DOĞUŞ CONSTRUCTION
Hilmi Burak ARASLI
Business Development Director
CONSTRUCTION SUMMIT 2019 209.10.2019
--
1. Doğuş Group
2. Doğuş Construction
3. Fields of Activities and Track Record
4. Diversification
5. Ongoing Projects
6. Recently Completed Projects
CONSTRUCTION SUMMIT 2019 309.10.2019
DOĞUŞ GROUP
1.
--
➢ Doğuş Group, founded in 1951, sets standards for a better living by being at the forefront of discoveries that shape modern life.
➢ Doğuş Group, active in seven core businesses including automotive, construction, media, tourism and services, real estate, energy and food & beverage, sustains its growth with new investments in the areas of technology, sports, and entertainment along with its current operations.
➢ With over 300 companies and more than 25.000 employees, the Group serves its customers with advanced technologies, highest brand quality and a dynamic human resource.
➢ The Doğuş Group currently partners and cooperates with some of the large global players including: Volkswagen AG and TÜVSÜD in automotive; Condé Nast (Vogue, GQ, Traveller) in media; Hyatt International Ltd. in tourism; the Latsis Group , the Kiriacoulis Group and the Adriatic Croatia International (ACI) Group in marina and nautical operations; the international Azumi Group that holds under its roof brands such as Coya, Roka, Zuma and Oblix in food & beverage and entertainment; and the South Korean SK Group in e-commerce.
➢ Doğuş Automotive has been the distributor of SCANIA since 1994 and continues to provide customized solutions and services in heavy vehicle sector by strengthening its 25-year business partnership every year.
CONSTRUCTION SUMMIT 2019 5
DOĞUŞ GROUP
01.10.2019
--CONSTRUCTION SUMMIT 2019 6
DOĞUŞ GROUP STRUCTURE
01.10.2019
DOĞUŞ CONSTRUCTION
2.
--CONSTRUCTION SUMMIT 2019 809.10.2019
--
• EPC contractor established in 1951, specialized in mega-infrastructure projects,
• Has been ranked among the “Top 250 International Contractors” by ENR (Engineering News Record) since 2003.
• “Best Place to Work” and “Occupational Health and Occupational Safety” awards in 2014 and “Best Place to Work” award 2017.
• More than 209 ongoing and completed projects amounting up to USD 27,2 bn in value
▪ 21 Dams and HEPPs capable of producing 3350 MW of electricity▪ 1.515 km Roads ▪ 200 km Subways and Tunnels▪ 43 km Bridges and Viaducts▪ 3.000.000 m² Buildings ▪ Environmental Projects, Ports, Marinas, Irrigation Projects, Sewage Systems, Office Buildings, Shopping and Leisure Centers,
Residential and Industrial Buildings
• Presence in Turkey, Qatar, Oman, Bulgaria, Ukraine, Morocco, Kazakhstan, Saudi Arabia and India.
• 6916 Total Employees (September 2019)
CONSTRUCTION SUMMIT 2019 9
CONSTRUCTION GROUP
09.10.2019
--
1. DOĞUŞ Construction & Trade Inc. Head Office(TURKEY)
2. DOĞUŞ Construction Branch & DOĞUŞ EOOD(L.L.C) & Representative Office (BULGARIA)
3. DOĞUŞ Construction Private Ltd. (INDIA)
4. DOĞUŞ L.L.P & DOĞUŞ Construction Branch (KAZAKHSTAN)
5. DOĞUŞ SARL (LLC) & DOĞUŞ ES (Branch)(MOROCCO)
6. DOĞUŞ Construction L.L.C. (OMAN)
7. DOĞUŞ Construction Branch (QATAR)
8. DOĞUŞ Construction Branch (SAUDI ARABIA)
9. DOĞUŞ Construction L.L.C & DOĞUŞ Commercial Representative Office (UKRAINE)
10. DOĞUŞ Construction Branch (TANZANIA)
CONSTRUCTION SUMMIT 2019 10
REGIONAL COVERAGE
09.10.2019
--
Hasan Uğurlu Dam and HEPP Project is the FIRST dam and HEPP Project implemented in Turkey solely by Turkish workers, technicians, engineers, contractors and financial institutions.
CONSTRUCTION SUMMIT 2019 11
THE FIRSTS AND THE MOSTS
09.10.2019
1971
1984
1988
2002
2005
Marib Dam Project is the FIRST dam project implemented in abroad by a Turkish Contractor.
Casablanca Tanger Motorway Project is the FIRST project that is awarded to a Turkish Contractor in the Kingdom of Morocco.
Edirne-Kınalı Motorway Project is the FIRST project implemented by a Turkish Contractor with the procurement of foreign finance and without joint ventures.
Otogar-Kirazlı-Başakşehir Rail Mass Transportation System is the LARGEST project implemented by a Turkish Contractor in a single contract.
--
Kiev Dnieper Bridge Project is the LARGEST project implemented by a Turkish company in Ukraine.
CONSTRUCTION SUMMIT 2019 12
THE FIRSTS AND THE MOSTS
09.10.2019
Üsküdar-Ümraniye-Çekmeköy Metro Project is the FIRST ever automated driverless and the LARGEST metro line of Turkey that is awarded to a sole contractor in Turkey. It is also the FIRST metro of Turkey to have Platform Screen Gates System.
Sofia Metro Project is the LARGEST infrastructure project implemented in Bulgaria.
Ankara-Sivas Railway, Viaducts Between Kayaş-Kırıkkale is the FIRST Project where MSS (Movable Scaffolding System)was employed for the FIRST time in Turkey and which involves the construction of 4 viaducts with a total length of 6.151m which are going to be the tallest high-speed train viaducts of Turkey.
2007
2008
2012
Ongoing
Ongoing Kömürhan Connection Tunnel and Bridge is the 4th single pylon cable-stayed bridge of the World.
--CONSTRUCTION SUMMIT 2019 13
STRATEGIES
9.10.2019
To increase market share in the current regions already operating while exploring the new opportunities in new regions.
Through strong relationships with partners focusing on negotiating projects in international markets.
Interested in infrastructure projects with limited competition that requires arrangement of sophisticated projectfinance for the Client through international markets.
Interested in the projects with secured financing from sources such as EIB, EBRD, WB, IFC, JBIC, PHARE Programs, EU Funds, Arab Fund and Strong Clients.
Share risks with partners and partnerships with other international and local contractors.
Broaden range of projects: EPC projects, environmental projects and marine works O&G projects.
FIELDS OF ACTIVITIES &
TRACK RECORD3.
FIELDS OF ACTIVITIES
➢ Metros, Railways & Tunnels
➢ Motorways & Bridges
➢ Energy
➢ Marine & Geotechnical Works
➢ Superstructure Projects
➢ Environmental Projects
METROS, RAILWAYS & TUNNELS
CONSTRUCTION SUMMIT 2019 1609.10.2019
➢ 14 Projects
➢ 67 Stations
➢ 192.000 m Tunnels
➢ 7.125 m long Viaducts
➢ 60.000.000 m³ Earthworks
➢ 3.500.000 m³ Concrete
MOTORWAYS & BRIDGES
CONSTRUCTION SUMMIT 2019 1709.10.2019
➢ 34 Projects
➢ 1.515 km Roads
➢ 30.500 m Tunnels
➢ 10.900 m long Bridges
➢ 20.600 m long Viaducts
➢ 335.000.000 m³ Earthworks
➢ 5.150.000 m³ Concrete
ENERGY
CONSTRUCTION SUMMIT 2019 1809.10.2019
➢ 27 Projects
➢ 3.350 MW Installed Capacity
➢ 6.280.000.000 kWh
Annual Power Generation
➢ 6.400.000.000 m³
Reservoir Volume
➢ 18.500 m Tunnels
➢ 17.500.000 m³ Concrete
MARINE & GEOTECHNICAL WORKS
CONSTRUCTION SUMMIT 2019 1909.10.2019
➢ 6 Projects
➢ 3.150 m Jetties
➢ 30.000 m Piles
➢ 195.000 m² Marine Area
➢ 61.000 m³ Concrete
SUPERSTRUCTURE PROJECTS
CONSTRUCTION SUMMIT 2019 2009.10.2019
➢ 28 Projects
➢ 5.300.000 m²
Total Construction Area
(including metro stations)
ENVIRONMENTAL PROJECTS
CONSTRUCTION SUMMIT 2019 2109.10.2019
➢ 10 Projects
➢ 1.485.000 m³ Earthworks
➢ 798.000 m³/day Water TreatmentCapacity
➢ 220.000 m Pipelines
DIVERSIFICATION
4.
--CONSTRUCTION SUMMIT 2019 23
DIVERSIFICATION
NORTHEAST EUROPE538 Million $Metro, Road,
Motorway, Bridge and Viaduct Projects
NORTH AFRICA2.242 Million $
Road, Motorway, Bridge, Viaduct Projects
and Buildings
TURKEY14.797 Million $
Metro, Railway, Road, Motorway, Bridge,
Viaduct, Dam and Energy, Port Projects, Buildings
and Other Projects
CIS , UKRAINE and INDIA1.356 Million $
Metro, Road, Motorway, Bridge, Viaduct and
Airport Projects
MIDDLE EAST1.977 Million $
Motorway, Bridge and Viaduct Projects
9.10.2019
--CONSTRUCTION SUMMIT 2019 24
MAJOR PROJECTS IN THE LAST 10 YEARS
9.10.2019
Metros, Railways and Tunnels
48%
Roads and Motorways24%
Dams and Energy12%
Ports and Airports7%
Buildings7%
Treatment Plants and Other2%
Metros, Railways and Tunnels
Roads and Motorways
Dams and Energy
Ports and Airports
Buildings
Treatment Plants and Other
ONGOING PROJECTS
5.
ONGOING PROJECTS (International)
➢ QATAR
Construction and Upgrade of Rayyan Road
➢ SAUDI ARABIA
Riyadh Metro Project
Aldara Hospital and Medical Center
➢ INDIA
Mumbai Metro Line III, Package UGC-03
➢ BULGARIA
Sofia Metro Extension Project, Line III Lot 4
➢ GEORGIA
Tbilisi Metro Rehabilitation (Cable & Ventilation)
➢ LIBYA
Al Tahadi University Complex
ONGOING PROJECTS (Turkey)
➢ Çekmeköy-Sancaktepe-Sultanbeyli and Sarıgazi-Taşdelen-Yenidoğan Metro Construction and Electromechanical Works
➢ Ankara-İzmir High Speed Railway, Infrastructure Works of Afyon-Uşak (Banaz) Section
➢ Eminönü-Alibeyköy Tram Line Construction and Electromechanical Works
➢ Petkim Container Port
➢ Tokat-Niksar Road
➢ Ankara-Sivas Railway, Section between Kayaş-Kırıkkale, Viaducts V7-V9-V10-V15
➢ Kayaş-Yerköy High Speed Railway, Superstructure and Electromechanical Works
➢ Kaynarca-Karasu-Kocaali Road
➢ Kılavuzlu Irrigation Main Channel, Section 1
➢ Kömürhan Bridge Connection Tunnel and Road
➢ Mavi Tünel Potable Water Transmission Pipeline
➢ Ergene Basin Deep Marine Discharge
➢ Afyon Alkaloids Factory Water Treatment Plant
➢ Construction of Wholesales Market Building Complex
➢ Tuzla Advanced Biological Wastewater Treatment Plant
➢ Torbalı(Excluded)-Ödemiş-Çatal-Tire Railway Line Signalization and Telecommunication Works
➢ Malatya-Elazığ State Road, Construction of Velipalas Landslide
--
Construction and Upgrade of Rayyan Road
Project Value: USD 1,208 BnEmployer: ASHGHALFinance: Guaranteed By EmployerProject Details :• Total Length of the Road: 10,7 km, 4x4 Lane• No. of Interchanges: 6• 4 underpasses• 1 tunnel (36 mt depth, Qatar’s the longest tunnel ever
built)• 1 viaduct and 1 bridge• 23 substations• 1 pump station• Excavation: 3.000.000 m³• Concrete: 1,3 Mil m3
• Fill: 570.000 m³• Asphalt: 745.000 m²
CONSTRUCTION SUMMIT 2019 28
ONGOING PROJECTS
9.10.2019
--
Çekmeköy-Sancaktepe-Sultanbeyli and Sarıgazi-Taşdelen-Yenidoğan Metro Construction andElectromechanical Works
Project Value: USD 642 MnDoğuş Share : 60%Employer: Istanbul Metropolitan MunicipalityFinance: Guaranteed by MunicipalityProject Details :• Civil and Electromechanical Works• Procurement, Installation and Commissioning Works• Length of the Main Line: 17,85 km TBM - NATM • 6 TBMs (3 Herrenknecht + 3 CRCHI)• 14 Stations and Depot Area Civil and
Electromechanical Works
CONSTRUCTION SUMMIT 2019 29
ONGOING PROJECTS
9.10.2019
Çekmeköy Station
Sancaktepe Station
Sultanbeyli Station
Yenidoğan Station
--
Riyadh Metro Project
Project Value : USD 425 MnEmployer: Bechtel – Almabani – CCC Civil Works JVFinance: Guaranteed by EmployerProject Details :• Total Length of Tunnels: 16.500 m (2x8) • Tunnel Inner Diameter: 9,20 m• Excavation Diameter: TBM – 10,30 m• Grouting Works• Piling Works (1F8 – 1F8 Portal – 1B3 – 1F5)• Olaya 1B3 Station Concrete Works• Supply and installation of trackworks
CONSTRUCTION SUMMIT 2019 30
ONGOING PROJECTS
9.10.2019
--
Sofia Metro Extension Project, Line III Lot 4
Project Value: USD 115 MnDoğuş Share : 60 %Employer: Metropoliten EADFinance: Guaranteed by Employer(OP Transport )Project Details :• Line Length, 6720 m• 5,987 m of TBM tunnel, Dia.: 9.39 m, • 6 station crossing
CONSTRUCTION SUMMIT 2019 31
ONGOING PROJECTS
9.10.2019
--
Mumbai Metro Line III, Package UGC-03
Project Value: USD 399 MnDoğuş Share : 50 %Employer: The Mumbai Metro Rail Corporation Limited (MMRC)Finance: JICAProject Details :• 3,7 km of TBM tunnel• 1,4 km of Cut & Cover Tunnel• No. of Stations: 5 - Cut & Cover • No. of TBM: 2 (Robbins)
CONSTRUCTION SUMMIT 2019 32
ONGOING PROJECTS
9.10.2019
--
Ankara-İzmir High Speed Railway, Infrastructure
Works of Afyon-Uşak (Banaz) Section
Project Value: USD 329 MnDoğuş Share : 50 %Employer: Turkish State Railways (TCDD)Finance: Guaranteed by EmployerProject Details :• Line Lenght: 81,5 km• Tunnel Lenght: 5,457 m (9 no.s)• Max speed: 250km/h• Double lines, electrified (25 kV, 50 Hz AC)• Standard railway gauge (1435 mm)
CONSTRUCTION SUMMIT 2019 33
ONGOING PROJECTS
9.10.2019
--
Ankara-Sivas Railway, Section between Kayaş-Kırıkkale, Viaducts V7-V9-V10-V15
Project Value: USD 116 MnEmployer: Turkish State Railways (TCDD)Finance: Guaranteed by EmployerProject Details :• Construction of 4 viaducts: Viaduct #7 (1.80 km, Max Column Height: 53,90 m)Viaduct #9 (1.44 km, Max Column Height: 43,65 m)Viaduct #10 (1.54 km, Max Column Height: 88,60 m)Viaduct #15 (1.44 km, Max Column Height: 64,50 m)
• Total length of 6.22 km
CONSTRUCTION SUMMIT 2019 34
ONGOING PROJECTS
9.10.2019
--
Project Value: USD 201 MnEmployer: Turkish State Railways (TCDD)Finance: Guaranteed by EmployerProject Details :• Route Length: 151,92 km. • Subballast Supply & Laying:585.557 m3• Ballast Supply & Laying: 770.860 m3 • Track work with ballast (Single Line): 275.262 line-m• Track work without ballast: 56.116 line-m• Electrification, signaling, telecommunication and
support works.
CONSTRUCTION SUMMIT 2019 35
ONGOING PROJECTS
9.10.2019
Kayaş-Yerköy High Speed Railway, Superstructure and Electromechanical Works
--
Petkim Container Port
Project Value: USD 41 MnEmployer: Petlim Limancılık Ticaret A.Ş. - Aliağa / İzmir Finance: Guaranteed by EmployerProject Details :• Sheet Pile Quay and Wall Construction Project by Using
Dolphin• Construction of Sheet Pile Quay: 700 m• Steel Pipe Driving Works: 19,005 m• C40 Concrete: 4.288 m3• C30 Concrete: 30.620 m3
CONSTRUCTION SUMMIT 2019 36
ONGOING PROJECTS
Temporary Acceptance Stage
9.10.2019
--
Kılavuzlu Irrigation Main Channel, Section 1
Project Value: USD 94 MnEmployer: : Turkish State Hydraulic Works General Directorate (DSİ)Finance: Guaranteed by EmployerProject Details :• Main transmission channel: 46,83 km• Conventional Tunnel: L: 500 m; Dia.: 7 m• TBM Tunnel: L: 5,450 m; Dia.: 6 m• Interception channel: 24 pcs; L: 32,821 m• Open excavation: 25.221.000 m3• Spreading sand-gravel: 335.900 m3• Spreading geo-textile: 1.150.000 m2• Channel pavement concrete: 171.750 m3
CONSTRUCTION SUMMIT 2019 37
ONGOING PROJECTS
9.10.2019
--
Kaynarca-Karasu-Kocaali Road
Project Value: USD 107 MnEmployer: Turkish State Highways General Directorate (KGM)Finance: Guaranteed by EmployerProject Details :• Length of the Road: 25 km• Total Length of the Tunnel: 1.075 m
CONSTRUCTION SUMMIT 2019
ONGOING PROJECTS
9.10.2019 38
--
Kömürhan Bridge Connection Tunnel and Road
Project Value: USD 88 MnDoğuş Share : 50 %Employer: Turkish State Highways General Directorate (KGM)Finance: Guaranteed by EmployerProject Details :• Tunnel length (NATM) : 2x2.411 km• Tunnel diameter : 5,30 m• Bridge length : 660 m; span : 380 m
CONSTRUCTION SUMMIT 2019 39
ONGOING PROJECTS
9.10.2019
--
Project Value: USD 180 MnDoğuş Share : 50 %Employer: Turkish State Highways General Directorate (KGM)Finance: Guaranteed by EmployerProject Details :• 49 km of road construction• 2x2 Lane• Km: 0+000-48+962 section• 125 Engineering Structures
CONSTRUCTION SUMMIT 2019 40
ONGOING PROJECTS
9.10.2019
Tokat–Niksar Road
--
Mavi Tünel Potable Water Transmission Pipeline
Project Value: USD 52 MnEmployer: General Directorate of State Hydraulic WorksFinance: Guaranteed by EmployerProject Details:• Total pipeline lenght : 59.014 km• Service Road : 23,6 km
CONSTRUCTION SUMMIT 2019 41
ONGOING PROJECTS
9.10.2019
--
Ergene Basin Deep Marine Discharge
Project Value: USD 26 MnEmployer: Çorlu Deri Organize Sanayi BölgesiFinance: Guaranteed by EmployerProject Details :• Construction of Collecting Lines • Supply of Steel Pipes and Reinforced Concrete Works:
8.500 tons of sheet, 4.665 m of steel pipe, 7.500 m3 of concrete
• Construction of tunnels and steel pipes with the diameter of 2.200 mm
• Deep marine discharge at the depth of • 4.500 m
CONSTRUCTION SUMMIT 2019 42
ONGOING PROJECTS
9.10.2019
--
Afyon Alkaloids Factory Water Treatment Plant
Project Value: USD 9 MnEmployer: Turkish Grain Board General Directorate (TMO)Finance: Guaranteed by EmployerProject Details :• Construction of wastewater treatment plant • Treatment of highly polluted wastewater from Afyon
Alcolaids Factory (AAF), using integrated membrane bioreactor (MBR) and nanofiltration (NF) systems
• Operation of the plant for 1 (one) year
CONSTRUCTION SUMMIT 2019 43
ONGOING PROJECTS
9.10.2019
--
Construction of Wholesales Market Building Complex
Project Value: USD 99 MnDoğuş Share : 60 %Employer: Emlak PlanlamaFinance: Guaranteed by EmployerProject Details :• Statical, mechanical, electrical, substructure and
landscaping works • Total Land Area: 322.002,81 m2• Total Construction Area: 109.819,03 m2
CONSTRUCTION SUMMIT 2019 44
ONGOING PROJECTS
9.10.2019
RECENTLY COMPLETED PROJECTS
6.
RECENTLY COMPLETED PROJECTS
➢ UKRAINE
Boryspil State International Airport
➢ BULGARIA
Sofia Metro Extension Project, Line II Lot 1
➢ KAZAKHSTAN
East-West Roads Project, Section between Almaty-Khorgos, Lot 1-2
➢ TURKEY
Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works
STAR Refinery Marine Works
Istanbul Otogar-Bağcılar Rail Mass Transportation System
Boyabat Dam and HEPP
Artvin Dam and HEPP
--
Üsküdar-Ümraniye- Çekmeköy Metro and E&M Works
Project Value: EUR 676 MnEmployer: Istanbul Metropolitan Municipality
Finance: EIB (EUR 479 mn), rest by Export Kreditnamnden (EKN) arranged by contractor , guaranteed by MunicipalityProject Details :• Civil and E&M works• Tunnel works include• 26,4 km EPM – TBM (TBM Diameter: 6.56 m)• 19,2 km NATM • 2.189 m Cut & Cover• 16 Underground stations and depot area civil and
electromechanical works
CONSTRUCTION SUMMIT 2019 47
RECENTLY COMPLETED PROJECTS
9.10.2019
--
Boryspil State International Airport
Project Value: USD 443 MnDoğuş Share : 37,5 %Employer: BIA-Boryspil International Airport State EnterpriseFinance: 49% JBIC, 51% Ukraine State Budget Project Details :• Airport Development Project• 100.000 m2 terminal building• 200.000 m2 Apron
RECENTLY COMPLETED PROJECTS
CONSTRUCTION SUMMIT 2019 48
RECENTLY COMPLETED PROJECTS
9.10.2019
--
Sofia Metro Extension Project, Line II Lot 1
Project Value: USD 296 MnEmployer: Metropoliten EADFinance: 75% European Union Funds, 25% Sofia Municipality Project Details :• Length of Alignment: 3,8 km • Tunnel Inner Diameter: 8,43 m• No. of Stations: 4• Electromechanical Works
CONSTRUCTION SUMMIT 2019 49
RECENTLY COMPLETED PROJECTS
9.10.2019
--
East-West Roads Project, Section between Almaty-Khorgos, Lot 1-21-2
Project Value: USD 283 MnDoğuş Share : 50 %Employer: Ministry of Transport and Communications of the Republic of KazakhstanFinance: World Bank (IBRD)Project Details :Lot 1: km 0 - 50 Almaty – Khorgos / MotorwayLot 2: km 50 – 111,7 Almaty – Khorgos / MotorwayTotal length: 111,7 kmNo. of lanes: 4 (2x2)
CONSTRUCTION SUMMIT 2019 50
RECENTLY COMPLETED PROJECTS
9.10.2019
--
Istanbul Otogar-Bağcılar Rail Mass Transportation System
Project Value: USD 1.324 MnDoğuş Share : 50 %Employer: İETT General DirectorateFinance: Guaranteed by Municipality of IstanbulProject Details :• E&M works• Procurement of trains• 5 stations (Otogar – Bagcilar)• 11 stations (Bagcilar – Olympic Village)• Tunnel with (23x2) 46 km length, radius circular cross
section with TBM method • EKN credit used• Many Swedish branded components are used in the
project
RECENTLY COMPLETED PROJECTS
CONSTRUCTION SUMMIT 2019 51
RECENTLY COMPLETED PROJECTS
9.10.2019
--
STAR Refinery Marine Works
Project Value: USD 225 MnDoğuş Share : 50 %Employer: TSGIFinance: Guaranteed by EmployerProject Details :• Engineering works, Environmental Studies and
Construction Works • Jetty Construction : 1.178 m• Steel Pipe Piles • Adding Works : 807 no.s• Driving Works : 14.518 m• Remedial internal boring/drilling : 4.069 m• Reclamation Length : 1200 m • Stone Column Installation: 104.382 m• Bored Pile Installation (Ø1200 mm): 35.641 m• Bored Pile Installation (Ø1200 mm):15.840 m
CONSTRUCTION SUMMIT 2019 52
RECENTLY COMPLETED PROJECTS
9.10.2019
--
Artvin Dam and HEPP
Project Value: USD 583 MnEmployer: Doğuş Electricity Generation and Trading Co.Finance: Equity and CreditProject Details :• Type: Arch Concrete Gravity • Height of the Dam: 180 m • Installed Capacity: 2 x 170 MW = 340 MW• Concrete Volume: 950.000 m3• Annual Power Generation: 1.026.000.000 kWh
CONSTRUCTION SUMMIT 2019 53
RECENTLY COMPLETED PROJECTS
9.10.2019
--
Boyabat Dam and HEPP
Project Value: USD 677 MnEmployer: UDD-Boyabat Enerji Üretim ve Ticaret Limited ŞirketiFinance: Guaranteed by EmployerProject Details :• Type: Concrete Gravity • Height of the Dam: 195 m• Concrete Volume: 2.700.000 m3• Installed Capacity: 513 MW• Annual Power Generation: 1.500.000.000 kWh
CONSTRUCTION SUMMIT 2019 54
RECENTLY COMPLETED PROJECTS
9.10.2019
--
"The joy and happiness of doing something that will benefit your country and your people, will rekindle your potential energy and set you
on the right course, in the direction of your goals."
Ayhan ŞahenkFounder and Eternal Leader
of Doğuş Group
CONSTRUCTION SUMMIT 2019 5509.10.2019
www.dogusinsaat.com.tr