High Performance Racetracks

Brian D. Prowell, Ph.D., P.E.

Good for a Racetrack, Good for a Highway?

38th Annual Rocky Mountain Asphalt Conference and Equipment Show

ADVANCED MATERIALSSERVICES, LLC

Advanced Materials ServicesCollective Experience

• Road Courses– Daytona International*– Portland International

Raceway

– Lime Rock Park

– Palm Beach International

– Circuit Gilles Villeneuve

• Repair– Watkins Glen*

– Phoenix International

– Chicagoland– Summit Point

• OvalsMiami-Homestead*Richmond International*

Martinsville Speedway*

Talladega Superspeedway*

Darlington RacewayDaytona International Speedway

*While working for NCAT

ADVANCED MATERIALSSERVICES, LLC

Design Concerns• Racetracks are about entertainment. What

might be a small problem on a highway would be a disaster if it delayed a race

• Smoothness• Durability

– Resistance to raveling

– Resistance to shoving

– Resistance to cracking

• Uniformity (texture etc.)

ADVANCED MATERIALSSERVICES, LLC

Fan Excitement

• A performance specification for a racetrack would provide for “fan excitement or driver entertainment”

• Side-by-side racing, a function of:– Geometry– Surface friction (including rubber laydown)

• The racing surface should not dictate the outcome of the race

Brian Prowell 12/4/08Removed NASCAR, added last bullet, edited surface friction sub bullet

ADVANCED MATERIALSSERVICES, LLC

Thoughts About Forces on a Racetrack Pavement

• Not concerned about rutting like on a highway, port, or possibly an airport taxiway

• Main concern is raveling• Lateral forces are greater on a road course or

flat oval with less banking, like Indianapolis, than on a steeply banked oval, like Talladega

• Down draft on cars produces suction under cars which can pull out loose chunks of pavement or manholes covers.

Brian Prowell 12/4/08Good to add a race car picture to this slide

ADVANCED MATERIALSSERVICES, LLC

Raveling

C/o A. Wilson

Brian Prowell 12/4/08Switched pictures upper left

ADVANCED MATERIALSSERVICES, LLC

Transverse Joints

Joint

ADVANCED MATERIALSSERVICES, LLC

Slippage

ADVANCED MATERIALSSERVICES, LLC

Typical Demolition• Take down all SAFERTM wall

• Take down catch fence if banking exceeds 24 degrees

• Light poles?• Remove asphalt and base if

reconstructing

• Mill

ADVANCED MATERIALSSERVICES, LLC

What is SAFERTM Wall?

Courtesy of Elrod Corporation – Developed by University of Nebraska - Lincoln

Demolition

ADVANCED MATERIALSSERVICES, LLC

Grade and Compact

ADVANCED MATERIALSSERVICES, LLC

MillingBrian Prowell 12/4/08Do you have a better milling picture from Miller?

ADVANCED MATERIALSSERVICES, LLC

Scabs

ADVANCED MATERIALSSERVICES, LLC

Assess the milled surface

ADVANCED MATERIALSSERVICES, LLC

Weak Spots

ADVANCED MATERIALSSERVICES, LLC

Drainage, Drainage, Drainage• Drainage is important to the long-term

performance of a track or any pavement• Some tracks are built in natural bowls, most

tracks have paving behind the crash wall• Edge drains used to intercept water at the

edge of the pavement, behind walls and at the toe of slopes

• Drainage layer can be used to keep water from percolating through the surface of the

Brian Prowell 12/4/08Modified thrid bullet

ADVANCED MATERIALSSERVICES, LLC

Poor Drainage?

ADVANCED MATERIALSSERVICES, LLC

Deterioration Due to WaterBrian Prowell 12/4/08new slide

ADVANCED MATERIALSSERVICES, LLC

Drainage Layer

HMA Wearing CourseHMA Leveling Course

HMA Base Course

Drainage Layer (optional)

Aggregate Subbase

Subgrade or embankment soil

1.5 in.

1.5 in.

2.0 in.

Typical Track Section

Separation geotextile (?)

Brian Prowell 12/4/08Added separation geotextile

ADVANCED MATERIALSSERVICES, LLC

Typical Surface Mix Design• Stiff Binder

– PG 82-XX – XX depends on climate– 180 °F Softening Point– Elastic Recovery – ensure polymer modification

• 9.5 mm (3/8 inch) NMAS Surface– Polish resistant aggregate– 75-Blow Marshall – Gradation close to maximum density line– Good in-place density!

Brian Prowell 12/4/08Added 3/8 inch to second major bullet

Plant on Site or Close By (Ideally)

ADVANCED MATERIALSSERVICES, LLC

Test Sections Required

ADVANCED MATERIALSSERVICES, LLC

Calibrate Nuclear Gauge

ADVANCED MATERIALSSERVICES, LLC

Bad Habits in the Test Section – Bad Habits on the Track

ADVANCED MATERIALSSERVICES, LLC

Begin Paving• Each lift is a dress rehearsal for the surface• Number of passes depends on geometry

– Want to minimize longitudinal joints

– Road courses can be paved in echelon – might not be best choice

– More passes may be needed to minimize grade change at hinge points on ovals

• Check smoothness after each lift• Grind or precision mill as necessary• Goal is a perfect surface!

ADVANCED MATERIALSSERVICES, LLC

Mix Generally Has to be Hauled Through Tunnel as Paving Progresses

ADVANCED MATERIALSSERVICES, LLC

Getting Mix to the Paver – A Challenge on Ovals

SlatConveyor

ADVANCED MATERIALSSERVICES, LLC

Tamping Bar Screed Paver• Can obtain up to

90% Gmm directly behind screed

• Minimizes roll down – 1/8 inch per inch instead of typical ¼ inch per inch

• Less roll down = smoother pavement

ADVANCED MATERIALSSERVICES, LLC

Smoothness

• Grade Control – 3 dimensions in curves

• String lines sometimes used

• Surface placed with paver on automatic– Uniform thickness– Ski with bridge to new mat– Tamping bar screed – minimizes roll down– Stable mix

ADVANCED MATERIALSSERVICES, LLC

Cut/fill every 10Feet in curves

ADVANCED MATERIALSSERVICES, LLC

Tack

Pave to String Line

Precision Mill Leveling

ADVANCED MATERIALSSERVICES, LLC

Come off Shims

ADVANCED MATERIALSSERVICES, LLC

Ski with Reference to New Mat

Typical Paving Train

Brian Prowell 12/4/08Added title

ADVANCED MATERIALSSERVICES, LLC

ADVANCED MATERIALSSERVICES, LLC

You can’t pave 40 feet wide in a single pass!

ADVANCED MATERIALSSERVICES, LLC

Longitudinal Joints• A weak point in a racetrack pavement as

well as a highway pavement

• Options– Paving in echelon - generally not possible

on ovals– Stagger joints between lifts– Cut back joints

• Saw• Cutting wheel

– Joint sealant

ADVANCED MATERIALSSERVICES, LLC

Longitudinal Joints• A weak point in a racetrack pavement as

well as a highway pavement

• Options– Paving in echelon - generally not possible

on ovals– Stagger joints between lifts– Cut back joints

• Saw• Cutting wheel

– Joint sealant

ADVANCED MATERIALSSERVICES, LLC

Paving in Echelon

ADVANCED MATERIALSSERVICES, LLC

Cut Back Joint

ADVANCED MATERIALSSERVICES, LLC

Rolling 6 in. off the joint –

ADVANCED MATERIALSSERVICES, LLC

Bad Joint after a few months

Good Joint after 3 years

ADVANCED MATERIALSSERVICES, LLC

ADVANCED MATERIALSSERVICES, LLC

ADVANCED MATERIALSSERVICES, LLC

Proper Compaction is a Must!

“The best designed mix in the world, poorly constructed, will not perform as well as a

lower quality mix constructed well.”

Brian Prowell 12/4/08Added quote about best designed mix

ADVANCED MATERIALSSERVICES, LLC

ADVANCED MATERIALSSERVICES, LLC

ADVANCED MATERIALSSERVICES, LLC

18 – 24 degrees – Support from below

ADVANCED MATERIALSSERVICES, LLC

> 24 degrees, suspend from above

ADVANCED MATERIALSSERVICES, LLC

Improper support

ADVANCED MATERIALSSERVICES, LLC

Compaction Against Wall

ADVANCED MATERIALSSERVICES, LLC

Courtesy of Danny James

ADVANCED MATERIALSSERVICES, LLC

Seal Joint with Crash Wall

ADVANCED MATERIALSSERVICES, LLC

Like on a highway, you need

ADVANCED MATERIALSSERVICES, LLC

Density on BaseAnd LevelingMonitored with gauge, accepted with cores

ADVANCED MATERIALSSERVICES, LLC

QA Density

TalladegaNuclear GaugeAvg. Mat = 94.2% Gmm

Avg. Joint = 92.1% Gmm

Darlington January 12, 2008Avg. Density: Cores 93.9% Gmm

Gauge 93.7% Gmm

ADVANCED MATERIALSSERVICES, LLC

Put Curbs in After AsphaltFinished Asphalt higher thancurb

ADVANCED MATERIALSSERVICES, LLC

Attention to Detail

ADVANCED MATERIALSSERVICES, LLC

Attention to Detail

ADVANCED MATERIALSSERVICES, LLC

Attention to Detail

Immediately after rolling Different track after one year

Brian Prowell 12/5/08Fly in picture with foot and oval

ADVANCED MATERIALSSERVICES, LLC

Attention to Detail

ADVANCED MATERIALSSERVICES, LLC

Testing

ADVANCED MATERIALSSERVICES, LLC

What Do You Need to Pave a Racetrack?

ADVANCED MATERIALSSERVICES, LLC

Thanks!

Brian ProwellAdvanced Materials Services, LLC2515 E. Glenn Ave., Suite 107Auburn, AL 36830(334) 246-4428Brian@AMSLLC.US