tensioned slab. 30 month contract period. 50,000 man hours of professional time.

Status:

Date of completion:

Completed

2000

COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS

CAPE GATELocation:

Client:

Construction cost(upon completion):

Cape Town

Abacus AssetManagement

R400m

Status:

Date of completion:

Completed

2005

Large regional shopping centre. Post tensioned slabs.

Construction cost(upon completion): R150m

PAARL MALLLocation:

Client:

Paarl

Flanagan & Gerrard

Status:

Date of completion:

Completed

2006

Regional shopping centre in the Western Cape.

Construction cost(upon completion): R150m

MOUNTAIN MILLLocation:

Client:

Worcester

Retail Africa

Status:

Date of completion:

Completed

2005

Regional shopping centre in the Western Cape.

OFFICES PROJECT EXPERIENCE

WORLD TRADE CENTREBAHRAIN

High-rise office and hotel (240m high) in Bahrain. Detail design done for Atkins. Precast floor construction.

Status: Completed

Date of completion: 2007

Location:

Client:

Manama City, Bahrain

Atkins (Middle East)

US$150mConstruction cost (upon completion):

COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS

BOE/CLOCKTOWER DEVELOPMENTLocation:

Client:

Status:

Date of completion:

V&A Waterfront, Cape Town

Nedbank

R180m

Completed

2002

Iconic corporate head office building in the V&A Waterfront with complex double basement construction below mean sea level.

Construction cost(upon completion):

CLAREMONT PROJECTSLocation:

Client:

Status:

Date of completion:

Claremont, Cape Town

Various

N/A

Completed

Last project completed 2004

Structural engineering consultant for 9 building projects over 10 year period in the Claremont CBD. 2 more projects in planning currently (2015).

Construction cost(upon completion):

GLACIER BUILDINGLocation:

Client:

Status:

Date of completion:

Tygervalley, Cape Town

Ingenuity Properties

R450m

Completed

2009

Office Building on complex sloping site. Post tensioned slab construction; 3.5m cantilever slabs to boardroom areas. 4 Star Green Building.

Construction cost(upon completion):

MIXED USE PROJECT EXPERIENCE

BURJUMAN

Mixed-use development including quadruple basement, retail centre and high rise office and apartment blocks. Management of detail design for the Contractor. Value engineering on core/shear wall requirements on high-rise buildings. Realized considerable savings over conceptual design by others.

Status:

Date of completion:

Completed

2005

Location:

Client:

Dubai, UAE

Murray & Roberts LLC (Middle East)

Construction cost (upon completion): R1bn+

COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS

PARAMOUNT PLACELocation:

Client:

Status:

Date of completion:

Claremont, Cape Town

Ingenuity Properties

R300m

Completed

2004

Large and complex mixed-use development in Claremont CBD. Includes retail, upmarket residential and corporate head office. Post tensioned slab construction.

Construction cost(upon completion):

HOTEL/RESIDENTIAL PROJECT EXPERIENCE

THE PARAGON

Multi storey residential building in Observatory. Double basement and 9 levels above ground.

Status: On site October 2015

Date of completion: Structure complete.Final completion April 2018.

Cape Town

Client: Rawson Property

Construction cost (upon completion): R150m

Location:

COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS

CULLINAN HOTELLocation:

Client:

Status:

Date of completion:

Cape Town

Private Developer

R150m

Completed

1999

High-rise hotel building. All post tensioned slab construction.

Construction cost(upon completion):

LAGOON BEACH HOTELLocation:

Client:

Status:

Milnerton, Cape Town

Irish Development Consortium

R220m

Completed

Date of completion: 2004

200 bed hotel; 172 apartments and basement parking. All post tensioned slab construction.

Construction cost(upon completion):

SPECIAL PROJECTS PROJECT EXPERIENCE

We specialise in unlocking value in existing properties. Numerous complex structural alterations attest to this fact. The most recent example

if the engineering of a complex 12-storey addition to the existing Triangle House Building in Cape Town. Although the client settled for a less

elaborate scheme, the engineering of the complex alteration sets the tone for what is possible with existing buildings in the near future.

TRIANGLE HOUSE BUILDING

CURRENT PROJECTS PROJECT EXPERIENCE

117 STRAND STREET

New mixed-use development in Cape Town CBD. 4 Star Green Building. Deep basement.

Image courtesy of Kotlowitz Marais Architects.

Location:

Client:

Cape Town

Ingenuity Properties

Construction cost (upon completion): R400m

Status: Currently on site

Date of completion: July 2019

COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS

THE MODERN (DOCK RD)Location:

Client:

Cost (current value):

Status:

Date of completion:

Cape Town

Ingenuity Properties

R1.5bn

In planning

N/A

Complex high-rise building in Cape Town CBD. Economic post tensioned slabs reduces overall building mass resulting in further savings in foundations and columns. New building built over existing listed building.

YACHT CLUBLocation:

Client:

Cost (current value):

Status:

Date of completion:

V&A Waterfront, Cape Town

Amdec

R500m

On site

December 2018

Hotel and apartment complex over super-basement.

Unit 201/202 De Jonker Centre, Morkel Street, Stellenbosch 021 883 2788 admin@devilliersconsult.co.za