8/17/2019 Component Parts of a Permanent Way
1/37
COMPONENT PARTS OF A PERMANENT WAY
Following are the components of a permanent wav!
"i# S$%gra&e
"ii# 'allast
"iii# Sleepers
"iv# Rails
"v# Fi(t$re an& Fastening
)n a permanent Wa*+ rails are ,oine& either %* wel&ing or %* $sing -sh plates an& are
-(e& with sleepers %* $sing &ifferent t*pes of fastenings! Sleepers are properl* place&
an& pac.e& with %allast! 'allast is place& on the prepare& s$%gra&e calle& formation!
RE/0)REMENTS OF AN )1EA2 PERMANENT WAY
Following are the %asic re3$irements of a permanent Wa*4
"i# The g$age sho$l& %e $niform an& correct!
"ii# 'oth the rails sho$l& %e at the same level in a straight trac.!
"iii# On c$rves proper s$perelevation sho$l& %e provi&e& to the o$ter rail!
"iv# The permanent Wa* sho$l& %e properl* &esigne& so that the loa& of the train is
$niforml* &istri%$te& over the two rails!
"v# The trac. sho$l& have eno$gh lateral strength!
"vi# The ra&ii an& s$perelevation+ provi&e& on c$rves+ sho$l& %e properl* &esigne&!
"vii# The trac. m$st have certain amo$nt of elasticit*!
"viii# All ,oints+ points an& crossings sho$l& %e properl* &esigne&!
"i(# 1rainage s*stem ofpermanent Wa* sho$l& %e perfect!
"(# All the components ofpermanent Wa* sho$l& satisf* the &esign re3$irements!
"(i# )t sho$l& have a&e3$ate provision for eas* renewals an& repairs!
TYPES OF RA)2S
The rails $se& in the constr$ction of railwa* trac. are of following t*pes4
5! 1o$%le hea&e& rails"1!6! Rails#
7! '$ll hea&e& rails"'!6!Rails#
8! Flat foote& rails"F!F!Rails#
8/17/2019 Component Parts of a Permanent Way
2/37
1O0'2E 6EA1E1 RA)2S
The rail sections+ whose foot an& hea& are of same &imensions+ are calle& 1o$%le
hea&e& or
1$m%9%ell rails! )n the %eginning+ these rails were wi&el* $se& in the railwa* trac.!
The i&ea
%ehin& $sing these rails was that when the hea& ha& worn o$t &$e to r$%%ing
action of
wheels+ the rails co$l& %e inverte& an& re$se&! '$t %* e(perience it was fo$n& that
their foot
co$l& not %e $se& as r$nning s$rface %eca$se it also got corr$gate& $n&er the impact
of wheel
loa&s! This t*pe of rail is not in $se in )n&ian Railwa*s now9a &a*s! Fig!
:!5 shows &o$%le hea&e& rail!
'022 6EA1E1 RA)2S
The rail section whose hea& &imensions are more than that of their foot are calle& %$ll
hea&e&
rails! )n this t*pe of rail the hea& is ma&e little thic.er an& stronger than the lower part
%*
a&&ing more metal to it! These rails also re3$ire chairs for hol&ing them in
position! '$ll
hea&e& rails are especiall* $se& for ma.ing points an& crossings!
MER)TS
"i# '!6! Rails .eep %etter alignment an& provi&e more smoother an& stronger trac.!
"ii# These rails provi&e longer life to woo&en sleepers an& greater sta%ilit* to
the
trac.!
"iii# These rails are easil* remove& from sleepers an& hence renewal of trac. is eas*!
1EMER)TS
"i# '!6! rails re3$ire a&&itional cost of iron chairs!
"ii# These rails re3$ire heav* maintenance cost!
8/17/2019 Component Parts of a Permanent Way
3/37
"iii# '!6! rails are of less strength an& stiffness!
F2AT FOOTE1 RA)2S
The rail sections having their foot rolle& to flat are calle& flat foote& or vignole;s rails!
This
t*pe of rail was invente& %* Charles ! )t was initiall* tho$ght that
the flat
foote& rails co$l& %* fi(e& &irectl* to woo&en sleepers an& wo$l& eliminate chairs an&
.e*s
re3$ire& for the '!6! rails! '$t later on+ it was o%serve& that heav* train loa&s ca$se&the foot
of the rail to sin. into the sleepers an& ma.ing the spi.es loose! To remove this &efect+
steel
%earing plates were $se& in %etween flat foote& rails an& the woo&en sleeper! These
rails are
most commonl* $se& in )n&ia! Fig!:!8 shows flat foote& rail!
MER)TS
"i# F!F! rails have more strength an& stiffness!
"ii# No chairs are re3$ire& for hol&ing them in position!
"iii# These rails re3$ire less n$m%er of fastenings!
"iv# The maintenance cost of trac. forme& with F!F! rails is less!
1EMER)TS
"i# The fittings get loosene& more fre3$entl*!
"ii# These rails are not easil* remove& an& hence renewal of trac. %ecomes
&iffic$lt!
"iii# )t is &iffic$lt to man$fact$re points an& crossings %* $sing these rails!
8/17/2019 Component Parts of a Permanent Way
4/37
8/17/2019 Component Parts of a Permanent Way
5/37
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
S2EEPERS
Sleepers are transverse mem%ers of the trac. place& %elos the rails to s$pport an& fi(
them in
position!
F0NCT)ONS OF S2EEPERS
Sleepers serve the following f$nctions4
"i# To hol& the rails to proper ga$ge!
"ii# To transfer the loa&s from rails to the %allast!
"iii# To s$pport an& fi( the rails in proper position!
"iv# To .eep the rails at a proper level in straight trac.s an& at proper s$per
elevation on c$rves!
"v# To provi&e elastic me&i$m %etween the rails an& the %allast!
"vi# To provi&e sta%ilit* to the permanent wa* on the whole!
RE/0)REMENTS OF ?OO1 S2EEPERS
The following are the re3$irements of goo& sleepers4
"i# The sleepers sho$l& %e s$fficientl* strong to act as a %eam $n&er loa&s!"ii# The sleepers sho$l& %e economical!
"iii# The* sho$l& maintain correct g$age!
"iv# The* sho$l& provi&e s$fficient %earing area for the rail!
"v# The sleepers sho$l& have s$fficient weight for sta%ilit*!
"vi# Sleepers sho$l& facilitate eas* fi(ing an& ta.ing o$t of rails witho$t &ist$r%ing
them!
"vii# The* sho$l& facilitate eas* removal an& replacement of %allast!
8/17/2019 Component Parts of a Permanent Way
6/37
"viii# The* sho$l& not %e p$she& o$t easil* of their position in an* &irection $n&er
ma(im$m forces of the moving trains!
"i(# The* sho$l& %e a%le to resist impact an& vi%rations of moving trains!
"(# The* sho$l& %e s$ita%le to each t*pe of %allast!
"(i# )f trac.9circ$iting is &one+ it sho$l& %e possi%le to ins$late them from the rails!
TYPES OF S2EEPERS
Sleepers are of the following t*pes4
5! Woo&en sleepers!
7! Steel sleepers!
8! Cast iron sleepers!
:! R!C!C! sleepers!
! Priestesses concrete sleepers!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
5! Woo&en Sleepers4 These sleepers are regar&e& to %e the %est as the* satisf*
all the
re3$irements of goo& sleepers an& are the onl* sleeper s$ita%le for trac.
circ$iting!
The life of woo&en sleepers &epen&s $pon their a%ilit* to resist wear+ attac. %* white
ants an&
3$alit* of tim%er $se&! Tim%ers commonl* $se& in )n&ia for sleepers are sal+ Tea.+
1eo&ar
an& chair woo&!
The stan&ar& siBes of woo&en sleepers for &ifferent ga$ges are as follows4
For '!?! 7D: mm 7 mm 58 mm
For MG !?! 5=8 mm 78 mm 55: mm
For N!?! 57 mm 5 mm 5 mm
8/17/2019 Component Parts of a Permanent Way
7/37
A1
8/17/2019 Component Parts of a Permanent Way
8/37
'!?!Rah$l
2$gs are forme& %* pressing o$t the metal of the channel section loose ,aw
t*pe is an
improvement on presse& l$g t*pe! Fig!!7 shows .e* t*pe steel sleepers!
"%#Clip an& %olt t*pe steel sleepers4 )n this t*pe of sleeper+ clips an& %olts are
$se& for
hol&ing the rails as shown in Fig!!8! Crac.s are not &evelope& in the sleepers as the
holes for
the %olts are small an& circ$lar! )t re3$ires fo$r clips an& fo$r %olts for hol&ing eachrail!
A1
8/17/2019 Component Parts of a Permanent Way
9/37
)n&ia as compare& to other co$ntries in the worl&! Cast iron sleepers are of the
following
t*pes4
"i# Pot or %owl sleeper
"ii# Plate sleeper
"iii# 'o( sleeper
"iv# CST9H sleeper
"v# 1$ple( sleeper
"i# Pot or %owl sleeper4 Pot sleeper consist of two %owls place& $n&er each
rail an&
connecte& together %* a tie9%ar! The total effective area of %oth the pots is !:>: s3!
m! Each
pot is provi&e& with two holes foe inspection an& pac.ing of %allast! On the top of
each pot+ a
rail seat is provi&e& to hol& rails at an inwar& slope of 5 in 7! ?i%s an& cotters are so
caste&
that %* interchanging them ga$ge is slac.ene& %* 8 mm!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
"ii# Plate sleeper4 Plate sleepers consists of two rectang$lar plates of =>: mm 8
mm in
siBe with short si&e parallel to rail! The plates are provi&e& with pro,ecting ri%s in the
%ottom
to provi&e a grip in the %allast for lateral sta%ilit*! The plates are hel& in position %*
tie9%ar!
Stiffners are provi&e& at the top of the plate to increase the strength! For
mi(ing of rails
s$ita%le arrangement is &one as shown in Fig!!>! )t provi&es the effective %earing
area of
8/17/2019 Component Parts of a Permanent Way
10/37
!:>:s3! m per sleeper!
"iii# 'o( Sleeper4 These sleepers are not in $ser these &a*s! 'o( sleepers are similar
to plate
sleepers! )n this t*pe of sleeper+ a %o( is provi&e& at the top of each plate to hol& the
rails!
"iv# CST9H Sleeper4 CST9H sleeper is more satisfactor* than other C!)!
Sleepers an& is
e(tensivel* $se& in )n&ian Railwa*s since last thirt* *ears! )t is a com%ination of pot+ plate+
an& %o( sleeper! CST9Hs sleeper consists of a triang$lar inverte& pot one on each si&e
of rail
seat! Rail seat is provi&e& at the top to hol& rails at 5 in 7 inwar& slope!
The pots are
connecte& across the trac. %* means of a tie9 %ar! Fig!!D shows CST9H sleeper!
"v# 1$ple( Sleepers4 1$ple( sleepers are also .nown as rail free &$ple( sleepers an&
have
%een $se& at rail ,oints in con,$nction with CSTH sleepers! These sleepers are $se& at
rail
,oints to prevent cantilever action %etween two s$pports of the CST9H sleepers! These
consists
of two plates+ each of siBe = mm D mm! The plates are place& with the longer
si&e
parallel to the rails an& are connecte& with a tie9%ar! Fig!!= shows &$ple( sleepers!
A&vantages of C!) sleepers are more!
"i# The life of C!) sleepers is more!
"ii# The maintenance cost of these sleepers is low!
"iii# ?$age can %e easil* maintaine& an& a&,$ste& with these sleepers!
"iv# These sleepers are more &$ra%le!
8/17/2019 Component Parts of a Permanent Way
11/37
"v# Creep rails can %e chec.e& %* $sing these sleepers!
1isa&vantages
"i# More %allast is re3$ire& than an* other t*pe of sleepers!
"ii# The n$m%er of fittings re3$ire& is more!
"iii# These sleepers are lia%le to %rea.!
"iv# C!)! Sleepers are lia%le to %rea.!
"v# These are not s$ita%le for all t*pes of %allast!
:! R!C!C! Sleepers4
Reinforce& cement concrete sleepers are of two t*pes4
"i# Thro$gh t*pe
"ii# 'loc. an& tie t*pe
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
"i#Thro$gh t*pe R!C!C! Sleeper4 This is also .nown as one piece or mono9
%loc.
sleeper! )n this t*pe of sleeper crac.s &evelop on the tension si&e when stresse&! These
crac.s
are ver* small an& almost invisi%le %$t ten& to enlarge with the repetition of impact
loa&ing+
ca$sing fail$re!
"ii#'loc. an& tie t*pe R!C!C! Sleeper4 This t*pe of sleeper consists of two
R!C!C!
%loc.s connecte& %* a metal tie of inverte& T9section! These sleepers are not s$%,ecte&
to an*
&egree of tensile stress as in thro$gh t*pe!
A&vantages of R!C!C! Sleepers
"i# Concrete sleepers have long life+ generall* :to > *ears!
8/17/2019 Component Parts of a Permanent Way
12/37
"ii# These are free from nat$ral &eca* an& attac. %* insects etc!
"iv# These sleepers re3$ire less fittings!
"v# Trac. circ$iting is possi%le in these sleepers!
"vi# These sleepers provi&e more lateral an& longit$&inal rigi&it* as compare& to
other sleepers!
"vii# The maintenance cost is low!
"viii# 1$e to higher elastic mo&$l$s+ these can withstan& the stresses &$e to
fast
moving trains!
1isa&vantages
"i# 1$e to heav* weight+ han&ling an& transportation of these sleepers are
1iffic$lt!
"ii# )f not han&le& properl*+ the chance of %rea.ing is more!
"iii# The renewal of trac. lai& with these sleepers is &iffic$lt!
"iv# The scrap val$e is nil!
! Prestresse& Concrete Sleepers4
Prestresse& concrete sleepers are now9a9&a*s e(tensivel* $se& in )n&ian
Railwa*s! These
sleepers have high initial cost %$t are ver* cheap in long r$n &$e to their long life! )n
these
sleepers+ high tension steel wires are $se&! These wires are stretche& %* h*&ra$lic ,ac. to give
necessar* tension in the wires! The concrete is then p$t $n&er a ver* high initial
compression!
These sleepers are heavil* &amage& in caser of &erailment or acci&ents of trains!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
8/17/2019 Component Parts of a Permanent Way
13/37
'!?!Rah$l
'A22AST
'allast is the gran$lar material $s$all* %ro.en stone or an* other s$ita%le material
which is
sprea& on the top of railwa* formation an& aro$n& the sleepers!
F0NCT)ONS OF 'A22AST
'allast in railwa* trac. performs the following f$nctions!
"i# To hol& the sleepers in position an& preventing the lateral an& longit$&inal
movement!
"ii# To &istri%$te the a(le loa& $niform from sleepers to a large area of formation!
"iii# To provi&e elasticit* to the trac.! )t acts as as elastic mat %etween s$%gra&e
an& sleepers!
"iv# To provi&e eas* means of maintaining the correct levels of the two rails in a
trac.!
"v# To &rain rain water from the trac.!
"vi# To prevent the growth of wee&s insi&e the trac.!!
C6ARACTER)ST)CS OF ?OO1 'A22AST
"i# )t sho$l& have s$fficient strength to resist cr$shing $n&er heav* loa&s of
moving trains!
"ii# )t sho$l& %e &$ra%le eno$gh to resist a%rasion an& weathering action!"iii# )t sho$l& have ro$gh an& ang$lar s$rface so as to provi&e goo& lateral
an&
longit$&inal sta%ilit* to the sleepers!
"iv# )t sho$l& have goo& wor.a%ilit* so that it can %e easil* sprea& of formation!
"v# )t sho$l& %e cheapl* availa%le in s$fficient 3$antit* near an& along the trac.!
"vi# )t sho$l& not ma.e the trac. &$st* or m$&&* &$e to its cr$shing to
pow&er
$n&er wheel loa&s!
8/17/2019 Component Parts of a Permanent Way
14/37
8/17/2019 Component Parts of a Permanent Way
15/37
%! )t has ang$lar an& ro$gh s$rface an& hence gives more sta%ilit* to the
sleepers!
c! )ts &rainage propert* is e(cellent!
1)SA1
8/17/2019 Component Parts of a Permanent Way
16/37
"%# ?ravel o%taine& from pits re3$ires washing!
"c# 1$e to ro$n& faces the pac.ing $n&er sleepers is loose!
" ?ravel easil* roll &own &$e to vi%rations!
"iii#SAN14
San& is reasona%l* a goo& material for the %allast! Coarse san& is generall* preferre&
to fine
san& for %allast! This t*pe of %allast is s$ita%le for pac.ing pot sleepers! )t is $se& onl*
on
$nimportant trac.s!
A1
8/17/2019 Component Parts of a Permanent Way
17/37
"v#@AN@AR4 )t is nat$ral material in the form of no&$les from which lime is
prepare&!
A1
8/17/2019 Component Parts of a Permanent Way
18/37
"%# )t has goo& &rainage properties!
"c# )t is a strong material!
" )t hol&s the trac. in correct alignment an& gra&ient!
1)SA1
8/17/2019 Component Parts of a Permanent Way
19/37
%* sin.ing into soft formation!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
F)T0RES AN1 FASTEN)N?S
F)T0RES AN1 FASTEN)N?S
Fi(t$res an& fastenings are fittings re3$ires for ,oining of rails en& to en& an& also forfi(ing
the rails to sleepers in a trac.!
F0NCT)ONS OF F)T0RES AN1 FASTEN)N?S
Rail fi(t$res an& fastenings have the following f$nctions4
"i# To ,oin the rails en& to en& to form f$ll length of trac.!
"ii# To fi( the rails to sleepers!
"iii# To maintain the correct alignment of the trac.!
8/17/2019 Component Parts of a Permanent Way
20/37
"iv# To provi&e proper e(pansion gap %etween rails!
"v# To maintain the re3$ire& tilt of rails!
"vi# To set the points an& crossings in proper position!
TYPES OF F)T0RES AN1 FASTEN)N?
Fi(t$res an& fastenings commonl* $se& in a permanent wa* are of following t*pes4
5! Fish plates
7! 'earing plates
8! Spi.es
:! Chairs
! 'olts
>! @e*s
D! Anticreepers
F)S6 P2ATES
Fish plates are $se& in rail ,oints to maintain the contin$it* of the rails! Two t*pes of
fish
plates are commonl* $se& on )n&ian Railwa*s for ,oining F!F! an& '!6! rails+ as
shown in
Fig!D!5! each fish plate is :D mm long an& provi&e& with fo$r holes 87 mm
at a spacing of
55: mm cIc! These are man$fact$re& of steel an& are so &esigne& that the* fit in
%etween the
hea& an& foot of the rail!
RE/0)REMENTS OF F)S6 P2ATES
"i# The* sho$l& hol& the a&,oining en&s of rails in correct horiBontal an&
vertical plane!
"ii# The* sho$l& allow free longit$&inal movements of rails &$e to
temperat$re variation!
"iii# The* sho$l& %e a%le to resist all t*pes of wear!
8/17/2019 Component Parts of a Permanent Way
21/37
"iv# The* sho$l& %e a%le to %ear the vertical an& lateral stresses which
come at ,oints witho$t an* &istortion!
"v# The* sho$l& allow eas* renewal an& replacement of rails in case of
wear an& &amage!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
!'EAR)N? P2ATES
'earing plates are cast iron or steel plates place& in %etween the F!F rail an& woo&ensleepers
of a railwa* trac.! F!F! rails if fi(e& &irectl* on woo&en sleepers sin. in the sleeper
&$e to the
heav* loa&s of trains an& th$s loosen the spi.es! To overcome this &iffic$lt* %earing
plates
are $se& $n&er F!F! rails to &istri%$te the loa& over a wi&er area an& %ring the intensit*
of
press$re within limit!
'earing plates give the re3$ire& 5 in 7 inwar& slope to the rail &irectl* an& no
a&BingJ is
re3$ire& in the woo&en sleeper! These are fi(e& to sleepers %* spi.es!
A1
8/17/2019 Component Parts of a Permanent Way
22/37
Following are the &isa&vantages of %earing plates4
"i# When the %earing plates %ecome loose &$e to settlement of %allast+
moist$re is li.el* to enter %etween the sleepers an& plates+ ca$sing
sleepers to wear!
"ii# When an* spi.e is &amage& an& it is re3$ire& to %e re&riven at another
place+ all other spi.es of the %earing plates have to %e remove&+ which will
re&$ce the hol&ing power of the spi.es!
SP)@ES
Spi.es are $se& to fi( rails to woo&en sleepers! Spi.es are of following t*pes4
"a# 1og spi.es
"%# Ro$n& spi.es
"c# Screw spi.es
" Elastic spi.es
1og spi.es are the cheaper t*pe of spi.es which hol& the rails at correct ga$ge
an& can %e easil* fi(e& an& remove&! These are commonl* $se& for hol&ing F!F! rails!
Fo$r
&og spi.es are $se& per sleeper+ two on either si&e of the rail! The &isa&vantage of &og
spi.es
is that these %ecome loose $n&er the wave action ca$se& %* the moving train!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
Ro$n& spi.es are $se& for fi(ing chairs of '!6! rails to woo&en sleepers an& also for
fi(ing sli&e chairs of points an& crossings! These have either c*lin&rical or
hemispherical
hea& an& %l$nt en&!
Screw spi.es are tapere& screws with
8/17/2019 Component Parts of a Permanent Way
23/37
&og spi.es!
Elastic spi.es are $se& for fi(ing F!F! rails to woo&en sleepers! These give %etter grip
an& res$lt in re&$ction of wear an& tear of rail! The a&vantage of this t*pe of spi.e is
that it is
not p$lle& $p %* the wave action of the moving train!
RE/0)REMENTS OS A ?OO1 SP)@E
"i# )t sho$l& %e eas* in fi(ing or removing from the sleepers!
"ii# )t sho$l& hol& the rails an& %earing plates in proper position!
"iii# )t sho$l& %e cheap!
"iv# )t sho$l& re3$ire minim$m maintenance!
"v# )t sho$l& not come o$t of the sleepers $n&er vi%rations!
'O2TS
&ifferent t*pes of %olts $se& in )n&ian Railwa* are &escri%e& %elow!
F)S6 'O2TS
Fish %olts are $se& for connecting fish plates with the rails! Fo$r %olts are re3$ire& for
each
pair of fish plates! These %olts are inserte& from o$tsi&e the trac. an& %olte& on the
insi&e of
the trac.!
Fish %olts have to withstan& shear &$e to heav* transverse stresses+ hence the*
are
man$fact$re& of me&i$m or high car%on steel! The length of fish %olt &epen&s on the
t*pe of
fish plate $se&! For ::!D.g rail+ the fish %olts of 7 mm &ia an& 57D!> mm length are
$se&!
These %olts get loosene& &$e to vi%ration of moving train an& hence these are to %e
tightene&
time ot time! Too m$ch tightening of %olts is prohi%ite& as it prevents free
e(pansion or
contraction of rails &$e to temperat$re vi%rations!
6OO@ 'O2TS
8/17/2019 Component Parts of a Permanent Way
24/37
6oo. %olts are also .nown as &og %olts &$e to the shape of their hea&s! These %olts
are $se&
to fi( sleepers which rest &irectl* on a gir&er! Two %olts per sleeper are $se&! 1og
%olts are of
two t*pes!
"i# Sloping lips9 for fi(ing sleepers to plate gir&er spans!
"ii# Straight lips9 for fi(ing sleepers to ,oist spans!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
FAN? 'O2TS
Fang %olts are $se& for fi(ing si&e chairs to sleepers! These are alternative to screw or
ro$n&
spi.es! The fang %olts are fo$n& to %e more effective %$t are not generall*
$se&+ %eca$se
fi(ing an& removal of these %olts are &iffic$lt!
@EYS
These are small tapere& pieces of tim%er or steel $se& to fi( rails to chairs on metal
sleepers!
@e*s are of two t*pes
"i# woo&en .e*s
"ii# Metal .e*s
Woo&en .e*s are small straight or tapere& pieces of tim%er! These are cheap
an& Easil*
prepare&! These are not strong an& %ecome loose $n&er vi%rations! These
re3$ire fre3$ent
maintenance! Woo&en .e*s are not $se& now9a &a*s in )n&ian Railwa*s!
Metal .e*s are small tapere& or spring li.e pieces of steel! These .e*s are m$ch more
&$ra%le
than woo&en .e*s! Metal .e*s are of two t*pes!
"i# St$art;s .e* an&
"ii# Morgan .e*
8/17/2019 Component Parts of a Permanent Way
25/37
ANT)9CREEPERS
Anti9creepers are $se& to prevent creep in a railwa* trac.! 1ifferent shapes of anti9
creepers
are availa%le an& are fi(e& to the foot of rail! )t is shown in Fig!:!5!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
?RA1)ENT
?ra&ient is the rate of rise or fall of the trac.! )t is e(presse& as the ratio of vertical
&istance
to horiBontal &istance or as percentage of rise or fall! )f an* trac. rises 5 m
in 5 m
horiBontal length+ its gra&ient is e(presse& as 5 in 5 or 5 percent! )f another trac.
falls %* 5
m in m length+ its gra&ient is 5 in or 7 percent!
?ra&ients are provi&e& to the formation of rail trac. to serve the following p$rpose4
"i# To re&$ce the cost of earthwor.!
"ii# To provi&e $niform rate or fall as far as practica%le!
"iii# To reach the stations sit$ate& at &ifferent elevations!
8/17/2019 Component Parts of a Permanent Way
26/37
"iv# To &rain off rain water!
Factors which affect the selection of gra&ient are the following4
"i# Nat$re of the gro$n&
"ii# Safet* re3$ire&
"iii# 1rainage re3$ire&
"iv# Total height to %e covere&
"v# 6a$ling capacit* of railwa* engines!
T*pes of gra&ient
"i# R$ling gra&ient
"ii# Moment$m gra&ient
"iii# P$sher gra&ient
"iv# Station *ar& gra&ient
"i# R$ling ?ra&ient4 R$ling gra&ient is the ma(im$m gra&ient to which the trac. ma*
%e lai& in a partic$lar section! )t &epen&s on the loa& of the train an& a&&itional
power of the locomotive! The a&&itional power re3$ire& to p$ll $p a train of
weight W moving in a trac. having slope
+ as shown in fig! =!7+ is
F K W sin
K W tan
K W ( gra&ient
From the a%ove e3$ation it is clear that the a&&itional power re3$ire& %* the
locomotive train+
the following r$ling gra&ients are a&opte&4
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
8/17/2019 Component Parts of a Permanent Way
27/37
'!?!Rah$l
)n plains 9 5 in 5 to 5 in 7
)n 6ill* trac.s 9 5 in 5 to 5 in 5
"ii# Moment$m ?ra&ient 4 gra&ient which is steeper than r$ling gra&ient an& where
the a&vantage of moment$m is $tiliBe&+ is .nown as moment$m gra&ient! A train
gets moment$m when moving in &own gra&ient an& this moment$m can %e
$tiliBe& for $p gra&ient! A train while coming &own a gra&ient gains s$fficient
moment$m! This moment$m gives a&&itional .inetic energ* to the moving train
which wo$l& help the train to rise a steeper gra&ient than the r$ling gra&ient for a
certain length of the trac.! This rising gra&ient is calle& moment$m gra&ient! )n
s$ch gra&ients no signals are provi&e& to stop the train!
"iii# P$sher ?ra&ient4 P$sher gra&ient is the gra&ient where e(tra engine is re3$ire& to
p$sh the train! These are steeper gra&ient than r$ling gra&ient an& are provi&e& at
certain places of mo$ntains to avoi& heav* c$tting or to re&$ce the length of trac.!
A p$sher gra&ient of 5 in 8D on western ?hats with '!?!trac. is provi&e&! On
1ar,eeling Railwa* with N!?! trac.+ a r$ling gra&ient of 5 in 7 is provi&e&!L
"iv# Station Yar& ?ra&ient4 Station *ar& gra&ient is the minim$m gra&ient provi&e& in
station *ar& for eas* &raining of rain water! ?ra&ients are avoi&e& as far as
possi%le in station *ar& &$e to following reasons
"a# )n station *ar&+ 'ogies stan&ing on gra&ients ma* start moving &$e to heav*
win& an& ma* ca$se acci&ent!
"%# The locomotives will re3$ire e(tra force of p$ll the train on gra&ients at the
time of starting the trains!
8/17/2019 Component Parts of a Permanent Way
28/37
)n station *ar&s+ ma(im$m limit of gra&ient is fi(e& as 5 in : an&
minim$m gra&ient
recommen&e& is 5 in 5 for eas* &rainage of rain water!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
?RA1E COMPENSAT)ON OF C0R
8/17/2019 Component Parts of a Permanent Way
29/37
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
S0PERE2E
8/17/2019 Component Parts of a Permanent Way
30/37
horiBontal force an& $neven loa& on rails will ca$se &erailment! This centrif$gal force
can %e
co$nteracte& %* intro&$cing the centripetal force %* raising the o$ter rail with respect
to inner
rail! This raising of o$ter rail with respect to inner rail is .nown as
s$perelevation or
canting!
O%,ects of Provi&ing S$perelevation
The following are the o%,ects of provi&ing s$perelevation4
"i# To intro&$ce centripetal force to co$nteract the centrif$gal force to avoi&
&erailment an& re&$ce the si&e wear of rails!
"ii# To &istri%$te the wheel loa&s e3$all* on the two rails! This re&$ces the top wear
of
rails an& res$lts in saving of maintenance cost!
"iii# To ens$re comforta%le ri&e to passengers an& safe movements of goo&s!
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
8/17/2019 Component Parts of a Permanent Way
31/37
'!?!Rah$l
CANT 1EF)C)ENCY
Cant &eficienc* is the &ifference %etween the act$al cant provi&e& an&
e3$ili%ri$m cant
necessar* for the ma(im$m permissi%le spee& on a c$rve!
Cant &eficienc* sho$l& %e as low as possi%le an& is limite& &$e to following reasons4
"a# 6igher &iscomfort to passengers &$e to higher cant &eficienc*
"%# 6igher cant &eficienc* res$lts in higher $n%alance& centrif$gal force an& hence
e(tra
press$re an& lateral thr$st on the o$ter rails+ re3$iring strong trac. an& more fastening
for sta%ilit*!
"c# Si&e wear an& creep of o$ter rails of the trac. are more &$e to higher cant
&eficienc*!
Ma(im$m val$es of cant &eficienc* as prescri%e& on )n&ian Railwa*s are given in
Ta%le
2imits of cant &eficienc* for &ifferent ga$ges on )n&ian Railwa*s
S!No! ?a$ge
Cant 1eficienc*
For spee&s
0pto 5 .mIhr
For spee&s higher
Than 5 .mIhr
5!
7!
8!
'!?
M!?!
N!?!
8/17/2019 Component Parts of a Permanent Way
32/37
D> mm
5 mm
8= mm
5 mm
Not specifie&
9&o9
NE?AT)
8/17/2019 Component Parts of a Permanent Way
33/37
'!?!Rah$l
T0RNO0T
T$rno$t is an arrangement of points an& crossings with lea& rails %* which trains ma*
%e
&iverte& from one trac. to another moving in the facing &irection
A t$rno$t is left han&e& or right han&e& as the train ta.ing the t$rno$t in the facing
&irection
is &iverte& ti the left or right of the main line!
Component parts of a T$rno$t an& their F$nctions
Following are the component parts of a t$rno$t
"i# A pair of tong$e rails
"ii# A pair of stoc. rails
"iii# Two chec. rails
"iv# Fo$r lea& rails
"v# A vee crossing
"vi# Sli&e chairs
"vii# Stretcher %ar
"viii# A pair of heel %loc.s
"i(# Switch tie plate or ga$ge tie chair
"(# Parts for operating points Ro&s+ cran.s+ levers etc!
"(i# 2oc.ing s*stem which incl$&es loc.ing %o(+ loc. %ar+ pl$nger %ar etc!
"(ii#
"i# A Pair of Tong$e Rails4 The tong$e rails along the stoc. rails in a t$rno$t form a
pair of points or switches! The tong$e rails facilitate the &iversion of a train from
the main trac. to a %ranch trac.!
"ii# A Pair of Stoc. Rails4 The* are the main rails to which the tong$e rails fit closel*!
The stoc. rails help in smooth wor.ing of tong$e rails!
"iii# Two Chec. Rails4 Chec. rails are provi&e& a&,acent to the lea& rails+ one in main
trac. an& another in %ranch trac.! These rails chec. the ten&enc* of wheels to
clim% over the crossing!
8/17/2019 Component Parts of a Permanent Way
34/37
"iv# Fo$r 2ea& Rails4 O$ter straight lea& rail+ o$ter c$rve lea& rail+ inner straight lea&
rail an& inner c$rve lea& rail are the fo$r lea& rails provi&e& in a t$rno$t! The
f$nction of these rails is to lea& the trac. from heel of switches to the toe of
crossing!
"v# A
8/17/2019 Component Parts of a Permanent Way
35/37
RA)2WAY EN?)NEER)N? 1ept! of Civil Engineering 9 @20
'!?!Rah$l
CROSS)N?
Crossing is a &evice provi&e& at the intersection of two r$nning rails to permit
the wheelflanges+ moving along one to pass across the other!
Component Parts of a Crossing
"i# A vee piece
"ii# A point rail
"iii# A splice rail
"iv# Two chec. rails
"v# Two wing rails
8/17/2019 Component Parts of a Permanent Way
36/37
"vi# 6eel %loc.s at throat+ nose an& heel of crossing
"vii# Chairs at crossing+ at toe an& at heel!
RE/0)REMENTS OF )1EA2 CROSS)N?
"i# Crossing assem%l* sho$l& %e rigi& eno$gh to withstan& severe vi%rations!
"ii# Wing rails an& nose of crossing sho$l& %e a%le to resist heav* wear &$e
to
movement of wheels+ hence sho$l& %e man$fact$re& of special steel "allo* steel#!
"iii# The nose of crossing sho$l& have a&e3$ate thic.ness to ta.e all stresses acting on
the crossing!
TYPES OF CROSS)N?S
Crossings can %e classifie& as follows4
5! On the %asis of shape of crossing
"a# S3$are crossing
"%# Ac$te angle or
8/17/2019 Component Parts of a Permanent Way
37/37
Recommended