Glatfelter Hall_Gettysburg College

Preview:

Citation preview

wagman.com

Glatfelter Hall

Wagman completed a $540,000 contract for Glatfelter Hall Renovations on the campus of Gettysburg College. Glatfelter Hall was built in 1888, upon a field stone foundation wall that varied in thickness from 2 - 3’. Wagman’s Geotechnical Construction group provided the required upgrades in the basement of the building, by underpinning the existing foundations in order to transfer the load of the building to the underpinning concrete and provide adequate capacity. The underpinning pits were performed in sequences. Each pit was dry-packed for 2 days following concrete placement.

The project was awarded 1st place in the Category C-1 Historical Restoration by the ABC Cumberland Valley Chapter in September 2015.

Project Glatfelter Hall, Gettysburg College

Location Gettysburg, PA

Project Type Underpinning

Duration July 2013 - October 2013

Construction Costs $540,000

Owner Gettysburg College

KEY CHALLENGES & PROJECT DETAILS• Glatfelter Hall was built in 1888.• 304 total underpinning pits were installed by hand.• Each pit was approximately 3’W x 3’H x 3’D.• Over 300 CY of concrete were placed in underpinning pits.• Work was performed utilizing air hammers, clay spades, mini-excavators and skid steers.

Recommended