El Camino College Parking Structure – Progress Photographs 12-19-15

Preparation & Installation of Deck Coating Mock-Up

Bead Blasting Deck Coating Mock-Up

Bead Blasting Deck Coating Mock-Up

Mixing Sikadur 22 Lo-Mod

Applying Sikadur 22 Lo-Mod, Primer Coat

Applying Sikadur 22 Lo-Mod, Broadcasting Sand

Applying Sikadur 22 Lo-Mod, 1st Coat Complete

Day 2 – Applying Sikalastic 720 Base

Day 3 – Applying Sikalastic 745 AL, Last Coats

Day 3 – Applying Sikalastic 745 AL, Broadcasting Sand

Day 3 – Applying Sikalastic 745 AL, Deck Coating Mock-Up Complete

Preparation for Test Pile Testing @ Gris Line D

Layout & Drilling of Drag/Chord Clips @ Grid Line C-68 & South

Layout & Drilling of Drag Plates @ Grid Line B

Electrical Rough-In Continues @ Phase I, Grid Lines 28 to 68

Howard Ridley Continuing Concrete Spall Repair @ Phase I, Grid Lines 28 to 68

Barcelo Begins Pile Cap Excavation @ Grid Lines 62 – 66

Temporary Fencing Installed Along Grid Line D, Between 28 & 68