Högsåra Island Demonstration
Project EWEC2007, Milano, 9th May 2007
HISPMerja Paakkari, Hafmex Windforce Oy
2HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Backgrounds
1. Project located on Högsåra island in Archipelago of SW Finland
2. Active local islanders as pioneers
3. New business possibilities to keep Archipelago inhabited and active
4. Utilize local pollution free energy production
5. Finland and EU policy to increase share of renewables and domestic production
6. Utilize vast nature reserve of near offshore wind conditions with installation on land
3HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Why EU project
1. Challenging environment of Archipelago of SW Finland
– Rough terrain
2. Remote site with difficult access - behind two ferries
– Logistics
– Installation
3. Weak grid
No ready solutions available, high risks
EU project applied for Spring 2003: HISP
- Started Spring 2004
- Project ends Summer 2007
4HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Project partners
1. Hafmex Windforce Oy (coordinator), Finland
2. Harakosan Europe BV, The Netherlands
(3. ABB, Switzerland – left the consortium Jan. 2006)
4. Roheline Ring, Estonia
5. VTT Technical Research Center of Finland
5HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Innovation: Foundation
1. Counterweight from bedrock by anchors
2. Smaller construction and less material
3. No excavation below ground level
4. Transportation critical as continuous casting required
6HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Innovation: grid connection
1. Connection to 20kV local distribution grid
2. Weak grid
– power limitations required
– compensation of reactive power
3. Special turbine/wind park control
4. Generator and Inverter from ABB Finland
5. Special filtering on transformer
6. Close cooperation with grid owner, Fortum
7HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Högsåra 1.6.2005-31.5.2006monthly average wind speeds
0
1
2
3
4
5
6
7
8
9
10
Janu
ary
Febru
ary
Mar
chApr
ilM
ayJu
ne July
Augus
t
Septe
mbe
r
Octobe
r
Novem
ber
Decem
ber
win
d s
pee
d (
m/s
)
v 66m (m/s) v 51m (m/s) v 30m (m/s)
Measurements and follow-up
1. Meteorological measurements
– wind (3 levels), temperature, icing risk
2. Power performance
3. Load measurements on the foundation
4. Wind farm control in weak grid
8HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Other aspects
1. Challenging environment
– Wind conditions studied
– Nature reservation areas nearby
– Visual aspects and noise
– erection on forested island
2. Public acceptance
– inhabitants and summer tourism
– local manpower and domestic production
3. Logistics
– ferry connection
– sea transportation
– narrow road through village
9HISP project Merja Paakkari, Hafmex Windforce Oy
ROHELINE RING OÜ
Conclusions
1. Three 2 MW gearless turbines on Archipelago
2. Partners gain valuable experience on
– remote conditions
– weak grid
– challenging environment
– new turbine technology
– test site for further needs
3. EU project a good way to demonstrate high risk innovations
4. Next towards FP7 !