Plant, Offshore Construction & Commissioning and Total Solutions Homepage:www.dyeng-offshore.com
E-Mail:[email protected] Tel :+82-52-237-4907 Fax : +82-52-237-4908
Exclusive Construction & Commissioning Group
GreetingsGreetings
Our Dae Yang ENG Co.,Ltd. Company has been established for construction & commissioning services in oil/gas project constructions on a basis of abundant experience of technology.
Since we have commenced our business in oil/gas project industry forming cooperative partnership with ship-building companies, it has become our mission to develop ourselvesto be in top class in the fields of specialty construction & commissioning with advanced technology and skilled engineers.We have been achieving great success in development of oil/gas projects and petro-chemical plant constructions when collaborate with a major ship-building companies.Moreover, our company had been improving its productivity, strict quality control and observance of HSE regulations.
We also execute offers in section of equipment installation, mechanical completion and operations, maintenance work with best service quality. Especially, our company had An experience in outsourced offshore operations and maintenance contracts for drilling equipment and sub-sea system.Hereafter, in the 21 st century, Our Dae Yang ENG Co.,Ltd. will advance to worldwide business putting best effort in every single project. At the same time, we will strive to enhance ourtechnology of commissioning services even high baring 'Challenge & Overcome' in everypersonnel’s mind.
We expect your affectionate advice and constant support in order to meet clients' need and development of our technology in oil/gas industry.
Index Index
1. Profile2. Organization3. History4. Business field5. Service activities6. Project experience list7. Major performance record8. Quality management system (Appendix)9. Technical manpower list (Appendix)10. Test equipment & instrument list ( Appendix )11. Location & Travel
ProfileProfile
BUSINESS :Construction & Commissioning of mechanical,electrical, instrumentation, hydro piping & Oil flushing drilling & sub-sea system for oil & gasproject and petro-chemical plant.
ESTABILISHMENT: May.2005FINANCE :Capital \600,000 $US
Assets \350,000 $USCAPACITY :\ 3,500,000 $US (Year 2012 )EMPLOYMENT :Office staff-4, Construction-3, Mechanical ,Piping
commissioning-3, Electrical/instrumentation-5.Total technician for production: 100
INSURANCE :National Pension, National health Insurance,Employment Insurance, Industrial Acident Compensation Insurance
OrganizationOrganization
SK Ahn
K S Kwon
Elect/Instcommissioning
Mech/Pipingcommissioining
Installation/Hook-up
Managing Director
JH Kwon
YS LeeSO YangLeader
Engineering /Supporting
President
Drilling/Sub-sea Team
Leader YS Choi
ProductionEngineering
Supporting
Mechanical /Piping
Elec./Inst. & HVACInstrumentationTeam
HVAC Team
Electrical Team
Leader Leader
Mechanical Team
Piping Team
HVAC Team
Company historyCompany history
Mar 1984 1984 AlienedAliened with SAM CHANG Industrial Co. and started oil/gas project with SAM CHANG Industrial Co. and started oil/gas project constructionconstruction
Feb 1998 Associated KUM YANG Industrial Co. and joined Al-Shaheen projectconstruction
May 2005 Established limited company “DAE Yang ENG. consist with SAM CHANG, and KUM YANG for exclusive construction & commissioning work of oil/gas at ship yard.
July 2013 Established limited company “DAE Yang ENG Co.,Ltd.. consist with SAM CHANG, and KUM YANG, Dae Yang ENG. for exclusive construction & commissioning work of oil/gas at ship yard.
Business fieldBusiness field
○ CONTRACT for Mechanical, Piping and Electrical & Instrumentation of offshore project .○ INSTALLATION & COMMISSIONING for Electrical / I&C / Mechanical / Piping/Hydro.○ Offshore Total Solutions.
◆◆ Mechanical/HydraulicMechanical/Hydraulic1. System MC, pre-commissioning, commissioning, start up test2. Rotating machinery installation, alignment, unit pre-start up test and operation3. Marine utility system installation and test
◆◆ Piping, Hydro test, Leak test (He)Piping, Hydro test, Leak test (He)1. Piping/tubing fabricating & installation, high pressure hydro test. line flushing, hydro test,
sensitive leak test and function test2. Field modification, repair and punch rectification
◆◆ Electrical and I&CElectrical and I&C1. Field instrument calibration, cable pulling & connection2. I/O validation check (Loop test, F&G, Cause & Effect test)3. Electrical testing (Sequence, no load test)
◆◆ HVACHVAC1. System installation check (Exclusive sub-contractor for AC MARINE-Norway)2. Pre-commissioning & commissioning includes air & chilled water balancing
◆◆Drilling / SubDrilling / Sub--sea systemsea system1. Drilling equipment installation & test,
Service activitiesService activities
Project experienceProject experience--11
Jul 1983 Arabian American Oil Co. - Mar Jan GOSP #2, #3 (C/O HHI)Fabrication & Installation of Electrical & Instrument at on-shore, off-shore commissioning
Oct 1984 Oil & Natural Gas Corporation – SH complex PH-3 (C/O HHI)Fabrication & Installation of Electrical & Instrumentation and Hydro piping at on-shore
Apr 1986 AGIP Co. Ltd, Libya – NC- 41 A & B (C/O HHI)Fabrication & Installation of Electrical & Instrument and Hydro piping at on-shore,
Mar 1993 Dusan Backhwa Co. - RGO PlantDesign, Procurement, Fab. & Install. of hydro Piping and Electrical & Instrument Works
Apr 1994 Iljin Electric Co. - Batch PlantInstallation of Electrical & Instrument and Hydro piping Works
May 1995 Hankook Glass Co, - Electric PrecipitatorDesign, Procurement, Fab. & Install. of Electrical & Instrument Works
May 1996 Ssangyong Oil Co. - Waste Treatment FacilitiesDesign, Fabrication & Installation of Piping System
Mar 1998 Deepwater Drilling LLC, U.S.A. - Drilling System & Gantry CraneInstallation & Pre-commissioning of Drilling Equipment (c/o SHI)Modification of Drill Pipe Handling 120Ton Crane (c/o MOS)
Apr 1998 Sakhalin Energy Co. - Molikpaq Drilling & Production Arctic StructureMating Work between the Spacer and the Arctic Structure (c/o DHI)
Jul. 1999 Daewoo Heavy Industries - Accommodation BargeModification & Refurbishment of Hook-up Barge (350 Crew)
Jan. 1999 Halliburton Group Canada Inc. - Terra Nova FPSO ProjectEngineering, Fabrication, Installation & Commissioning of Winterization System (Steam Tracing, Electric Tracing) & Insulation Works
Aug. 1999 Halliburton Group Canada Inc. - Terra Nova FPSO ProjectConstruction Engineering, Fabrication, Installation & Commissioning of Piping, Hydraulic, Electrical & Instrument Systems for Internal Turret
Aug. 1999 Reading & Bates - Navis Explorer#1 Drill Ship Fabrication, Installation, Modification of Fingerboard & Conveyor System
Apr. 2000 Chevron, U.S.A – North Nemba II Project (C/O DHI)Detail design and Fabrication of MCC Building
Apr. 2001 Petro drill Engineering – Amethyst ,Semi-submersible Drilling Rigs (2 Units)Electric and I&C Loop test , Marine system Pre-com., Commissioning & Sea Trial
Jul. 2001 Stelma Chemical tanker, Tank monitoring system (C/O Ship owner: Stelma @ STX Yard)Detail design, Prefab, installation and test onboard at sea.
Project experienceProject experience--22
Project experienceProject experience--33
Nov.2001 H-1145 Main engine Cascade tank / JCFW Cooling unit (C/O DSME)Detail design, supply , fabrication , ass’y , test, transportation
Jan.2002 Minoan Passenger ship , 3 units (C/O SHI)Hot and cold insulation / electric tracing workDetail design, supply, installation and test.
Jun.2003 Mearsk Oil Qatar AS – Al Shaheen Block – 5 field (C/O HHI)Fabrication & Installation of Electrical & InstrumentationE & I commissioning at on-shore
Feb.2004 Kone (Finland) shipboard gantry crane 68 tons ,8 units( C/O DSME)Mechanical, Hydraulic ,Electric and I&C control station/test/commissioning
Mar.2004 A.P. Moller Jack-up Drilling Rig Harsh Environment ( C/O HHI)Construction work for electrical & Instrumentation, Hydro piping, commissioning of Electrical & Instrument at on-shore, off-shore
May.2004 Donghae – 1 KNOC (C/O HHI)Fabrication & Installation of Electrical & Instrument at on-shore, off-shore commissioning
Jun. 2004 ESSO Exploration Angola – KIZOMBA “A/B” FPSO (C/O HHI)Construction work for electrical & Instrumentation, and Hydro piping, commissioning of Electrical & Instrument at on-shore ,off-shore.
Project experienceProject experience--44
Jul. 2004 BP Thunderhorse semi-submersible rig,(C/O DSME)HVAC/Marine utility/Electrical/I&C and Hydro ping Construction,M/C, pre-comm’g, commissioning.
Sep.2004 AGIP Gas BV Sabratha platform (C/O HHI)Construction work for electrical & Instrumentation, and Hydro piping commissioning of Electrical & Instrument at on-shore
Dec.2004 Exxonmobil Kizomba-BTLP (C/O DSME)Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Feb.2005 BP Atlantis semi-submersible rig, (C/O DSME)HVAC/Marine utility/Electrical/I&C, Hydro piping, M/C,pre-comm’g, commissioning.
Feb.2005 Chevron Bengular Belige production platform,(C/O DSME)Electrical/I&C, Hydro piping M/C, pre-commissioning and offshore commissioning.
Mar. 2006 Total Dalia FPSO Topsides , integration & test/commissioning,(C/O DSME)Electrical/I&C M/C, onshore commissioning.
Dec. 2007 Chevron AGBAMI FPSO (C/O DSME)Electrical/ Mech. & Hydro Piping installation, Hook-up, M/C, onshore commissioning.
Feb. 2007 Smedvig 7045 West E-Drill Rig ,(C/O SHI)LQ Piping Construction and Hydro Testing,M/C, pre-comm’g, commissioning.
Oct. 2007 Drick and Helideck for Seadrill Rig (C/O 호창/거성)Construction work for electrical & Instrumentation, and Piping and Hydro piping with testing.
Feb. 2008 Helideck for Petroserve & Odfiell (C/O 호창/거성)Construction work for electrical & Instrumentation, and Piping and Hydro piping with testing.
Apr. 2007 Chevron Takula Fixed Platform (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
June. 2007 Seadrill (GVA 7500) Semi Drilling Rig, (C/O DSME)Derick and Drill floow Equipment Electrical/I&C, Hydro piping, M/C,pre-comm’g, commissioning.
June. 2008 Pyrenees FPSO Development Project (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and
I&C total installation/test/commissioning.June. 2008 IHI/GP Phase-3 Dehydration Unit (Part-C) (C/O NATCO JAPAN)
Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Feb. 2009 HHI/Gsi Vapour recovery compressor Package Package Equipment Mechanical, Hook-up, Electric punch killing.
Feb. 2009 MODEC/GUARA PWT SKID Project (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Project experienceProject experience--55
Feb. 2009 TOTAL/FPSO PAZFLOW Project (C/O NATCO JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Feb. 2010 MODEC/FPSO BP Block31 PSVM Project GDU PKG(C/O CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Mar. 2010 MODEC/FPSO BP Block31 Project VRU PKG(C/O NASH)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Mar. 2010 MODEC/FPSO BP Block31 PSVM Project CIP PKG(C/O CAMERON USA)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Mar. 2010 TOTAL USAN FPSO E&P Nigeria Limited project(C/O TOTAL)PUNCH clearance
Mar. 2010 HYUNDAI KARAN GAS Project GDU/OFF GAS 3 SKID(C/O CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Aug. 2010 MODEC GUARA-FPSO Produced Water Treatment PKG(C/O CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
Mar. 2011 SHWE GDU Two Packages (C/O HHI/GPS)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning.
June. 2011 KOC/BS-132 GDU Packages (C/O SKEC/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
Project experienceProject experience--66
Mar. 2011 CLOV GDU Two Packages (C/O DSME/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
Mar. 2012 CLOV FPSO PWT-3 Packages (C/O DSME/FLSmidth)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
Mar. 2012 OSX3 FPSO PWT Packages (C/O MODEC/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
Aug. 2012 Refinery Master Plan 2(RMP-2) Packages (C/O DAELIM/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
June. 2012 Salman cost plus offshore platform (C/O IOC/GO Plantech)Offshore platformtotal construction and commissioning workTotal solution
Nov. 2012 Ocean#6 Rig Deerick Fabriction and construction (C/O NOVK/GSSE)Piping, Hydraulic, Electric and I&C total installation/test/commissioning
Project experienceProject experience--77
Mar. 2012 CLOV FPSO PWT-3 Packages (C/O DSME/FLSmidth)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
Mar. 2012 OSX3 FPSO PWT Packages (C/O MODEC/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
Aug. 2012 Refinery Master Plan 2(RMP-2) Packages (C/O DAELIM/CAMERON JAPAN)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning
June. 2012 Salman cost plus offshore platform (C/O IOC/GO Plantech)Offshore platformtotal construction and commissioning workTotal solution
Nov. 2012 Ocean#6 Rig Deerick Fabriction and construction (C/O NOVK/GSSE)Piping, Hydraulic, Electric and I&C total installation/test/commissioning
Project experienceProject experience--88
Mar. 2013 MEASK #2 Derrick project (C/O SHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning
Aug. 2013 BP CLAIR Derrick project (C/O HHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning
Aug. 2013 SEADRILL #9 Derrick project (C/O SHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning
Feb. 2013 Goliat project GAS Compressor 4 Package (C/O HHI/GE)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning with Punch Clearance
Feb. 2013 Goliat project Chemical Injection Package (C/O HHI/AG)Package Equipment Mechanical, Hydraulic, Electric and I&C total installation/test/commissioning with Punch Clearance
May. 2013 Goliat project Fresh Water Generator 3 Package (C/O HHI/ENI Norge)Mezz deck and Access platform Fabrication and InstallationPackage Equipment Mechanical,Installation, Electric and I&C total installation/test/commissioning with Punch Clearance
Project experienceProject experience--99
Nov. 2013 IJPS DKPP project Package(C/O SIJPS)Piping and Electric&Instrument installation/test/commissioning
Dec. 2013 OCEAN RIG#8 Derrick project (C/O SHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning
Jan. 2014 MMCS 60 Derrick project (C/O HHI/NOVK/GSSE)Piping and Electric&Instrument installation/test/commissioning
Mar. 2014 GQGOG#3 Derrick project (C/O SHI/NOVK/GSSE) Jan. 2014 Mafumeira Sul Platform Project(C/O DSME/SHEVRON)
E&I Construction Inspection and SupervisingJuly. 2014 Moho Nord FPU Project(C/O TOTAL/HHI/KOLON System)
TEG Package Electric&Instrument installation/test/commissioningAug 2014 Pyunggil Green Water Ship W,W,T Project(C/O Pyunggil Green Water)
Plant Electric&Instrument installation/test/commissioningSep. 2014 Moho Nord FPU Project(C/O TOTAL/HHI/KOLON System)
SCF/SRU,CIP Package Electric&Instrument installation/test/commissioning
Project experienceProject experience--1010
MarJan OffhoreMarJan Offhore--GOSP #2,#3GOSP #2,#3
■
CLIENT : Saudi Arabia Aramco (c/o HHI)■ Onshore : 1984~1985■ Offshore : 1985~1987Performed work in the name of Sam Chang Industries
■
CLIENT : Saudi Arabia Aramco (c/o HHI)■ Onshore : 1984~1985■ Offshore : 1985~1987Performed work in the name of Sam Chang Industries
■ Description: Jacket-10eaPile-42” X 58eaTop side module-22eaBridge-8ea
■ Fabrication & Installation,Fabrication & Installation,■ Elect. &Inst. ConstructionElect. &Inst. Construction
ONGC SH Complex PHONGC SH Complex PH--33
■
CLIENT: Oil & Natural Gas Corporation in INDIA (c/o HHI)■ Location: Mumbai High India■ Period: 1984~1985Performed work in the name of Sam Chang Industries
■
CLIENT: Oil & Natural Gas Corporation in INDIA (c/o HHI)■ Location: Mumbai High India■ Period: 1984~1985Performed work in the name of Sam Chang Industries
■ Description: Platform-2eaBridge, Pile
■ Fabrication & Installation, Fabrication & Installation, ■ E&I & Hydro piping E&I & Hydro piping
Construction & Construction & Commissioning.Commissioning.
AgipAgip NCNC--41A&B41A&B
■
CLIENT : Agip in Libya (c/o HHI)■ Onshore : 1986~1987■ Offshore : 1987~1988Performed work in the name of Sam Chang Industries
■
CLIENT : Agip in Libya (c/o HHI)■ Onshore : 1986~1987■ Offshore : 1987~1988Performed work in the name of Sam Chang Industries
■ Description: Top side module-9ea
■ Fabrication & Installation, Fabrication & Installation, ■ E&I & Hydro piping E&I & Hydro piping
Construction &Construction &CommissioningCommissioning
MOLIKPAQ MOLIKPAQ –– Sakhalin II ProjectSakhalin II Project
■ CLIENT : Sakhalin Energy Investment Co. (c/o DHI)
■ CONTRACT : June 10, 1998■ COMPLETION : September 20, 1999
■ CLIENT : Sakhalin Energy Investment Co. (c/o DHI)
■ CONTRACT : June 10, 1998■ COMPLETION : September 20, 1999
■ Arctic Mobile Structure- Drilling & Production Steel Mobile
Arctic Caisson - Operating Location
: Offshore Sakhalin, Russia- Production Capacity
Oil 90,000 bbl/DayGas 72 mmscf/Day
■ Scope of Work- Modification & Refurbishment of
Drilling Equipment, Process Facilities- Removal & Reinstatement of
HVAC System for Accommodation- Sea Mating between a Spacer
and the Steel Caisson to heighten Operating Water Depth
Winterization System Terra Nova FPSO Project Winterization System Terra Nova FPSO Project
■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : January 7, 1999■ COMPLETION : March 15, 2000
■■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : January 7, 1999■ COMPLETION : March 15, 2000
■ FPSO Vessel- Monohull
: 291m(L) x 45m(W) x 28m(D)- Oprating Location
: Canadian New Foundland
■ Process- Oil Production : 20,000m3/Day- Storage : 155,000 m3
- Offloading : 8,000 m3/Hour
■ Scope of Work System- Steam Tracing * Cargo Oil- Electric Tracing * Steam Supply- Insulation * Condensate
* Potable & Sea Water
* Fuel OilEngineering, Procurement, Fabrication, Installation, Test & Commissioning
Internal Turret Terra Nova FPSO Project Internal Turret Terra Nova FPSO Project
■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : August 10, 1999■ COMPLETION : February 18, 2000
■ CLIENT : Halliburton, Canada (c/o DHI)■ CONTRACT : August 10, 1999■ COMPLETION : February 18, 2000
■ FPSO Vessel- Monohull
: 291m(L) x 45m(W) x 28m(D)- Operating Location
: Canadian New Foundland
■ Process- Internal Turret for Mooring & Risers- Production Risers 8 Ea
HP Gas Lift 2 EaHP Gas Injection 2 EaWater Injection 2 Ea
■ Scope of WorkConstruction engineering, Fabrication, Installation, Test & Pre- commissioning of Lower Turret Structure
- Piping System- Hydraulic System- Electrical & Instrument Works
Fingerboard & Conveyor R & B Navis Explorer #1Fingerboard & Conveyor R & B Navis Explorer #1
■ CLIENT : Reading & Bates, USA (c/o Hitec, Norway)■ CONTRACT : July 2, 1999■ COMPLETION : September 11,1999
■■ CLIENT : Reading & Bates, USA (c/o Hitec, Norway)■ CONTRACT : July 2, 1999■ COMPLETION : September 11,1999
■ Fingerboard on Drill Ship- Derrick : 66m(H) x 15m x 14m
■ Scope Of Work- Fabrication, Installation & Test
of Vertical Pipe Handler
- Installed & Tested at SHI yard
■ Pipedeck Conveyor on Drill Ship- Conveyor : 19m(L) x 2.2m x
2.5m
■ Scope of Work- Modification & Refurbishment
Commissioning & Sea Trial Amethyst Rigs ( 2 units) Commissioning & Sea Trial Amethyst Rigs ( 2 units)
■ CLIENT : Petrodrill Eng., Netherlands (c/o DHI)■ CONTRACT : April 1, 2000■ COMPLETION : April 1, 2002
■ CLIENT : Petrodrill Eng., Netherlands (c/o DHI)■ CONTRACT : April 1, 2000■ COMPLETION : April 1, 2002
■ Drilling Rigs (2 Units)- Semi-Submersible Type- Two Pontoons : 76mL x 55mB
Four ColumnsOne Buoyant Twin Deck
- Topside Platform : 74mL x 49mB- Deck Load : 3,500 Tons- Power Generation : 6 x 3.3mW
■ Scope of Work (Commissioning of mechanical, electrical, instrumentation)- Marine & Utility commissioning
(at Quay and at Sea)- Automation System Loop test- Elect. System commissioning
Assembly,Installation,testing and commissioningAssembly,Installation,testing and commissioning 68Ton Shipboard gantry crane(8sets)68Ton Shipboard gantry crane(8sets)
■ CLIENT : KONE crane inc, Finland■ CONTRACT : August 19, 2002■ COMPLETION : Feb. 5, 2004
■ CLIENT : KONE crane inc, Finland■ CONTRACT : August 19, 2002■ COMPLETION : Feb. 5, 2004
■ Shipboard gantry crane(8sets/4shipsets)- 68 ton- container turntable & grab adaptor - Hydraulic devices: hatch cover lifting
Jib slewing/parking jacking/Jib locking
- 44OVAC Supply & 275 kg/㎠ 50KW x2 HPU 750m hyd. Piping per crane.
- 2 cable reel & 2 cable boom
■ Scope of Work (Mech./Hydraulic/Electrical)- From assembly to onshore commissioning- Hyd. Pressure test & flushing to DNV
ALAL--Shaheen BlockShaheen Block--5 Field Development5 Field Development
■
CLIENT : Maersk Oil Qatar (c/o HHI)■ Preiod: 2002~2003Performed work in the name of Kum Yang Industries
■
CLIENT : Maersk Oil Qatar (c/o HHI)■ Preiod: 2002~2003Performed work in the name of Kum Yang Industries
■
Description: Platform-10eaGas comp.-4ea
■
Fabrication & Installation Fabrication & Installation ■
E&I, piping Construction & E&I, piping Construction & CommissioningCommissioning
onon--shore & offshore & off--shoreshore
Harsh Environment JackHarsh Environment Jack--up Drilling Rig # 2up Drilling Rig # 2
■
Client: A.P. Moller, Denmark (c/o HHI)
■ Period: 2002~2004Performed work in the name of Kum Yang Industries
■
Client: A.P. Moller, Denmark (c/o HHI)
■ Period: 2002~2004Performed work in the name of Kum Yang Industries
■ E & I ,piping Construction & pre-commissioning at on-shore
■ Electrical test, I&C Loop test ■ E & I commissioning at off-shore
DonghaeDonghae--11
■
Client: Korea National Oil Corporation (c/o HHI)
■ Location: Ulsan Korea■ Period: 2002~May 2004Performed work in the name of Kum Yang Industries
■
Client: Korea National Oil Corporation (c/o HHI)
■ Location: Ulsan Korea■ Period: 2002~May 2004Performed work in the name of Kum Yang Industries
■
Fabrication & InstallationFabrication & Installation■ E&I,and piping E&I,and piping
Construction & PreConstruction & Pre--commissioning at oncommissioning at on--shoreshore
■ Electrical equipment commissioning and I & Ctest at off-shore
■ Top side: 35000 ton
Kizomba A/B FPSOKizomba A/B FPSO
■
Client: Exxonmobil Angola (c/o HHI)
■ Period: Sep. 2002 ~Jun. 2004Performed work in the name of Kum Yang Industries
■
Client: Exxonmobil Angola (c/o HHI)
■ Period: Sep. 2002 ~Jun. 2004Performed work in the name of Kum Yang Industries
■ Description: FPSO285M X 63M X 32.2M
■ E & I, and piping Construction ■ Electrical equipment and Hydro
commissioning■ I&C Loop test at on/off- shore
BP Thunderhorse semiBP Thunderhorse semi--submersible rigsubmersible rig
■ CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : July 15, 2004
■ CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : July 15, 2004
■ Marine Utility system pre- commissioning and commissioning.- Bilge system - HVAC system
■ Electrical test ■ Hydro test■ Oil Flushing■ I&C Loop test, hydro test
Sabratha PlatformSabratha Platform
■
Client :Agip Gas BV Italy (c/o HHI)■ Period: Dec. 2003 ~ Sep.2004Performed work in the name of Kum Yang Industries
■
Client :Agip Gas BV Italy (c/o HHI)■ Period: Dec. 2003 ~ Sep.2004Performed work in the name of Kum Yang Industries
■ Fabrication & Installation■ Electrical test for pre-commissioning■ I&C Loop, function, logic test,
Hydro piping.
Exxonmobil KizombaExxonmobil Kizomba--BTLPBTLP
■ CLIENT : Exxonmobil,USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : December 23, 2004
■ CLIENT : Exxonmobil,USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : December 23, 2004
■ Drilling systemMechanical and E&IMechanical completionand testing
■ Marine Utility system pre-commissioning and commissioning.- Bilge system - Deck machinery
■ Electrical test■ Hydro test&Oil Flushing■ I&C Loop test,
BP Atlantis semiBP Atlantis semi--submersible rigsubmersible rig
■
CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : February 25, 2005
■
CLIENT : British Petrol, USA (c/o DSME)■ CONTRACT : August 19, 2002■ COMPLETION : February 25, 2005
■Marine Utility system pre-commissioning and commissioning.- Bilge system - HVAC system- Hydraulic valve system
■ Electrical test■ I&C Loop test ,hydro test ■ Punch clear work
(esp. vendor punches)
Chevron Benguela Belize platformChevron Benguela Belize platform..
■
CLIENT : Chevron (c/o DSME)■ CONTRACT : October 01. 2003■ COMPLETION : February 28. 2005Performed work in the name of Dae Yang ENG
■
CLIENT : Chevron (c/o DSME)■ CONTRACT : October 01. 2003■ COMPLETION : February 28. 2005Performed work in the name of Dae Yang ENG
■ Electrical testing,Hydro piping, and testing.
■ Fuel gas package field ass’y & test
■Package equipment PLC control test and mechanical commissioning at offshore(Swage treatment sys, Sea water strainer sys, Emergency D/G)
■ Instrument Loop test at offshore( in process).
TOTAL Dalia FPSOTOTAL Dalia FPSO
■
CLIENT : TOTAL / TSS (c/o DSME)■ CONTRACT : September 20. 2005■ COMPLETION : March 07. 2006
■
CLIENT : TOTAL / TSS (c/o DSME)■ CONTRACT : September 20. 2005■ COMPLETION : March 07. 2006
■ Ballast for module installation■ Cable connection inside E&I
modules.■ Onshore commissioning assist
to TSS Elect/ Inst./ Mech./ Process.
■ Preservation■ Offshore commissioning and
COW during ocean towing
ExxonmobilExxonmobil fixed platform SABLESABLE
■Package equipment MC and commissioning
(Fire water pump, ethanol injection pump etc)
■ Instrument Loop test■ Fiber optical cable
installation and connection■ N2 leak test for piping■ Punch clearance
■
CLIENT : Exxonmobil (c/o DSME)■ CONTRACT : January 14. 2006■ COMPLETION : April 11. 2006
■
CLIENT : Exxonmobil (c/o DSME)■ CONTRACT : January 14. 2006■ COMPLETION : April 11. 2006
Chevron FPSO AGBAMIChevron FPSO AGBAMI
■E & I loop test for Hull and Top-side
■Hydro piping and Flushing for ROV and Sub-sea control system
■Helium leak test■COW & Punch work■Commissioning for marine
utility system■Commissioning for production
equipment
■ CLIENT : Chevron (c/o DSME)■ CONTRACT : July. 2006■ COMPLETION: October. 2007Performed work in the name of Dae Yang ENG
■ CLIENT : Chevron (c/o DSME)■ CONTRACT : July. 2006■ COMPLETION: October. 2007Performed work in the name of Dae Yang ENG
Smedvig 7045 West ESmedvig 7045 West E--DrillDrill
■ LQ Piping MC and commissioning
( All piping etc) ■ Hydro test■ Punch clearance
■
CLIENT : SMEDVIG (c/o SHI)■ CONTRACT : February 01. 2007■ COMPLETION : December 31. 20Performed work in the name of Dae Yang ENG
■
CLIENT : SMEDVIG (c/o SHI)■ CONTRACT : February 01. 2007■ COMPLETION : December 31. 20Performed work in the name of Dae Yang ENG
Derick and HelideckDerick and Helideck
■ Package equipment MC and commissioning
(E&I and Piping, Hydro piping etc)
■ Instrument Loop test■ Hydro Testing■ Punch clearance
■
CLIENT : Seadrill (3019/3020)/호창/거성
■ CONTRACT : October 10. 2007■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG
■
CLIENT : Seadrill (3019/3020)/호창/거성
■ CONTRACT : October 10. 2007■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG
Helideck(Petroserve&Odfiell)Helideck(Petroserve&Odfiell)
■ Package equipment MC and commissioning
(E&I and Piping, Hydro piping etc)
■ Instrument Loop test■ Hydro Testing■ Punch clearance
■
CLIENT : Petroserve, Odfjell/호창/거성
■ CONTRACT : Feb. 01. 2008■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG
■
CLIENT : Petroserve, Odfjell/호창/거성
■ CONTRACT : Feb. 01. 2008■ COMPLETION : October 10. 2008Performed work in the name of Dae Yang ENG
ChevronChevron Takula fixed platform
■Package equipment MC and commissioning
(E&I and Piping installation) ■ Instrument Loop test■ Hydro Testing (with G.R.E)■ Punch clearance
■
CLIENT : SHI(c/o Natco Japan)■ CONTRACT : April 01. 2007■ COMPLETION : Feb 20 2008Performed work in the name of Dae Yang ENG
■
CLIENT : SHI(c/o Natco Japan)■ CONTRACT : April 01. 2007■ COMPLETION : Feb 20 2008Performed work in the name of Dae Yang ENG
Seadrill (GVA 7500) Semi Drilling Rig
■ Derick and Drill Floow Equipment MC and commissioning
(E&I and Hydro Piping etc) ■ Instrument Loop test■ Hydro Testing■ Punch clearance
■
CLIENT : Seadrill (c/o DSME), Geo Seoung■ CONTRACT : June 20. 2007■ COMPLETION : Dec 30 . 2009Performed work in the name of Dae Yang ENG
■
CLIENT : Seadrill (c/o DSME), Geo Seoung■ CONTRACT : June 20. 2007■ COMPLETION : Dec 30 . 2009Performed work in the name of Dae Yang ENG
Pyrenees Development ProjectPyrenees Development Project
■ Package equipment MC and commissioning
(E&I and Piping, Hydro piping etc)
■ Instrument Loop test■ Hydro Testing■ Punch clearance
■
CLIENT : Modec (c/o Natco Japan)■ CONTRACT : May,05. 2008■ COMPLETION : Octobere 05. 2008Performed work in the name of Dae Yang ENG
■
CLIENT : Modec (c/o Natco Japan)■ CONTRACT : May,05. 2008■ COMPLETION : Octobere 05. 2008Performed work in the name of Dae Yang ENG
IHI/GP1Z PhaseIHI/GP1Z Phase--3 Dehydration Unit(Part3 Dehydration Unit(Part--C)C)
■ Package equipment MC and commissioning
(E&I and Piping, Hydro piping etc)
■ Instrument Loop test■ Hydro Testing■ Punch clearance
■
CLIENT : IHI (c/o Natco Japan)■ CONTRACT : May.05 2008■ COMPLETION : Feb 25 . 2009Performed work in the name of Dae Yang ENG
■
CLIENT : IHI (c/o Natco Japan)■ CONTRACT : May.05 2008■ COMPLETION : Feb 25 . 2009Performed work in the name of Dae Yang ENG
GSI Vapour recovery compressor PKGGSI Vapour recovery compressor PKG
■ Package equipment MC and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : HHI (c/o GSI)■ CONTRACT : Feb.05, 2009■ COMPLETION : Mar’ 30th 2009Performed work in the name of Dae Yang ENG
■
CLIENT : HHI (c/o GSI)■ CONTRACT : Feb.05, 2009■ COMPLETION : Mar’ 30th 2009Performed work in the name of Dae Yang ENG
MODEC/GUARA PWT PackageMODEC/GUARA PWT Package
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG
■
CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG
TOTAL/FPSO Pazflow GDU PackageTOTAL/FPSO Pazflow GDU Package
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG
■
CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG
TOTAL/FPSO Pazflow GDU PackageTOTAL/FPSO Pazflow GDU Package
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG
■
CLIENT : DSME (c/o Natco Japan)■ CONTRACT : Feb.05, 2009■ COMPLETION : December 05,2009Performed work in the name of Dae Yang ENG
MODEC/FPSO BP Block31 GDU PKGMODEC/FPSO BP Block31 GDU PKG
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.01, 2010■ COMPLETION : InprogressPerformed work in the name of Dae Yang ENG
■
CLIENT : MODEC (c/o Natco Japan)■ CONTRACT : Feb.01, 2010■ COMPLETION : InprogressPerformed work in the name of Dae Yang ENG
MODEC/FPSO BP Block31 VRU PKGMODEC/FPSO BP Block31 VRU PKG
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : MODEC (c/o NASH)■ CONTRACT : Apr.01, 2010■ COMPLETION : Aug.31. 2010Performed work in the name of Dae Yang ENG
■
CLIENT : MODEC (c/o NASH)■ CONTRACT : Apr.01, 2010■ COMPLETION : Aug.31. 2010Performed work in the name of Dae Yang ENG
MODEC/FPSO BP Block31 CIP PKGMODEC/FPSO BP Block31 CIP PKG
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : MODEC (c/o Cameron USA)■ CONTRACT : Mar.01, 2010■ COMPLETION : Aug.31,2010Performed work in the name of Dae Yang ENG
■
CLIENT : MODEC (c/o Cameron USA)■ CONTRACT : Mar.01, 2010■ COMPLETION : Aug.31,2010Performed work in the name of Dae Yang ENG
TOTAL USAN FPSO(E&P Nigeria Limited) TOTAL USAN FPSO(E&P Nigeria Limited)
■ Punch clearance (E&I and Piping, Equipment, etc)
■
CLIENT : Total■ CONTRACT : Mar.01, 2010■ COMPLETION : Inprogress.Performed work in the name of Dae Yang ENG
■
CLIENT : Total■ CONTRACT : Mar.01, 2010■ COMPLETION : Inprogress.Performed work in the name of Dae Yang ENG
HYUNDAI KARAN GAS GDU/OFF GAS SKID(3set)HYUNDAI KARAN GAS GDU/OFF GAS SKID(3set)
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : HYUNDAI (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2010■ COMPLETION : Apr.30 , 2011Performed work in the name of Dae Yang ENG
■
CLIENT : HYUNDAI (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2010■ COMPLETION : Apr.30 , 2011Performed work in the name of Dae Yang ENG
MODEC GUARAMODEC GUARA--FPSO PWT PKG FPSO PWT PKG
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2010■ COMPLETION : Mar,30, 2011.Performed work in the name of Dae Yang ENG
■
CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2010■ COMPLETION : Mar,30, 2011.Performed work in the name of Dae Yang ENG
SHWE Project GDU PKG(2 set) SHWE Project GDU PKG(2 set)
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : DAEWOO E&P (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2011■ COMPLETION : Oct.31,2011Performed work in the name of Dae Yang ENG
■
CLIENT : DAEWOO E&P (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2011■ COMPLETION : Oct.31,2011Performed work in the name of Dae Yang ENG
KOC/BSKOC/BS--132 Project GDU PKG 132 Project GDU PKG
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : SKEC (c/o Cameron JAPAN)■ CONTRACT : June.01, 2011■ COMPLETION : Dec.31,2012Performed work in the name of Dae Yang ENG
■
CLIENT : SKEC (c/o Cameron JAPAN)■ CONTRACT : June.01, 2011■ COMPLETION : Dec.31,2012Performed work in the name of Dae Yang ENG
CLOV FPSO Project GDU PKG(2 set) CLOV FPSO Project GDU PKG(2 set)
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : DSME (c/o Cameron JAPAN)■ CONTRACT : Nov.01, 2011■ COMPLETION : Oct.31,2012Performed work in the name of Dae Yang ENG
■
CLIENT : DSME (c/o Cameron JAPAN)■ CONTRACT : Nov.01, 2011■ COMPLETION : Oct.31,2012Performed work in the name of Dae Yang ENG
CLOV FPSO Project PWT PKG(3 set) CLOV FPSO Project PWT PKG(3 set)
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : DSME/FLSmidth (c/o 일진에너지㈜)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2013Performed work in the name of Dae Yang ENG
■
CLIENT : DSME/FLSmidth (c/o 일진에너지㈜)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2013Performed work in the name of Dae Yang ENG
OS3X FPSO Project PWT PKG OS3X FPSO Project PWT PKG
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2012Performed work in the name of Dae Yang ENG
■
CLIENT : MODEC (c/o Cameron JAPAN)■ CONTRACT : Mar.01, 2012■ COMPLETION : Dec.31.2012Performed work in the name of Dae Yang ENG
Refinery Master PlanRefinery Master Plan--2 Project 2 Project
■ Package equipment Construction and commissioning
(E&I and Piping, Equipment, etc)
■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : DAELIM (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2012■ COMPLETION : Dec.31. 2012Performed work in the name of Dae Yang ENG
■
CLIENT : DAELIM (c/o Cameron JAPAN)■ CONTRACT : Aug.01, 2012■ COMPLETION : Dec.31. 2012Performed work in the name of Dae Yang ENG
Salman cost plus offshore project Salman cost plus offshore project
■ Offshore Platform Total Construction and commissioning
■ Total Solution
■
CLIENT : IOOC(c/o GO Plantec)■ CONTRACT : June.01, 2012■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG
■
CLIENT : IOOC(c/o GO Plantec)■ CONTRACT : June.01, 2012■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG
Ocean#6 Rig Derrick Project Ocean#6 Rig Derrick Project
■ Piping Construction and commissioning
■ E&I Construction and commissioning
■ Instrument Hook-up■ Punch clearance
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Nov.01, 2012■ COMPLETION : Mar.31, 2013Performed work in the name of Dae Yang ENG
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Nov.01, 2012■ COMPLETION : Mar.31, 2013Performed work in the name of Dae Yang ENG
MEARSK#2 Derrick Project MEARSK#2 Derrick Project
■ Piping Construction and commissioning
■ E&I Construction and commissioning
■ Instrument Hook-up■ Punch clearance
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Mar.01, 2013■ COMPLETION : June.31, 2013Performed work in the name of Dae Yang ENG
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Mar.01, 2013■ COMPLETION : June.31, 2013Performed work in the name of Dae Yang ENG
BP CLAIR Derrick Project BP CLAIR Derrick Project
■ Piping Construction and commissioning
■ E&I Construction and commissioning
■ Instrument Hook-up■ Punch clearance
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
SEADRILL#9 Derrick Project SEADRILL#9 Derrick Project
■ Piping Construction and commissioning
■ E&I Construction and commissioning
■ Instrument Hook-up■ Punch clearance
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Aug.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
Goliat Project GAS Compressor 4 PackageGoliat Project GAS Compressor 4 Package
■ Piping ■ Electrical ■ Instrument Hook-up■ Punch clearance
■
CLIENT : HHI(c/o GE)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : HHI(c/o GE)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
Goliat Project Chemical Injection PackageGoliat Project Chemical Injection Package
■ Piping ■ Electrical ■ Instrument Hook-up■ Punch clearance
■
CLIENT : HHI(c/o AG)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : HHI(c/o AG)■ CONTRACT : Feb.01, 2013■ COMPLETION : May. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
Goliat Project Fresh Water Generator PackageGoliat Project Fresh Water Generator Package
■ Piping Fab’Installation ■ Electrical Installation■ Instrument Hook-up■ Mechine Inatllation■ Mezz deck&Access
platform Fab’Installation■ Punch clearance
■
CLIENT : HHI(c/o ENI Norge)■ CONTRACT : May.01, 2013■ COMPLETION : Feb. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : HHI(c/o ENI Norge)■ CONTRACT : May.01, 2013■ COMPLETION : Feb. 2014Performed work in the name of Dae Yang ENG Co.,Ltd.
IJPS DKPP Project PackageIJPS DKPP Project Package
■ Piping Fab’Installation ■ Electrical Installation■ Instrument Hook-up■ Mechine Inatllation■ Punch clearance
■
CLIENT : ILJIN plant service Co.,Ltd.■ CONTRACT : Nov.01, 2013■ COMPLETION : Feb.28,2014Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : ILJIN plant service Co.,Ltd.■ CONTRACT : Nov.01, 2013■ COMPLETION : Feb.28,2014Performed work in the name of Dae Yang ENG Co.,Ltd.
Ocean#8(SHI) Derrick Project Ocean#8(SHI) Derrick Project
■ Piping Installation ■ Electrical Installation■ Instrument Hook-up■ Punch clearance
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Dec.01, 2013■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Dec.01, 2013■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.
MMCS60(HHI)
Derrick Project Derrick Project
■ Piping Installation ■ Electrical Installation■ Instrument Hook-up■ Punch clearance
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Jan.01, 2014■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : NOVK (c/o GSSE)■ CONTRACT : Jan.01, 2014■ COMPLETION : July. 2014 Performed work in the name of Dae Yang ENG Co.,Ltd.
Mafumeird Sul Platform
Project Project
■ Electrical Installation■ Instrument Hook-up■ Punch clearance■ Supervising &Inspection
■
CLIENT : DSME/SHEVRON (C/0 CAMERON)■ CONTRACT : Jan.01, 2014■ COMPLETION : June,30,2014Performed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : DSME/SHEVRON (C/0 CAMERON)■ CONTRACT : Jan.01, 2014■ COMPLETION : June,30,2014Performed work in the name of Dae Yang ENG Co.,Ltd.
Moho Nord FPU Project TEG PKG Project Project
■ Package equipment Construction and commissioning
(E&I and Equipment, etc) ■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.
Pyunggil Green Water Ship W.W.T Project
■ Plant Construction and commissioning
(E&I and Equipment, etc) ■ HV Power system■ MV Power/Panel system■ Instrument Hook-up■ Leak Testing■ Punch clearance■ Testing & Commissioning
■
CLIENT : Pyunggil Green Water■ CONTRACT : Sep.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : Pyunggil Green Water■ CONTRACT : Sep.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.
Moho Nord FPU Project TEG PKG Project Project
■ Package equipment Construction and commissioning
(E&I and Equipment, etc) ■ Instrument Hook-up■ Leak Testing■ Punch clearance
■
CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.
■
CLIENT : HHI/TOTAL (C/0 Kolon system)■ CONTRACT : July.01, 2014■ COMPLETION : be in progressPerformed work in the name of Dae Yang ENG Co.,Ltd.
Route 1 (Seoul →Pusan →Ulsan)(1) Seoul → Pusan : 1 hr. by air(2) Pusan →
Ulsan. Car :1 hrs
Route 2 (Seoul → Ulsan)(1) Seoul →
Ulsan : 1 hr. by air
Location & Travel
KOREA
ULSAN
1 H
SEOUL
1 H
1 H
Location & TravelLocation & Travel