content
1. About EISU introduce. ................................................................................................................... 4
2. EISU(MCOM) to BBU connection(COM) ............................................................................. 7
3. EISU Connect to Rectifier ............................................................................................................... 8
4. Bell ring connection .................................................................................................................... 11
5. Smoke sensor connection ............................................................................................................ 13
6. Temperature and humidity sensor connection ........................................................................... 15
7. Door contact(door magnistor) connection ................................................................................. 17
8. GND cut cable connection ........................................................................................................... 19
10. Phase Failure connection ......................................................................................................... 23
11. Door Access control(CHD 202FC) connection ........................................................................ 24
12. battery theft Connection....................................................................................................... 24
13. feeder theft connection..................................................................................................... 27
14. DC
Fan connection ................................................................................................................ 29
15. AC remove connection ............................................................................................................. 32
16. air condition control installation and connection.................................................................... 33
17 air condition status ........................................................................................................................ 34
8/18/2019 EISU Connection Guidance(Indoor Site)
4/35
ZTE中兴
1. About EISU introduce.
(EISU mount on the wall)The distance from the bottom to the Ground should be 1.2m---1.5m. and
cannot install below the Air-condition in case leak.
Switch
8/18/2019 EISU Connection Guidance(Indoor Site)
5/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
6/35
ZTE中兴
EISU
mount on the wall and the bottom height from ground is about 1.2m –
1.5
m. Do not mount the EISU below the Air-condition or somewhere easy to leak
8/18/2019 EISU Connection Guidance(Indoor Site)
7/35
ZTE中兴
2. EISU MCOM to BBU connection COM
8/18/2019 EISU Connection Guidance(Indoor Site)
8/35
ZTE中兴
3. EISU Connect to Rectifier
8/18/2019 EISU Connection Guidance(Indoor Site)
9/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
10/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
11/35
ZTE中兴
4. Bell ring connection
Connect cable
8/18/2019 EISU Connection Guidance(Indoor Site)
12/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
13/35
ZTE中兴
5. Smoke sensor connection
Heat Fire and Smoke sensor inside same
8/18/2019 EISU Connection Guidance(Indoor Site)
14/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
15/35
ZTE中兴
6. Temperature and humidity sensor connection
8/18/2019 EISU Connection Guidance(Indoor Site)
16/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
17/35
ZTE中兴
7. Door contact(door magnistor) connection
8/18/2019 EISU Connection Guidance(Indoor Site)
18/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
19/35
ZTE中兴
8. GND cut cable connection
8/18/2019 EISU Connection Guidance(Indoor Site)
20/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
21/35
ZTE中兴
9. Arrester Failure connection
8/18/2019 EISU Connection Guidance(Indoor Site)
22/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
23/35
ZTE中兴
10. Phase Failure connection
8/18/2019 EISU Connection Guidance(Indoor Site)
24/35
ZTE中兴
11. Door Access control(CHD 202FC) connection
12. battery theft Connection(use the black outdoor hook-up power cable twine thebattery frame)
8/18/2019 EISU Connection Guidance(Indoor Site)
25/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
26/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
27/35
ZTE中兴
13. feeder theft connection(use the black outdoor hook-up power cable twine thefeeder cable)
8/18/2019 EISU Connection Guidance(Indoor Site)
28/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
29/35
ZTE中兴
14. DC Fan connection
8/18/2019 EISU Connection Guidance(Indoor Site)
30/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
31/35
ZTE中兴
8/18/2019 EISU Connection Guidance(Indoor Site)
32/35
ZTE中兴
15. AC remove connection
8/18/2019 EISU Connection Guidance(Indoor Site)
33/35
ZTE中兴
16. air condition control installation and connection
8/18/2019 EISU Connection Guidance(Indoor Site)
34/35
ZTE中兴
17 air condition status