DOĞUŞ CONSTRUCTION

Hilmi Burak ARASLI

Business Development Director

CONSTRUCTION SUMMIT 2019 209.10.2019

--

1. Doğuş Group

2. Doğuş Construction

3. Fields of Activities and Track Record

4. Diversification

5. Ongoing Projects

6. Recently Completed Projects

CONSTRUCTION SUMMIT 2019 309.10.2019

DOĞUŞ GROUP

1.

--

➢ Doğuş Group, founded in 1951, sets standards for a better living by being at the forefront of discoveries that shape modern life.

➢ Doğuş Group, active in seven core businesses including automotive, construction, media, tourism and services, real estate, energy and food & beverage, sustains its growth with new investments in the areas of technology, sports, and entertainment along with its current operations.

➢ With over 300 companies and more than 25.000 employees, the Group serves its customers with advanced technologies, highest brand quality and a dynamic human resource.

➢ The Doğuş Group currently partners and cooperates with some of the large global players including: Volkswagen AG and TÜVSÜD in automotive; Condé Nast (Vogue, GQ, Traveller) in media; Hyatt International Ltd. in tourism; the Latsis Group , the Kiriacoulis Group and the Adriatic Croatia International (ACI) Group in marina and nautical operations; the international Azumi Group that holds under its roof brands such as Coya, Roka, Zuma and Oblix in food & beverage and entertainment; and the South Korean SK Group in e-commerce.

➢ Doğuş Automotive has been the distributor of SCANIA since 1994 and continues to provide customized solutions and services in heavy vehicle sector by strengthening its 25-year business partnership every year.

CONSTRUCTION SUMMIT 2019 5

DOĞUŞ GROUP

01.10.2019

--CONSTRUCTION SUMMIT 2019 6

DOĞUŞ GROUP STRUCTURE

01.10.2019

DOĞUŞ CONSTRUCTION

2.

--CONSTRUCTION SUMMIT 2019 809.10.2019

--

• EPC contractor established in 1951, specialized in mega-infrastructure projects,

• Has been ranked among the “Top 250 International Contractors” by ENR (Engineering News Record) since 2003.

• “Best Place to Work” and “Occupational Health and Occupational Safety” awards in 2014 and “Best Place to Work” award 2017.

• More than 209 ongoing and completed projects amounting up to USD 27,2 bn in value

▪ 21 Dams and HEPPs capable of producing 3350 MW of electricity▪ 1.515 km Roads ▪ 200 km Subways and Tunnels▪ 43 km Bridges and Viaducts▪ 3.000.000 m² Buildings ▪ Environmental Projects, Ports, Marinas, Irrigation Projects, Sewage Systems, Office Buildings, Shopping and Leisure Centers,

Residential and Industrial Buildings

• Presence in Turkey, Qatar, Oman, Bulgaria, Ukraine, Morocco, Kazakhstan, Saudi Arabia and India.

• 6916 Total Employees (September 2019)

CONSTRUCTION SUMMIT 2019 9

CONSTRUCTION GROUP

09.10.2019

--

1. DOĞUŞ Construction & Trade Inc. Head Office(TURKEY)

2. DOĞUŞ Construction Branch & DOĞUŞ EOOD(L.L.C) & Representative Office (BULGARIA)

3. DOĞUŞ Construction Private Ltd. (INDIA)

4. DOĞUŞ L.L.P & DOĞUŞ Construction Branch (KAZAKHSTAN)

5. DOĞUŞ SARL (LLC) & DOĞUŞ ES (Branch)(MOROCCO)

6. DOĞUŞ Construction L.L.C. (OMAN)

7. DOĞUŞ Construction Branch (QATAR)

8. DOĞUŞ Construction Branch (SAUDI ARABIA)

9. DOĞUŞ Construction L.L.C & DOĞUŞ Commercial Representative Office (UKRAINE)

10. DOĞUŞ Construction Branch (TANZANIA)

CONSTRUCTION SUMMIT 2019 10

REGIONAL COVERAGE

09.10.2019

--

Hasan Uğurlu Dam and HEPP Project is the FIRST dam and HEPP Project implemented in Turkey solely by Turkish workers, technicians, engineers, contractors and financial institutions.

CONSTRUCTION SUMMIT 2019 11

THE FIRSTS AND THE MOSTS

09.10.2019

1971

1984

1988

2002

2005

Marib Dam Project is the FIRST dam project implemented in abroad by a Turkish Contractor.

Casablanca Tanger Motorway Project is the FIRST project that is awarded to a Turkish Contractor in the Kingdom of Morocco.

Edirne-Kınalı Motorway Project is the FIRST project implemented by a Turkish Contractor with the procurement of foreign finance and without joint ventures.

Otogar-Kirazlı-Başakşehir Rail Mass Transportation System is the LARGEST project implemented by a Turkish Contractor in a single contract.

--

Kiev Dnieper Bridge Project is the LARGEST project implemented by a Turkish company in Ukraine.

CONSTRUCTION SUMMIT 2019 12

THE FIRSTS AND THE MOSTS

09.10.2019

Üsküdar-Ümraniye-Çekmeköy Metro Project is the FIRST ever automated driverless and the LARGEST metro line of Turkey that is awarded to a sole contractor in Turkey. It is also the FIRST metro of Turkey to have Platform Screen Gates System.

Sofia Metro Project is the LARGEST infrastructure project implemented in Bulgaria.

Ankara-Sivas Railway, Viaducts Between Kayaş-Kırıkkale is the FIRST Project where MSS (Movable Scaffolding System)was employed for the FIRST time in Turkey and which involves the construction of 4 viaducts with a total length of 6.151m which are going to be the tallest high-speed train viaducts of Turkey.

2007

2008

2012

Ongoing

Ongoing Kömürhan Connection Tunnel and Bridge is the 4th single pylon cable-stayed bridge of the World.

--CONSTRUCTION SUMMIT 2019 13

STRATEGIES

9.10.2019

To increase market share in the current regions already operating while exploring the new opportunities in new regions.

Through strong relationships with partners focusing on negotiating projects in international markets.

Interested in infrastructure projects with limited competition that requires arrangement of sophisticated projectfinance for the Client through international markets.

Interested in the projects with secured financing from sources such as EIB, EBRD, WB, IFC, JBIC, PHARE Programs, EU Funds, Arab Fund and Strong Clients.

Share risks with partners and partnerships with other international and local contractors.

Broaden range of projects: EPC projects, environmental projects and marine works O&G projects.

FIELDS OF ACTIVITIES &

TRACK RECORD3.

FIELDS OF ACTIVITIES

➢ Metros, Railways & Tunnels

➢ Motorways & Bridges

➢ Energy

➢ Marine & Geotechnical Works

➢ Superstructure Projects

➢ Environmental Projects

METROS, RAILWAYS & TUNNELS

CONSTRUCTION SUMMIT 2019 1609.10.2019

➢ 14 Projects

➢ 67 Stations

➢ 192.000 m Tunnels

➢ 7.125 m long Viaducts

➢ 60.000.000 m³ Earthworks

➢ 3.500.000 m³ Concrete

MOTORWAYS & BRIDGES

CONSTRUCTION SUMMIT 2019 1709.10.2019

➢ 34 Projects

➢ 1.515 km Roads

➢ 30.500 m Tunnels

➢ 10.900 m long Bridges

➢ 20.600 m long Viaducts

➢ 335.000.000 m³ Earthworks

➢ 5.150.000 m³ Concrete

ENERGY

CONSTRUCTION SUMMIT 2019 1809.10.2019

➢ 27 Projects

➢ 3.350 MW Installed Capacity

➢ 6.280.000.000 kWh

Annual Power Generation

➢ 6.400.000.000 m³

Reservoir Volume

➢ 18.500 m Tunnels

➢ 17.500.000 m³ Concrete

MARINE & GEOTECHNICAL WORKS

CONSTRUCTION SUMMIT 2019 1909.10.2019

➢ 6 Projects

➢ 3.150 m Jetties

➢ 30.000 m Piles

➢ 195.000 m² Marine Area

➢ 61.000 m³ Concrete

SUPERSTRUCTURE PROJECTS

CONSTRUCTION SUMMIT 2019 2009.10.2019

➢ 28 Projects

➢ 5.300.000 m²

Total Construction Area

(including metro stations)

ENVIRONMENTAL PROJECTS

CONSTRUCTION SUMMIT 2019 2109.10.2019

➢ 10 Projects

➢ 1.485.000 m³ Earthworks

➢ 798.000 m³/day Water TreatmentCapacity

➢ 220.000 m Pipelines

DIVERSIFICATION

4.

--CONSTRUCTION SUMMIT 2019 23

DIVERSIFICATION

NORTHEAST EUROPE538 Million $Metro, Road,

Motorway, Bridge and Viaduct Projects

NORTH AFRICA2.242 Million $

Road, Motorway, Bridge, Viaduct Projects

and Buildings

TURKEY14.797 Million $

Metro, Railway, Road, Motorway, Bridge,

Viaduct, Dam and Energy, Port Projects, Buildings

and Other Projects

CIS , UKRAINE and INDIA1.356 Million $

Metro, Road, Motorway, Bridge, Viaduct and

Airport Projects

MIDDLE EAST1.977 Million $

Motorway, Bridge and Viaduct Projects

9.10.2019

--CONSTRUCTION SUMMIT 2019 24

MAJOR PROJECTS IN THE LAST 10 YEARS

9.10.2019

Metros, Railways and Tunnels

48%

Roads and Motorways24%

Dams and Energy12%

Ports and Airports7%

Buildings7%

Treatment Plants and Other2%

Metros, Railways and Tunnels

Roads and Motorways

Dams and Energy

Ports and Airports

Buildings

Treatment Plants and Other

ONGOING PROJECTS

5.

ONGOING PROJECTS (International)

➢ QATAR

Construction and Upgrade of Rayyan Road

➢ SAUDI ARABIA

Riyadh Metro Project

Aldara Hospital and Medical Center

➢ INDIA

Mumbai Metro Line III, Package UGC-03

➢ BULGARIA

Sofia Metro Extension Project, Line III Lot 4

➢ GEORGIA

Tbilisi Metro Rehabilitation (Cable & Ventilation)

➢ LIBYA

Al Tahadi University Complex

ONGOING PROJECTS (Turkey)

➢ Çekmeköy-Sancaktepe-Sultanbeyli and Sarıgazi-Taşdelen-Yenidoğan Metro Construction and Electromechanical Works

➢ Ankara-İzmir High Speed Railway, Infrastructure Works of Afyon-Uşak (Banaz) Section

➢ Eminönü-Alibeyköy Tram Line Construction and Electromechanical Works

➢ Petkim Container Port

➢ Tokat-Niksar Road

➢ Ankara-Sivas Railway, Section between Kayaş-Kırıkkale, Viaducts V7-V9-V10-V15

➢ Kayaş-Yerköy High Speed Railway, Superstructure and Electromechanical Works

➢ Kaynarca-Karasu-Kocaali Road

➢ Kılavuzlu Irrigation Main Channel, Section 1

➢ Kömürhan Bridge Connection Tunnel and Road

➢ Mavi Tünel Potable Water Transmission Pipeline

➢ Ergene Basin Deep Marine Discharge

➢ Afyon Alkaloids Factory Water Treatment Plant

➢ Construction of Wholesales Market Building Complex

➢ Tuzla Advanced Biological Wastewater Treatment Plant

➢ Torbalı(Excluded)-Ödemiş-Çatal-Tire Railway Line Signalization and Telecommunication Works

➢ Malatya-Elazığ State Road, Construction of Velipalas Landslide

--

Construction and Upgrade of Rayyan Road

Project Value: USD 1,208 BnEmployer: ASHGHALFinance: Guaranteed By EmployerProject Details :• Total Length of the Road: 10,7 km, 4x4 Lane• No. of Interchanges: 6• 4 underpasses• 1 tunnel (36 mt depth, Qatar’s the longest tunnel ever

built)• 1 viaduct and 1 bridge• 23 substations• 1 pump station• Excavation: 3.000.000 m³• Concrete: 1,3 Mil m3

• Fill: 570.000 m³• Asphalt: 745.000 m²

CONSTRUCTION SUMMIT 2019 28

ONGOING PROJECTS

9.10.2019

--

Çekmeköy-Sancaktepe-Sultanbeyli and Sarıgazi-Taşdelen-Yenidoğan Metro Construction andElectromechanical Works

Project Value: USD 642 MnDoğuş Share : 60%Employer: Istanbul Metropolitan MunicipalityFinance: Guaranteed by MunicipalityProject Details :• Civil and Electromechanical Works• Procurement, Installation and Commissioning Works• Length of the Main Line: 17,85 km TBM - NATM • 6 TBMs (3 Herrenknecht + 3 CRCHI)• 14 Stations and Depot Area Civil and

Electromechanical Works

CONSTRUCTION SUMMIT 2019 29

ONGOING PROJECTS

9.10.2019

Çekmeköy Station

Sancaktepe Station

Sultanbeyli Station

Yenidoğan Station

--

Riyadh Metro Project

Project Value : USD 425 MnEmployer: Bechtel – Almabani – CCC Civil Works JVFinance: Guaranteed by EmployerProject Details :• Total Length of Tunnels: 16.500 m (2x8) • Tunnel Inner Diameter: 9,20 m• Excavation Diameter: TBM – 10,30 m• Grouting Works• Piling Works (1F8 – 1F8 Portal – 1B3 – 1F5)• Olaya 1B3 Station Concrete Works• Supply and installation of trackworks

CONSTRUCTION SUMMIT 2019 30

ONGOING PROJECTS

9.10.2019

--

Sofia Metro Extension Project, Line III Lot 4

Project Value: USD 115 MnDoğuş Share : 60 %Employer: Metropoliten EADFinance: Guaranteed by Employer(OP Transport )Project Details :• Line Length, 6720 m• 5,987 m of TBM tunnel, Dia.: 9.39 m, • 6 station crossing

CONSTRUCTION SUMMIT 2019 31

ONGOING PROJECTS

9.10.2019

--

Mumbai Metro Line III, Package UGC-03

Project Value: USD 399 MnDoğuş Share : 50 %Employer: The Mumbai Metro Rail Corporation Limited (MMRC)Finance: JICAProject Details :• 3,7 km of TBM tunnel• 1,4 km of Cut & Cover Tunnel• No. of Stations: 5 - Cut & Cover • No. of TBM: 2 (Robbins)

CONSTRUCTION SUMMIT 2019 32

ONGOING PROJECTS

9.10.2019

--

Ankara-İzmir High Speed Railway, Infrastructure

Works of Afyon-Uşak (Banaz) Section

Project Value: USD 329 MnDoğuş Share : 50 %Employer: Turkish State Railways (TCDD)Finance: Guaranteed by EmployerProject Details :• Line Lenght: 81,5 km• Tunnel Lenght: 5,457 m (9 no.s)• Max speed: 250km/h• Double lines, electrified (25 kV, 50 Hz AC)• Standard railway gauge (1435 mm)

CONSTRUCTION SUMMIT 2019 33

ONGOING PROJECTS

9.10.2019

--

Ankara-Sivas Railway, Section between Kayaş-Kırıkkale, Viaducts V7-V9-V10-V15

Project Value: USD 116 MnEmployer: Turkish State Railways (TCDD)Finance: Guaranteed by EmployerProject Details :• Construction of 4 viaducts: Viaduct #7 (1.80 km, Max Column Height: 53,90 m)Viaduct #9 (1.44 km, Max Column Height: 43,65 m)Viaduct #10 (1.54 km, Max Column Height: 88,60 m)Viaduct #15 (1.44 km, Max Column Height: 64,50 m)

• Total length of 6.22 km

CONSTRUCTION SUMMIT 2019 34

ONGOING PROJECTS

9.10.2019

--

Project Value: USD 201 MnEmployer: Turkish State Railways (TCDD)Finance: Guaranteed by EmployerProject Details :• Route Length: 151,92 km. • Subballast Supply & Laying:585.557 m3• Ballast Supply & Laying: 770.860 m3 • Track work with ballast (Single Line): 275.262 line-m• Track work without ballast: 56.116 line-m• Electrification, signaling, telecommunication and

support works.

CONSTRUCTION SUMMIT 2019 35

ONGOING PROJECTS

9.10.2019

Kayaş-Yerköy High Speed Railway, Superstructure and Electromechanical Works

--

Petkim Container Port

Project Value: USD 41 MnEmployer: Petlim Limancılık Ticaret A.Ş. - Aliağa / İzmir Finance: Guaranteed by EmployerProject Details :• Sheet Pile Quay and Wall Construction Project by Using

Dolphin• Construction of Sheet Pile Quay: 700 m• Steel Pipe Driving Works: 19,005 m• C40 Concrete: 4.288 m3• C30 Concrete: 30.620 m3

CONSTRUCTION SUMMIT 2019 36

ONGOING PROJECTS

Temporary Acceptance Stage

9.10.2019

--

Kılavuzlu Irrigation Main Channel, Section 1

Project Value: USD 94 MnEmployer: : Turkish State Hydraulic Works General Directorate (DSİ)Finance: Guaranteed by EmployerProject Details :• Main transmission channel: 46,83 km• Conventional Tunnel: L: 500 m; Dia.: 7 m• TBM Tunnel: L: 5,450 m; Dia.: 6 m• Interception channel: 24 pcs; L: 32,821 m• Open excavation: 25.221.000 m3• Spreading sand-gravel: 335.900 m3• Spreading geo-textile: 1.150.000 m2• Channel pavement concrete: 171.750 m3

CONSTRUCTION SUMMIT 2019 37

ONGOING PROJECTS

9.10.2019

--

Kaynarca-Karasu-Kocaali Road

Project Value: USD 107 MnEmployer: Turkish State Highways General Directorate (KGM)Finance: Guaranteed by EmployerProject Details :• Length of the Road: 25 km• Total Length of the Tunnel: 1.075 m

CONSTRUCTION SUMMIT 2019

ONGOING PROJECTS

9.10.2019 38

--

Kömürhan Bridge Connection Tunnel and Road

Project Value: USD 88 MnDoğuş Share : 50 %Employer: Turkish State Highways General Directorate (KGM)Finance: Guaranteed by EmployerProject Details :• Tunnel length (NATM) : 2x2.411 km• Tunnel diameter : 5,30 m• Bridge length : 660 m; span : 380 m

CONSTRUCTION SUMMIT 2019 39

ONGOING PROJECTS

9.10.2019

--

Project Value: USD 180 MnDoğuş Share : 50 %Employer: Turkish State Highways General Directorate (KGM)Finance: Guaranteed by EmployerProject Details :• 49 km of road construction• 2x2 Lane• Km: 0+000-48+962 section• 125 Engineering Structures

CONSTRUCTION SUMMIT 2019 40

ONGOING PROJECTS

9.10.2019

Tokat–Niksar Road

--

Mavi Tünel Potable Water Transmission Pipeline

Project Value: USD 52 MnEmployer: General Directorate of State Hydraulic WorksFinance: Guaranteed by EmployerProject Details:• Total pipeline lenght : 59.014 km• Service Road : 23,6 km

CONSTRUCTION SUMMIT 2019 41

ONGOING PROJECTS

9.10.2019

--

Ergene Basin Deep Marine Discharge

Project Value: USD 26 MnEmployer: Çorlu Deri Organize Sanayi BölgesiFinance: Guaranteed by EmployerProject Details :• Construction of Collecting Lines • Supply of Steel Pipes and Reinforced Concrete Works:

8.500 tons of sheet, 4.665 m of steel pipe, 7.500 m3 of concrete

• Construction of tunnels and steel pipes with the diameter of 2.200 mm

• Deep marine discharge at the depth of • 4.500 m

CONSTRUCTION SUMMIT 2019 42

ONGOING PROJECTS

9.10.2019

--

Afyon Alkaloids Factory Water Treatment Plant

Project Value: USD 9 MnEmployer: Turkish Grain Board General Directorate (TMO)Finance: Guaranteed by EmployerProject Details :• Construction of wastewater treatment plant • Treatment of highly polluted wastewater from Afyon

Alcolaids Factory (AAF), using integrated membrane bioreactor (MBR) and nanofiltration (NF) systems

• Operation of the plant for 1 (one) year

CONSTRUCTION SUMMIT 2019 43

ONGOING PROJECTS

9.10.2019

--

Construction of Wholesales Market Building Complex

Project Value: USD 99 MnDoğuş Share : 60 %Employer: Emlak PlanlamaFinance: Guaranteed by EmployerProject Details :• Statical, mechanical, electrical, substructure and

landscaping works • Total Land Area: 322.002,81 m2• Total Construction Area: 109.819,03 m2

CONSTRUCTION SUMMIT 2019 44

ONGOING PROJECTS

9.10.2019

RECENTLY COMPLETED PROJECTS

6.

RECENTLY COMPLETED PROJECTS

➢ UKRAINE

Boryspil State International Airport

➢ BULGARIA

Sofia Metro Extension Project, Line II Lot 1

➢ KAZAKHSTAN

East-West Roads Project, Section between Almaty-Khorgos, Lot 1-2

➢ TURKEY

Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works

STAR Refinery Marine Works

Istanbul Otogar-Bağcılar Rail Mass Transportation System

Boyabat Dam and HEPP

Artvin Dam and HEPP

--

Üsküdar-Ümraniye- Çekmeköy Metro and E&M Works

Project Value: EUR 676 MnEmployer: Istanbul Metropolitan Municipality

Finance: EIB (EUR 479 mn), rest by Export Kreditnamnden (EKN) arranged by contractor , guaranteed by MunicipalityProject Details :• Civil and E&M works• Tunnel works include• 26,4 km EPM – TBM (TBM Diameter: 6.56 m)• 19,2 km NATM • 2.189 m Cut & Cover• 16 Underground stations and depot area civil and

electromechanical works

CONSTRUCTION SUMMIT 2019 47

RECENTLY COMPLETED PROJECTS

9.10.2019

--

Boryspil State International Airport

Project Value: USD 443 MnDoğuş Share : 37,5 %Employer: BIA-Boryspil International Airport State EnterpriseFinance: 49% JBIC, 51% Ukraine State Budget Project Details :• Airport Development Project• 100.000 m2 terminal building• 200.000 m2 Apron

RECENTLY COMPLETED PROJECTS

CONSTRUCTION SUMMIT 2019 48

RECENTLY COMPLETED PROJECTS

9.10.2019

--

Sofia Metro Extension Project, Line II Lot 1

Project Value: USD 296 MnEmployer: Metropoliten EADFinance: 75% European Union Funds, 25% Sofia Municipality Project Details :• Length of Alignment: 3,8 km • Tunnel Inner Diameter: 8,43 m• No. of Stations: 4• Electromechanical Works

CONSTRUCTION SUMMIT 2019 49

RECENTLY COMPLETED PROJECTS

9.10.2019

--

East-West Roads Project, Section between Almaty-Khorgos, Lot 1-21-2

Project Value: USD 283 MnDoğuş Share : 50 %Employer: Ministry of Transport and Communications of the Republic of KazakhstanFinance: World Bank (IBRD)Project Details :Lot 1: km 0 - 50 Almaty – Khorgos / MotorwayLot 2: km 50 – 111,7 Almaty – Khorgos / MotorwayTotal length: 111,7 kmNo. of lanes: 4 (2x2)

CONSTRUCTION SUMMIT 2019 50

RECENTLY COMPLETED PROJECTS

9.10.2019

--

Istanbul Otogar-Bağcılar Rail Mass Transportation System

Project Value: USD 1.324 MnDoğuş Share : 50 %Employer: İETT General DirectorateFinance: Guaranteed by Municipality of IstanbulProject Details :• E&M works• Procurement of trains• 5 stations (Otogar – Bagcilar)• 11 stations (Bagcilar – Olympic Village)• Tunnel with (23x2) 46 km length, radius circular cross

section with TBM method • EKN credit used• Many Swedish branded components are used in the

project

RECENTLY COMPLETED PROJECTS

CONSTRUCTION SUMMIT 2019 51

RECENTLY COMPLETED PROJECTS

9.10.2019

--

STAR Refinery Marine Works

Project Value: USD 225 MnDoğuş Share : 50 %Employer: TSGIFinance: Guaranteed by EmployerProject Details :• Engineering works, Environmental Studies and

Construction Works • Jetty Construction : 1.178 m• Steel Pipe Piles • Adding Works : 807 no.s• Driving Works : 14.518 m• Remedial internal boring/drilling : 4.069 m• Reclamation Length : 1200 m • Stone Column Installation: 104.382 m• Bored Pile Installation (Ø1200 mm): 35.641 m• Bored Pile Installation (Ø1200 mm):15.840 m

CONSTRUCTION SUMMIT 2019 52

RECENTLY COMPLETED PROJECTS

9.10.2019

--

Artvin Dam and HEPP

Project Value: USD 583 MnEmployer: Doğuş Electricity Generation and Trading Co.Finance: Equity and CreditProject Details :• Type: Arch Concrete Gravity • Height of the Dam: 180 m • Installed Capacity: 2 x 170 MW = 340 MW• Concrete Volume: 950.000 m3• Annual Power Generation: 1.026.000.000 kWh

CONSTRUCTION SUMMIT 2019 53

RECENTLY COMPLETED PROJECTS

9.10.2019

--

Boyabat Dam and HEPP

Project Value: USD 677 MnEmployer: UDD-Boyabat Enerji Üretim ve Ticaret Limited ŞirketiFinance: Guaranteed by EmployerProject Details :• Type: Concrete Gravity • Height of the Dam: 195 m• Concrete Volume: 2.700.000 m3• Installed Capacity: 513 MW• Annual Power Generation: 1.500.000.000 kWh

CONSTRUCTION SUMMIT 2019 54

RECENTLY COMPLETED PROJECTS

9.10.2019

--

"The joy and happiness of doing something that will benefit your country and your people, will rekindle your potential energy and set you

on the right course, in the direction of your goals."

Ayhan ŞahenkFounder and Eternal Leader

of Doğuş Group