Our Dae Yang ENG Co.,Ltd. Company has been established for construction & commissioning services in oil/gas project constructions on a basis of abundant experience of technology.

Since we have commenced our business in oil/gas project industry forming cooperative partnership with ship-building companies, it has become our mission to develop ourselvesto be in top class in the fields of specialty construction & commissioning with advanced technology and skilled engineers.We have been achieving great success in development of oil/gas projects and petro-chemical plant constructions when collaborate with a major ship-building companies.Moreover, our company had been improving its productivity, strict quality control and observance of HSE regulations.

We also execute offers in section of equipment installation, mechanical completion and operations, maintenance work with best service quality. Especially, our company had An experience in outsourced offshore operations and maintenance contracts for drilling equipment and sub-sea system.Hereafter, in the 21 st century, Our Dae Yang ENG Co.,Ltd. will advance to worldwide business putting best effort in every single project. At the same time, we will strive to enhance ourtechnology of commissioning services even high baring 'Challenge & Overcome' in everypersonnel’s mind.

We expect your affectionate advice and constant support in order to meet clients' need and development of our technology in oil/gas industry.

Index Index

1. Profile2. Organization3. History4. Business field5. Service activities6. Project experience list7. Major performance record8. Quality management system (Appendix)9. Technical manpower list (Appendix)10. Test equipment & instrument list ( Appendix )11. Location & Travel

ProfileProfile

BUSINESS :Construction & Commissioning of mechanical,electrical, instrumentation, hydro piping & Oil flushing drilling & sub-sea system for oil & gasproject and petro-chemical plant.

ESTABILISHMENT: May.2005FINANCE :Capital \600,000 $US

Assets \350,000 $USCAPACITY :\ 3,500,000 $US (Year 2012 )EMPLOYMENT :Office staff-4, Construction-3, Mechanical ,Piping

commissioning-3, Electrical/instrumentation-5.Total technician for production: 100

INSURANCE :National Pension, National health Insurance,Employment Insurance, Industrial Acident Compensation Insurance

OrganizationOrganization

SK Ahn

K S Kwon

Elect/Instcommissioning

Mech/Pipingcommissioining

Installation/Hook-up

Managing Director

JH Kwon

YS LeeSO YangLeader

Engineering /Supporting

President

Drilling/Sub-sea Team

Leader YS Choi

ProductionEngineering

Supporting

Mechanical /Piping

Elec./Inst. & HVACInstrumentationTeam

HVAC Team

Electrical Team

Leader Leader

Mechanical Team

Piping Team

HVAC Team

Company historyCompany history

Mar 1984 1984 AlienedAliened with SAM CHANG Industrial Co. and started oil/gas project with SAM CHANG Industrial Co. and started oil/gas project constructionconstruction

Feb 1998 Associated KUM YANG Industrial Co. and joined Al-Shaheen projectconstruction

May 2005 Established limited company “DAE Yang ENG. consist with SAM CHANG, and KUM YANG for exclusive construction & commissioning work of oil/gas at ship yard.

July 2013 Established limited company “DAE Yang ENG Co.,Ltd.. consist with SAM CHANG, and KUM YANG, Dae Yang ENG. for exclusive construction & commissioning work of oil/gas at ship yard.

Business fieldBusiness field

○ CONTRACT for Mechanical, Piping and Electrical & Instrumentation of offshore project .○ INSTALLATION & COMMISSIONING for Electrical / I&C / Mechanical / Piping/Hydro.○ Offshore Total Solutions.

◆◆ Mechanical/HydraulicMechanical/Hydraulic1. System MC, pre-commissioning, commissioning, start up test2. Rotating machinery installation, alignment, unit pre-start up test and operation3. Marine utility system installation and test

◆◆ Piping, Hydro test, Leak test (He)Piping, Hydro test, Leak test (He)1. Piping/tubing fabricating & installation, high pressure hydro test. line flushing, hydro test,

sensitive leak test and function test2. Field modification, repair and punch rectification

◆◆ Electrical and I&CElectrical and I&C1. Field instrument calibration, cable pulling & connection2. I/O validation check (Loop test, F&G, Cause & Effect test)3. Electrical testing (Sequence, no load test)

◆◆ HVACHVAC1. System installation check (Exclusive sub-contractor for AC MARINE-Norway)2. Pre-commissioning & commissioning includes air & chilled water balancing

◆◆Drilling / SubDrilling / Sub--sea systemsea system1. Drilling equipment installation & test,

Service activitiesService activities

Project experienceProject experience--11

Jul 1983 Arabian American Oil Co. - Mar Jan GOSP #2, #3 (C/O HHI)Fabrication & Installation of Electrical & Instrument at on-shore, off-shore commissioning

Oct 1984 Oil & Natural Gas Corporation – SH complex PH-3 (C/O HHI)Fabrication & Installation of Electrical & Instrumentation and Hydro piping at on-shore

Apr 1986 AGIP Co. Ltd, Libya – NC- 41 A & B (C/O HHI)Fabrication & Installation of Electrical & Instrument and Hydro piping at on-shore,

Mar 1993 Dusan Backhwa Co. - RGO PlantDesign, Procurement, Fab. & Install. of hydro Piping and Electrical & Instrument Works

Apr 1994 Iljin Electric Co. - Batch PlantInstallation of Electrical & Instrument and Hydro piping Works

May 1995 Hankook Glass Co, - Electric PrecipitatorDesign, Procurement, Fab. & Install. of Electrical & Instrument Works

May 1996 Ssangyong Oil Co. - Waste Treatment FacilitiesDesign, Fabrication & Installation of Piping System

Mar 1998 Deepwater Drilling LLC, U.S.A. - Drilling System & Gantry CraneInstallation & Pre-commissioning of Drilling Equipment (c/o SHI)Modification of Drill Pipe Handling 120Ton Crane (c/o MOS)

Apr 1998 Sakhalin Energy Co. - Molikpaq Drilling & Production Arctic StructureMating Work between the Spacer and the Arctic Structure (c/o DHI)

Jul. 1999 Daewoo Heavy Industries - Accommodation BargeModification & Refurbishment of Hook-up Barge (350 Crew)

Jan. 1999 Halliburton Group Canada Inc. - Terra Nova FPSO ProjectEngineering, Fabrication, Installation & Commissioning of Winterization System (Steam Tracing, Electric Tracing) & Insulation Works

Aug. 1999 Halliburton Group Canada Inc. - Terra Nova FPSO ProjectConstruction Engineering, Fabrication, Installation & Commissioning of Piping, Hydraulic, Electrical & Instrument Systems for Internal Turret

Aug. 1999 Reading & Bates - Navis Explorer#1 Drill Ship Fabrication, Installation, Modification of Fingerboard & Conveyor System

Apr. 2000 Chevron, U.S.A – North Nemba II Project (C/O DHI)Detail design and Fabrication of MCC Building

Apr. 2001 Petro drill Engineering – Amethyst ,Semi-submersible Drilling Rigs (2 Units)Electric and I&C Loop test , Marine system Pre-com., Commissioning & Sea Trial

Jul. 2001 Stelma Chemical tanker, Tank monitoring system (C/O Ship owner: Stelma @ STX Yard)Detail design, Prefab, installation and test onboard at sea.

Project experienceProject experience--22

Project experienceProject experience--33

Nov.2001 H-1145 Main engine Cascade tank / JCFW Cooling unit (C/O DSME)Detail design, supply , fabrication , ass’y , test, transportation

Jan.2002 Minoan Passenger ship , 3 units (C/O SHI)Hot and cold insulation / electric tracing workDetail design, supply, installation and test.

Jun.2003 Mearsk Oil Qatar AS – Al Shaheen Block – 5 field (C/O HHI)Fabrication & Installation of Electrical & InstrumentationE & I commissioning at on-shore

Feb.2004 Kone (Finland) shipboard gantry crane 68 tons ,8 units( C/O DSME)Mechanical, Hydraulic ,Electric and I&C control station/test/commissioning

Mar.2004 A.P. Moller Jack-up Drilling Rig Harsh Environment ( C/O HHI)Construction work for electrical & Instrumentation, Hydro piping, commissioning of Electrical & Instrument at on-shore, off-shore

May.2004 Donghae – 1 KNOC (C/O HHI)Fabrication & Installation of Electrical & Instrument at on-shore, off-shore commissioning

Jun. 2004 ESSO Exploration Angola – KIZOMBA “A/B” FPSO (C/O HHI)Construction work for electrical & Instrumentation, and Hydro piping, commissioning of Electrical & Instrument at on-shore ,off-shore.

Project experienceProject experience--44

Jul. 2004 BP Thunderhorse semi-submersible rig,(C/O DSME)HVAC/Marine utility/Electrical/I&C and Hydro ping Construction,M/C, pre-comm’g, commissioning.

Sep.2004 AGIP Gas BV Sabratha platform (C/O HHI)Construction work for electrical & Instrumentation, and Hydro piping commissioning of Electrical & Instrument at on-shore

Dec.2004 Exxonmobil Kizomba-BTLP (C/O DSME)Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Feb.2005 BP Atlantis semi-submersible rig, (C/O DSME)HVAC/Marine utility/Electrical/I&C, Hydro piping, M/C,pre-comm’g, commissioning.

Feb.2005 Chevron Bengular Belige production platform,(C/O DSME)Electrical/I&C, Hydro piping M/C, pre-commissioning and offshore commissioning.

Mar. 2006 Total Dalia FPSO Topsides , integration & test/commissioning,(C/O DSME)Electrical/I&C M/C, onshore commissioning.

Dec. 2007 Chevron AGBAMI FPSO (C/O DSME)Electrical/ Mech. & Hydro Piping installation, Hook-up, M/C, onshore commissioning.

Feb. 2007 Smedvig 7045 West E-Drill Rig ,(C/O SHI)LQ Piping Construction and Hydro Testing,M/C, pre-comm’g, commissioning.

Oct. 2007 Drick and Helideck for Seadrill Rig (C/O 호창/거성)Construction work for electrical & Instrumentation, and Piping and Hydro piping with testing.

Feb. 2008 Helideck for Petroserve & Odfiell (C/O 호창/거성)Construction work for electrical & Instrumentation, and Piping and Hydro piping with testing.

Apr. 2007 Chevron Takula Fixed Platform (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

June. 2007 Seadrill (GVA 7500) Semi Drilling Rig, (C/O DSME)Derick and Drill floow Equipment Electrical/I&C, Hydro piping, M/C,pre-comm’g, commissioning.

June. 2008 Pyrenees FPSO Development Project (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and

I&C total installation/test/commissioning.June. 2008 IHI/GP Phase-3 Dehydration Unit (Part-C) (C/O NATCO JAPAN)

Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Feb. 2009 HHI/Gsi Vapour recovery compressor Package Package Equipment Mechanical, Hook-up, Electric punch killing.

Feb. 2009 MODEC/GUARA PWT SKID Project (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Project experienceProject experience--55

Feb. 2009 TOTAL/FPSO PAZFLOW Project (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Feb. 2010 MODEC/FPSO BP Block31 PSVM Project GDU PKG(C/O CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Mar. 2010 MODEC/FPSO BP Block31 Project VRU PKG(C/O NASH)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Mar. 2010 MODEC/FPSO BP Block31 PSVM Project CIP PKG(C/O CAMERON USA)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Mar. 2010 TOTAL USAN FPSO E&P Nigeria Limited project(C/O TOTAL)PUNCH clearance

Mar. 2010 HYUNDAI KARAN GAS Project GDU/OFF GAS 3 SKID(C/O CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Aug. 2010 MODEC GUARA-FPSO Produced Water Treatment PKG(C/O CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

Mar. 2011 SHWE GDU Two Packages (C/O HHI/GPS)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.

June. 2011 KOC/BS-132 GDU Packages (C/O SKEC/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

Project experienceProject experience--66

Mar. 2011 CLOV GDU Two Packages (C/O DSME/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

Mar. 2012 CLOV FPSO PWT-3 Packages (C/O DSME/FLSmidth)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

Mar. 2012 OSX3 FPSO PWT Packages (C/O MODEC/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

Aug. 2012 Refinery Master Plan 2(RMP-2) Packages (C/O DAELIM/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

June. 2012 Salman cost plus offshore platform (C/O IOC/GO Plantech)Offshore platformtotal construction and commissioning workTotal solution

Nov. 2012 Ocean#6 Rig Deerick Fabriction and construction (C/O NOVK/GSSE)Piping, Hydraulic, Electric and I&C total installation/test/commissioning

Project experienceProject experience--77

Mar. 2012 CLOV FPSO PWT-3 Packages (C/O DSME/FLSmidth)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

Mar. 2012 OSX3 FPSO PWT Packages (C/O MODEC/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

Aug. 2012 Refinery Master Plan 2(RMP-2) Packages (C/O DAELIM/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning

June. 2012 Salman cost plus offshore platform (C/O IOC/GO Plantech)Offshore platformtotal construction and commissioning workTotal solution

Nov. 2012 Ocean#6 Rig Deerick Fabriction and construction (C/O NOVK/GSSE)Piping, Hydraulic, Electric and I&C total installation/test/commissioning

Project experienceProject experience--88

Mar. 2013 MEASK #2 Derrick project (C/O SHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning

Aug. 2013 BP CLAIR Derrick project (C/O HHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning

Aug. 2013 SEADRILL #9 Derrick project (C/O SHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning

Feb. 2013 Goliat project GAS Compressor 4 Package (C/O HHI/GE)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning with Punch Clearance

Feb. 2013 Goliat project Chemical Injection Package (C/O HHI/AG)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning with Punch Clearance

May. 2013 Goliat project Fresh Water Generator 3 Package (C/O HHI/ENI Norge)Mezz deck and Access platform Fabrication and InstallationPackage Equipment Mechanical,Installation, Electric and I&C total installation/test/commissioning with Punch Clearance

Project experienceProject experience--99

Nov. 2013 IJPS DKPP project Package(C/O SIJPS)Piping and Electric&Instrument installation/test/commissioning

Dec. 2013 OCEAN RIG#8 Derrick project (C/O SHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning

Jan. 2014 MMCS 60 Derrick project (C/O HHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning

Mar. 2014 GQGOG#3 Derrick project (C/O SHI/NOVK/GSSE) Jan. 2014 Mafumeira Sul Platform Project(C/O DSME/SHEVRON)

E&I Construction Inspection and SupervisingJuly. 2014 Moho Nord FPU Project(C/O TOTAL/HHI/KOLON System)

TEG Package Electric&Instrument installation/test/commissioningAug 2014 Pyunggil Green Water Ship W,W,T Project(C/O Pyunggil Green Water)

Plant Electric&Instrument installation/test/commissioningSep. 2014 Moho Nord FPU Project(C/O TOTAL/HHI/KOLON System)

SCF/SRU,CIP Package Electric&Instrument installation/test/commissioning

Project experienceProject experience--1010

MarJan OffhoreMarJan Offhore--GOSP #2,#3GOSP #2,#3

CLIENT : Saudi Arabia Aramco (c/o HHI)■ Onshore : 1984~1985■ Offshore : 1985~1987Performed work in the name of Sam Chang Industries

CLIENT : Saudi Arabia Aramco (c/o HHI)■ Onshore : 1984~1985■ Offshore : 1985~1987Performed work in the name of Sam Chang Industries

■ Description: Jacket-10eaPile-42” X 58eaTop side module-22eaBridge-8ea

■ Fabrication & Installation,Fabrication & Installation,■ Elect. &Inst. ConstructionElect. &Inst. Construction

ONGC SH Complex PHONGC SH Complex PH--33

CLIENT: Oil & Natural Gas Corporation in INDIA (c/o HHI)■ Location: Mumbai High India■ Period: 1984~1985Performed work in the name of Sam Chang Industries

CLIENT: Oil & Natural Gas Corporation in INDIA (c/o HHI)■ Location: Mumbai High India■ Period: 1984~1985Performed work in the name of Sam Chang Industries

■ Description: Platform-2eaBridge, Pile

■ Fabrication & Installation, Fabrication & Installation, ■ E&I & Hydro piping E&I & Hydro piping

Construction & Construction & Commissioning.Commissioning.

AgipAgip NCNC--41A&B41A&B

CLIENT : Agip in Libya (c/o HHI)■ Onshore : 1986~1987■ Offshore : 1987~1988Performed work in the name of Sam Chang Industries

CLIENT : Agip in Libya (c/o HHI)■ Onshore : 1986~1987■ Offshore : 1987~1988Performed work in the name of Sam Chang Industries

■ Description: Top side module-9ea

■ Fabrication & Installation, Fabrication & Installation, ■ E&I & Hydro piping E&I & Hydro piping

Construction &Construction &CommissioningCommissioning

MOLIKPAQ MOLIKPAQ –– Sakhalin II ProjectSakhalin II Project

■ CLIENT : Sakhalin Energy Investment Co. (c/o DHI)

■ CONTRACT : June 10, 1998■ COMPLETION : September 20, 1999

■ CLIENT : Sakhalin Energy Investment Co. (c/o DHI)

■ CONTRACT : June 10, 1998■ COMPLETION : September 20, 1999

■ Arctic Mobile Structure- Drilling & Production Steel Mobile

Arctic Caisson - Operating Location

: Offshore Sakhalin, Russia- Production Capacity

Oil 90,000 bbl/DayGas 72 mmscf/Day

■ Scope of Work- Modification & Refurbishment of

Drilling Equipment, Process Facilities- Removal & Reinstatement of

HVAC System for Accommodation- Sea Mating between a Spacer

and the Steel Caisson to heighten Operating Water Depth

Winterization System Terra Nova FPSO Project Winterization System Terra Nova FPSO Project

■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : January 7, 1999■ COMPLETION : March 15, 2000

■■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : January 7, 1999■ COMPLETION : March 15, 2000

■ FPSO Vessel- Monohull

: 291m(L) x 45m(W) x 28m(D)- Oprating Location

: Canadian New Foundland

■ Process- Oil Production : 20,000m3/Day- Storage : 155,000 m3

- Offloading : 8,000 m3/Hour

■ Scope of Work System- Steam Tracing * Cargo Oil- Electric Tracing * Steam Supply- Insulation * Condensate

* Potable & Sea Water

* Fuel OilEngineering, Procurement, Fabrication, Installation, Test & Commissioning

Internal Turret Terra Nova FPSO Project Internal Turret Terra Nova FPSO Project

■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : August 10, 1999■ COMPLETION : February 18, 2000

■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : August 10, 1999■ COMPLETION : February 18, 2000

■ FPSO Vessel- Monohull

: 291m(L) x 45m(W) x 28m(D)- Operating Location

: Canadian New Foundland

■ Process- Internal Turret for Mooring & Risers- Production Risers 8 Ea

HP Gas Lift 2 EaHP Gas Injection 2 EaWater Injection 2 Ea

■ Scope of WorkConstruction engineering, Fabrication, Installation, Test & Pre- commissioning of Lower Turret Structure

- Piping System- Hydraulic System- Electrical & Instrument Works

Fingerboard & Conveyor R & B Navis Explorer #1Fingerboard & Conveyor R & B Navis Explorer #1

■ CLIENT : Reading & Bates, USA (c/o Hitec, Norway)■ CONTRACT : July 2, 1999■ COMPLETION : September 11,1999

■■ CLIENT : Reading & Bates, USA (c/o Hitec, Norway)■ CONTRACT : July 2, 1999■ COMPLETION : September 11,1999

■ Fingerboard on Drill Ship- Derrick : 66m(H) x 15m x 14m

■ Scope Of Work- Fabrication, Installation & Test

of Vertical Pipe Handler

- Installed & Tested at SHI yard

■ Pipedeck Conveyor on Drill Ship- Conveyor : 19m(L) x 2.2m x

2.5m

■ Scope of Work- Modification & Refurbishment

Commissioning & Sea Trial Amethyst Rigs ( 2 units) Commissioning & Sea Trial Amethyst Rigs ( 2 units)

■ CLIENT : Petrodrill Eng., Netherlands (c/o DHI)■ CONTRACT : April 1, 2000■ COMPLETION : April 1, 2002

■ CLIENT : Petrodrill Eng., Netherlands (c/o DHI)■ CONTRACT : April 1, 2000■ COMPLETION : April 1, 2002

■ Drilling Rigs (2 Units)- Semi-Submersible Type- Two Pontoons : 76mL x 55mB

Four ColumnsOne Buoyant Twin Deck

- Topside Platform : 74mL x 49mB- Deck Load : 3,500 Tons- Power Generation : 6 x 3.3mW

■ Scope of Work (Commissioning of mechanical, electrical, instrumentation)- Marine & Utility commissioning

(at Quay and at Sea)- Automation System Loop test- Elect. System commissioning

Assembly,Installation,testing and commissioningAssembly,Installation,testing and commissioning 68Ton Shipboard gantry crane(8sets)68Ton Shipboard gantry crane(8sets)

■ CLIENT : KONE crane inc, Finland■ CONTRACT : August 19, 2002■ COMPLETION : Feb. 5, 2004

■ CLIENT : KONE crane inc, Finland■ CONTRACT : August 19, 2002■ COMPLETION : Feb. 5, 2004

■ Shipboard gantry crane(8sets/4shipsets)- 68 ton- container turntable & grab adaptor - Hydraulic devices: hatch cover lifting

Jib slewing/parking jacking/Jib locking

- 44OVAC Supply & 275 kg/㎠ 50KW x2 HPU 750m hyd. Piping per crane.

- 2 cable reel & 2 cable boom

■ Scope of Work (Mech./Hydraulic/Electrical)- From assembly to onshore commissioning- Hyd. Pressure test & flushing to DNV

ALAL--Shaheen BlockShaheen Block--5 Field Development5 Field Development

CLIENT : Maersk Oil Qatar (c/o HHI)■ Preiod: 2002~2003Performed work in the name of Kum Yang Industries

CLIENT : Maersk Oil Qatar (c/o HHI)■ Preiod: 2002~2003Performed work in the name of Kum Yang Industries

Description: Platform-10eaGas comp.-4ea

Fabrication & Installation Fabrication & Installation ■

E&I, piping Construction & E&I, piping Construction & CommissioningCommissioning

onon--shore & offshore & off--shoreshore

Harsh Environment JackHarsh Environment Jack--up Drilling Rig # 2up Drilling Rig # 2

Client: A.P. Moller, Denmark (c/o HHI)

■ Period: 2002~2004Performed work in the name of Kum Yang Industries

Client: A.P. Moller, Denmark (c/o HHI)

■ Period: 2002~2004Performed work in the name of Kum Yang Industries

■ E & I ,piping Construction & pre-commissioning at on-shore

■ Electrical test, I&C Loop test ■ E & I commissioning at off-shore

DonghaeDonghae--11

Client: Korea National Oil Corporation (c/o HHI)

■ Location: Ulsan Korea■ Period: 2002~May 2004Performed work in the name of Kum Yang Industries

Client: Korea National Oil Corporation (c/o HHI)

■ Location: Ulsan Korea■ Period: 2002~May 2004Performed work in the name of Kum Yang Industries

Fabrication & InstallationFabrication & Installation■ E&I,and piping E&I,and piping

Construction & PreConstruction & Pre--commissioning at oncommissioning at on--shoreshore

■ Electrical equipment commissioning and I & Ctest at off-shore

■ Top side: 35000 ton

Kizomba A/B FPSOKizomba A/B FPSO

Client: Exxonmobil Angola (c/o HHI)

■ Period: Sep. 2002 ~Jun. 2004Performed work in the name of Kum Yang Industries

Client: Exxonmobil Angola (c/o HHI)

■ Period: Sep. 2002 ~Jun. 2004Performed work in the name of Kum Yang Industries

■ Description: FPSO285M X 63M X 32.2M

■ E & I, and piping Construction ■ Electrical equipment and Hydro

commissioning■ I&C Loop test at on/off- shore

BP Thunderhorse semiBP Thunderhorse semi--submersible rigsubmersible rig

■ CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : July 15, 2004

■ CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : July 15, 2004

■ Marine Utility system pre- commissioning and commissioning.- Bilge system - HVAC system

■ Electrical test ■ Hydro test■ Oil Flushing■ I&C Loop test, hydro test

Sabratha PlatformSabratha Platform

Client :Agip Gas BV Italy (c/o HHI)■ Period: Dec. 2003 ~ Sep.2004Performed work in the name of Kum Yang Industries

Client :Agip Gas BV Italy (c/o HHI)■ Period: Dec. 2003 ~ Sep.2004Performed work in the name of Kum Yang Industries

■ Fabrication & Installation■ Electrical test for pre-commissioning■ I&C Loop, function, logic test,

Hydro piping.

Exxonmobil KizombaExxonmobil Kizomba--BTLPBTLP

■ CLIENT : Exxonmobil,USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : December 23, 2004

■ CLIENT : Exxonmobil,USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : December 23, 2004

■ Drilling systemMechanical and E&IMechanical completionand testing

■ Marine Utility system pre-commissioning and commissioning.- Bilge system - Deck machinery

■ Electrical test■ Hydro test&Oil Flushing■ I&C Loop test,

BP Atlantis semiBP Atlantis semi--submersible rigsubmersible rig

CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : February 25, 2005

CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : February 25, 2005

■Marine Utility system pre-commissioning and commissioning.- Bilge system - HVAC system- Hydraulic valve system

■ Electrical test■ I&C Loop test ,hydro test ■ Punch clear work

(esp. vendor punches)

Chevron Benguela Belize platformChevron Benguela Belize platform..

CLIENT : Chevron (c/o DSME)■ CONTRACT : October 01. 2003■ COMPLETION : February 28. 2005Performed work in the name of Dae Yang ENG

CLIENT : Chevron (c/o DSME)■ CONTRACT : October 01. 2003■ COMPLETION : February 28. 2005Performed work in the name of Dae Yang ENG

■ Electrical testing,Hydro piping, and testing.

■ Fuel gas package field ass’y & test

■Package equipment PLC control test and mechanical commissioning at offshore(Swage treatment sys, Sea water strainer sys, Emergency D/G)

■ Instrument Loop test at offshore( in process).

TOTAL Dalia FPSOTOTAL Dalia FPSO

CLIENT : TOTAL / TSS (c/o DSME)■ CONTRACT : September 20. 2005■ COMPLETION : March 07. 2006

CLIENT : TOTAL / TSS (c/o DSME)■ CONTRACT : September 20. 2005■ COMPLETION : March 07. 2006

■ Ballast for module installation■ Cable connection inside E&I

modules.■ Onshore commissioning assist

to TSS Elect/ Inst./ Mech./ Process.

■ Preservation■ Offshore commissioning and

COW during ocean towing

ExxonmobilExxonmobil fixed platform SABLESABLE

■Package equipment MC and commissioning

(Fire water pump, ethanol injection pump etc)

■ Instrument Loop test■ Fiber optical cable

installation and connection■ N2 leak test for piping■ Punch clearance

CLIENT : Exxonmobil (c/o DSME)■ CONTRACT : January 14. 2006■ COMPLETION : April 11. 2006

CLIENT : Exxonmobil (c/o DSME)■ CONTRACT : January 14. 2006■ COMPLETION : April 11. 2006

Chevron FPSO AGBAMIChevron FPSO AGBAMI

■E & I loop test for Hull and Top-side

■Hydro piping and Flushing for ROV and Sub-sea control system

■Helium leak test■COW & Punch work■Commissioning for marine

utility system■Commissioning for production

equipment

■ CLIENT : Chevron (c/o DSME)■ CONTRACT : July. 2006■ COMPLETION: October. 2007Performed work in the name of Dae Yang ENG

■ CLIENT : Chevron (c/o DSME)■ CONTRACT : July. 2006■ COMPLETION: October. 2007Performed work in the name of Dae Yang ENG

Smedvig 7045 West ESmedvig 7045 West E--DrillDrill

■ LQ Piping MC and commissioning

( All piping etc) ■ Hydro test■ Punch clearance

CLIENT : SMEDVIG (c/o SHI)■ CONTRACT : February 01. 2007■ COMPLETION : December 31. 20Performed work in the name of Dae Yang ENG

CLIENT : SMEDVIG (c/o SHI)■ CONTRACT : February 01. 2007■ COMPLETION : December 31. 20Performed work in the name of Dae Yang ENG

Derick and HelideckDerick and Helideck

■ Package equipment MC and commissioning

(E&I and Piping, Hydro piping etc)

■ Instrument Loop test■ Hydro Testing■ Punch clearance

CLIENT : Seadrill (3019/3020)/호창/거성

■ CONTRACT : October 10. 2007■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG

CLIENT : Seadrill (3019/3020)/호창/거성

■ CONTRACT : October 10. 2007■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG

Helideck(Petroserve&Odfiell)Helideck(Petroserve&Odfiell)

■ Package equipment MC and commissioning

(E&I and Piping, Hydro piping etc)

■ Instrument Loop test■ Hydro Testing■ Punch clearance

CLIENT : Petroserve, Odfjell/호창/거성

■ CONTRACT : Feb. 01. 2008■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG

CLIENT : Petroserve, Odfjell/호창/거성

■ CONTRACT : Feb. 01. 2008■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG

ChevronChevron Takula fixed platform

■Package equipment MC and commissioning

(E&I and Piping installation) ■ Instrument Loop test■ Hydro Testing (with G.R.E)■ Punch clearance

CLIENT : SHI(c/o Natco Japan)■ CONTRACT : April 01. 2007■ COMPLETION : Feb 20 2008Performed work in the name of Dae Yang ENG

CLIENT : SHI(c/o Natco Japan)■ CONTRACT : April 01. 2007■ COMPLETION : Feb 20 2008Performed work in the name of Dae Yang ENG

Seadrill (GVA 7500) Semi Drilling Rig

■ Derick and Drill Floow Equipment MC and commissioning

(E&I and Hydro Piping etc) ■ Instrument Loop test■ Hydro Testing■ Punch clearance

CLIENT : Seadrill (c/o DSME), Geo Seoung■ CONTRACT : June 20. 2007■ COMPLETION : Dec 30 . 2009Performed work in the name of Dae Yang ENG

CLIENT : Seadrill (c/o DSME), Geo Seoung■ CONTRACT : June 20. 2007■ COMPLETION : Dec 30 . 2009Performed work in the name of Dae Yang ENG

Pyrenees Development ProjectPyrenees Development Project

■ Package equipment MC and commissioning

(E&I and Piping, Hydro piping etc)

■ Instrument Loop test■ Hydro Testing■ Punch clearance

CLIENT : Modec (c/o Natco Japan)■ CONTRACT : May,05. 2008■ COMPLETION : Octobere 05. 2008Performed work in the name of Dae Yang ENG

CLIENT : Modec (c/o Natco Japan)■ CONTRACT : May,05. 2008■ COMPLETION : Octobere 05. 2008Performed work in the name of Dae Yang ENG

IHI/GP1Z PhaseIHI/GP1Z Phase--3 Dehydration Unit(Part3 Dehydration Unit(Part--C)C)

■ Package equipment MC and commissioning

(E&I and Piping, Hydro piping etc)

■ Instrument Loop test■ Hydro Testing■ Punch clearance

CLIENT : IHI (c/o Natco Japan)■ CONTRACT : May.05 2008■ COMPLETION : Feb 25 . 2009Performed work in the name of Dae Yang ENG

CLIENT : IHI (c/o Natco Japan)■ CONTRACT : May.05 2008■ COMPLETION : Feb 25 . 2009Performed work in the name of Dae Yang ENG

GSI Vapour recovery compressor PKGGSI Vapour recovery compressor PKG

■ Package equipment MC and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : HHI (c/o GSI)■ CONTRACT : Feb.05, 2009■ COMPLETION : Mar’ 30th 2009Performed work in the name of Dae Yang ENG

CLIENT : HHI (c/o GSI)■ CONTRACT : Feb.05, 2009■ COMPLETION : Mar’ 30th 2009Performed work in the name of Dae Yang ENG

MODEC/GUARA PWT PackageMODEC/GUARA PWT Package

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG

CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG

TOTAL/FPSO Pazflow GDU PackageTOTAL/FPSO Pazflow GDU Package

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG

CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG

TOTAL/FPSO Pazflow GDU PackageTOTAL/FPSO Pazflow GDU Package

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG

CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG

MODEC/FPSO BP Block31 GDU PKGMODEC/FPSO BP Block31 GDU PKG

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.01, 2010■ COMPLETION : InprogressPerformed work in the name of Dae Yang ENG

CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.01, 2010■ COMPLETION : InprogressPerformed work in the name of Dae Yang ENG

MODEC/FPSO BP Block31 VRU PKGMODEC/FPSO BP Block31 VRU PKG

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : MODEC (c/o NASH)■ CONTRACT : Apr.01, 2010■ COMPLETION : Aug.31. 2010Performed work in the name of Dae Yang ENG

CLIENT : MODEC (c/o NASH)■ CONTRACT : Apr.01, 2010■ COMPLETION : Aug.31. 2010Performed work in the name of Dae Yang ENG

MODEC/FPSO BP Block31 CIP PKGMODEC/FPSO BP Block31 CIP PKG

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : MODEC (c/o Cameron USA)■ CONTRACT : Mar.01, 2010■ COMPLETION : Aug.31,2010Performed work in the name of Dae Yang ENG

CLIENT : MODEC (c/o Cameron USA)■ CONTRACT : Mar.01, 2010■ COMPLETION : Aug.31,2010Performed work in the name of Dae Yang ENG

TOTAL USAN FPSO(E&P Nigeria Limited) TOTAL USAN FPSO(E&P Nigeria Limited)

■ Punch clearance (E&I and Piping, Equipment, etc)

CLIENT : Total■ CONTRACT : Mar.01, 2010■ COMPLETION : Inprogress.Performed work in the name of Dae Yang ENG

CLIENT : Total■ CONTRACT : Mar.01, 2010■ COMPLETION : Inprogress.Performed work in the name of Dae Yang ENG

HYUNDAI KARAN GAS GDU/OFF GAS SKID(3set)HYUNDAI KARAN GAS GDU/OFF GAS SKID(3set)

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : HYUNDAI (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2010■ COMPLETION : Apr.30 , 2011Performed work in the name of Dae Yang ENG

CLIENT : HYUNDAI (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2010■ COMPLETION : Apr.30 , 2011Performed work in the name of Dae Yang ENG

MODEC GUARAMODEC GUARA--FPSO PWT PKG FPSO PWT PKG

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2010■ COMPLETION : Mar,30, 2011.Performed work in the name of Dae Yang ENG

CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2010■ COMPLETION : Mar,30, 2011.Performed work in the name of Dae Yang ENG

SHWE Project GDU PKG(2 set) SHWE Project GDU PKG(2 set)

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : DAEWOO E&P (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2011■ COMPLETION : Oct.31,2011Performed work in the name of Dae Yang ENG

CLIENT : DAEWOO E&P (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2011■ COMPLETION : Oct.31,2011Performed work in the name of Dae Yang ENG

KOC/BSKOC/BS--132 Project GDU PKG 132 Project GDU PKG

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : SKEC (c/o Cameron JAPAN)■ CONTRACT : June.01, 2011■ COMPLETION : Dec.31,2012Performed work in the name of Dae Yang ENG

CLIENT : SKEC (c/o Cameron JAPAN)■ CONTRACT : June.01, 2011■ COMPLETION : Dec.31,2012Performed work in the name of Dae Yang ENG

CLOV FPSO Project GDU PKG(2 set) CLOV FPSO Project GDU PKG(2 set)

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : DSME (c/o Cameron JAPAN)■ CONTRACT : Nov.01, 2011■ COMPLETION : Oct.31,2012Performed work in the name of Dae Yang ENG

CLIENT : DSME (c/o Cameron JAPAN)■ CONTRACT : Nov.01, 2011■ COMPLETION : Oct.31,2012Performed work in the name of Dae Yang ENG

CLOV FPSO Project PWT PKG(3 set) CLOV FPSO Project PWT PKG(3 set)

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : DSME/FLSmidth (c/o 일진에너지㈜)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2013Performed work in the name of Dae Yang ENG

CLIENT : DSME/FLSmidth (c/o 일진에너지㈜)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2013Performed work in the name of Dae Yang ENG

OS3X FPSO Project PWT PKG OS3X FPSO Project PWT PKG

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2012Performed work in the name of Dae Yang ENG

CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2012Performed work in the name of Dae Yang ENG

Refinery Master PlanRefinery Master Plan--2 Project 2 Project

■ Package equipment Construction and commissioning

(E&I and Piping, Equipment, etc)

■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : DAELIM (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2012■ COMPLETION : Dec.31. 2012Performed work in the name of Dae Yang ENG

CLIENT : DAELIM (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2012■ COMPLETION : Dec.31. 2012Performed work in the name of Dae Yang ENG

Salman cost plus offshore project Salman cost plus offshore project

■ Offshore Platform Total Construction and commissioning

■ Total Solution

CLIENT : IOOC(c/o GO Plantec)■ CONTRACT : June.01, 2012■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG

CLIENT : IOOC(c/o GO Plantec)■ CONTRACT : June.01, 2012■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG

Ocean#6 Rig Derrick Project Ocean#6 Rig Derrick Project

■ Piping Construction and commissioning

■ E&I Construction and commissioning

■ Instrument Hook-up■ Punch clearance

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Nov.01, 2012■ COMPLETION : Mar.31, 2013Performed work in the name of Dae Yang ENG

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Nov.01, 2012■ COMPLETION : Mar.31, 2013Performed work in the name of Dae Yang ENG

MEARSK#2 Derrick Project MEARSK#2 Derrick Project

■ Piping Construction and commissioning

■ E&I Construction and commissioning

■ Instrument Hook-up■ Punch clearance

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Mar.01, 2013■ COMPLETION : June.31, 2013Performed work in the name of Dae Yang ENG

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Mar.01, 2013■ COMPLETION : June.31, 2013Performed work in the name of Dae Yang ENG

BP CLAIR Derrick Project BP CLAIR Derrick Project

■ Piping Construction and commissioning

■ E&I Construction and commissioning

■ Instrument Hook-up■ Punch clearance

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

SEADRILL#9 Derrick Project SEADRILL#9 Derrick Project

■ Piping Construction and commissioning

■ E&I Construction and commissioning

■ Instrument Hook-up■ Punch clearance

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

Goliat Project GAS Compressor 4 PackageGoliat Project GAS Compressor 4 Package

■ Piping ■ Electrical ■ Instrument Hook-up■ Punch clearance

CLIENT : HHI(c/o GE)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : HHI(c/o GE)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

Goliat Project Chemical Injection PackageGoliat Project Chemical Injection Package

■ Piping ■ Electrical ■ Instrument Hook-up■ Punch clearance

CLIENT : HHI(c/o AG)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : HHI(c/o AG)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

Goliat Project Fresh Water Generator PackageGoliat Project Fresh Water Generator Package

■ Piping Fab’Installation ■ Electrical Installation■ Instrument Hook-up■ Mechine Inatllation■ Mezz deck&Access

platform Fab’Installation■ Punch clearance

CLIENT : HHI(c/o ENI Norge)■ CONTRACT : May.01, 2013■ COMPLETION : Feb. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : HHI(c/o ENI Norge)■ CONTRACT : May.01, 2013■ COMPLETION : Feb. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.

IJPS DKPP Project PackageIJPS DKPP Project Package

■ Piping Fab’Installation ■ Electrical Installation■ Instrument Hook-up■ Mechine Inatllation■ Punch clearance

CLIENT : ILJIN plant service Co.,Ltd.■ CONTRACT : Nov.01, 2013■ COMPLETION : Feb.28,2014Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : ILJIN plant service Co.,Ltd.■ CONTRACT : Nov.01, 2013■ COMPLETION : Feb.28,2014Performed work in the name of Dae Yang ENG Co.,Ltd.

Ocean#8(SHI) Derrick Project Ocean#8(SHI) Derrick Project

■ Piping Installation ■ Electrical Installation■ Instrument Hook-up■ Punch clearance

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Dec.01, 2013■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Dec.01, 2013■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.

MMCS60(HHI)

Derrick Project Derrick Project

■ Piping Installation ■ Electrical Installation■ Instrument Hook-up■ Punch clearance

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Jan.01, 2014■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : NOVK (c/o GSSE)■ CONTRACT : Jan.01, 2014■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.

Mafumeird Sul Platform

Project Project

■ Electrical Installation■ Instrument Hook-up■ Punch clearance■ Supervising &Inspection

CLIENT : DSME/SHEVRON (C/0 CAMERON)■ CONTRACT : Jan.01, 2014■ COMPLETION : June,30,2014Performed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : DSME/SHEVRON (C/0 CAMERON)■ CONTRACT : Jan.01, 2014■ COMPLETION : June,30,2014Performed work in the name of Dae Yang ENG Co.,Ltd.

Moho Nord FPU Project TEG PKG Project Project

■ Package equipment Construction and commissioning

(E&I and Equipment, etc) ■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.

Pyunggil Green Water Ship W.W.T Project

■ Plant Construction and commissioning

(E&I and Equipment, etc) ■ HV Power system■ MV Power/Panel system■ Instrument Hook-up■ Leak Testing■ Punch clearance■ Testing & Commissioning

CLIENT : Pyunggil Green Water■ CONTRACT : Sep.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : Pyunggil Green Water■ CONTRACT : Sep.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.

Moho Nord FPU Project TEG PKG Project Project

■ Package equipment Construction and commissioning

(E&I and Equipment, etc) ■ Instrument Hook-up■ Leak Testing■ Punch clearance

CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.

CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.

Route 1 (Seoul →Pusan →Ulsan)(1) Seoul → Pusan : 1 hr. by air(2) Pusan →

Ulsan. Car :1 hrs

Route 2 (Seoul → Ulsan)(1) Seoul →

Ulsan : 1 hr. by air

Location & Travel

KOREA

ULSAN

1 H

SEOUL

1 H

1 H

Location & TravelLocation & Travel

Recommended