EISU Connection Guidance(Indoor Site)

Embed Size (px)

Citation preview

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    1/35

     

    ZTE中兴 

    EISU installation guidance

    indoor site

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    2/35

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    3/35

     

    ZTE中兴 

    content

    1.  About EISU introduce. ................................................................................................................... 4 

    2.  EISU(MCOM) to BBU connection(COM) ............................................................................. 7 

    3.  EISU Connect to Rectifier ............................................................................................................... 8 

    4.  Bell ring connection .................................................................................................................... 11 

    5.  Smoke sensor connection ............................................................................................................ 13 

    6.  Temperature and humidity sensor connection ........................................................................... 15 

    7.  Door contact(door magnistor) connection ................................................................................. 17 

    8.  GND cut cable connection ........................................................................................................... 19 

    10.  Phase Failure connection ......................................................................................................... 23 

    11.  Door Access control(CHD 202FC) connection ........................................................................ 24 

    12.  battery theft Connection....................................................................................................... 24 

    13.  feeder theft connection..................................................................................................... 27 

    14.  DC 

    Fan connection ................................................................................................................ 29 

    15.  AC remove connection ............................................................................................................. 32 

    16.  air condition control installation and connection.................................................................... 33 

    17 air condition status ........................................................................................................................ 34 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    4/35

     

    ZTE中兴 

    1.  About EISU introduce.

    (EISU mount on the wall)The distance from the bottom to the Ground should be 1.2m---1.5m. and

    cannot install below the Air-condition in case leak.

    Switch

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    5/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    6/35

     

    ZTE中兴 

    EISU 

    mount on the wall and the bottom height from ground is about 1.2m –

    1.5

    m. Do not mount the EISU  below the Air-condition or somewhere easy to leak

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    7/35

     

    ZTE中兴 

    2.  EISU MCOM  to BBU connection COM 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    8/35

     

    ZTE中兴 

    3.  EISU Connect to Rectifier

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    9/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    10/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    11/35

     

    ZTE中兴 

    4.  Bell ring connection

    Connect cable

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    12/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    13/35

     

    ZTE中兴 

    5.  Smoke sensor connection

    Heat Fire and Smoke sensor inside same

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    14/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    15/35

     

    ZTE中兴 

    6.  Temperature and humidity sensor connection 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    16/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    17/35

     

    ZTE中兴 

    7.  Door contact(door magnistor) connection

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    18/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    19/35

     

    ZTE中兴 

    8.  GND cut cable connection

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    20/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    21/35

     

    ZTE中兴 

    9.  Arrester Failure connection

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    22/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    23/35

     

    ZTE中兴 

    10.  Phase Failure connection

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    24/35

     

    ZTE中兴 

    11.  Door Access control(CHD 202FC) connection

    12. battery theft Connection(use the black outdoor hook-up power cable twine thebattery frame)

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    25/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    26/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    27/35

     

    ZTE中兴 

    13. feeder theft connection(use the black outdoor hook-up power cable twine thefeeder cable)

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    28/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    29/35

     

    ZTE中兴 

    14.  DC  Fan connection

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    30/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    31/35

     

    ZTE中兴 

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    32/35

     

    ZTE中兴 

    15.   AC remove connection

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    33/35

     

    ZTE中兴 

    16.  air condition control installation and connection

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    34/35

     

    ZTE中兴 

    17 air condition status

  • 8/18/2019 EISU Connection Guidance(Indoor Site)

    35/35

     

    ZTE中兴