COMPANY OVERVIEW
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS
De Villiers Consulting is the continuation of a proud legacy in structural engineering started in 1986. We pride ourselves in offering a personal approach to the engineering challenges on all our projects, regardless of size or scope.
We never merely settle for the obvious solution but continue to interrogate all the possible options until we are satisfied that we have balanced structural requirements with economy of design and constructability.
Lateral thinking and creativity is what differentiates us. The numerous past clients we have served in various capacities over many years can attest to a unique approach that has been adding real value to their projects.
This portfolio showcases some of these projects. IP DE VILLIERS CP DE VILLIERS
APPLIED INTELLIGENCE.INNOVATIVE SOLUTIONS.
RETAIL PROJECT EXPERIENCE
CANAL WALKSHOPPING CENTRE
Location:
Client:
Construction cost (upon completion):
Cape Town
Monex
R1bn+
Largest regional shopping centre in the Western Cape. 350,000m2 of post tensioned slab. 30 month contract period. 50,000 man hours of professional time.
Status:
Date of completion:
Completed
2000
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS
CAPE GATELocation:
Client:
Construction cost(upon completion):
Cape Town
Abacus AssetManagement
R400m
Status:
Date of completion:
Completed
2005
Large regional shopping centre. Post tensioned slabs.
Construction cost(upon completion): R150m
PAARL MALLLocation:
Client:
Paarl
Flanagan & Gerrard
Status:
Date of completion:
Completed
2006
Regional shopping centre in the Western Cape.
Construction cost(upon completion): R150m
MOUNTAIN MILLLocation:
Client:
Worcester
Retail Africa
Status:
Date of completion:
Completed
2005
Regional shopping centre in the Western Cape.
OFFICES PROJECT EXPERIENCE
WORLD TRADE CENTREBAHRAIN
High-rise office and hotel (240m high) in Bahrain. Detail design done for Atkins. Precast floor construction.
Status: Completed
Date of completion: 2007
Location:
Client:
Manama City, Bahrain
Atkins (Middle East)
US$150mConstruction cost (upon completion):
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS
BOE/CLOCKTOWER DEVELOPMENTLocation:
Client:
Status:
Date of completion:
V&A Waterfront, Cape Town
Nedbank
R180m
Completed
2002
Iconic corporate head office building in the V&A Waterfront with complex double basement construction below mean sea level.
Construction cost(upon completion):
CLAREMONT PROJECTSLocation:
Client:
Status:
Date of completion:
Claremont, Cape Town
Various
N/A
Completed
Last project completed 2004
Structural engineering consultant for 9 building projects over 10 year period in the Claremont CBD. 2 more projects in planning currently (2015).
Construction cost(upon completion):
GLACIER BUILDINGLocation:
Client:
Status:
Date of completion:
Tygervalley, Cape Town
Ingenuity Properties
R450m
Completed
2009
Office Building on complex sloping site. Post tensioned slab construction; 3.5m cantilever slabs to boardroom areas. 4 Star Green Building.
Construction cost(upon completion):
MIXED USE PROJECT EXPERIENCE
BURJUMAN
Mixed-use development including quadruple basement, retail centre and high rise office and apartment blocks. Management of detail design for the Contractor. Value engineering on core/shear wall requirements on high-rise buildings. Realized considerable savings over conceptual design by others.
Status:
Date of completion:
Completed
2005
Location:
Client:
Dubai, UAE
Murray & Roberts LLC (Middle East)
Construction cost (upon completion): R1bn+
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS
PARAMOUNT PLACELocation:
Client:
Status:
Date of completion:
Claremont, Cape Town
Ingenuity Properties
R300m
Completed
2004
Large and complex mixed-use development in Claremont CBD. Includes retail, upmarket residential and corporate head office. Post tensioned slab construction.
Construction cost(upon completion):
HOTEL/RESIDENTIAL PROJECT EXPERIENCE
THE PARAGON
Multi storey residential building in Observatory. Double basement and 9 levels above ground.
Status: On site October 2015
Date of completion: Structure complete.Final completion April 2018.
Cape Town
Client: Rawson Property
Construction cost (upon completion): R150m
Location:
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS
CULLINAN HOTELLocation:
Client:
Status:
Date of completion:
Cape Town
Private Developer
R150m
Completed
1999
High-rise hotel building. All post tensioned slab construction.
Construction cost(upon completion):
LAGOON BEACH HOTELLocation:
Client:
Status:
Milnerton, Cape Town
Irish Development Consortium
R220m
Completed
Date of completion: 2004
200 bed hotel; 172 apartments and basement parking. All post tensioned slab construction.
Construction cost(upon completion):
SPECIAL PROJECTS PROJECT EXPERIENCE
We specialise in unlocking value in existing properties. Numerous complex structural alterations attest to this fact. The most recent example
if the engineering of a complex 12-storey addition to the existing Triangle House Building in Cape Town. Although the client settled for a less
elaborate scheme, the engineering of the complex alteration sets the tone for what is possible with existing buildings in the near future.
TRIANGLE HOUSE BUILDING
CURRENT PROJECTS PROJECT EXPERIENCE
117 STRAND STREET
New mixed-use development in Cape Town CBD. 4 Star Green Building. Deep basement.
Image courtesy of Kotlowitz Marais Architects.
Location:
Client:
Cape Town
Ingenuity Properties
Construction cost (upon completion): R400m
Status: Currently on site
Date of completion: July 2019
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS
THE MODERN (DOCK RD)Location:
Client:
Cost (current value):
Status:
Date of completion:
Cape Town
Ingenuity Properties
R1.5bn
In planning
N/A
Complex high-rise building in Cape Town CBD. Economic post tensioned slabs reduces overall building mass resulting in further savings in foundations and columns. New building built over existing listed building.
YACHT CLUBLocation:
Client:
Cost (current value):
Status:
Date of completion:
V&A Waterfront, Cape Town
Amdec
R500m
On site
December 2018
Hotel and apartment complex over super-basement.
Unit 201/202 De Jonker Centre, Morkel Street, Stellenbosch 021 883 2788 [email protected]